Lot 3 pricing template.xlsx
XLSX spreadsheet 252 KB Posted
- Attached to
- CABLE AND WIRE RFQ State and local contract opportunity
- Solicitation number
- 5400021122
- Issued by
- South Carolina
About this file
This is a pricing template for Lot 3 Engineering Services associated with a Cable and Wire RFQ issued by the State of South Carolina. The template outlines fifteen bid line items covering design and engineering services, project management, inspection and supervision, drafting, blueprint review, DOT mark-ups and permit coordination, general labor, skilled technician labor, circuit testing services, and wireless project management and outside plant services. The services are categorized by labor type, with specific designations for normal business hours versus after-hours and weekend work. Two line items (items 11 and 12) reference specialized circuit testing using Digital and Analog T-Berd field service testers, each with a suggested make and model designation of 950.
Bidders are required to submit unit pricing for each of the fifteen line items in the template, establishing hourly rates or per-unit costs for the various engineering and labor categories. The pricing structure accommodates differentiated rates for services performed during normal business hours and those performed after 5 p.m. and on weekends, reflecting the operational demands of cable and wire infrastructure projects. No specific quantities, contract term, renewal options, set-asides, or funding information is provided in this pricing template document.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| Lot 1 pricing template.xlsm | XLSM spreadsheet | |
| Lot 2 pricing template.xls | XLS spreadsheet | |
| RFQ v2.docx | DOCX document | |
| Amendment 1 Q&A.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Lot 3 Engineering Services | ||||||
| Bid | Item | Make of | Model of | Average Total | ||
| unit | category | Unit Description | Equipment | Equipment | Price | |
| 1 | hr | Des/Eng | Project Engineering - Fiber, Copper and conduit | Normal business hrs. | ||
| 2 | hr | Des/Eng | Project Management - Inspection & Supervision | Normal business hrs. | ||
| 3 | hr | Des/Eng | Project Management - Inspection & Supervision | After Hours/Weekends | ||
| 4 | hr | Des/Eng | Drafting - Autocad, etc. or hand drawings where appropriate | Normal business hrs. | ||
| 5 | hr | Des/Eng | Review Blueprints to assure all standards and codes are met. Submit written evaluation of findings and recommendations. | Normal business hrs. | ||
| 6 | hr | Des/Eng | DOT Mark-ups and Permit Coordination | Normal business hrs. | ||
| 7 | hr | General Labor | General labor 8-5 (move equipment, set out sets, deliveries, etc.) | Normal Business Hours | ||
| 8 | hr | General Labor | Adjusted general labor rate after 5 and weekends | After Hours/Weekends | ||
| 9 | hr | Skilled Labor | Technician Labor (cross connects, install sets, under direction of DSIT) | Normal Business Hours | ||
| 10 | hr | Skilled Labor | Technician Labor (cross connects, install sets, under direction of DSIT) | After Hours/Weekends | ||
| 11 | hr | Testing | Special Circuit testing - Digital | T-Berd field service tester 950 suggested | ||
| 12 | hr | Testing | Special Circuit testing - Analog | T-Berd field service tester 950 suggested | ||
| 13 | hr | Project Eng. | Wireless | |||
| 14 | hr | Project Management | Wireless | |||
| 15 | hr | Project Management | Outside Plant |
File details come from the government source that posted it. Updated .