Sol_L15PS00369.pdf
PDF 398 KB Posted
- Attached to
- 2015 Pecos Water System Supplies Federal contract opportunity
- Solicitation number
- L15PS00369
About this file
L15PS00369
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_L15PS00369_Amd_000001.pdf | ||
| Attachment_1_-_Delivery_Locations-Sites.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUMIS CHECKED
CODE 18a. PAYMENT WILL BE MADE BY
CODE
FACILITYCODE
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER
OFFEROR
LXL
LAS CRUCES NM 88005
1800 MARQUESS STREET
BLM NM-LAS CRUCES DIST OFC(NML00)
0004276456 CODE 16. ADMINISTERED BYCODE
X
X
X
221310
SIZE STANDARD:
100.00 % FOR:SET ASIDE:UNRESTRICTED ORLXL
RFPIFB
10. THIS ACQUISITION ISCODE
RFQ
14. METHOD OF SOLICITATION
13b. RATING
NAICS:
SMALL BUSINESS
05/18/2015 1700 ET
04/27/2015
(575) 525-4400John Mclaughlin (No collect calls)
INFORMATION CALL:
FOR SOLICITATION 8. OFFER DUE DATE/LOCAL TIMEb. TELEPHONE NUMBER a. NAME
4. ORDER NUMBER3. AWARD/ 6. SOLICITATION
L15PS00369
5. SOLICITATION NUMBER
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS 1. REQUISITION NUMBER PAGE OF
1 44 0040208805OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
TELEPHONE NO.
17a. CONTRACTOR/
ROSWELL NM 88201-2019
2909 WEST 2ND STREET
BLM-NM ROSWELL FIELD OFFICE
15. DELIVER TO
LAS CRUCES NM 88005
1800 MARQUESS STREET
9. ISSUED BY
7.
2. CONTRACT NO.
EFFECTIVE DATE
$27.5
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW
ISSUE DATE
DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
11.
SEE SCHEDULE
12. DISCOUNT TERMS
THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
13a.
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
8(A)
BLM NM-LAS CRUCES DIST OFC(NML00)
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
24.
AMOUNT
23.
UNIT PRICE
22.
UNIT
21.
QUANTITY
20.
SCHEDULE OF SUPPLIES/SERVICES
19.
ITEM NO.
This requirement is to order and deliver various water system supplies in accordance with all terms and conditions of this solicitation. This requirement is being solicited as a combined synopsis and solicitation in accordance with FAR Subpart 12.6 - Steamlined Procedures for Evaluation and Solicitation for Commercial Items.
Suggested COR: RFOX Delivery: 08/31/2015 Period of Performance: 05/29/2015 to 08/31/2015 Continued ...
(Use Reverse and/or Attach Additional Sheets as Necessary)
HEREIN, IS ACCEPTED AS TO ITEMS:
X
DATED
John Mclaughlin
. YOUR OFFER ON SOLICITATION (BLOCK 5),
INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER
ARE
ARE
31c. DATE SIGNED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or print)
ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL
SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA
26. TOTAL AWARD AMOUNT (For Govt. Use Only)
OFFER
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA - FAR (48 CFR) 53.212
ARE NOT ATTACHED.
ARE NOT ATTACHED.
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
30b. NAME AND TITLE OF SIGNER (Type or print)
30a. SIGNATURE OF OFFEROR/CONTRACTOR
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
25. ACCOUNTING AND APPROPRIATION DATA
29. AWARD OF CONTRACT:
REF.
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32c. DATE 32b. SIGNATURE OF AUTHORIZED GOVERNMENT REPRESENTATIVE
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
40. PAID BY39. S/R VOUCHER NUMBER38. S/R ACCOUNT NUMBER
37. CHECK NUMBER
FINALPARTIAL
36. PAYMENT
FINALPARTIAL
35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER33. SHIP NUMBER
COMPLETE
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
42d. TOTAL CONTAINERS42c. DATE REC'D (YY/MM/DD)
42b. RECEIVED AT (Location)
42a. RECEIVED BY (Print)
41c. DATE41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
STANDARD FORM 1449 (REV. 2/2012) BACK
24.
AMOUNT
23.
UNIT PRICE
22.
UNIT
21.
QUANTITY
20.
SCHEDULE OF SUPPLIES/SERVICES
19.
ITEM NO.
00010 Ordering of various water system supplies and delivery per Section's B, C, E, F below and
Attachment 1.
32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT REPRESENTATIVE
44 2 of
SOLICITATION
Document No.
L15PS00369
Document Title
2015 Pecos Water System Supply Page 3 of 44
SECTION A - Solicitation/Contract Form
CONTRACT INFORMATION:
This is a Firm-Fixed Priced total small business set-aside acquisition for water system supplies described in Section C below and to be delivered to various locations in Southeastern New Mexico (See Attachment 1 – Delivery Locations - Sites).
The following addresses and points of contact are provided for your information:
Contracting Officer:
Name: John P. McLaughlin Phone: (575) 525-4400
FAX: (575) 525-4412
Email address: jpmclaughlin@blm.gov
Contracting Officer Representative (COR):
Name: To be Filled in at Contract Award Phone: (575)
FAX: (575)
Email address:
SECTION B - Supplies or Services/Prices
Bid Schedule:
Line Item Description Quantity Units Price Per Unit Total of Line 1 DR-9 250 psi 1.25" PE pipe (2,000' rolls) 101100 Foot _______________ ________________ 2 DR-9 250 psi 2.00" PE pipe (100' rolls) 100 Foot _______________ ________________ 3 Valve Box, 24" length by 24" diameter riser and septic lid 1 Each _______________ ________________ 4 8' rubber tire trough, 22.5" max height ~500 gallons 16 Each _______________ ________________ 5 1,500 gallon PE storage (desert tan, or light brown in color) 2 Each _______________ ________________ 6 3,000 gallon PE storage (desert tan, or light brown in color) 5 Each _______________ ________________ 7 5,000 gallon PE storage (green in color) 1 Each _______________ ________________ 8 10,000 gallon PE storage (black in color) 5 Each _______________ ________________ 9 Sackcrete 840 Each _______________ ________________ 10 Steel troughs 2'x4'x12' 18 Each _______________ ________________ 11 Solar Pump Grundfos 6SQF3 1 Each _______________ ________________ 12 Solar Panel 250 watt 4 Each _______________ ________________ 13 4 panel pole mount 1 Each _______________ ________________ 14 control wire kit 1 Each _______________ ________________ 15 101-115V Interface 1 Each _______________ ________________ 16 8/3 Flat Double Jacket PVC pump wire, with drop cable 575 Feet _______________ ________________ 17 1.25" PVC pipe schedule 80, 20' lengths 550 Feet _______________ ________________ 18 1.25" stainless steel drop pipe couplers 27 Each _______________ ________________
Total all or none ______________
L15PS00369
Document Title
2015 Pecos Water System Supply Page 4 of 44
SECTION C - Description/Specifications
1. GENERAL
The Bureau of Land Management has a requirement for water supply materials to be delivered to the Carlsbad Field Office, Roswell Field office, and various sites in southeastern New Mexico as described in the delivery schedule of this contract - Deliveries or Performance and Attachment 1 – Delivery Locations - Sites. The water system materials shall meet, at a minimum, the following requirements.
2. MATERIALS
Bid Items 1, and 2: Polyethylene (PE) Pipe and Fittings: Polyethylene pipe shall carry the seal of approval of the National Sanitation Foundation NSF-PW. Nominal diameters of pipe are outside dimensions for DR rated pipe. All pipe shall be protected against damage by freezing, heat, sunlight, and traffic until delivered and accepted. Polyethylene pipe shall be type PE 4710 and meet ASTM D 3035 (Specifications for PE Plastic Pipe (DR PR) based on controlled outside diameter) and D3261 (Butt Heat fusion for PE Plastic Pipe) for DR rated pipe. Pressure rating for DR ratio of pipe shall be as shown on the Bid Schedule. Each roll of pipe shall be marked along its entire length with a tag that states the diameter, pressure rating, and DR ratio.
PE pipe shall be of the size and quantity shown in the Bid Schedule. All pipe ends shall be capped to exclude contaminate entry.
Bid Item 3: Valve Boxes, 24” height by 24” diameter HDPE corrugated pipe septic tank riser with ring and lid assembly. Must have weight bearing capacity of at least 200 pounds.
The following generally recognized testing methods for plastic materials shall apply:
2.1.1 ASTM D 1248 – Standard Specification for Polyethylene Plastics Extrusion Materials for Wire and Cable;
2.1.2 ASTM D 1693 – Standard Test Method for Environmental Stress-Cracking of Ethylene Plastics;
2.1.3 ASTM D638 - Standard Test Method for Tensile Properties of Plastics;
2.1.4 CSA International - B66-00 Prefabricated Septic Tanks and Sewage Holding Tanks;
2.1.5 International Association of Plumbing and Mechanical Officials – IAPMO PS 1-98 Material and Property Standard for Prefabricated Septic Tanks.
2.1.6 ASTM D790 - Test Methods for Flexural Properties of Unreinforced and Reinforced Plastics and Electrical Insulating Materials
Bid Item 4: 8' rubber tire trough, 22.5" max height ~500 gallon. A single 65/45-45 L-5 Loader- Dozer tire cut through the center of the 45” tread will make two of these rubber tire drinkers.
The sidewall must have a 2” hole centered through it. Tires must be capable of holding water and all holes shall be patched in a method acceptable for 10 years of use without tire water holding failure upon delivery.
Bid Item 5, 6, 7, and 8: The UV resistant 3,000 gallon PE storage must be tan in color, low profile, one piece, dimensions: 8' diameter, not to exceed 8' in height. The UV resistant 5,000 gallon PE storage must be green in color, low profile, one piece, dimensions: 8' diameter, not to exceed 8' in height. The UV resistant 10,000 gallon PE storage must be black or tan in color, low profile, one piece, dimensions: 12' diameter, not to exceed 14' in height.
Storages shall conform to ASTM D1998-06.
L15PS00369
Document Title
2015 Pecos Water System Supply Page 5 of 44
Abstract: This specification covers flat-bottom, upright, cylindrical tanks molded in one-piece seamless construction by rotational molding. The tanks are molded from polyethylene for above ground, vertical installation and are capable of containing aggressive chemicals at atmospheric pressure. This specification does not cover the design of vessels intended for use at pressures other than atmospheric pressure. Furthermore, this specification does not cover the design of portable tanks and is not for vessels intended for use with liquids heated above their flash points in continuous service. Special design considerations not covered in this specification shall be given to vessels subject to superimposed mechanical forces, such as seismic forces, wind load or agitation; to vessels subject to service above specified temperature; and vessels subject to specified superimposed pressure of water. Low-temperature impact test shall be performed on rotational-molded polyethylene tanks. The test method is used on tanks molded from both the crosslinked and non-crosslinked polyethylenes. Dart drop impact test shall be performed to determine the quality of the tank. O-xylene-insoluble fraction or gel test shall be performed on crosslinked polyethylene. Visual inspection and water test shall also be performed on the samples.
This abstract is a brief summary of the referenced standard. It is informational only and not an official part of the standard; the full text of the standard itself must be referred to for its use and application. ASTM does not give any warranty express or implied or make any representation that the contents of this abstract are accurate, complete or up to date.
1. Scope
1.1 This specification covers flat-bottom, upright, cylindrical tanks molded in one-piece seamless construction by rotational molding. The tanks are molded from polyethylene for above ground, vertical installation and are capable of containing aggressive chemicals at atmospheric pressure. Included are requirements for materials, properties, design, construction, dimensions, tolerances, workmanship and appearance. Tank capacities are from 1900 L [500 gal] up.
1.2 This specification does not cover the design of vessels intended for use at pressures other than atmospheric pressure. Furthermore, this specification does not cover the design of portable tanks. It is also not for vessels intended for use with liquids heated above their flash points, or temperatures above 66C [150°F] for Type I tanks and 60°C [140°F] for Type II tanks for continuous service. NFPA Standards 30 and 31 shall be consulted for installations that are subject to the requirements of these standards.
1.3 Special design considerations not covered in this specification shall be given to vessels subject to superimposed mechanical forces, such as seismic forces, wind load or agitation; to vessels subject to service temperature in excess of 23°C [73.4°F]; and vessels subject to superimposed pressure exceeding 25.4 cm [10 in.] of water or 2.5 10 3 MPa [0.36 psi].
1.4 The values stated in SI units are to be regarded as the standard. The values given in brackets are for information only. There is no similar or equivalent ISO standard.
The following precautionary caveat pertains only to the test methods portion, Section 11, of this specification: This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use.
L15PS00369
Document Title
2015 Pecos Water System Supply Page 6 of 44
All storage tanks shall have at a minimum two (2) 1.25” bulkhead fitting with threaded plugs.
One bulkhead fitting shall be installed at the top of the tank in the manhole assembly and capable of being used as an overflow. The second bulkhead fitting shall be installed at the bottom outside edge of the tank under the manhole.
Bid Item 9: Sacked ready mix concrete ASTM C94/C94M. Sacked Concrete: 80 lb. sacks ASTM C 404. All concrete shall be palletized and wrapped in plastic to be water resistant upon delivery.
Bid Item 10:
A. Steel Trough:
Height of Troughs: 1 foot - 10 inches (Includes Height of Runner) Length of Troughs: 12 feet - 0 inches (Top Dimension) Width of Troughs: 4 feet - 0 inches (Top Dimension)
1. Trough material shall be 14-gauge sheet steel as shown on the drawings. Steel sheets shall meet the requirements of ASTM A 6/A6M and ASTM A 570, minimum yield strength shall be 36 ksi. Troughs shall have a rolled rim or a 1½-inch by 1½-inch by 1¼-inch by 1/8 -inch thick steel continuous rim welded to the trough or 1¼-inch diameter Schedule 40 steel pipe, as shown on the drawings. Height of trough shall be as shown on the drawings.
2. Water Trough: Trough dimensions shall conform to the dimensions in the drawing NM-030- 02802-1. The troughs shall be fabricated from steel and shall be designed and fabricated for use as a water trough. Welding shall meet the requirements of AWS D 1.1 and AWS D 1.3.
B. Float box shall be constructed from ¾ inch by No. 9 expanded metal with frame of angle iron and steel strap as shown on the drawing and shall meet the requirements of ASTM A 123, ASTM A 6/A6M and ASTM A570/A570M.
C. Bolts shall be grade 5 minimum, washers, lock nuts and nuts shall be cadmium plated, stainless steel or galvanized.
D. Painting:
1. Paint shall be a commercially available polyamide epoxy system.
2. All paint shall be lead free.
E. Fabrication:
1. Water troughs shall be fabricated as shown on the drawings. All welding processes shall meet the requirements of AWS D 1.1 and AWS D 1.3.
2. Water troughs shall be watertight.
F. Surface Preparation:
1. Sandblasting shall be done in accordance with SSPC-SP6 on the interior and exterior surfaces of the tanks.
2. Cleaning and surface preparation shall meet the requirements of ASTM D 2092 and ASTM D 2200.
L15PS00369
Document Title
2015 Pecos Water System Supply Page 7 of 44
3. All surfaces to be painted shall be clean. Any cleaning solvents shall be removed completely by washing with clear, hot water.
G. Shop Painting:
1. After sandblasting, paint shall be applied on the inside of the trough before oxidation occurs, not to exceed 24 hours. Surface preparation and painting the inside of the tank shall conform to NSF 61 and SSPC Manual, Good Painting Practices, Volume 1, Chapter 14.
2. Applications of primers and finish coats shall follow the manufacturer's recommendations for drying time between coats of paint. Color shall meet the requirements of Federal Standard 595a, paint color 30475, or Munsel Soil Colors Desert Brown 10YR6/3, or Carlsbad Canyon 2.5Y6/2 for the entire trough with exception of the float box which shall be painted flat black with a polyamide epoxy system. Total thickness of all painted surfaces shall have a minimum dryfilm thickness of [7 mils] and free from runs or drips.
H. Weather Conditions:
1. Paint shall not be applied when the ambient temperature is 50 degrees Fahrenheit and falling or when the ambient temperature is 90 degrees Fahrenheit and rising.
2. Paint shall not be applied when there is any precipitation, unless the surface to be painted is protected from the precipitation.
3. Paint shall not be applied over any wet surface.
Bid Item 11: Solar Pump Grundfos 6SQF3, or equivalent, submersible motor/pump unit:
Motor/Pump unit shall be AC/DC multistage, helical type, brushless motor, capable of operating as per specifications stated in work data.
1. Pump and motor materials exposed to water shall be corrosion resistant, and require a minimum of maintenance for a 10 year period or more.
2. The pump shall be internally threaded and have a built in check valve and pump inlet screen.
3. Pump shall have dry-running and overload protection.
4. Pump shall have over and under voltage protection with a wide voltage range.
5. Pump shall have a high efficiency permanent-magnetic motor (PM motor) with maximum power point tracking (MPPT).
Bid Item 12: General: PV Pumping System shall meet the requirements of the NEC articles 690 and all other applicable articles to ensure installer/operator safety. Equipment shall be UL listed where available. All equipment and conductors shall be capable of operating in temperatures of 0oF to 120oF. PV pumping system shall also include the following:
1. A manual electrical disconnect (safety switch) that shuts off power from the PV Power Supply designed to be attached to the array support pole above or below the pump controller.
L15PS00369
Document Title
2015 Pecos Water System Supply Page 8 of 44
2. Furnish grounding rod, wire, and attachments according to the NEC articles 250 and 690.
A. Photovoltaic Power Supply: Power supply shall be complete with PV array, mounting structure, controller, and any balance of system hardware and conductors required for “above ground” installation. The power supply shall be sized by supplier and be capable of supplying the pump controller proper current and voltage to pump from 550 feet of depth, anticipated wattage is 1000.
1. Photovoltaic modules shall be UL listed and include a minimum 10-year 90% power rating warranty.
2. Bypass diodes shall be installed in modules according to module manufacturers’ requirements.
3. Power supplies must display hazard-warning signs where there is a high voltage danger to the installer/operator.
4. Controller shall be designed to work specifically with manufacturers motor/pump unit. Controller shall include hardware required to mount directly to array support pole and shall be in a rain tight NEMA enclosure.
Controller shall include on/off switch and wired connection for a generator sufficient to run the pump as a back-up.
5. Module interconnections and output shall be sunlight resistant cable or in flexible conduit.
Bid item 13: 4 Panel pole mount kit. Module support structures shall mount on top of a SCH 40 steel pipe. Modules must be able to withstand a minimum wind load of 100 mph.
Bid Item 14: Control wire kit. Controller shall be designed to work specifically with manufacturers motor/pump unit. Controller shall include hardware required to mount directly to array support pole and shall be in a rain tight NEMA enclosure. Controller shall include on/off switch and wired connection for a generator sufficient to run the pump as a back-up. Electrical generator plug and 20 feet of wire to be compatible with typical generator sufficient to operate the pump shall be supplied.
Bid Item 15: IO 101-115V switchbox interface, or compatible equal, which will allow pump to operate with solar and generator capabilities.
Bid Item 16: 8/3 Flat double jacket PVC pump wire. The power supply shall be sized by supplier and be capable of supplying the pump controller proper current and voltage. Drop cable safety/rope is required to connect pump to PV system, to be sized by supplier. Safety rope appropriate to pull the drop pipe and pump in case of emergency or failure of drop pipe.
Bid Item 17: Drop Pipe will be threaded schedule 80 PVC in 20’ lengths and shall be complete with 1.25” stainless steel drop pipe couplings. Shall conform to ASTM D1785-12.
Bid Item 18: 1.25” (1 ¼”) Mpt NPT (tapered threads) stainless steel drop pipe couplings for submersible well. Shall conform to ASTM A312/A312-14b.
L15PS00369
Document Title
2015 Pecos Water System Supply Page 9 of 44
3. DELIVERY NOTIFICATION
The Contractor shall notify the COR (Contracting Officer's Representative) or the PI (Project Inspector) at least 5 working days prior to delivery, to arrange for inspection and acceptance at destinations.
4. DELIVERY TIMES
Delivery shall be made between the hours of 8:30 a.m. and 3:30 p.m., Monday through Friday, holidays excluded. All delivery times shall be coordinated between the Contractor and Contracting Officer Representative.
5. RESPONSIBILITY FOR UNLOADING AT DESTINATIONS
a. The Contractor shall be responsible for unloading at destinations cited below. The BLM will not have any vehicle or fork-lift on site to unload the materials.
b. The Contractor shall load and unload products in such a manner that protects them from damage until accepted by the Contracting Officer.
6. TRANSPORTATION/FREIGHT CHARGES
All costs of transportation/freight, from shipping points to the destinations shall be paid by the Contractor and included in his unit price quoted for the items. FAR Clause 52.247-34 – F. O. B.
Destination shall apply to this requirement.
7. DELIVERY DESTINATIONS
Quantities of fencing materials/supplies shall be delivered in the amounts shown below to each delivery site/location.
1. Corn headquarters delivery. Please see attached 2015 Corn headquarters delivery map.
Mike and BA Corn delivery Line Item Description Quantity Units
1 DR-9 250 psi 1.25" PE pipe (2,000' rolls) 25600 Foot 4 8' rubber tire trough, 22.5" max height ~500 gallons 8 Each 6 3,000 gallon PE storage (desert tan, or light brown in color) 2 Each 9 Sackcrete 336 Each
2. Fort Stanton Delivery Location. Please see map.
Fort Stanton Delivery Line Item Description Quantity Units
4 8' rubber tire trough, 22.5" max height ~500 gallons 6 Each 5 1,500 gallon PE storage (desert tan, or light brown in color) 2 Each 9 Sackcrete 252 Each
L15PS00369
Document Title
2015 Pecos Water System Supply Page 10 of 44
3. CFO/BOR/BLM Wareyard Hwy 62 and Orchard Lane
Carlsbad, New Mexico Please see attached delivery maps for BOR yard.
CFO/BOR yard Delivery Line Item Description Quantity Units
1 DR-9 250 psi 1.25" PE pipe (2,000' rolls) 75500 Foot 4 8' rubber tire trough, 22.5" max height ~500 gallons 2 Each 8 10,000 gallon PE storage (black in color) 5 Each 10 Steel troughs 18 Each
4. Speedy delivery location. Please see attached 2015 Speedy Solar delivery map for delivery instructions of the following items.
Speedy delivery Line Item Description Quantity Units
11 Solar Pump Grundfos 6SQF3 1 Each 12 Solar Panel 250 watt 4 Each 13 4 panel pole mount 1 Each 14 control wire kit 1 Each 15 101-115V Interface 1 Each 16 8/3 Flat Double Jacket PVC pump wire 575 Feet 17 1.25" PVC pipe schedule 80, 20' lengths 550 Feet 18 1.25" stainless steel drop pipe couplers 27 Each
5. Diamond Mound delivery location. Please see attached 2015 Diamond Mound map.
Diamond Mound delivery Line Item Description Quantity Units
4 8' rubber tire trough, 22.5" max height ~500 gallons 2 Each 7 Sackcrete 84 Each
6. Russell Leonard Delivery. Please see attached 2015 Russell Leonard Delivery map.
Russell Leonard delivery Line Item Description Quantity Units
7 33,000 gallon PE storage (green in color) 1 Each
L15PS00369
Document Title
2015 Pecos Water System Supply Page 11 of 44
7. Roswell Field Office (RFO) BLM wareyard delivery location.
2909 West Second Street Roswell, NM 88201
RFO wareyard delivery Line Item Description Quantity Units
2 DR-9 250 psi 2.00" PE pipe (100' rolls) 100 Foot 3 Valve Box, 24" length by 24" diameter riser and septic lid 1 Each 4 8' rubber tire trough, 22.5" max height ~500 gallons 4 Each 6 3,000 gallon PE storage (desert tan, or light brown in color) 3 Each 9 Sackcrete 168 Each
SECTION D - Packaging and Marking
(No Clauses)
SECTION E - Inspection and Acceptance
All services performed shall be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Government Location The Government Government Location The Government NOTE: Government location are defined above in Section C and shown on Attachment 1 (minus Roswell Field Office as this is a physical address located in town).
SECTION F - Deliveries or Performance
See SECTION C - Description/Specifications numbers three (3) through seven (7).
52.247-34 F.o.b. Destination. (NOV 1991)
(a) The term "f.o.b. destination," as used in this clause, means -
(1) Free of expense to the Government, on board the carrier's conveyance, at a specified delivery point where the consignee's facility (plant, warehouse, store, lot, or other location to which shipment can be made) is located; and
(2) Supplies shall be delivered to the destination consignee's wharf (if destination is a port city and supplies are for export), warehouse unloading platform, or receiving dock, at the expense of the Contractor. The Government shall not be liable for any delivery, storage, demurrage, accessorial, or other charges involved before the actual delivery (or "constructive placement" as defined in carrier tariffs) of the supplies to the destination, unless such charges are caused by an act or order of the Government acting in its contractual capacity. If rail carrier is used, supplies shall be delivered to the specified unloading platform of the consignee. If motor carrier (including "piggyback") is used, supplies shall be delivered to truck tailgate at the unloading platform of the consignee, except when the supplies delivered meet the requirements of Item 568 of the National Motor Freight Classification for "heavy or bulky freight." When supplies meeting the requirements of the referenced Item 568 are delivered, unloading (including movement to
L15PS00369
Document Title
2015 Pecos Water System Supply Page 12 of 44 the tailgate) shall be performed by the consignee, with assistance from the truck driver, if requested. If the contractor uses rail carrier or freight forwarded for less than carload shipments, the contractor shall ensure that the carrier will furnish tailgate delivery, when required, if transfer to truck is required to complete delivery to consignee.
(b) The Contractor shall -
(1)(i) Pack and mark the shipment to comply with contract specifications; or
(ii) In the absence of specifications, prepare the shipment in conformance with carrier requirements;
(2) Prepare and distribute commercial bills of lading;
(3) Deliver the shipment in good order and condition to the point of delivery specified in the contract;
(4) Be responsible for any loss of and/or damage to the goods occurring before receipt of the shipment by the consignee at the delivery point specified in the contract;
(5) Furnish a delivery schedule and designate the mode of delivering carrier; and
(6) Pay and bear all charges to the specified point of delivery.
(End of clause)
SECTION G - Contract Administration Data
DOI ELECTRONIC INVOICING Electronic Invoicing and Payment Requirements - Invoice Processing Platform (IPP) (April 2013)
Payment requests must be submitted electronically through the U. S. Department of the Treasury's Invoice Processing Platform System (IPP).
"Payment request" means any request for contract financing payment or invoice payment by the Contractor.
To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions - Commercial Items included in commercial item contracts. The IPP website address is:
https://www.ipp.gov.
Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice:
COPY OF VENDOR INVOICE
The Contractor must use the IPP website to register, access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in SAM will receive enrollment instructions via email from the Federal Reserve Bank of Boston (FRBB) within 3 - 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email ippgroup@bos.frb.org or phone (866) 973-3131.
L15PS00369
Document Title
2015 Pecos Water System Supply Page 13 of 44
If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.
DOI AUTHORITIES AND DELEGATIONS AUTHORITIES AND DELEGATIONS (MAY 2010)
(a) The Contracting Officer is the only individual authorized to enter into or terminate this contract, modify any term or condition of this contract, waive any requirement of this contract, or accept nonconforming work.
(b) The Contracting Officer will designate a Contracting Officer's Representative (COR) at time of award.
The COR will be responsible for technical monitoring of the contractor's performance and deliveries. The COR will be appointed in writing, and a copy of the appointment will be furnished to the Contractor.
Changes to this delegation will be made by written changes to the existing appointment or by issuance of a new appointment. The COR for this contract will be:
NAME ORGANIZATIONAL ADDRESS TELEPHONE
To be filled in at Bureau of Land Management (575) Contract award
@blm.gov
(c) The COR is not authorized to perform, formally or informally, any of the following actions:
(1) Promise, award, agree to award, or execute any contract, contract modification, or notice of intent that changes or may change this contract;
(2) Waive or agree to modification of the delivery schedule;
(3) Make any final decision on any contract matter subject to the Disputes Clause;
(4) Terminate, for any reason, the Contractor's right to proceed;
(5) Obligate in any way, the payment of money by the Government.
(d) The Contractor shall comply with the written or oral direction of the Contracting Officer or authorized representative(s) acting within the scope and authority of the appointment memorandum. The Contractor need not proceed with direction that it considers to have been issued without proper authority. The Contractor shall notify the Contracting Officer in writing, with as much detail as possible, when the COR has taken an action or has issued direction (written or oral) that the Contractor considers to exceed the COR¿s appointment, within 3 days of the occurrence. Unless otherwise provided in this contract, the Contractor assumes all costs, risks, liabilities, and consequences of performing any work it is directed to perform that falls within any of the categories defined in paragraph (c) prior to receipt of the Contracting Officer's response issued under paragraph (e) of this clause.
(e) The Contracting Officer shall respond in writing within 30 days to any notice made under paragraph (d) of this clause. A failure of the parties to agree upon the nature of a direction, or upon the contract action to be taken with respect thereto, shall be subject to the provisions of the Disputes clause of this contract.
(f) The Contractor shall provide copies of all correspondence to the Contracting Officer and the COR.
L15PS00369
Document Title
2015 Pecos Water System Supply Page 14 of 44
(g) Any action(s) taken by the Contractor, in response to any direction given by any person acting on behalf of the Government or any Government official other than the Contracting Officer or the COR acting within his or her appointment, shall be at the Contractor’s risk.
(End of notice)
SECTION H - Special Contract Requirements
DOI AGENCY PROTESTS Agency Protests
(a) Interested parties may request an independent review at a level above the Contracting Officer of protests filed directly with the agency. This review is available as an alternative to consideration of the protest by the Contracting Officer or as an appeal of the Contracting Officer's response to the protest. An interested party may:
(1) Protest to the Contracting Officer;
(2) Protest directly to the Bureau Procurement Chief without first protesting to the Contracting Officer; or
(3) Appeal a contracting officer¿s decision to the Bureau Procurement Chief.
(b) Requests for Bureau Procurement Chief review should be addressed to:
Bureau of Land Management Albuquerque District Office Attn: Reb H. Conn, Supervisory Procurement Analyst 435 Montano Road NE Albuquerque, NM 87107-4935
(c) Requesting independent agency review will not extend the Government Accountability Office¿s (GAO¿s) timeliness requirements. Any subsequent protest to the GAO must be filed within ten days of knowledge of initial adverse agency action (see 4 CFR 21.2(a)(3).)
(End of Clause)
SECTION I - Contract Clauses
CLAUSES INCORPORATED BY REFERENCE
52.203-3 Gratuities. (APR 1984)
52.203-6 Restrictions on Subcontractor Sales to the Government. (SEP 2006) - Alternate I (OCT 1995)
52.204-7 System for Award Management. (JUL 2013)
52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards. (JUL 2013)
52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment. (AUG 2013)
L15PS00369
Document Title
2015 Pecos Water System Supply Page 15 of 44
52.212-4 Contract Terms and Conditions - Commercial Items. (DEC 2014)
52.219-6 Notice of Total Small Business Set-Aside
52.222-3 Convict Labor. (JUN 2003)
52.222-19 Child Labor - Cooperation with Authorities and Remedies. (JAN 2014)
52.222-21 Prohibition of Segregated Facilities. (FEB 1999)
52.222-26 Equal Opportunity. (MAR 2007)
52.222-35 Equal Opportunity for Veterans. (JUL 2014)
52.222-36 Equal Opportunity for Workers with Disabilities. (JUL 2014)
52.222-37 Employment Reports on Veterans. (JUL 2014)
52.222-50 Combating Trafficking in Persons. (MAR 2015)
52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving. (AUG 2011)
52.225-13 Restrictions on Certain Foreign Purchases. (JUN 2008)
52.228-5 Insurance - Work on a Government Installation. (JAN 1997)
52.229-10 State of New Mexico Gross Receipts and Compensating Tax. (APR 2003)
52.232-17 Interest. (MAY 2014)
52.232-33 Payment by Electronic Funds Transfer - System for Award Management. (JUL 2013)
52.233-3 Protest after Award. (AUG 1996)
52.237-2 Protection of Government Buildings, Equipment, and Vegetation. (APR 1984)
52.242-13 Bankruptcy. (JUL 1995)
52.253-1 Computer Generated Forms. (JAN 1991)
CLAUSES INCORPORATED BY FULL TEXT
52.212-5 Contract Terms and Conditions Required To Implement Statutes or Executive Orders - Commercial Items. (MAR 2015)
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
L15PS00369
Document Title
2015 Pecos Water System Supply Page 16 of 44
(1) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (DEC 2014)
(2) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).
(3) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Public Laws 108-77 and 108-78 (19 U.S.C. 3805 note)).
(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items: (Contracting Officer check as appropriate.)
[ ] (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (SEP 2006), with Alternate I (OCT 1995) (41 U.S.C. 4704 and 10 U.S.C. 2402).
[ ] (2) 52.203-13, Contractor Code of Business Ethics and Conduct (APR 2010) (41 U.S.C. 3509).
[ ] (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (JUN 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)
[ ] (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (JUL 2013) (Pub. L. 109-282) (31 U.S.C. 6101 note).
(5) (Reserved)
[ ] (6) 52.204-14, Service Contract Reporting Requirements (JAN 2014) (Pub. L. 111- 117, section 743 of Div. C).
[ ] (7) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (JAN 2014) (Pub. L. 111-117, section 743 of Div. C).
[X] (8) 52.209-6, Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (AUG 2013) (31 U.S.C.
6101 note).
[ ] (9) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (JUL 2013) (41 U.S.C. 2313).
[ ] (10) (Reserved)
[ ] (11)(i) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (NOV 2011) (15 U.S.C. 657a).
[ ] (ii) Alternate I (NOV 2011) of 52.219-3.
L15PS00369
Document Title
2015 Pecos Water System Supply Page 17 of 44
[ ] (12)(i) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (OCT 2014) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).
[ ] (ii) Alternate I (JAN 2011) of 52.219-4.
[ ] (13) (Reserved)
[X] (14)(i) 52.219-6, Notice of Total Small Business Set-Aside (NOV 2011) (15 U.S.C.
644).
[ ] (ii) Alternate I (NOV 2011).
[ ] (iii) Alternate II (NOV 2011).
[ ] (15)(i) 52.219-7, Notice of Partial Small Business Set-Aside (JUN 2003) (15 U.S.C.
644).
[ ] (ii) Alternate I (OCT 1995) of 52.219-7.
[ ] (iii) Alternate II (MAR 2004) of 52.219-7.
[ ] (16) 52.219-8, Utilization of Small Business Concerns (OCT 2014) (15 U.S.C.
637(d)(2) and (3)).
[ ] (17)(i) 52.219-9, Small Business Subcontracting Plan (OCT 2014) (15 U.S.C.
637(d)(4)).
[ ] (ii) Alternate I (OCT 2001) of 52.219-9.
[ ] (iii) Alternate II (OCT 2001) of 52.219-9.
[ ] (iv) Alternate III (OCT 2014) of 52.219-9.
[ ] (18) 52.219-13, Notice of Set-Aside of Orders (NOV 2011) (15 U.S.C. 644(r)).
[ ] (19) 52.219-14, Limitations on Subcontracting (NOV 2011) (15 U.S.C. 637(a)(14)).
[ ] (20) 52.219-16, Liquidated Damages-Subcontracting Plan (JAN 1999) (15 U.S.C.
637(d)(4)(F)(i)).
[ ] (21) 52.219-27, Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (NOV 2011) (15 U.S.C. 657f).
[ ] (22) 52.219-28, Post Award Small Business Program Representation (JUL 2013) (15 U.S.C. 632(a)(2)).
[ ] (23) 52.219-29, Notice of Set-Aside for Economically Disadvantaged Women-Owned Small Business (EDWOSB) Concerns (JUL 2013) (15 U.S.C. 637(m)).
L15PS00369
Document Title
2015 Pecos Water System Supply Page 18 of 44
[ ] (24) 52.219-30, Notice of Set-Aside for Women-Owned Small Business (WOSB) Concerns Eligible Under the WOSB Program (JUL 2013) (15 U.S.C. 637(m)).
[X] (25) 52.222-3, Convict Labor (JUN 2003) (E.O. 11755).
[X] (26) 52.222-19, Child Labor-Cooperation with Authorities and Remedies (JAN 2014) (E.O. 13126).
[X] (27) 52.222-21, Prohibition of Segregated Facilities (FEB 1999).
[X] (28) 52.222-26, Equal Opportunity (MAR 2007) (E.O. 11246).
[X] (29) 52.222-35, Equal Opportunity for Veterans (JUL 2014) (38 U.S.C. 4212).
[X] (30) 52.222-36, Equal Opportunity for Workers with Disabilities (JUL 2014) (29 U.S.C. 793).
[X] (31) 52.222-37, Employment Reports on Veterans (JUL 2014) (38 U.S.C. 4212).
[ ] (32) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (DEC 2010) (E.O. 13496).
[X] (33)(i) 52.222-50, Combating Trafficking in Persons (MAR 2015) (22 U.S.C. chapter 78 and E.O. 13627).
[ ] (ii) Alternate I (MAR 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O.
13627).
[ ] (34) 52.222-54, Employment Eligibility Verification (AUG 2013). (Executive Order 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial items as prescribed in 22.1803.)
[ ] (35)(i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA- Designated Items (MAY 2008) (42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
[ ] (ii) Alternate I (MAY 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
[ ] (36)(i) 52.223-13, Acquisition of EPEAT®-Registered Imaging Equipment (JUN 2014) (E.O.s 13423 and 13514).
(ii) Alternate I (JUN 2014) of 52.223-13.
[ ] (37)(i) 52.223-14, Acquisition of EPEAT®-Registered Televisions (JUN 2014) (E.O.s 13423 and 13514).
(ii) Alternate I (JUN 2014) of 52.223-14.
L15PS00369
Document Title
2015 Pecos Water System Supply Page 19 of 44
[ ] (38) 52.223-15, Energy Efficiency in Energy-Consuming Products (DEC 2007) (42 U.S.C. 8259b).
[ ] (39)(i) 52.223-16, Acquisition of EPEAT®-Registered Personal Computer Products (JUN 2014) (E.O.s 13423 and 13514).
[ ](ii) Alternate I (JUN 2014) of 52.223-16.
[X] (40) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving (AUG 2011)
[X] (41) 52.225-1, Buy American-Supplies (MAY 2014) (41 U.S.C. chapter 83).
[ ] (42)(i) 52.225-3, Buy American-Free Trade Agreements-Israeli Trade Act (MAY 2014) (41 U.S.C. chapter 83, 19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, Pub. L. 103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, and 112-43.
[ ] (ii) Alternate I (MAY 2014) of 52.225-3.
[ ] (iii) Alternate II (MAY 2014) of 52.225-3.
[ ] (iv) Alternate III (MAY 2014) of 52.225-3.
[ ] (43) 52.225-5, Trade Agreements (NOV 2013) (19 U.S.C. 2501, et seq., 19 U.S.C.
3301 note).
[X] (44) 52.225-13, Restrictions on Certain Foreign Purchases (JUN 2008) (E.O.'s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).
[ ] (45) 52.225-26, Contractors Performing Private Security Functions Outside the United States (JUL 2013) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).
[ ] (46) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (NOV 2007) (42 U.S.C. 5150).
[ ] (47) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area
(NOV 2007) (42 U.S.C. 5150).
[ ] (48) 52.232-29, Terms for Financing of Purchases of Commercial Items (FEB 2002) (41 U.S.C. 4505, 10 U.S.C. 2307(f)).
[ ] (49) 52.232-30, Installment Payments for Commercial Items (OCT 1995) (41 U.S.C.
4505, 10 U.S.C. 2307(f)).
[X] (50) 52.232-33, Payment by Electronic Funds Transfer-System for Award Management (JUL 2013) (31 U.S.C. 3332).
L15PS00369
Document Title
2015 Pecos Water System Supply Page 20 of 44
[ ] (51) 52.232-34, Payment by Electronic Funds Transfer - Other than System for Award Management (JUL 2013) (31 U.S.C. 3332).
[ ] (52) 52.232-36, Payment by Third Party (MAY 2014) (31 U.S.C. 3332).
[ ] (53) 52.239-1, Privacy or Security Safeguards (AUG 1996) (5 U.S.C. 552a).
[ ] (54)(i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (FEB 2006) (46 U.S.C. Appx. 1241(b) and 10 U.S.C. 2631).
[ ] (ii) Alternate I (APR 2003) of 52.247-64.
(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items: (Contracting Officer check as appropriate.)
[ ] (1) 52.222-41, Service Contract Labor Standards (MAY 2014) (41 U.S.C. chapter 67).
[ ] (2) 52.222-42, Statement of Equivalent Rates for Federal Hires (MAY 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67).
[ ] (3) 52.222-43, Fair Labor Standards Act and Service Contract Labor Standards-Price Adjustment (Multiple Year and Option Contracts) (MAY 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67).
[ ] (4) 52.222-44, Fair Labor Standards Act and Service Contract Labor Standards-Price Adjustment (MAY 2014) (29 U.S.C 206 and 41 U.S.C. chapter 67).
[ ] (5) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment-Requirements (MAY 2014) (41 U.S.C. chapter 67).
[ ] (6) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services-Requirements (MAY 2014) (41 U.S.C. chapter 67).
[ ] (7) 52.222-17, Nondisplacement of Qualified Workers (MAY 2014) (E.O. 13495).
[ ] (8) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (MAY 2014) (42 U.S.C. 1792).
[ ] (9) 52.237-11, Accepting and Dispensing of $1 Coin (SEP 2008) (31 U.S.C.
5112(p)(1)).
[ ] (10) 52.222-55, Minimum Wages Under Executive Order 13658 (DEC 2014) (Executive Order 13658).
(d) Comptroller General Examination of Record. The Contractor shall comply with the provisions of this paragraph (d) if this contract was awarded using other than sealed bid, is in excess of the
L15PS00369
Document Title
2015 Pecos Water System Supply Page 21 of 44 simplified acquisition threshold, and does not contain the clause at 52.215-2, Audit and Records - Negotiation.
(1) The Comptroller General of the United States, or an authorized representative of the Comptroller General, shall have access to and right to examine any of the Contractor's directly pertinent records involving transactions related to this contract.
(2) The Contractor shall make available at its offices at all reasonable times the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR Subpart 4.7, Contractor Records Retention, of the other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement. Records relating to appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved.
(3) As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and regardless of form. This does not require the Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law.
(e)(1) Notwithstanding the requirements of the clauses in paragraphs (a), (b), (c), and (d) of this clause, the Contractor is not required to flow down any FAR clause, other than those in this paragraph (e)(1) of this paragraph in a subcontract for commercial items. Unless otherwise indicated below, the extent of the flow down shall be as required by the clause-
(i) 52.203-13, Contractor Code of Business Ethics and Conduct (APR 2010) (41 U.S.C. 3509).
(ii) 52.219-8, Utilization of Small Business Concerns (OCT 2014) (15 U.S.C.
637(d)(2) and (3)), in all subcontracts that offer further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds $650,000 ($1.5 million for construction of any public facility), the subcontractor must include 52.219-8 in lower tier subcontracts that offer subcontracting opportunities.
(iii) 52.222-17, Nondisplacement of Qualified Workers (MAY 2014) (E.O.
13495). Flow down required in accordance with paragraph (l) of FAR clause 52.222-17.
(iv) 52.222-26, Equal Opportunity (MAR 2007) (E.O. 11246).
(v) 52.222-35, Equal Opportunity for Veterans (JUL 2014) (38 U.S.C. 4212).
(vi) 52.222-36, Equal Opportunity for Workers with Disabilities (JUL 2014) (29 U.S.C. 793).
(vii) 52.222-37, Employment Reports on Veterans (JUL 2014) (38 U.S.C. 4212).
L15PS00369
Document Title
2015 Pecos Water System Supply Page 22 of 44
(viii) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (DEC 2010) (E.O. 13496). Flow down required in accordance with paragraph (f) of FAR clause 52.222-40.
(ix) 52.222-41, Service Contract Labor Standards (MAY 2014) (41 U.S.C.
chapter 67).
(x) __ (A) 52.222-50, Combating Trafficking in Persons (MAR 2015) (22 U.S.C. chapter 78 and E.O. 13627).
__ (B) Alternate I (MAR 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).
(xi) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment-Requirements (MAY 2014) (41 U.S.C. chapter 67).
(xii) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services-Requirements (MAY 2014) (41 U.S.C. chapter 67).
(xiii) 52.222-54, Employment Eligibility Verification (AUG 2013).
(xiv) 52.225-26, Contractors Performing Private Security Functions Outside the United States (JUL 2013) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).
(xv) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (MAY 2014) (42 U.S.C. 1792). Flow down required in accordance with paragraph (e) of FAR clause 52.226-6.
(xvi) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (FEB 2006) (46 U.S.C. Appx. 1241(b) and 10 U.S.C. 2631).
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .