RFQ_M0026320Q0001.docx
DOCX document 137 KB Posted
- Attached to
- Drill Instructor Development and Assessment Federal contract opportunity
- Solicitation number
- M00263-20-Q-0001
- Issued by
- United States Marine Corps
About this file
Commercial Solicitation
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| AMENDMENT_Q&A.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
M0026320Q0001
Section B - Supplies or Services and Prices
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
DI Assessment and Evaluation
FFP
The contractor shall provide episodic personnel support services IAW the PWS.
MILSTRIP: M3200120SUDIDEV
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0001AA
| 12 |
| Months |
DI Assessment and Evaluation Support
Drill Instructor Assessment and Evaluation Personnel Support. The contractor shall provide all episodic personnel support services IAW the PWS.for Drill Instructor School and Drill Instructors in one (1) RTR Company. The assessment should be completed prior to January 6th, 2020.
FOB: Destination
PSC CD: AJ2
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0001AB
| 12 |
| Months |
Software License
The contractor Shall Provide all services IAW the PWS.
FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| DI Assessment and Evaluation |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1001AA
| 12 |
| Months |
DI Assessment and Evaluation Support
The contractor shall provide all episodic personnel support services IAW the PWS for Drill Instructor School and all Drill Instructors in Recruit Training Regiment (RTR).
FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1001AB
| 12 |
| Months |
Software License
The contractor Shall Provide all services IAW the PWS.
FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| DI Assessment and Evaluation |
FFP
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2001AA
| 12 |
| Months |
DI Assessment and Evaluation Support
The contractor shall provide all episodic personnel support services IAW the PWS for Drill Instructor School and all Drill Instructors in Recruit Training Regiment (RTR).
FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2001AB
| 12 |
| Months |
Software License
The contractor shall provide all services IAW the PWS.
FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| DI Assessment and Evaluation |
FFP
6 month extenstion associated with FAR Clause 52.217-8
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
3001AA
| 6 |
| Months |
| OPTION |
| DI Assessment and Evaluation Support |
FFP
6 month extenstion associated with FAR Clause 52.217-8
The contractor shall provide all episodic personnel support services IAW the PWS for Drill Instructor School and all Drill Instructors in Recruit Training Regiment (RTR).
FOB: Destination
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
3001AB
| 6 |
| Months |
Software License
6 month extenstion associated with FAR Clause 52.217-8
The contractor shall provide all services IAW the PWS.
NET AMT
Section C - Descriptions and Specifications
PERFORMANCE WORK STATEMENT
PART 1
GENERAL INFORMATION
1. GENERAL: This a service contract that will align and implement a commercial off the shelf (COTS) software solution that will measure, weigh, and report clearly defined performance attributes of Drill Instructors (DI) at the Marine Corps Recruit Depot, Parris Island (MCRDPI), South Carolina..
1.1. BACKGROUND: Drill Instructors (DI) are the backbone that support the mission of “Making Marines”. The success or failure of recruit training relies heavily on the professionalism, maturity, and performance of the Drill Instructors. MCRDPI, Recruiting Training Regiment (RTR) requires a systematic and deliberate development process that measures and evaluates the knowledge, skills and essential attributes of the DI workforce from the commencement of training at DI School and through the completion of their tour of duty as a DI.
1.2. SCOPE OF WORK: The contractor will utilize the current DI School curriculum, schedule and performance standards to develop a DI competency model that describes the skill, knowledge, and other key attributes that a DI should embody. This competency model will depict the level of proficiency for a graduating DI and define the “Basic” DI. The model will be further refined to capture the responsibilities and attributes of the “Experienced” DI as well as “Senior” DI (SDI) and “Chief” DI (CDI) per paragraphs (2.3.2 and 2.3.3). The contractor will develop and implement a “networked” automated software solution set that captures DI attributes and profiles and leverages that data to increase efficiencies and to enhance DI training and development. As well, the contractor will utilize the competency models; coupled, with direct interaction with DI School, the DI workforce and DI leadership to target opportunities to foster professional development to further define/refine human performance behavior critical to DI training and development.
1.3. PERIOD OF PERFORMANCE: The period of performance shall be for one (1) Base Year of 12 months, and two (2) 12 month option year’s period of performance.
1.4. CONCEPT OF EXECUTION:
1.4.1. Phase I – Development and Initial Implementation (Base Year): This phase will analyze and create the initial competency and performance metrics and models for the professional development of DIs from their initial training at DI School to include the completion of their tour of duty as a DI. These competency and performance models will be automated via COTS software and networked to measure and report the performance and professional development of Drill Instructor School graduates and one (1) Company of “working” Drill Instructors. The implementation will be a rapid development process that will allow the contractor and MCRDPI staff to incrementally prototype the competency models so as to properly identify, consider and evaluate alternative points of measure. The automated network will only reside within the confines of the DI school (closed network), but will be developed with the intention to migrated the solution to the Marine Corps Enterprise Network (MCEN). Phase I will start no later than 1 November 2019.
1.4.2. Phase II Implementation (Option Year One): This phase will leverage the competency and performance metrics and models developed in Phase I and will begin the incremental migration to the MCEN, coupled with the training and implementation across all the Battalions/Company’s within the RTR. Additionally, MCRDPI IT staff will be trained in the installation, operation and maintenance (IO&M) of the solution set and will assume operational sustainment by the end of this PoP.
1.4.3. Phase III Sustainment (Option Year Two): This phase will continue the MCRDPI IT staff operational sustainment augmented with software licensing and off-site technical support.
1.5. OBJECTIVES:
1.5.1. Base Year:
1.5.1.1. Develop competency and performance measurement models that represents the knowledge, skills, performance indicators and other key attributes that define and evaluate DI performance. This effort will capture performance measurements during deliberate DI training events and during the DI basic daily routine as a working DI.
1.5.1.2. Implement a commercial of the shelf software (COTS) solution set that utilizes the competency and performance models that will assist RTR leadership in making informed decisions relative to the competency, development, performance and assignment DIs.
1.5.1.3. Implement a one (1) stand-alone network within DI School utilizing the software solution set to measure and report the performance and professional development of DI School graduates and one (1) Company of” working” DIs (approximately 450 DIs).
1.5.1.4. Train MCRDPI staff and instructors on how to operate the software solution set provided.
1.5.2. Option Year One:
1.5.2.1. Expand and continue to refine the software solution set to support 15 companies within the RTR with an expected end-user base of 250 users that manage 1000 DIs profiles a year.
1.5.2.2. Expand training across all companies within the RTR in the use of the solution set to track and measure the professional development of all RTR Drill Instructors.
1.5.2.3. Install and migrate the software solution set to government owned equipment on the MCEN.
1.5.2.4. Provide software/hardware licensing and maintenance as required during this period of performance.
1.5.2.5. Train MCRDPI IT Staff on the installation and maintenance procedures to sustain the hardware and software provided.
1.5.2.6. Provide software version changes and/or updates to maintain USMC Information Assurance Certification and Accreditation compliancy.
1.5.3. Option Year two:
1.5.3.1. Provide software licensing as required during this period of performance.
1.5.3.2. Provide software maintenance and help desk support during this period of performance.
1.5.3.3. Provide software version changes and/or updates to maintain USMC Information Assurance Certification and Accreditation compliancy.
1.6 Quality Assurance
1.6.1 Below is the Performance Requirements Summary (PRS) describing objectives, standards, and measures. An Acceptable Quality Level (AQL) is the method the Government will use to measure and assess Contractor performance against performance standards within the PRS. The performance thresholds stated in the PRS describes the minimum AQL of service required for each performance requirement. Procedures that address how the Government will manage performance that does not meet performance standards as set by the AQLs.
1.6.1.1 Performance Requirements Summay (PRS)
Performance Objective Performance Standard
PWS
Ref:
| Acceptable Quality Level |
| Surveillance |
Method Incentive / Disincentive
| Develop competency and performance measurement models for the following profiles: Basic DI, EDI, SDI, CDI |
| Performance is met when the model is created and approved by the government. Final product will be completed within six (6) months from contract award. |
PWS
Para 1.5.1.1, 1.6 & 2.1.4.6
| Competency and Performance model approved by the Government |
| Review Bi-Weekly progress report will be provided to the government during implementaiton phase. Review Monthly progress report will be provided to the government during the sustainment phase. |
| CPARS rating (positive or negative) |
Option (exercise or not exercise).
Contractor rework at no cost to Govt.
| Implement a one (1) stand-alone network within DI School no later than 5 January 2020. |
| Performance is met when the network is operational at DI School and compentency model is tracking DI Students and one (1) RTR Company |
| PWS |
1.5.1.3
| Network operational |
| Inspection by COR |
| CPARS rating (positive or negative) |
Option (exercise or not exercise) Contractor rework at no cost to Govt.
| Implement a commercial of the shelf software (COTS) solution set that utilizes the competency and performance models |
| Performance is met when the software is implemented on the MCEN network no later than end of base year. |
| PWS |
1.5.1.2, 1.6 & 1.5.2.4
| Software installed and migrated into the network |
| Review Bi-weekly report submitted to the COR on progress and approval during implementation phase. Review Monthly progress report will be provided to the government during the sustainment phase. |
| CPARS rating (positive or negative) |
Option (exercise or not exercise) Contractor rework at no cost to Govt.
| Produces reports and forms that are uniquely designed for use by RTR in their evaluation of DI competency and performance. |
| Performance is met when DI School and RTR are able to generate and retrieve reports. |
| PWS |
2.1.4.2
| Reports are generated and retrieved in a format that can be editable by DI School and RTR’s Staff |
| Inspection by the COR |
| CPARS rating (positive or negative) |
Option (exercise or not exercise) Contractor rework at no cost to Govt.
| The contractor will provide training, to include training manuals and quick reference guides on the operation and use of the software solution |
| Performance met when 100% of the 250 users are trained. |
| PWS Para 2.1.10 |
| Trained users achieve a level of proficiency that enables them to operate the system without the contractor’s assistance. |
| Verified by COR, user feedback |
| CPARS rating (positive or negative) |
Option (exercise or not exercise) Contractor rework at no cost to Govt.
PART 2
CONTRACTOR TASKS AND REQUIREMENTS
2.1. BASE YEAR SPECIFIC TASKS:
2.1.1. The contractor will oversee and manage the contracting effort to include: resource management, planning and measuring project milestones, provide in-progress review and managing the overall success of the project.
2.1. 2. The contractor shall provide on-site organizational and human performance analysts to analyze, assess/evaluate DI training, culture, tactics, techniques, procedures methodology’s, historical training data to define and establish competency and performance measures. Additionally, analysts will work exclusively with RTR training instructors, leadership, DIs, training evaluators/supervisors to interpret and provide critical insight to produce comprehensive performance indicators and results.
2.1.3. Based on the analysis, the contractor will develop competency and performance models for the following DI profiles:
2.1.3.1. Basic Drill Instructor (DI school graduate).
2.1.3.2. Experienced Drill Instructor
2.1.3.3. Senior Drill Instructor
2.1.3.4. Chief Drill Instructor
2.1.4. The contractor will utilize COTS software to implement an automated process that provides the following functionality:
2.1.4.1. Create data entry and retrieval interfaces that utilize the competency and performance models to create a comprehensive assessment of the DI workforce.
2.1.4.2. Produces reports and forms that are uniquely designed for use by RTR in their evaluation of DI competency and performance. The content of these reports will permit the RTR to make informed decisions that increase efficiencies and enhance the selection, retention and professional development of DIs and DI training
2.1.4.3. The software solution set will provide user interfaces and permission sets base on the level of access required of the user to execute their functional role. The following functional roles are anticipated:
2.1.4.3.1 Drill Instructor
2.1.4.3.2 Senior Drill Instructor
2.1.4.3.3. Chief Drill Instructor
2.1.4.3.4. Series Commander
2.1.4.3.5. 1st Sgt
2.1.4.3.6. Company Commander
2.1.4.3.7. BN SgtMaj
2.1.4.3.8. Bn Executive Officer
2.1.4.3.9. Bn Commander
2.1.4.3.10. RTR SgtMaj
2.1.4.3.11. RTR Executive Officer
2.1.4.3.12. RTR Commander
2.1.4.3.13. DI School Instructor
2.1.4.3.14. DI School Chief Instructor
2.1.4.3.15. DI School Deputy Director
2.1.4.3.16. DI School Director
2.1.4.4. The software solution set will be web based and utilize an Internet browser to access and use the application.
2.1.4.5. The software solution set will be capable of managing large amounts of data. The initial DI workforce will be composed of DI School graduates and one (1) Company of” working” DIs (approximately 450 DIs); however, the solution set must be able to support all DI school graduates and all working DIs within the RTR.
2.1.4.6. The software solution set will be fully operational capable no later six months before the end of the base year.
2.1.5. The contractor will provide the necessary hardware and software to install, operate and maintain a closed network within the confines of the DI school. This network will host the software solution set for the duration of the Base Year PoP.
2.1.6. The contractor will provide on-site technical assistance with the implementation and operation of the software solution set.
2.1.7. The contractor will ensure that software defects (Bugs) that are identified by the government are addressed and resolved.
2.1.8. The contractor will provide technical support to provide assistance in the development of an integration and transition plan to migrate the software solution set to the Marine Corps Enterprise Network (MCEN) to include the development of the required artifacts and documentation to generate an Authority to Operate (ATO) package for submission to the USMC HQ Approving Official. The actual migration will occur during the Option Year One PoP.
2.1.9. The contractor will provide software and hardware licensing, technical support and maintenance as required during this period of performance to sustain the installation, operation and maintenance of the software and hardware solution set.
2.1.10. The contractor will provide training, to include training manuals and quick reference guides on the operation and use of the software solution set to support an estimated end-user base of 250 users.
2.2. OPTION YEAR ONE SPECIFIC TASKS:
2.2.1. The contractor will provide a program manager to oversee and manage the contracting effort to include resource management, planning and measuring project milestones, provide in-progress review and managing the overall success of the project.
2.2.2. The contractor will scale and configure the software solution set to support an end-user population of 250 users managing 1000 DI profiles.
2.2.3. The contractor will prepare the software solution for migration to the MCEN.
2.2.4. The contractor will provide on-site technical assistance to assist the MCRDPI IT staff in the installation and configuration of the software solution set on the MCEN. The migration will occur on government furnished equipment and will be executed by government personnel.
2.2.5. The contractor will provide training on the installation, operation and maintenance of the software solution to include manuals to the MCRDPI IT staff so that MCRDPI IT Staff can assume operational sustainment of the solution set.
2.2.6. The contractor will provide technical support to provide assistance for maintaining required artifacts and documentation to maintain the MCEN Authority to Operate (ATO) package.
2.2.7. The contractor will provide training, to include training manuals and quick reference guides on the operation and use of the software solution set to all RTR end-users. The estimated end-user base is 250.
2.2.8. The contractor will provide software and hardware licensing, technical support and maintenance as required during this period of performance to sustain the stand alone network within DI School and to support the transition to the MCEN.
2.2.9. The contractor will decommission the stand-alone network within DI School after full operational capability has been established on the MCEN.
2.2.10. The contractor will provide complete technical diagrams, system schematics and software, hardware and network configurations of the deployed MCEN software solution set.
2.3. OPTION YEAR TWO SPECIFIC TASKS:
2.3.1. The contractor will provide software licensing to sustain the software solution set as required during this period of performance.
2.3.2. The contractor will provide remote off-site technical support to assist MCRDPI IT staff with resolving software maintenance, upgrades or troubleshooting software performance issues.
2.3.3. The contractor will provide software version changes and/or updates to maintain USMC Information Assurance Certification and Accreditation compliancy.
2.4. SPECIFIC REQUIREMENTS:
2.4.1. The COTS software solution set will be full operation capable and registered with the Department of Navy (DoN) Application and Database Management System (DADMS) no later than six months before the end of the base year. This will facilitate the generation of an ATO package for the solution set to operate on the MCEN. DADMS information can be found at https://www.dadms.navy.mil/. A copy of the DADMS questionnaire is provided in the solicitation package. Section VIII contains a list of all USMC approved software that is already registered in DADMS.
2.4.2. The software solution set will meet Marine Corps Enterprise Network (MCEN) compliancy and all DoD and USMC network security requirements as defined in the references contained in section V.
2.4.3. The contractor will be required to generate an ATO for the solution set to operate on the MCEN no later than six months before the end of the base option year (Phase I). The Government will be responsible for submitting the ATO for approval. ATO package will meet the requirements as established in the following reference: ECSM 018, Marine Corps Assessment and Authorization Process, 28 Jul 17
2.4.4. Contractor provided workstation clients and server hardware will meet the hardware specification of the USMC common hardware suite (specifications contained in section VI).
2.4.5. Contractor provided workstation client and server hardware will meet the following USMC data encryption standard: Windows BitLocker.
2.4.6. The software solution set will coexist and operate on the MCEN client operating software baseline. The MCEN baseline image is contained in section VII.
2.4.7. The contractor will provide a list of required hardware and software to establish the software solution set on the MCEN no later than six months before the end of the base option year (Phase I).
2.4.8. All software supporting the software solutions set will need to be on USMC approved software list before the end of the base year (Phase I).
2.4.9. The Government has unlimited rights to all documentation/material produced to include human performance data under this contract. All documents, materials, and data produced under this contract shall be Government owned and are the property of the Government with all rights and privileges of ownership/copyright belonging exclusively to the Government. These documents, materials and data may not be used or sold by the contractor without written permission from the Contracting Officer. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.
2.5 Reporting Requirements
2.5.1 Implementation Phase – Contractor shall provide bi-weekly project status report listing metrics describing the progress and results of the project to date as well as projected actions.
2.5.2 Sustainment Phase - Contractor shall provide monthly project status report listing metrics describing the progress and results of the project to date as well as projected actions.
PART 3
CONTRACTOR PROVIDE EQUIPMENT AND SERVICES
3.1. CONTRACTOR PROVIDE EQUIPMENT:
3.1.1. The contractor will provide all hardware and software to establish the software solution set on the closed network within DI School for the base option year (Phase I). This equipment will remain the property of the contractor.
3.2. CONTRACTOR PROVIDE SERVICES:
3.2.1. The contractor will provide their own computer equipment to conduct on-site work in support of this contract.
3.2.2. The contractor will provide its own internet service.
PART 4
GOVERNMENT PROVIDED EQUIPMENT AND SERVICES
4.1. GOVERNMENT EQUIPMENT:
4.1.1. The Government will make available, all hardware and network connectivity for the software solutions set to operate on the MCEN.
4.1.2. The Government will make available, all inside and outside plant for MCEN connectivity.
4.2. GOVERNMENT PROVIDED SERVICES:
4.2.1 The Government will configure and manage all government equipment on the MCEN to include the security posture of all equipment.
4.2.2 The Government will provide electrical power and HVAC for all contractor provided equipment.
4.2.2 The Government will provide facilities for on-site contractors to include work space and furnishings.
PART 5
MCEN AND DOD SECURITY REFERENCES
5.1. REFERENCES:
5.1.1. DoDI 8510.01, Risk Management Framework (RMF) for DoD Information Technology (IT), 28 Jul 17, as amended
5.1.2. Marine Corps Operational Security Control Assessor (SCA) Recommendation ATO MCEN-N HQMC 5230, 8 Nov 17
5.1.3. MCEN-N Marine Corps Compliance and Authorization Support Tool (MCCAST) Security Authorization Package (SAP) for MCEN-N, RMF-1092, 8 Nov 17
5.1.4. CJCSI 6211.02D, Defense Information System Network (DISN) Responsibilities, 24 Jan 12 (current 4 Aug 15)
5.1.5. CJCSI 6510.01F, Information Assurance (IA) and Support to Computer Network Defense (CND), 9 Feb 11 (current 9 Jun 15)
5.1.6. DoDI 8500.01, Cybersecurity, 14 Mar 14
5.1.7. ECSM 018, Marine Corps Assessment and Authorization Process, 28 Jul 17
5.1.8. ECSM 021, Ports, Protocols and Services Management, 15 May 12
5.1.9. MARADMIN 371-13, Requirement for Registration of Ports, Protocols and Services Operating on the MCEN, DTG 240043Z Jul13
PART 6
USMC COMMON HARDWARE SPECIFICATIONS
5.1. REFERENCES:
5.1.1. MINIMUM END USER DEVICE SPECS
· Form Factor: Laptop
· Operating System: Windows 10 Professional
· Operating System Type: 64-bit
· CPU: CORE i5 7th Gen 2.6 Ghz
· RAM: 8 GB DDR4 RAM
· Graphic Processor: Intel HD 620
· Display: 15.6 inches, 1920 x 1080 pixels, WLED backlit display
· Storage: 500 GB SATA 5400 RPM
· Wireless LAN: 802.11 a/b/g/n/ac
· USB 3.0 slots: 2
· Battery: Li-Ion
5.1.2. MINIMUM SERVER HARDWARE SPECS
· Processor: Up to four 2nd Generation Intel® Xeon® Scalable processors with up to 28 cores per processor
· Bezel: Security Bezel
· Memory: DIMM Speed up to 2933 MT/s
· Memory Type: RDIMM
· Memory Module Slots: 48 DDR4 DIMM slots
· Maximum RAM: 3TB
· Operating System: Microsoft Windows Server 2016
· Internal Controllers: PERC H330, H730P, H740P, HBA330
· Software RAID: S140
· External HBAs (non-RAID): 12Gbps SAS HBA
· External PERC (RAID): H840
· Boot Optimized Storage Subsystem: HWRAID 2 x M.2 SSDs 240GB or 480GB
· Accelerators: Up to two double-width GPUs; Up to two full-height FPGAs
· Storage – Front Bays
· Up to 8 x 2.5” SAS/SATA (HDD/SSD) max 61.44TB Up to 24 x 2.5” SAS/SATA (HDD/SSDs) with up to 12 NVMe PCIe SSDs max 184.32TB Up to 24 x NVMe PCIe SSDs max 153TB
· Rear Bays: Up to 2 x 2.5” SAS/SATA (HDD/SSD), max 15.36TB
· Power Supplies: Hot plug power supplies with full redundancy option Up to 6 hot plug fans with N +1 redundancy
· Slots – PCIe: 6 x Gen3 slots
· Video Card: 1 x VGA
· Form Factor: 2U Rack Server
PART 6
USMC COMMON HARDWARE SPECIFICATIONS (CONT.)
· Network Options Ports 4 x 1GbE 4 x 10GbE 2 x 10GbE + 2 x 1GbE 2 x 25GbE
· Front Ports 1 x Dedicated iDRAC direct USB 2 x USB 2.0 1 x USB 3.0 (optional on the 8-drive configuration only) 1 x VGA
· Rear Ports 1 x Dedicated iDRAC port 1 x Serial 2 x USB 3.0 1 x Video
· Internal Ports 1 x USB 3.0
5.1.4. UNINTERRUPTABLE POWER SUPPLY x 2
· Form Factor: External Rack Mountable
· Energy Star: Yes
· Batteries Qty: 1
· Battery Technology: Lead acid
· Device Energy Rating : 530 Joules
· Device Output Connector Type : 2 x power NEMA 5-20R, 6 x power NEMA 5-15R
· Lead Acid Battery Features : Leak-proof, Maintenance free, Sealed
· Load Type : At full load
· Recharge Time : 3 hours
· Run Time (Up To) : 6.6 min
· Power Output Connectors
· Connector Qty : 2
· Connector Type : Power NEMA 5-20R
· Connector Qty : 6
· Connector Type : Power NEMA 5-15R
· Interface Type Qty : 1
· Type : Management (RS-232)
· Type : EPO (emergency power off)
· Type : USB
· Compliant Standards : CSA, FCC Part 15 A, REACH, RoHS, UL 1778
· Height (Rack Units) : 2U
· Remote Management Interface : RS-232, USB
· Circuit Protection : Circuit breaker
· Form Factor : Rack-mountable
· Frequency Provided : 50/60 Hz
· Frequency Provided Margin : ± 3Hz
· Frequency Required : 50/60 Hz
· Frequency Required Margin : ± 3Hz
· Input Connector Qty : 1
PART 6
USMC COMMON HARDWARE SPECIFICATIONS (CONT.)
· Input Connector Type : Power NEMA 5-20P
· Input Voltage Range : AC 82 - 143 V
· Input Voltage Range (Adjustable) : AC 75 - 154 V
· Output Connector Qty : 8
· Power Capacity (VA) : 2200 VA
· Power Device Features : Audible alarm, Automatic self-test, Automatic Voltage Regulation (AVR), Cold-start function, Emergency power off, Energy meter, Hot-swappable batteries, LCD display, Predicitive failure notification
· Power Provided : 1.98 kW
· Surge Suppression : Yes
· Switchover Time : 6
· UPS Output Waveform : Sinewave
· UPS Technology : Line interactive
· Voltage Provided : AC 110/120/127 V
· Voltage Provided Margin : ± 5%
· Voltage Required : AC 110/120/127 V
5.1.5. Cisco Catalyst 4506-E - Switch - 96 ports
· Managed
· Interface Console Qty : 1
· Comments : PoE
· Connector Type : RJ-45
· Interface : Ethernet 10Base-T/100Base-TX/1000Base-T Qty : 96
· Connector Type : SFP (mini-GBIC) Qty : 2
· Connector Type : Type A
· Type : USB
· Compliant Standards : IEEE 802.1D, IEEE 802.1p, IEEE 802.1Q, IEEE 802.1s, IEEE 802.1w, IEEE 802.1x, IEEE 802.3, IEEE 802.3ad (LACP), IEEE 802.3ae, IEEE 802.3af, IEEE 802.3at
· Features : Flow control, Full duplex mode, Half duplex mode, IPv4 support, IPv6 support, Jumbo Frames support, Layer 2 switching, Link Aggregation Control Protocol (LACP), MLD snooping, Modular design, NetFlow, PoE+, Power over Ethernet (PoE), Quality of Service (QoS), Spanning Tree Protocol (STP)
· Form Factor : Rack-mountable
· Jumbo Frame Support : 9216 bytes
· MAC Address Table Size : 55K entries
· Manageable : Yes
· Ports Qty : 96
· Power Over Ethernet (PoE) : PoE+
· Remote Management Protocol : RMON 1, RMON 2
· Routing Protocol : RIP, Static IP routing
· Status Indicators : Link OK, Link/activity, Port status, Power, Status of modules
· Subcategory : Network hubs and switches
· Subtype : Gigabit Ethernet
PART 6
USMC COMMON HARDWARE SPECIFICATIONS (CONT.)
· Hot-Plug : Hot-plug
· Power Redundancy : Yes
· Type : Internal power supply
· Processor Clock Speed : 1.5 GHz
· Installed Qty : 1
· Software Type : Cisco IOS LAN Base
· Chassis:
· Installed Devices Modules Qty : 3
· Supported Devices Modules Qty : 6
· Flash Memory Installed Size : 1 GB
· Performance
· Type : IPv4 routing
· Value : 225 Mbps
· Type : IPv6 routing
· Value : 110 Mbps
· Type : Per-slot switching capacity
· Value : 48 Gbps
· Type : Switching capacity
· Value : 520 Gbps
PART 7
MCEN CLIENT SOFTWARE BASELINE
| Component |
| Version |
| Description |
| .NET FRAMEWORK 3.5 (INCLUDES 2.0 AND 3.0) |
| 3.5 |
| Supports applications developed for the .NET environment |
| .NET FRAMEWORK 4.x |
| 4.7.1 |
| Supports applications developed for the .NET environment |
| ACTIVIDENTITY ACTIVCLIENT x64 |
| 7.1.0.205 |
| Middleware for reading Common Access Card (CAC) credentials |
| ADOBE ACROBAT READER DC |
| 2018.011.20040 |
| Supports Portable Document Format (PDF) documents and forms |
| ADOBE SHOCKWAVE PLAYER |
| 12.3.2.202 |
| Supports media content developed in Adobe Shockwave |
| ATHOCGOV DESKTOP SOFTWARE |
| 6.2.4.270 |
| Client for the USMC Mass Notification System |
| AXWAY TUMBLEWEED DESKTOP VALIDATOR |
| 4.12.1 |
| Supports digital certificate validation |
| CITRIX RECEIVER |
| 4.9.2000.21 |
| Supports connection to Citrix-enabled applications |
| EXTENDED ASIAN LANGUAGE FONT FOR ADOBE ACROBAT READER DC |
| 15.007.20033 |
| Supports Adobe PDF documents and forms that contain Asian Language fonts |
| IBM BIGFIX CLIENT |
| 9.5.7.90 |
| Client for the IBM Endpoint Manager (IEM) tool within MCEN |
| LOCAL ADMINISTRATOR PASSWORD SOLUTION (LAPS) |
| 6.2 |
| Provides a secure solution for utilizing the local Built-in Administrator account on EUDs |
| MCAFEE AGENT WIN CLIENT |
| 5.0.6.220 |
| HBSS client supporting the management of all HBSS modules installed on the EUD. |
| MCAFEE VIRUSSCAN ENTERPRISE CLIENT |
| 8.8.0.1982 |
| Provides anti-virus and anti-spyware protection |
| MICRO FOCUS REFLECTION |
| 16.0.308 |
| Terminal emulator supporting access to USMC Mainframe computer applications hosted by DISA. |
| MICROSOFT NETBANNER |
| 2.3.178 |
| Display banner that provides information on the classification level of the EUD. |
| MICROSOFT OFFICE PROFESSIONAL PLUS 2016 |
| 16.0.4266.1001 |
| Office productivity suite (Word processing, Spreadsheet, Database, Presentation, E-mail client) |
| MICROSOFT SILVERLIGHT |
| 5.1.50907.0 |
| Supports the Microsoft SCCM client component |
| MICROSOFT SMIME FOR OWA |
| 14.3.123 |
| Supports viewing of encrypted e-mails when using Outlook Web Access |
| MICROSOFT SYSTEM CENTER CONFIGURATION MANAGER CLIENT |
| 5.00.8540.1007 |
| Supports SCCM management of the EUD. |
| MICROSOFT VISUAL C++ 2005 REDISTRIBUTABLE x86 |
| 8.0.61001 |
| Supports applications developed using Microsoft C++ development tools. |
| MICROSOFT VISUAL C++ 2005 REDISTRIBUTABLE x64 |
| 8.0.56336 |
8.0.61000 Supports applications developed using Microsoft C++ development tools.
PART 7
MCEN CLIENT SOFTWARE BASELINE (CONT)
| MICROSOFT VISUAL C++ 2008 REDISTRIBUTABLE x64 |
| 9.0.30729.17 |
9.0.30729.6161 Supports applications developed using Microsoft C++ development tools.
| MICROSOFT VISUAL C++ 2008 REDISTRIBUTABLE x86 |
| 9.0.30729.17 |
9.0.30729.6161 Supports applications developed using Microsoft C++ development tools.
| MICROSOFT VISUAL C++ 2010 REDISTRIBUTABLE x64 |
| 10.0.40219 |
| Supports applications developed using Microsoft C++ development tools. |
| MICROSOFT VISUAL C++ 2010 REDISTRIBUTABLE x86 |
| 10.0.40219 |
| Supports applications developed using Microsoft C++ development tools. |
| MICROSOFT VISUAL C++ 2012 REDISTRIBUTABLE x64 |
| 11.0.61030 |
| Supports applications developed using Microsoft C++ development tools. |
| MICROSOFT VISUAL C++ 2012 REDISTRIBUTABLE x86 |
| 11.0.61030 |
| Supports applications developed using Microsoft C++ development tools. |
| MICROSOFT VISUAL C++ 2013 REDISTRIBUTABLE x64 |
| 12.0.30501 |
| Supports applications developed using Microsoft C++ development tools. |
| MICROSOFT VISUAL C++ 2013 REDISTRIBUTABLE x86 |
| 12.0.30501 |
| Supports applications developed using Microsoft C++ development tools. |
| MICROSOFT VISUAL C++ 2015 REDISTRIBUTABLE x64 |
| 14.0.24215.1 |
| Supports applications developed using Microsoft C++ development tools. |
| MICROSOFT VISUAL C++ 2015 REDISTRIBUTABLE x86 |
| 14.0.24215.1 |
| Supports applications developed using Microsoft C++ development tools. |
| MICROSOFT WINDOWS 10 ENTERPRISE |
| 1709 |
| Windows 10 Operating System |
| ORACLE JAVA RUNTIME ENVIRONMENT |
| 8.0.172 |
| Supports applications created with Java development tools |
| PULSE SECURE INSTALLER |
| 8.1.59735 |
| Supports installation of VPN client software |
QUESTIONMARK SECURE BROWSER
| 5.8.1.4 |
| Enables the “lockdown” of web browsers (disable copy/paste and screen captures) when taking on-line Distance Learning tests to protect unauthorized distribution of test content. |
| SWIFT CHAT CLIENT |
| 3.0.6.2 |
| DISA supported instant messaging (Chat) client |
PART 8
MCEN APPROVED SOFTWARE LIST
| Application Long Name | |
| Acronym | |
| Version |
| Adobe Acrobat Pro DC - MCIEAST |
| Acrobat Pro |
| 2015 |
| Adobe Acrobat Pro DC - MFP-HQ |
| Acrobat Pro DC - MFP-HQ |
| 2015 |
| ADOBE ACROBAT PRO DC 2015-MARFORRES |
| ACROBAT PRO DC |
| 2015 |
| ADOBE ACROBAT PRO DC 2015-MCWL |
| ACROBAT PRO DC |
| 2015 |
| ADOBE ACROBAT PRO DC 2015-USMC |
| ACROBAT PRO DC |
| 2015 |
| ADOBE ACROBAT READER FILEOPEN CLIENT PLUG-IN |
| ACROBAT READER FILEOPEN CLIENT PLUG-IN |
| 3 |
| Adobe Creative Suite Design Standard CS 6 |
| CL23-Adobe Creative Suite Design Standard CS 6 |
| CS 6 |
| Adobe Dreamweaver |
| Dreamweaver |
| CC 2014 |
| Adobe FrameMaker |
| FrameMaker |
| 2017 (14.0) |
2019 (15.0.2)
| Adobe Illustrator Creative Cloud - MCIEast |
| Illustrator |
| 2015 |
| Adobe Illustrator Creative Cloud - USMC License |
| Illustrator |
| 2017 (21.1) |
| ADOBE PHOTOSHOP CC - MCIEAST |
| PHOTOSHOP |
| 2015 |
19.1 19.1.5 19.1.6 19.1.7 19.1.8
| ADOBE PHOTOSHOP CC - NAMED LICENSE |
| PHOTOSHOP |
| 19.1.6 |
19.1.7 19.1.8
| ADOBE PHOTOSHOP CC - USMC |
| PHOTOSHOP |
| 16.1.2 |
19.1 19.1.5 19.1.6 19.1.7 19.1.8
| Adobe Premier Pro Creative Cloud - No License |
| Premier Pro |
| CC 2014 |
| AN/ARC-210 FILL PROGRAM |
| AFP (ARC210) |
| 7 |
| Anaconda |
| Anaconda |
| 5.3.0 |
ANYLOGIC
7.2.0
| Appligent Redax |
| Redax |
| 5 |
5.6 5.8
| ArcGIS Earth |
| ArcGIS Earth |
| 1.6 |
| ARMED FORCES CORRESPONDENCE APPLICATION |
| AFCA MAY 2015 |
| 1.2.2 |
1.2.2 MAY 2015
| AT&T All Access |
| AT&T All Acess |
| 10.1.305.2 |
AUTOCAD 2016-NETWORK LICENSE
AUTOCAD 2018-NETWORK LICENSE
| AUTODESK AUTOCAD - STANDALONE |
| AUTOCAD |
| 2012 |
| Autodesk DWG True View |
| TrueView |
| 2019 |
| Automated Cost Estimating Integrated Tools |
| ACEIT |
| 7.5 |
| AUTOMATED COST ESTIMATING INTEGRATED TOOLS |
| ACEIT |
| 7.4B |
| Automated Manifest System - Tactical |
| AMS-TAC |
| 3.1.3.1 |
4.0 4.0.0.1 4.0.1.0 4.0.1.1
4.0.1.1 Build 5-22-2018
| AUTOMATED TOOLS INVENTORY CONTROL & TRACKING SYSTEM |
| ATICTS |
| 6.5 |
| AUTOMATED WEIGHT & BALANCE SYSTEM (AWBS) |
| AWBS |
| 10.0.4135 |
| AV8 PERFORMANCE HOVER |
| AV8BPH |
| 2.1.0.9 |
| AVIATION STORE KEEPER INFORMATION TRACKING SYSTEM |
| ASKIT |
| 7.1.1 |
| BIZFLOW WORK ITEM HANDLER |
| BIZFLOW WORK ITEM HANDLER |
| 8.7.12 |
| BLACKBERRY 10 DESKTOP SOFTWARE |
| BLACKBERRY 10 DESKTOP SOFTWARE |
| 1.2 |
| Budget Builder |
| Budget Builder |
| 11 |
| CA SOFTWARE CHANGE MANAGER |
| CASCM |
| 12.5 |
| Cameo Enterprise Architecture |
| CEA |
| 19 |
CMOSWeb
7.6 7.8
7.8 with Zebra Printer
| COMMON MISSION DATA LOADER |
| CMDL |
| 3.06.0058 |
| COMPUTER EMERGENCY NOTIFICATION SYSTEM |
| CENS |
| 1 |
| Computerized Accounts Payable System - Windows |
| CAPS-W |
| 18.3 |
19.2.3.1
| CREO View |
| CREO View |
| 3 |
4.1
| DataLoad Professional |
| DataLoad |
| 5.4.1 |
| DEFENSE MEDICAL LOGISTICS STANDARD SUPPORT |
| DMLSS |
| 3.1.3.0 |
3.3.0.287 3.1.3.0.290 3.1.3.0.296
| DEPLOYABLE DISBURSING SYSTEM |
| DDS |
| 7 |
| DL WILLS |
| DL WILLS |
| 10 |
| DLI. TOOLS DLI. UPLOADER PRO |
| DLI. UPLOADER PRO |
| 1.5.0 |
| Dragon Naturally Speaking |
| Dragon |
| 15 |
| DRUG TESTING PROGRAM |
| DTP |
| 5.2.4 |
5.4
| DYMO LABELWRITER |
| LABELWRITER |
| 8.5.1 |
8.7.3
| ELECTRONIC MAINTENANCE SYSTEM NEXT GENERATION VIEWER |
| EMS-NG Viewer |
| 2.11.1 |
| Endicia Professional |
| Endicia |
| 6.29 |
| EPUK TO NTCSS TRANSACTION ACCUMULATOR |
| ENTA |
| 152-01.00.11 |
152-01.00.12
| EQUIPMENT LOCATION-CERTIFICATION INFORMATION DATABASE APPLICATION |
| EL-CID |
| 6.1 |
| Erwin Data Modeler |
| Erwin |
| 2018 R1 (9.8) |
| Expeditionary Airfield Design and Analysis Tool |
| EDAT |
| 1.0.0 |
| F5 FIREPASS CONTROLLER |
| F5 FIREPASS CONTROLLER |
| CONTROLLER VERSION 6.X |
| Finale |
| Finale |
| 26 |
| FINALE |
| FINALE |
| 25 |
25.4
| FLUKEVIEW POWER QUALITY ANALYZER SOFTWARE |
| FLUKEVIEW POWER QUALITY ANALYZER SOFTWARE |
| 2 |
| Forescout CounterACT |
| Forescout |
| 7 |
| FORTICLIENT SSL VPN |
| N/A |
| 4.0.2073 |
| FTR PLAYER |
| FTR Player |
| 5.7 |
| Fuels Management Defense |
| FM |
| 8.0.4 |
8.0.4 Update 5
| Full Monte |
| Full Monte |
| 2.1 |
| Full Monte |
| Full Monte |
| 3.1 |
3.2
| Fusion |
| Fusion |
| 2019 |
| GEOPHYSICS FLEET MISSION PROGRAM LIBRARY |
| GFMPL |
| 2.8.1U |
| Google Chrome |
| Google Chrome |
| 66.0 |
67.0 71.0 74.0 75.0
| GrabCAD Print |
| GrabCAD Print |
| 1.2 |
| HAZARDOUS MATERIAL MANAGEMENT SYSTEM |
| HMMS |
| 4 |
| HOTDOCS PLAYER |
| HOTDOCS |
| 10.1.0 |
| HURREVAC |
| HURREVAC |
| 2016 |
1.6.2.1 1.7.2 1.8.1
| IBM Notes |
| IBM Notes |
| 8.5.3 |
8.5.3 FP6
9.0.1
IBM Planning Analytics
| IGRAFX Viewer |
| IGRAFX Viewer |
| 2013 |
IMAGING FOR WINDOWS, PROFESSIONAL EDITION
2.6
| IMPROVED PERFORMANCE RESEARCH INTEGRATION TOOL - PROFESSIONAL |
| IMPRINT PRO |
| 4.1.194.0 |
4.1.283.0 4.5.99.0
| INFOPATH DIGITAL SIGNATURE |
| N/A |
| 14.0.x |
| INTEGRATED BARCODE SYSTEM |
| IBS ONE |
| 105.02.03.10 |
105-02.03.20 105-02.03.25
| INTEGRATED COMPUTERIZED DEPLOYMENT SYSTEM |
| ICODES |
| 6.0.2 |
7.0.1 7.1.0
| Interactive Authoring and Display System |
| IADS |
| 4.0.3.25 |
| JAWS |
| JAWS |
| 12 |
| JEDMICS ACTIVEX CONTROL PLUG-IN |
| JEDMICS PLUG-IN |
| 3.12 |
| LEADING ENVIRONMENTAL ANALYSIS AND DISPLAY SYSTEM - LIGHT |
| LEADS LIGHT |
| 4.4.2.002 |
| LIVE SCAN MANAGEMENT SYSTEM |
| LSMS |
| 8.4.4 |
| LT VIEWER 32 |
| LTV32 |
| 1.7.0.0 |
| MAGTF (MARINE AIR GROUND TASK FORCE) DEPLOYMENT SUPPORT SYSTEM II |
| MDSS II |
| 7.4.1 |
7.4.1.22
MDSS II Removal Script
1.1
| METPRO |
| METPRO-SYSTEM LEVEL |
| 2.3 |
2.3.1
| Micro Focus Reflection |
| Reflection |
| 16.0.308 |
16.1.362
| MICROSOFT OFFICE 2013 (X64) |
| OFFICE 2013 (X64) |
| 2013 |
Microsoft Office Access Database Engine 2007
| Microsoft Power BI Desktop |
| Power BI |
| 2.xx |
| MICROSOFT PROJECT PROFESSIONAL 2013 |
| PROJECT PRO |
| 2013 |
| MICROSOFT PROJECT PROFESSIONAL 2013 SP1 X64 |
| PROJECT PRO X64 |
| 2013 SP1 |
| MICROSOFT PROJECT STANDARD 2013 |
| PROJECT STD |
| 2013 |
| MICROSOFT PROJECT STANDARD 2013 SP1 X64 |
| PROJECT STD X64 |
| 2013 SP1 |
| MICROSOFT SHAREPOINT DESIGNER 2013 |
| SHAREPOINT DESIGNER |
| 2013 - 32 BIT |
| MICROSOFT SHAREPOINT DESIGNER 2013 SP1 X64 |
| SPD X64 |
| 2013 SP1 |
| Microsoft SQL Server Management Studio |
| SSMS |
| 13 |
| MICROSOFT VISIO PROFESSIONAL |
| VISIO PRO |
| 2013 |
| MICROSOFT VISIO STANDARD |
| VISIO STD |
| 2013 |
| MICROSOFT WINDOWS MOBILE DEVICE CENTER |
| WINDOWS MOBILE DEVICE CENTER |
| 6.1.6965 |
| MINITAB |
| MINITAB |
| 16 |
| MobiKEY |
| MobiKEY |
| 5.2.133 |
5.2.248 5.6.84
| Mozilla Firefox Extended Support Release |
| Firefox |
| 52.1.0 ESR |
52.5.0 ESR
52.7.1 ESR
60.0.2 ESR
60.1.0 ESR
60.2.2 ESR
60.4.0 ESR
60.5.2 ESR
60.6.0 ESR
60.6.1 ESR
60.8.0
| NALCOMIS OPTIMIZED OMA (OOMA) WORKSTATION |
| NTCSS-NALCOMIS OOMA WORKSTATION |
| 825-03.05.00 |
| NALCOMIS OPTIMIZED OMA (OOMA) WORKSTATION |
| NTCSS-NALCOMIS OOMA WORKSTATION |
| 825-03.05.10 |
| NALCOMIS OPTIMIZED OMA (OOMA) WORKSTATION |
| OOMA WORKSTATION |
| 825-03.05.22 |
| NALCOMIS OPTIMIZED OMA (OOMA) WORKSTATION |
| OOMA WORKSTATION |
| 825-03.05.22.01 Update 3 |
| NAVAL TACTICAL COMMAND SUPPORT SYSTEM II DESKTOP |
| NTCSS-II DESKTOP |
| 803-02.05.00 |
| NAVFIT98A |
| NAVFIT98A |
| 2.2.0.30 |
| NTCSS 3.40 NALCOMIS OPTIMIZED INTERMEDIATE MAINTENANCE ACTIVITY |
| NTCSS-NALCOMIS OIMA |
| 815-01.10.00 |
| NTCSS 3.40 NTCSS-II DESKTOP |
| NTCSS-II DESKTOP |
| 803-02.06.00 |
| NTCSS 3.40 RELATIONAL SUPPLY I |
| NTCSS-RSUPPLY I |
| 822-01.08.00 |
| NTCSS NALCOMIS OPTIMIZED INTERMEDIATE MAINTENANCE ACTIVITY |
| NTCSS-NALCOMIS OIMA |
| 815-01.09.00 |
| NTCSS ORGANIZATIONAL MAINTENANCE MANAGEMENT SYSTEM NEXT GENERATION |
| NTCSS-OMMS NG |
| 805-02.06.00 |
| NTCSS RELATIONAL ADMINISTRATIVE DATA MANAGEMENT |
| NTCSS-RADM |
| 810-02.07.00 |
| NTCSS RELATIONAL SUPPLY I |
| NTCSS-RSUPPLY I |
| 822-01.07.00 |
| ONEPAGER PRO |
| ONEPAGER PRO |
| 5.3.10 |
6.0.10 6.1.5
| ORACLE 11G CLIENT |
| ORACLE 11G CLIENT |
| 11.2.0.1.0 |
| Oracle Crystal Ball |
| Oracle Crystal Ball |
| 11.1.2.4 |
| ORACLE FORMS AND REPORTS 6I RELEASE 2 FOR MICROSOFT WINDOWS 95/98/NT/2000/XP |
| ORACLE FORMS AND REPORTS |
| 6.0.8.25.2 Patch 16 |
| ORDNANCE INFORMATION SYSTEM |
| OIS-SYSTEM LEVEL |
| 1 |
| PMS VIEWER |
| PMS VIEWER |
| 2 |
| PORTABLE FLIGHT PLANNING SYSTEM |
| PFPS |
| 4.2.1.1039 SP1 |
4.2.2 SP2
| PowerBuilder |
| PowerBuilder |
| 2017 |
| PROGRAM MANAGERS WORKSTATION |
| PMWS |
| N-7.0A |
| PUBLICATIONS LIBRARY MANAGEMENT SYSTEM |
| PLMS |
| 3 |
| R for Statistical Computing |
| R |
| 3.4.1 |
3.5.2 3.6.0
| REMOTE SERVER ADMINISTRATION TOOLS FOR WINDOWS 10 |
| RSAT |
| 1.2 |
| Riverbed SteelHead Mobile Client |
| Steelhead Mobile |
| 4 |
4.8.2
| R-Studio |
| R-Studio |
| 0.99 |
1.1.463 1.2.1335
| SAP CRYSTAL REPORTS, VERSION FOR VISUAL STUDIO .NET 2010 RUNTIME |
| CRYSAL REPORTS FOR VS.NET 2010 RUNTINE |
| 13.0.2.469 |
| SEIKO SMART LABEL |
| SMART LABEL |
| 7.0.3 |
| SharePoint Color Palette Tool |
| SharePoint Color Palette Tool |
| 1 |
| Siemens Apogee Insight |
| Insight |
| 3.15 |
| SKED |
| PMS-SKED |
| 3.1 |
3.2.5 3.2.6
| SMART TECHNOLOGIES SMART MEETING PRO |
| SMART MEETING PRO |
| 4 |
| SMART TECHNOLOGIES SMARTBOARD |
| SMARTBOARD |
| 10.7 |
| SOLAR/LUNAR ALMANAC PREDICTION |
| SLAP |
| 1.5 |
| Stamps.com |
| Stamps.com |
| 14 |
| Stamps.com |
| Stamps |
| 16 |
| Standard Contract Reconciliation Tool |
| SCRT |
| 8.01 |
| STANDARD PROCUREMENT SYSTEM |
| SPS PD2 |
| 4.2.2 SR15 |
4.2.2 SR15a
4.2.2 SR16
4.2.2 SR17a
4.2.2 SR17a (plus patch)
| Stata |
| Stata |
| 13 |
| Success Estimator |
| Success |
| 8.1 |
9.1
| SYBASE OPEN CLIENT |
| OPEN CLIENT |
| 15.0.01 |
| SYBASE SDK FOR SAP ASE |
| SYBASE SDK FOR SAP ASE |
| 16 |
| T-58 VIB REVIEW |
| T-58 VIB REVIEW |
| 3.02 |
| TABLEAU DESKTOP |
| TABLEAU DESKTOP |
| 9.1 |
| Tableau Desktop |
| Tableau Desktop |
| 10.3 |
| Tableau Desktop |
| Tableau |
| 2018.3 |
| Tableau Reader |
| Tableau Reader |
| 10.3 |
| TANKER, AIRLIFT, AND SPECIAL MISSION |
| TASM |
| 5.0.00 |
| TARGET ACQUISITION WEAPONS SOFTWARE |
| TAWS |
| 7.1.1 |
| TECHSOFT PIXEDIT |
| PIXEDIT |
| 7.10.5 |
| TROUX ARCHITECT |
| ARCHITECT |
| 9.2 |
| TurningPoint |
| TurningPoint |
| 5.3 |
8.5
| VIDYO VTC SOFTWARE |
| VIDYO |
| 3.5.6 |
| VISIONEER ONETOUCH |
| ONETOUCH |
| 4.6 |
| VSPHERE CLIENT |
| VSPHERE CLIENT |
| 5.1 |
Webcard Smart Card Browser Plugin
0.6.14
| Windows Integrated Automated Travel System |
| WINIATS |
| 6.19 |
6.20 6.21.4 7.1.1
WINSCP
5.7.4
| ZOOMTEXT 2018 |
| ZOOMTEXT |
| 10 |
Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
| CLIN |
| INSPECT AT |
| INSPECT BY |
| ACCEPT AT |
| ACCEPT BY |
| 0001 |
| N/A |
| N/A |
| N/A |
| N/A |
| 0001AA |
| Destination |
| Government |
| Destination |
| Government |
| 0001AB |
| Destination |
| Government |
| Destination |
| Government |
| 1001 |
| N/A |
| N/A |
| N/A |
| N/A |
| 1001AA |
| Destination |
| Government |
| Destination |
| Government |
| 1001AB |
| Destination |
| Government |
| Destination |
| Government |
| 2001 |
| N/A |
| N/A |
| N/A |
| N/A |
| 2001AA |
| Destination |
| Government |
| Destination |
| Government |
| 2001AB |
| Destination |
| Government |
| Destination |
| Government |
| 3001 |
| N/A |
| N/A |
| N/A |
| N/A |
| 3001AA |
| Destination |
| Government |
| Destination |
| Government |
| 3001AB |
| Destination |
| Government |
| Destination |
| Government |
Section F - Deliveries or Performance
DELIVERY INFORMATION
| CLIN |
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
| 0001 |
| N/A |
| N/A |
| N/A |
| N/A |
| 0001AA |
| POP 01-NOV-2019 TO |
31-OCT-2020
| N/A |
| SUPPORT BATTALION |
CAPT OBRIEN, ZIARE
BLDG. 599
PARRIS ISLAND SC 29902
843-476-8650
M32001
| 0001AB |
| POP 01-NOV-2019 TO |
31-OCT-2020
| N/A |
| (SAME AS PREVIOUS LOCATION) |
M32001
| 1001 |
| N/A |
| N/A |
| N/A |
| N/A |
| 1001AA |
| POP 01-NOV-2020 TO |
31-OCT-2021
| N/A |
| SUPPORT BATTALION |
CAPT OBRIEN, ZIARE
BLDG. 599
PARRIS ISLAND SC 29902
843-476-8650
M32001
| 1001AB |
| POP 01-NOV-2020 TO |
31-OCT-2021
| N/A |
| (SAME AS PREVIOUS LOCATION) |
M32001
| 2001 |
| N/A |
| N/A |
| N/A |
| N/A |
| 2001AA |
| POP 01-NOV-2021 TO |
31-OCT-2022
| N/A |
| SUPPORT BATTALION |
CAPT OBRIEN, ZIARE
BLDG. 599
PARRIS ISLAND SC 29902
843-476-8650
M32001
| 2001AB |
| POP 01-NOV-2021 TO |
31-OCT-2022
| N/A |
| (SAME AS PREVIOUS LOCATION) |
M32001
| 3001 |
| N/A |
| N/A |
| N/A |
| N/A |
| 3001AA |
| N/A |
| N/A |
| N/A |
| N/A |
| 3001AB |
| N/A |
| N/A |
| N/A |
| N/A |
Section G - Contract Administration Data
BASE CONTRACTOR ACCESS
CONTRACTOR ACCESS TO MCRD PARRIS ISLAND, SOUTH CAROLINA
1. INTRODUCTION
The Commanding General (CG), MCRD/ERR PI grants the privilege to gain access to the Depot, conditionally, to those individuals or organizations that meet the minimum qualifications and conform to regulations. CG, MCRD/ERR PI retains the responsibility to suspend or revoke access privileges if necessitated by and action deemed contrary to maintaining good order and discipline aboard this installation. In order to gain access to Marine Corps Recruit Depot, Parris Island (MCRDPI), SC, non-Federal Government and non-DoD issued ID cardholders require identity proofing and vetting to determine fitness and eligibility for access.
All contractor personnel, to include delivery personnel, who perform work on Marine Corps Recruit Depot Parris Island, SC (MCRDPI) for the cited contract must adhere to the Defense Biometric Identification System (DBIDS) process to gain access MCRDPI provided in paragraphs B and C. Individuals operating a vehicle aboard our military installations are required to have a valid, U.S. Driver’s License, registration, and insurance. If an individual has a foreign driver’s license, said individual must also provide a valid Passport. The contractor shall understand and comply with Depot Order 5512.12A Access Control Regulations.
Marine Corps Installations across the region are transitioning to a new government-owned access control system called Defense Biometric Identification System (DBIDS). This new and enhanced system replaces RAPIDGate and MCESS for contractors and other non-DoD-affiliated personnel requiring installation access. DBIDS is already installed at more than 320 sites with over 5 million registered personnel and unlike previous systems, this one is a free service.
In order to reduce wait time when exchanging your RAPIDGate/MCESS credential, it is highly recommended each applicant pre-register at https://dbids-global.dmdc.mil/enroll#!/.
1. DBIDS ACCESS
DBIDS credentials is now being issued as of October 1, 2018. If you currently hold a valid Common Access Card (CAC), dependent ID card, reserve ID card, or retiree ID card, issued by the Defense Enrollment Eligibility Reporting System (DEERS), no further action is required.
You will be automatically enrolled in DBIDS when your ID card is initially scanned at the gate. Expect a one-time delay of 3-6 seconds as the DBIDS system initially registers your information.
CURRENT CONTRACTORS
· DBIDS credentials will be valid for the duration of your contract, not to exceed five years; however, re-vetting of individuals’ information will occur each year.
· RAPIDGate/MCESS credentials are still being accepted at Parris Island Depot. An exact termination of RAPIDGate is 31 December 2018.
NEW CONTRACTORS
The contractor shall submit a written request on company letterhead to the Contracting Office listing the following: contract number, location of work site, start and stop dates, and names of employees and subcontractor employees needing access to the base. The format for the letter will be provided by the Contracting Office. In addition to the aforementioned letter, the contractor must also submit a contractor information sheet on each employee. A template for the letter and contractor informational sheet template will be provided upon contract award. The Contracting Office will endorse the request and forward to the Depot Security Manager Office for processing. This information must be provided to the assigned Contract Specialist and/or Contracting Officer for the contract at least two (2) weeks prior to start of the contracts period of performance.
Contractors must do the following in order to obtain a base access card:
· Submit Contractor Application Form and cover sheet to the Contracting Office
· The Contracting Office will send the form to G3 Security
· Once cleared (weekly list sent out), pre-register at DBIDS
· Google DBIDS (1st link)
· https://dbids-global.dmdc.mil/enroll#!/
· Take QR code to PMO for badge
· If cleared with the Air Station, an application still needs to be submitted to Security at Parris Island but we will reciprocate off of their cleared/not cleared for base access.
· New contractors requiring access for over 60 days will receive a credential valid for up to one year.
· New contractors requiring access for less than 60 days will receive a temporary paper pass.
Pending means that there were issues that our office needs to review to determine if the individual will or will not be denied base access.
If you have questions regarding the exchange of a current RAPIDGate/MCESS credential for DBIDS or you are a new contractor seeking enrollment into DBIDS, please contact the Security Office at 843-228-4174.
1. Contractor’s Responsibility A criminal background check conducted by the MCRDPI Security Manager’s Office shall be required for all contractor personnel who make frequent visits to or perform work on the MCRDPI cited in the Contract, prior to the start date of the contract. Contractors are required to review any proposed employee prior to submitting their names for the background check. Depot access will be denied if it is determined that the personnel requesting access are within one of the following categories:
1. On the National Terrorist Watch List.
1. Illegally present in the United States.
1. The subject to any outstanding warrant or criminal summons.
1. Has knowingly submitted an employment questionnaire with false or fraudulent information.
1. Has been issued a debarment order and is currently banned from any military installation.
1. A prisoner on work-release program or currently on felony probation/parole.
1. A registered sex offender.
1. Membership within the previous 10 years in any organization that advocated the overthrow of the U.S. Government or affiliated with any active gang.
1. Is pending any felony charges.
1. Has been convicted of a felony within the last ten (10) years.
1. Has multiple (three or more) misdemeanor criminal offenses to include, but not limited to:
10. Drug Offenses
10. Offenses of violence
10. Weapons offenses including those where the weapon was used as either the means of the violence or threat of violence
10. Larceny/theft
1. Any reason the Installation Commander deems reasonable for good order and discipline.
No physical badge will be issued. If a contractor’s proposed employees requiring access meet the required criminal background check, upon entry, each contractor employee must present a valid form of identification (Driver’s License). At the front gate, the Provost Marshall’s Office will screen each contractor employee against MCRDPI Security Manager’s Office listing of approved contractor employees. The operator of the motor vehicle must also provide valid registration and current insurance.
1. ADDITIONAL BASE ACCESS GUIDANCE
1. All vehicles are subject to search
1. No Illegal Drugs
1. Firearms are prohibited
1. Fireworks are prohibited
1. Strictly obey speed limits
1. No Cell Phone use while driving
1. DO NOT enter any training, unauthorized, or restricted areas.
1. Military Police Contact Information
0. Emergency Dial – 911
0. Non-Emergency Dial – 843.228.3444
Contractor’s Letterhead Here (Date)
From: (Position, Company Name, Phone, Email, and Address) To: Assistant Chief of Staff, Operations and Training (G-3) Via: (Requesting Commercial/Contract…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.