M0026321Q0002.pdf

PDF 1 MB Posted

Attached to
Cooler and Chiller Maintenance and Testing Federal contract opportunity
Solicitation number
M0026321Q0002
Issued by
United States Marine Corps

View the file

Other files for this federal contract opportunity

Other files attached to Cooler and Chiller Maintenance and Testing, newest first.
File Type Posted
M0026321Q0002-0001_Amendment.pdf PDF
M0026321Q0002-0001_Conformed SF1449.pdf PDF
M0026321Q0002.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

(No Collect Calls)

M0026321Q0002 22-Oct-2020

b. TELEPHONE NUMBER

(843) 228-3622

8. OFFER DUE DATE/LOCAL TIME

11:00 AM 10 Nov 2020

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA X ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

M002639. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

ANTHONY ISLAS

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.X

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

M3200021SUM1CTC

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED OR X

SMALL BUSINESSX

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

REGIONAL CONTRACTING OFFICE

ATTN: ANTHONY ISLAS

P.O. BOX 5069

PARRIS ISLAND SC 29905

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE M00263 16. ADMINISTERED BY

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

X SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

M00263

SEE SCHEDULE

FOR EXACT LOCATION

PARRIS ISLAND SOUTH CAROLINA 29905

TEL: 843-228-2632 FAX:

(843) 228-2163FAX:

TEL: (843) 228-3622

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

$16,500,000

NAICS:

238210

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF48

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

M0026321Q0002

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Maintenance and Testing of Equipment

FFP

Preventative maintenance and Eddy-current testing of cooling towers and chillers aboard MCRD Parris Island. See Section C, Performance Work Statement (PWS) for additional details.

MILSTRIP: M3200021SUM1CTC

PURCHASE REQUEST NUMBER: M3200021SUM1CTC

NET AMT

0001AA 1 Job Preventative Maintenance

FFP

Preventative maintenance of cooling towers and chillers aboard MCRD Parris

Island. See Section C, Performance Work Statement (PWS) for additional details.

FOB: Destination

MILSTRIP: M3200021SUM1CTC

PSC CD: J041

0001AB 1 Job Eddy Current Testing

FFP

Eddy Current Testing of cooling towers and chillers aboard MCRD Parris Island.

See Section C, Performance Work Statement (PWS) for additional details.

FOB: Destination

MILSTRIP: M3200021SUM1CTC

PSC CD: J041

Section C - Descriptions and Specifications

PWS

Performance Work Statement

Cooling Tower and Chiller Maintenance and Eddy Current Testing

1. GENERAL: This is a non-personnel services contract to clean tubes and perform EDDY testing on various model chillers aboard Marine Corps Recruit Depot Parris Island, South Carolina (MCRD PI). The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.

1.1 Description of Services/Introduction: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary for the tube cleaning and EDDY testing on chillers aboard MCRDPI. The contractor shall be required to provide adequate maintenance services and eddy current testing during as defined in this Performance Work Statement. The contractor shall perform to the standards in this contract.

1.2 Objectives:

1.2.1 Contractor shall perform condenser tube cleaning, perform maintenance on all chillers, and cooling towers.

1.2.2 Type and location of towers and chillers to be cleaned, maintained are listed below:

Cooling Towers

Bldg Make Model# Ser # Asset#

148 Marley NC2115 013394-001-91 3249

589 Imeco IMC1072M-1-15 N/A 1929

590 Reymsa

591 Evapco AT19-611 T002912 6959

599 Imeco IMC1072M-1-15 1-1 (1-11-1994) 2067

601 Evapco USS 19-78 9-373380 1009

679 Evapco USS 19-99 9-361470

679 Evapco USS 19-99 9-361469

679 Evapco USS 19-99 9-361471

926 Marley NC 322 15M 120496-001-97 2376

939 Marley 160028-001-CELL NC 5221SS 5787

6000 Marley NC8402GG 10106708-A2-15 6963

6012 Baltimore 3412C U107497401 1655

7020 Marley MD50160AC-L-SBF-MD 10090505A1 5335

7022 MD5016QAC1LSBF 10090505A1 5249

7022 7891

Chillers

Bldg. Make Model # Ser.# Asset #

589 * McQuay WMC145DSC-ER10 STNU071200058 1923

591 * McQuay WMC145DSC-ER10 STNU070800022 4372

599 * McQuay WMC145DSC-ER10 STNU080600051 2110

601 * McQuay WMC145DSC-ER10 STNU080600052 2162

679 * McQuay WMC250DSC-ER10 STNU090800036 2277

679 * McQuay WMC250DSC-ER10 STNU090800020 2278

679 * McQuay WMC250DSC-ER10 STNU090800021 2279

679 * McQuay WMC250DSC-ER10 STNU090800010 2280

926 * McQuay WMC145DSC-ER10 STNU090300060 4295

939 Trane RTHB150FLFOOLWPO U0OOCO6477

939 * McQuay WMC290DSC-ER10 STNU080400041 3279

6000 * McQuay WMC145DSC-ER10 STNU090700025 4358

6000 * McQuay WMC145DSC-ER10 STNU090700030 4360

6012 * McQuay WMC400DBC-ER10 STNU100900016 1657

7020 * McQuay WMC250DSC-ER10 STNU090800037 3263

7020 * McQuay WMC250DSC-ER10 STNU090800050 3262

1.4 Scope: The contractor shall provide cleaning, maintenance and service, EDDY testing per manufacture’s recommended instructions. The contractor shall perform maintenance and notify the Government end user and the

Contracting office of any problems found during the cleaning and maintenance the machines listed in paragraph

1.2.2 of the PWS. The Contractor shall be required to provide all solvent, container labels, required DOT/EPA paperwork, and reports in the performance of the services listed in the PWS.

1.5 Tasks: The following is a list of tasks that the contractor shall complete during the service appointments. All service shall be performed at the various building locations listed in paragraph 1.2.2 aboard MCRD Parris Island, SC:

1.5.1 Clean, maintain, and test chilling cooling towers to the manufacturer’s standard.

1.5.2 Clean, maintain, and test all chiller condenser tubes to the manufacturer’s standard.

1.5.3 Provide a writen report of findings for all machines, including all discrepancies and recommended repairs.

1.5.4 Provide a quote for all required repairs.

1.5.5 Period of Performance: December 1, 2020 to January 31, 2021.

1.6 General Information

1.6.1 Recognized Holidays: The contractor is to continue providing commercial internet services during all major holidays.

New Year’s Day Labor Day

Martin Luther King Jr.’s Birthday Columbus Day

President’s Day Veteran’s Day

Memorial Day Thanksgiving Day

Independence Day Christmas Day

1.6.2 Hours of Operation: The contractor is responsible for providing regularly scheduled service during normal working hours 0700 to 1700, Monday through Thursday. For other than firm fixed price contracts, the contractor will not be reimbursed when the government facility is closed for federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. The Contractor shall at all times maintain an adequate workforce for the performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the

Contractor shall keep in mind that the stability and continuity of the workforce are essential.

1.6.3 Place of Performance: The work to be performed under this contract will be performed at Marine Corps

Recruit Depot Parris Island, South Carolina.

1.6.4 Site Visit: Site visit will is scheduled on November 2, 2020 at 0900 EST. In order to attend the site visit, contact the Contract Specialist, Anthony Islas at anthony.islas@usmc.mil no later than October 29, 2020 to confirm interest and intent to attend site visit. Additional site visit information will be provided along with instructions for base access.

1.6.5 Security Requirements: The contractor shall be responsible for safeguarding all government equipment, information and property provided for contractor use. At the close of each work period, government facilities, equipment, and materials shall be secured. Materials removed by the contractor shall be turned over to the COR for disposition. The contractor shall not dispose of any government property being removed.

1.6.6 Key Control. Access to cooling towers and chiller locations will be provided by liaising with the MCRD Parris

Island Environmental Division to request an escort or temporarily sign out of an access key for direct contractor access. The Contractor shall establish and implement methods of making sure all keys issued to the Contractor by the Government are not lost or misplaced and are not used by unauthorized persons. NOTE: All references to keys include key cards. No keys issued to the Contractor by the Government shall be duplicated. At no time will the

Contractor permanently retain keys to facilities. The Contractor shall develop procedures covering key control that shall be included in the Quality Control Plan. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas. The Contractor shall immediately report any occurrences of lost or duplicate keys/key cards to the Contracting Officer.

1.6.7 In the event keys, other than master keys, are lost or duplicated, the Contractor shall, upon direction of the

Contracting Officer, re-key or replace the affected lock or locks. In the event a master key is lost or duplicated, all locks and keys for that system shall be replaced by the Government and the total cost deducted from the monthly payment due the Contractor.

1.6.8 The Contractor shall prohibit the use of Government issued keys/key cards by any persons other than the

Contractor’s employees. The Contractor shall prohibit the opening of locked areas by Contractor employees to permit entrance of persons other than Contractor employees engaged in the performance of assigned work in those areas, or personnel authorized entrance by the Contracting Officer.

1.6.9 Lock Combinations. Lock combinations will not be issued to the contractor. In the event that the contractor requires access to a controlled space with a lock combination, MCRD Parris Island Environmental Division will provide a liaison to the contractor to grant contractor personnel access to the space, and supervise contractor personnel until the space is vacated and secured.

1.6.10 Special Qualifications: The contractor shall ensure contractor employees are licensed contractors in the State of South Carolina.

1.6.11 Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal

Acquisition Regulation Subpart 42.5. The contracting officer and other Government personnel, as appropriate, may meet periodically with the contractor during the performance of the contract to review the contractor's performance.

At these meetings the contracting officer will apprise the contractor of how the government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the government.

1.6.12 Identification of Contractor Employees: All contract personnel attending meetings and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed.

1.6.13 Contractor Travel: Contractor personnel will not be required to travel outside MCRDPI in the performance of this service. All travel required in the performance of the service(s) is the sole responsibility of the contractor.

1.6.14 Other Direct Costs: There are no other predetermined direct costs to the contractor.

1.6.15 Organizational Conflict of Interest: Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information

(e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in FAR Subpart 9.5. The Contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the

Contracting Officer to avoid or mitigate any such OCI. The Contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the Contracting Officer and in the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may effect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.

PART 2

CONTRACTOR BASE ACCESS INFORMATION

A. INTRODUCTION

The Commanding General (CG), MCRD/ERR PI grants the privilege to gain access to the Depot, conditionally, to those individuals or organizations that meet the minimum qualifications and conform to regulations. CG, MCRD/ERR PI retains the responsibility to suspend or revoke access privileges if necessitated by and action deemed contrary to maintaining good order and discipline aboard this installation. In order to gain access to Marine

Corps Recruit Depot, Parris Island (MCRDPI), SC, non-Federal Government and non-DoD issued ID cardholders require identity proofing and vetting to determine fitness and eligibility for access.

All contractor personnel, to include delivery personnel, who perform work on Marine Corps Recruit Depot Parris

Island, SC (MCRDPI) for the cited contract must adhere to the Defense Biometric Identification System (DBIDS) process to gain access MCRDPI provided in paragraphs B and C. Individuals operating a vehicle aboard our military installations are required to have a valid, U.S. Driver’s License, registration, and insurance. If an individual has a foreign driver’s license, said individual must also provide a valid Passport. The contractor shall understand and comply with Depot Order 5512.12A Access Control Regulations.

Marine Corps Installations across the region are transitioning to a new government-owned access control system called Defense Biometric Identification System (DBIDS). This new and enhanced system replaces RAPIDGate and

MCESS for contractors and other non-DoD-affiliated personnel requiring installation access. DBIDS is already installed at more than 320 sites with over 5 million registered personnel and unlike previous systems, this one is a free service.

In order to reduce wait time when exchanging your RAPIDGate/MCESS credential, it is highly recommended each applicant pre-register at https://dbids-global.dmdc.mil/enroll#!/.

B. DBIDS ACCESS

DBIDS credentials is now being issued as of October 1, 2018. If you currently hold a valid Common Access Card

(CAC), dependent ID card, reserve ID card, or retiree ID card, issued by the Defense Enrollment Eligibility

Reporting System (DEERS), no further action is required.

You will be automatically enrolled in DBIDS when your ID card is initially scanned at the gate. Expect a one- time delay of 3-6 seconds as the DBIDS system initially registers your information.

CURRENT CONTRACTORS

- DBIDS credentials will be valid for the duration of your contract, not to exceed five years; however, re-vetting of individuals’ information will occur each year.

- RAPIDGate/MCESS credentials are still being accepted at Parris Island Depot. An exact termination of RAPIDGate is 31 December 2018.

NEW CONTRACTORS

The contractor shall submit a written request on company letterhead to the Contracting Office listing the following:

contract number, location of work site, start and stop dates, and names of employees and subcontractor employees needing access to the base. The format for the letter will be provided by the Contracting Office. In addition to the aforementioned letter, the contractor must also submit a contractor information sheet on each employee. A template for the letter and contractor informational sheet template will be provided upon contract award. The Contracting

Office will endorse the request and forward to the Depot Security Manager Office for processing. This information must be provided to the assigned Contract Specialist and/or Contracting Officer for the contract at least two (2) weeks prior to start of the contracts period of performance.

Contractors must do the following in order to obtain a base access card:

- Submit Contractor Application Form and cover sheet to the Contracting Office

- The Contracting Office will send the form to G3 Security

- Once cleared (weekly list sent out), pre-register at DBIDS

Google DBIDS (1st link) https://dbids-global.dmdc.mil/enroll#!/

- Take QR code to PMO for badge

- If cleared with the Air Station, an application still needs to be submitted to Security at Parris Island but we will reciprocate off of their cleared/not cleared for base access.

- New contractors requiring access for over 60 days will receive a credential valid for up to one year.

- New contractors requiring access for less than 60 days will receive a temporary paper pass.

Pending means that there were issues that our office needs to review to determine if the individual will or will not be denied base access.

If you have questions regarding the exchange of a current RAPIDGate/MCESS credential for DBIDS or you are a new contractor seeking enrollment into DBIDS, please contact the Security Office at 843-228-4174.

C. Contractor’s Responsibility

A criminal background check conducted by the MCRDPI Security Manager’s Office shall be required for all contractor personnel who make frequent visits to or perform work on the MCRDPI cited in the Contract, prior to the start date of the contract. Contractors are required to review any proposed employee prior to submitting their names for the background check. Depot access will be denied if it is determined that the personnel requesting access are within one of the following categories:

- On the National Terrorist Watch List.

- Illegally present in the United States.

- The subject to any outstanding warrant or criminal summons.

- Has knowingly submitted an employment questionnaire with false or fraudulent information.

- Has been issued a debarment order and is currently banned from any military installation.

- A prisoner on work-release program or currently on felony probation/parole.

- A registered sex offender.

- Membership within the previous 10 years in any organization that advocated the overthrow of the U.S.

Government or affiliated with any active gang.

- Is pending any felony charges.

- Has been convicted of a felony within the last ten (10) years.

- Has multiple (three or more) misdemeanor criminal offenses to include, but not limited to:

o Drug Offenses o Offenses of violence o Weapons offenses including those where the weapon was used as either the means of the violence or threat of violence o Larceny/theft

- Any reason the Installation Commander deems reasonable for good order and discipline.

No physical badge will be issued. If a contractor’s proposed employees requiring access meet the required criminal background check, upon entry, each contractor employee must present a valid form of identification (Driver’s

License). At the front gate, the Provost Marshall’s Office will screen each contractor employee against MCRDPI

Security Manager’s Office listing of approved contractor employees. The operator of the motor vehicle must also provide valid registration and current insurance.

D. ADDITIONAL BASE ACCESS GUIDANCE

1. All vehicles are subject to search

2. No Illegal Drugs

3. Firearms are prohibited

4. Fireworks are prohibited

5. Strictly obey speed limits

6. No Cell Phone use while driving

7. DO NOT enter any training, unauthorized, or restricted areas.

8. Military Police Contact Information

a. i. Emergency Dial – 911

b. Non-Emergency Dial – 843.228.3444

Section E - Inspection and Acceptance

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 N/A N/A N/A N/A

0001AA Destination Government Destination Government

0001AB Destination Government Destination Government

Section F - Deliveries or Performance

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 N/A N/A N/A N/A

0001AA POP 01-DEC-2020 TO

31-JAN-2021

N/A M00263

SEE SCHEDULE

FOR EXACT LOCATION

PARRIS ISLAND SOUTH CAROLINA 29905

843-228-2632

FOB: Destination

M00263

0001AB POP 01-DEC-2020 TO

31-JAN-2021

N/A (SAME AS PREVIOUS LOCATION)

FOB: Destination

M00263

Section G - Contract Administration Data

CLAUSES INCORPORATED BY FULL TEXT

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)

(a) Definitions. As used in this clause—

“Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.

“Document type” means the type of payment request or receiving report available for creation in Wide Area

WorkFlow (WAWF).

“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.

“Payment request” and “receiving report” are defined in the clause at 252.232-7003, Electronic Submission of

Payment Requests and Receiving Reports.

(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-

7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall—

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training

Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.

(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data

Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:

(1) Document type. The Contractor shall submit payment requests using the following document type(s):

(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.

(ii) For fixed price line items—

(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting

Officer.

https://www.sam.gov/ https://wawf.eb.mil/ https://wawf.eb.mil/

(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the

Contracting Officer.

Invoice 2in1

(iii) For customary progress payments based on costs incurred, submit a progress payment request.

(iv) For performance based payments, submit a performance based payment request.

(v) For commercial item financing, submit a commercial item financing request.

(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table*

Field Name in WAWF Data to be entered in WAWF

Pay Official DoDAAC M67443

Issue By DoDAAC M00263

Admin DoDAAC** M00263

Inspect By DoDAAC M00263

Ship To Code ____

Ship From Code ____

Mark For Code ____

Service Approver (DoDAAC) ____

Service Acceptor (DoDAAC) M00263

Accept at Other DoDAAC ____

LPO DoDAAC ____

DCAA Auditor DoDAAC ____

Other DoDAAC(s) ____

(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition

Regulation 52.216-7, Allowable Cost and Payment, as applicable.

(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.

(g) WAWF point of contact.

(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s

WAWF point of contact.

Bryan McAlhany; bryan.mcalhany@usmc.mil; (843) 228-1776 mailto:bryan.mcalhany@usmc.mil

Dan Kuelker; daniel.kuelker@usmc.mil; (843) 228-2273

(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.

(End of clause)

ECMRA

The contractor shall report contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the Maintenance and Eddy current testing of cooling towers and chillers aboard MCRD Parris Island, via a secure data collection site. Contracted services excluded from reporting are based on Product Service Codes (PSCs). The excluded PSCs are:

(1) W, Lease/Rental of Equipment;

(2) X, Lease/Rental of Facilities;

(3) Y, Construction of Structures and Facilities;

(4) D, Automatic Data Processing and Telecommunications, IT and Telecom- Telecommunications

Transmission (D304) and Internet (D322) ONLY;

(5) S, Utilities ONLY;

(6) V, Freight and Shipping ONLY.

The contractor is required to completely fill in all required data fields using the following web address:

https://www.ecmra.mil.

Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year

(FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. Contractors may direct questions to the help desk, linked at https://www.ecmra.mil

CONTRACT ADMINISTRATION

1.1 Contract administration functions shall be retained by the Regional Contracting Office, Marine Corps Recruit

Depot, Parris Island, South Carolina. Any inquiries pertaining to the administration of performance of this contract should be directed to the Regional Contracting Office. The contractor shall contact the assigned Contract Specialist following award to coordinate dates for installation and base access.

1.2 Government Technical Point of Contact. The Government Technical Point of Contact is not authorized to make any commitments or changes that will affect price, quality, quantity, delivery, or any other terms or conditions of the contract:

Project Manager

Eric Johnson

Phone: 843-228-3677

FSC

Bryan McAlhany

Phone: 843-228-1776 mailto:daniel.kuelker@usmc.mil

1.3 Non-Personal Services. The Government shall neither supervise contractor employees nor control the method by which the contractor performs the required tasks. Under no circumstances shall the Government assign tasks to, or prepare work schedules for, individual contractor employees. It shall be the responsibility of the contractor to manage its employees and to guard against any actions that are of the nature of personal services, or give the perception of personal services. If the contractor believes that any actions constitute, or are perceived to constitute personal services, it shall be the contractor's responsibility to notify the Contracting Officer immediately.

2. Contract Correspondence and Inquiries

2.1 All correspondence/inquiries shall Reference the appropriate Contract Number, and shall be submitted to the email points of contact address:

Regional Contracting Office, Parris Island Marine Corps Recruit Depot

Attn: Anthony Islas, Contract Specialist

Parris Island, SC 29905

Phone: 843-228-3622

E-mail: anthony.islas@usmc.mil

Regional Contracting Office, Parris Island Marine Corps Recruit Depot

Attn: Rodney Small, Contracting Officer

Parris Island, SC 29905

Phone: 843-228-2151

E-mail: rodney.small@usmc.mil

3. Technical Inquiries - Upon contract award, all inquiries that relate to technical issues shall be directed to the contracting office.

4. Authority of Government Personnel - The Contracting Officer (KO) is the only person authorized to approve changes to any of the terms and conditions of the contract. In the event that the contractor, effects any changes at the direction of any person other than the KO, the changes will be considered to have been made without the authority and no adjustment will be made to the contract price to cover any increase in costs incurred as a result thereof. The KO is the only individual to accept nonconforming work, waive any requirement of the contract, or modify any terms or conditions of the contract. The KO is the only individual who can legally obligate Government funds.

5. PAYMENT SPECIAL INSTRUCTIONS - Invoices and receiving documents shall be submitted through Wide

Area Workflow (WAWF) for payment in accordance with DFARS 252.232-7006. In addition, the contractor shall also send an electronic copy of the invoice to the Regional Contracting Office (RCO) and Government

Technical Point of Contact for final review. A final fair and reasonable determination must be made prior invoice acceptance and processing for payment.

WAGE DETERMINATION

WD 15-5800 (Rev.-14)

U.S. Department of Labor Wage Determination Number 2015-5800, Revision Number 14 dated 28 Apr 2020 is hereby incorporated into this contract and any subsequent order.

This Wage Determination can be found at http://www.dol.gov mailto:anthony.islas@usmc.mil mailto:rodney.small@usmc.mil

Section I - Contract Clauses

CLAUSES INCORPORATED BY REFERENCE

52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011

52.204-10 Reporting Executive Compensation and First-Tier

Subcontract Awards

JUN 2020

52.204-13 System for Award Management Maintenance OCT 2018

52.204-18 Commercial and Government Entity Code Maintenance AUG 2020

52.212-4 Contract Terms and Conditions--Commercial Items OCT 2018

52.232-40 Providing Accelerated Payments to Small Business

Subcontractors

DEC 2013

52.233-4 Applicable Law for Breach of Contract Claim OCT 2004

252.203-7000 Requirements Relating to Compensation of Former DoD

Officials

SEP 2011

252.204-7003 Control Of Government Personnel Work Product APR 1992

252.204-7004 Antiterrorism Awareness Training for Contractors. FEB 2019

252.204-7015 Notice of Authorized Disclosure of Information for Litigation

Support

MAY 2016

252.204-7018 Prohibition on the Acquisition of Covered Defense

Telecommunications Equipment or Services

DEC 2019

252.223-7008 Prohibition of Hexavalent Chromium JUN 2013

252.227-7015 Technical Data--Commercial Items FEB 2014

252.232-7003 Electronic Submission of Payment Requests and Receiving

Reports

DEC 2018

252.232-7010 Levies on Contract Payments DEC 2006

252.244-7000 Subcontracts for Commercial Items OCT 2020

52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR

EXECUTIVE ORDERS--COMMERCIAL ITEMS (OCT 2020)

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:

(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017)

(section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L.

113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).

(2) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by

Kaspersky Lab and Other Covered Entities (Jul 2018) (Section 1634 of Pub. L. 115-91).

(3) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or

Equipment. (AUG 2020) (Section 889(a)(1)(A) of Pub. L. 115-232).

(4) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015).

(5) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).

(6) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Public Laws 108-77 and 108-78 (19

U.S.C. 3805 note)).

(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items:

___ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (JUN 2020), with Alternate I (Oct 1995)

(41 U.S.C. 4704 and 10 U.S.C. 2402).

____ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (JUN 2020) (41 U.S.C. 3509).

____ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (JUN

2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment

Act of 2009.)

___ (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (JUN 2020) (Pub. L.

109-282) (31 U.S.C. 6101 note).

___ (5) [Reserved]

X (6) 52.204-14, Service Contract Reporting Requirements (Oct 2016) (Pub. L. 111-117, section 743 of Div. C).

___ (7) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (Oct 2016) (Pub.

L. 111-117, section 743 of Div. C).

X (8) 52.209-6, Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (JUN 2020) (31 U.S.C. 6101 note).

____ (9) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (OCT 2018) (41

U.S.C. 2313).

____ (10) [Reserved]

____ (11)(i) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (MAR 2020) (15 U.S.C. 657a).

____ (ii) Alternate I (MAR 2020) of 52.219-3.

____ (12) (i) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (MAR 2020)

(if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).

____ (ii) Alternate I (MAR 2020) of 52.219-4.

____ (13) [Reserved]

X (14)(i) 52.219-6, Notice of Total Small Business Set-Aside (MAR 2020) (15 U.S.C. 644).

____ (ii) Alternate I (MAR 2020) of 52.219-6.

____ (15)(i) 52.219-7, Notice of Partial Small Business Set-Aside (MAR 2020) (15 U.S.C. 644).

____ (ii) Alternate I (MAR 2020) of 52.219-7.

____ (16) 52.219-8, Utilization of Small Business Concerns (OCT 2018) (15 U.S.C. 637(d)(2) and (3)).

____ (17)(i) 52.219-9, Small Business Subcontracting Plan (JUN 2020) (15 U.S.C. 637(d)(4)).

____ (ii) Alternate I (NOV 2016) of 52.219-9.

____ (iii) Alternate II (NOV 2016) of 52.219-9.

____ (iv) Alternate III (JUN 2020) of 52.219-9.

____ (v) Alternate IV (JUN 2020) of 52.219-9.

____ (18) (i) 52.219-13, Notice of Set-Aside of Orders (MAR 2020) (15 U.S.C. 644(r)).

____ (ii) Alternate I (MAR 2020) of 52.219-13.

____ (19) 52.219-14, Limitations on Subcontracting (MAR 2020) (15 U.S.C. 637(a)(14)).

____ (20) 52.219-16, Liquidated Damages—Subcontracting Plan (Jan 1999) (15 U.S.C. 637(d)(4)(F)(i)).

____ (21) 52.219-27, Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (MAR 2020) (15

U.S.C. 657f).

____ (22) (i) 52.219-28, Post Award Small Business Program Rerepresentation (MAY 2020) (15 U.S.C. 632(a)(2)).

____ (ii) Alternate I (MAR 2020) of 52.219-28.

____ (23) 52.219-29, Notice of Set-Aside for, or Sole Source Award to, Economically Disadvantaged Women-

Owned Small Business (EDWOSB) Concerns (MAR 2020) (15 U.S.C. 637(m)).

____ (24) 52.219-30, Notice of Set-Aside for, or Sole Source Award to, Women-Owned Small Business Concerns

Eligible Under the Women-Owned Small Business Program (MAR 2020) (15 U.S.C. 637(m)).

____ (25) 52.219-32, Orders Issued Directly Under Small Business Reserves (MAR 2020) (15 U.S.C. 644(r)).

____ (26) 52.219-33, Nonmanufacturer Rule (MAR 2020) (15 U.S.C. 637(a)(17)).

X (27) 52.222-3, Convict Labor (JUN 2003) (E.O. 11755).

____(28) 52.222-19, Child Labor--Cooperation with Authorities and Remedies (JAN 2020) (E.O. 13126).

X (29) 52.222-21, Prohibition of Segregated Facilities (APR 2015).

X (30)(i) 52.222-26, Equal Opportunity (SEPT 2016) (E.O. 11246).

____ (ii) Alternate I (FEB 1999) of 52.222-26.

____ (31)(i) 52.222-35, Equal Opportunity for Veterans (JUN 2020) (38 U.S.C. 4212).

____ (ii) Alternate I (JUL 2014) of 52.222-35.

X (32)(i) 52.222-36, Equal Opportunity for Workers with Disabilities (JUN 2020) (29 U.S.C. 793).

____ (ii) Alternate I (JUL 2014) of 52.222-36.

____ (33) 52.222-37, Employment Reports on Veterans (JUN 2020) (38 U.S.C. 4212).

____ (34) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (DEC 2010) (E.O.

13496).

X (35)(i) 52.222-50, Combating Trafficking in Persons (OCT 2020) (22 U.S.C. chapter 78 and E.O. 13627).

____ (ii) Alternate I (MAR 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).

____ (36) 52.222-54, Employment Eligibility Verification (OCT 2015). (E. O. 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial items as prescribed in

22.1803.)

____ (37)(i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA–Designated Items (MAY

2008) (42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

____ (ii) Alternate I (MAY 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

X (38) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (JUN

2016) (E.O. 13693).

X (39) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners

(JUN 2016) (E.O. 13693).

____ (40) (i) 52.223-13, Acquisition of EPEAT® Registered Imaging Equipment (JUN 2014) (E.O.s 13423 and

13514).

____ (ii) Alternate I (OCT 2015) of 52.223-13.

____ (41)(i) 52.223-14, Acquisition of EPEAT® Registered Televisions (JUN 2014) (E.O.s 13423 and 13514).

____ (ii) Alternate I (JUN 2014) of 52.223-14.

____ (42) 52.223-15, Energy Efficiency in Energy-Consuming Products (MAY 2020) (42 U.S.C. 8259b).

____ (43)(i) 52.223-16, Acquisition of EPEAT®-Registered Personal Computer Products (OCT 2015) (E.O.s

13423 and 13514).

____ (ii) Alternate I (JUN 2014) of 52.223-16.

X (44) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving (JUN 2020) (E.O.

13513).

X (45) 52.223-20, Aerosols (JUN 2016) (E.O. 13693).

____ (46) 52.223-21, Foams (JUN 2016) (E.O. 13693).

____ (47)(i) 52.224-3, Privacy Training (JAN 2017) (5 U.S.C. 552a).

____ (ii) Alternate I (JAN 2017) of 52.224-3.

____ (48) 52.225-1, Buy American--Supplies (MAY 2014) (41 U.S.C. chapter 83).

____ (49) (i) 52.225-3, Buy American--Free Trade Agreements--Israeli Trade Act (MAY 2014) (41 U.S.C. chapter

83, 19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, Pub. L. 103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, and 112-43.

____ (ii) Alternate I (MAY 2014) of 52.225-3.

____ (iii) Alternate II (MAY 2014) of 52.225-3.

____ (iv) Alternate III (MAY 2014) of 52.225-3.

____ (50) 52.225-5, Trade Agreements (OCT 2019) 19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).

____ (51) 52.225-13, Restrictions on Certain Foreign Purchases (JUN 2008) (E.O.'s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).

____ (52) 52.225-26, Contractors Performing Private Security Functions Outside the United States (OCT 2016)

(Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).

____ (53) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (NOV 2007) (42 U.S.C. 5150

____ (54) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (NOV 2007) (42 U.S.C.

5150).

____ (55) 52.229-12, Tax on Certain Foreign Procurements (JUN 2020).

____ (56) 52.232-29, Terms for Financing of Purchases of Commercial Items (FEB 2002) (41 U.S.C. 4505, 10

U.S.C. 2307(f)).

____ (57) 52.232-30, Installment Payments for Commercial Items (JAN 2017) (41 U.S.C. 4505, 10 U.S.C. 2307(f)).

X (58) 52.232-33, Payment by Electronic Funds Transfer—System for Award Management (OCT 2018) (31

U.S.C. 3332).

____ (59) 52.232-34, Payment by Electronic Funds Transfer—Other than System for Award Management (JUL

2013) (31 U.S.C. 3332).

____ (60) 52.232-36, Payment by Third Party (MAY 2014) (31 U.S.C. 3332).

____ (61) 52.239-1, Privacy or Security Safeguards (AUG 1996) (5 U.S.C. 552a).

____ (62) 52.242-5, Payments to Small Business Subcontractors (JAN 2017)(15 U.S.C. 637(d)(13)).

____ (63)(i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (FEB 2006) (46 U.S.C.

Appx. 1241(b) and 10 U.S.C. 2631).

____ (ii) Alternate I (APR 2003) of 52.247-64.

____ (iii) Alternate II (FEB 2006) of 52.247-64.

(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items:

X (1) 52.222-41, Service Contract Labor Standards (AUG 2018) (41 U.S.C. chapter 67).

X (2) 52.222-42, Statement of Equivalent Rates for Federal Hires (MAY 2014) (29 U.S.C. 206 and 41 U.S.C.

chapter 67).

_____ (3) 52.222-43, Fair Labor Standards Act and Service Contract Labor Standards--Price Adjustment (Multiple

Year and Option Contracts) (AUG 2018) (29 U.S.C. 206 and 41 U.S.C. chapter 67).

_____ (4) 52.222-44, Fair Labor Standards Act and Service Contract Labor Standards--Price Adjustment (MAY

2014) (29 U.S.C 206 and 41 U.S.C. chapter 67).

_____ (5) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for

Maintenance, Calibration, or Repair of Certain Equipment--Requirements (MAY 2014) (41 U.S.C. chapter 67).

_____ (6) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain

Services--Requirements (MAY 2014) (41 U.S.C. chapter 67).

X (7) 52.222-55, Minimum Wages Under Executive Order 13658 (DEC 2015) (E.O. 13658).

X (8) 52.222-62, Paid Sick Leave Under Executive Order 13706 (JAN 2017) (E.O. 13706).

_____ (9) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (JUN 2020) (42 U.S.C. 1792).

(d) Comptroller General Examination of Record. The Contractor shall comply with the provisions of this paragraph

(d) if this contract was awarded using other than sealed bid, is in excess of the simplified acquisition threshold, as defined in FAR 2.101, on the date of award of this contract, and does not contain the clause at 52.215-2, Audit and

Records--Negotiation.

(1) The Comptroller General of the United States, or an authorized representative of the Comptroller General, shall have access to and right to examine any of the Contractor's directly pertinent records involving transactions related to this contract.

(2) The Contractor shall make available at its offices at all reasonable times the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR Subpart 4.7, Contractor Records Retention, of the other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement. Records relating to appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved.

(3) As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and regardless of form. This does not require the Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law.

(e) (1) Notwithstanding the requirements of the clauses in paragraphs (a), (b), (c), and (d) of this clause, the

Contractor is not required to flow down any FAR clause, other than those in this paragraph (e)(1)in a subcontract for commercial items. Unless otherwise indicated below, the extent of the flow down shall be as required by the clause—

(i) 52.203-13, Contractor Code of Business Ethics and Conduct (JUN 2020) (41 U.S.C. 3509).

(ii) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017)

(section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L.

113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).

(iii) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by

Kaspersky Lab and Other Covered Entities (Jul 2018) (Section 1634 of Pub. L. 115-91).

(iv) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or

Equipment. (AUG 2020) (Section 889(a)(1)(A) of Pub. L. 115-232).

(v) 52.219-8, Utilization of Small Business Concerns (Oct 2018) (15 U.S.C. 637(d)(2) and (3)), in all subcontracts that offer further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds the applicable threshold specified in FAR 19.702(a) on the date of subcontract award, the subcontractor must include 52.219-8 in lower tier subcontracts that offer subcontracting opportunities.

(vi) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).

(vii) 52.222-26, Equal Opportunity (Sep 2016) (E.O. 11246).

(viii) 52.222-35, Equal Opportunity for Veterans (JUN 2020) (38 U.S.C. 4212).

(ix) 52.222-36, Equal Opportunity for Workers with Disabilities (JUN 2020) (29 U.S.C. 793).

(x) 52.222-37, Employment Reports on Veterans (JUN 2020) (38 U.S.C. 4212).

(xi) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O. 13496).

Flow down required in accordance with paragraph (f) of FAR clause 52.222-40.

(xii) 52.222-41, Service Contract Labor Standards (Aug 2018), (41 U.S.C. chapter 67).

(xiii) _____ (A) 52.222-50, Combating Trafficking in Persons (OCT 2020) (22 U.S.C. chapter 78 and E.O. 13627).

_____ (B) Alternate I (March 2, 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).

(xiv) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for

Maintenance, Calibration, or Repair of Certain Equipment--Requirements (May 2014) (41 U.S.C. chapter 67.)

(xv) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain

Services--Requirements (May 2014) (41 U.S.C. chapter 67)

(xvi) 52.222-54, Employment Eligibility Verification (Oct 2015) (E. O. 12989).

(xvii) 52.222-55, Minimum Wages Under Executive Order 13658 (Dec 2015) (E.O. 13658).

(xviii) 52.222-62, Paid Sick Leave Under Executive Order 13706 (Jan 2017) (E.O. 13706).

(xix) (A) 52.224-3, Privacy Training (Jan…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .