2015 Pecos Water System Supplies Federal contract opportunity
Solicitation number
L15PS00369
Issued by
Department of the Interior Bureau of Land Management New Mexico Region

About this file

L15PS00369

View the file

Other files for this federal contract opportunity

Other files attached to 2015 Pecos Water System Supplies, newest first.
File Type Posted
Attachment_1_-_Delivery_Locations-Sites.pdf PDF
Sol_L15PS00369.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

L15PS00369

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

LXL

LAS CRUCES NM 88005

1800 MARQUESS STREET

BLM NM-LAS CRUCES DIST OFC(NML00)

04/27/2015000001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

04/27/2015

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment is to answer submitted vendor/contractor questions, update specifications and quantities shown below, and to add Attachment 2 - Water Trough McGregor

B Specifications. All changed specifications and quantities are shown below highlighted in yellow.

Suggested COR: RFOX

Delivery: 08/31/2015

Delivery Location Code: 0004276456

BLM-NM ROSWELL FIELD OFFICE

2909 WEST 2ND STREET

ROSWELL NM 88201-2019 US

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

John Mclaughlin

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 45

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

L15PS00369/000001

FOB: Destination

Period of Performance: 05/29/2015 to 08/31/2015

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

SOLICITATION

Document No.

L15PS00369-000001

Document Title

2015 Pecos Water System Supply Page 3 of 46

Amendment 000001

Contractor/Vendor Submitted Questions Answered by the BLM:

Q1.) Can a drawing be provided for the steel trough?

A1.) Please see Attachment 2 – Water Trough McGregor B Specifications added in Section J of the Amended Solicitation.

Q2.) Is galvanized metal preferred for the steel troughs?

A2.) The solicitation/contract specifications are for 14 gauge steel painted with a polyamide epoxy system.

Q3.) Please provide clarifications on the dimensions of the 5,000 gallon storage tank Bid Items 5, 6, 7, and 8.

A3.) See updated Bid Items 5, 6, 7, and 8 shown below highlighted in yellow in Section C – Description/Specifications.

Q4.) Should Bid Item 7 for the Russell Leonard Delivery be 33,000 gallon storage or 5,000 gallon?

A4.) It should be 5,000 gallons and updated in Section C – Descriptions/Specifications shown below highlighted in yellow.

The BLM has also updated the number of rubber tires wanted on the bid schedule in Section B and Delivery Schedules in Section C. The BLM has updated Line Item 17 changing it from 1.25” PVC pipe schedule 80, 20’ lengths to 1.25” PVC pipe schedule 120, 20’ lengths. All changes are shown below highlighted in yellow.

L15PS00369-000001

Document Title

2015 Pecos Water System Supply Page 4 of 46

SECTION A - Solicitation/Contract Form

CONTRACT INFORMATION:

This is a Firm-Fixed Priced total small business set-aside acquisition for water system supplies described in Section C below and to be delivered to various locations in Southeastern New Mexico (See Attachment 1 – Delivery Locations - Sites).

The following addresses and points of contact are provided for your information:

Contracting Officer:

Name: John P. McLaughlin Phone: (575) 525-4400

FAX: (575) 525-4412

Email address: jpmclaughlin@blm.gov

Contracting Officer Representative (COR):

Name: To be Filled in at Contract Award Phone: (575)

FAX: (575)

Email address:

SECTION B - Supplies or Services/Prices

Bid Schedule:

Line Item

Description Quantity Units Price Per Unit

Total of Line

1 DR-9 250 psi 1.25" PE pipe (2,000' rolls) 101100 Foot 2 DR-9 250 psi 2.00" PE pipe (100' rolls) 100 Foot 3 Valve Box, 24" length by 24" diameter riser and septic lid 1 Each

4 8' rubber tire trough, 22.5" max height ~500 gallons

22 Each

5 1,500 gallon PE storage (desert tan, or light brown in color)

2 Each

6 3,000 gallon PE storage (desert tan, or light brown in color)

5 Each

7 5,000 gallon PE storage (green in color) 3 Each 8 10,000 gallon PE storage (black in color) 5 Each 9 Sackcrete 840 Each 10 Steel troughs 2'x4'x12' 18 Each 11 Solar Pump Grundfos 6SQF3 1 Each 12 Solar Panel 250 watt 4 Each 13 4 panel pole mount 1 Each 14 control wire kit 1 Each 15 101-115V Interface 1 Each 16 8/3 Flat Double Jacket PVC pump wire, with drop cable 575 Feet

17 1.25" PVC pipe schedule 120, 20' lengths 550 Feet mailto:jpmclaughlin@blm.gov

L15PS00369-000001

Document Title

2015 Pecos Water System Supply Page 5 of 46

18 1.25" stainless steel drop pipe couplers 27 Each Total all or none

SECTION C - Description/Specifications

1. GENERAL

The Bureau of Land Management has a requirement for water supply materials to be delivered to the Carlsbad Field Office, Roswell Field office, and various sites in southeastern New Mexico as described in the delivery schedule of this contract - Deliveries or Performance and Attachment 1 – Delivery Locations - Sites. The water system materials shall meet, at a minimum, the following requirements.

2. MATERIALS

Bid Items 1, and 2: Polyethylene (PE) Pipe and Fittings: Polyethylene pipe shall carry the seal of approval of the National Sanitation Foundation NSF-PW. Nominal diameters of pipe are outside dimensions for DR rated pipe. All pipe shall be protected against damage by freezing, heat, sunlight, and traffic until delivered and accepted. Polyethylene pipe shall be type PE 4710 and meet ASTM D 3035 (Specifications for PE Plastic Pipe (DR PR) based on controlled outside diameter) and D3261 (Butt Heat fusion for PE Plastic Pipe) for DR rated pipe. Pressure rating for DR ratio of pipe shall be as shown on the Bid Schedule. Each roll of pipe shall be marked along its entire length with a tag that states the diameter, pressure rating, and DR ratio.

PE pipe shall be of the size and quantity shown in the Bid Schedule. All pipe ends shall be capped to exclude contaminate entry.

Bid Item 3: Valve Boxes, 24” height by 24” diameter HDPE corrugated pipe septic tank riser with ring and lid assembly. Must have weight bearing capacity of at least 200 pounds.

The following generally recognized testing methods for plastic materials shall apply:

2.1.1 ASTM D 1248 – Standard Specification for Polyethylene Plastics Extrusion Materials for Wire and Cable;

2.1.2 ASTM D 1693 – Standard Test Method for Environmental Stress-Cracking of Ethylene Plastics;

2.1.3 ASTM D638 - Standard Test Method for Tensile Properties of Plastics;

2.1.4 CSA International - B66-00 Prefabricated Septic Tanks and Sewage Holding Tanks;

2.1.5 International Association of Plumbing and Mechanical Officials – IAPMO PS 1-98 Material and Property Standard for Prefabricated Septic Tanks.

2.1.6 ASTM D790 - Test Methods for Flexural Properties of Unreinforced and Reinforced Plastics and Electrical Insulating Materials

Bid Item 4: 8' rubber tire trough, 22.5" max height ~500 gallon. A single 65/45-45 L-5 Loader- Dozer tire cut through the center of the 45” tread will make two of these rubber tire drinkers.

The sidewall must have a 2” hole centered through it. Tires must be capable of holding water and all holes shall be patched in a method acceptable for 10 years of use without tire water holding failure upon delivery.

Bid Item 5, 6, 7, and 8: The UV resistant 1,500 gallon PE storage shall be tan in color, low profile (~87”dia. X 68” tall), and one piece. The UV resistant 3,000 gallon PE storage shall be tan in color, low profile (~96” dia. X ~107” tall), and one piece. The UV resistant 5,000 gallon PE storage must be green in color, low profile (~141” dia. X 86” tall), and one piece. The UV

L15PS00369-000001

Document Title

2015 Pecos Water System Supply Page 6 of 46 resistant 10,000 gallon PE storage must be black in color, (~141” dia. X 160” tall), and one piece.

Storages shall conform to ASTM D1998-06.

Abstract: This specification covers flat-bottom, upright, cylindrical tanks molded in one-piece seamless construction by rotational molding. The tanks are molded from polyethylene for above ground, vertical installation and are capable of containing aggressive chemicals at atmospheric pressure. This specification does not cover the design of vessels intended for use at pressures other than atmospheric pressure. Furthermore, this specification does not cover the design of portable tanks and is not for vessels intended for use with liquids heated above their flash points in continuous service. Special design considerations not covered in this specification shall be given to vessels subject to superimposed mechanical forces, such as seismic forces, wind load or agitation; to vessels subject to service above specified temperature; and vessels subject to specified superimposed pressure of water. Low-temperature impact test shall be performed on rotational-molded polyethylene tanks. The test method is used on tanks molded from both the crosslinked and non-crosslinked polyethylenes. Dart drop impact test shall be performed to determine the quality of the tank. O-xylene-insoluble fraction or gel test shall be performed on crosslinked polyethylene. Visual inspection and water test shall also be performed on the samples.

This abstract is a brief summary of the referenced standard. It is informational only and not an official part of the standard; the full text of the standard itself must be referred to for its use and application. ASTM does not give any warranty express or implied or make any representation that the contents of this abstract are accurate, complete or up to date.

1. Scope

1.1 This specification covers flat-bottom, upright, cylindrical tanks molded in one-piece seamless construction by rotational molding. The tanks are molded from polyethylene for above ground, vertical installation and are capable of containing aggressive chemicals at atmospheric pressure. Included are requirements for materials, properties, design, construction, dimensions, tolerances, workmanship and appearance. Tank capacities are from 1900 L [500 gal] up.

1.2 This specification does not cover the design of vessels intended for use at pressures other than atmospheric pressure. Furthermore, this specification does not cover the design of portable tanks. It is also not for vessels intended for use with liquids heated above their flash points, or temperatures above 66C [150°F] for Type I tanks and 60°C [140°F] for Type II tanks for continuous service. NFPA Standards 30 and 31 shall be consulted for installations that are subject to the requirements of these standards.

1.3 Special design considerations not covered in this specification shall be given to vessels subject to superimposed mechanical forces, such as seismic forces, wind load or agitation; to vessels subject to service temperature in excess of 23°C [73.4°F]; and vessels subject to superimposed pressure exceeding 25.4 cm [10 in.] of water or 2.5 10 3 MPa [0.36 psi].

1.4 The values stated in SI units are to be regarded as the standard. The values given in brackets are for information only. There is no similar or equivalent ISO standard.

The following precautionary caveat pertains only to the test methods portion, Section 11, of this specification: This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish

L15PS00369-000001

Document Title

2015 Pecos Water System Supply Page 7 of 46 appropriate safety and health practices and determine the applicability of regulatory limitations prior to use.

All storage tanks shall have at a minimum two (2) 1.25” bulkhead fitting with threaded plugs.

One bulkhead fitting shall be installed at the top of the tank in the manhole assembly and capable of being used as an overflow. The second bulkhead fitting shall be installed at the bottom outside edge of the tank under the manhole.

Bid Item 9: Sacked ready mix concrete ASTM C94/C94M. Sacked Concrete: 80 lb. sacks ASTM C 404. All concrete shall be palletized and wrapped in plastic to be water resistant upon delivery.

Bid Item 10:

A. Steel Trough:

Height of Troughs: 1 foot - 10 inches (Includes Height of Runner) Length of Troughs: 12 feet - 0 inches (Top Dimension) Width of Troughs: 4 feet - 0 inches (Top Dimension)

1. Trough material shall be 14-gauge sheet steel as shown on the drawings. Steel sheets shall meet the requirements of ASTM A 6/A6M and ASTM A 570, minimum yield strength shall be 36 ksi. Troughs shall have a rolled rim or a 1½-inch by 1½-inch by 1¼-inch by 1/8 -inch thick steel continuous rim welded to the trough or 1¼-inch diameter Schedule 40 steel pipe, as shown on the drawings. Height of trough shall be as shown on the drawings.

2. Water Trough: Trough dimensions shall conform to the dimensions in the drawing NM-030- 02802-1. The troughs shall be fabricated from steel and shall be designed and fabricated for use as a water trough. Welding shall meet the requirements of AWS D 1.1 and AWS D 1.3.

B. Float box shall be constructed from ¾ inch by No. 9 expanded metal with frame of angle iron and steel strap as shown on the drawing and shall meet the requirements of ASTM A 123, ASTM A 6/A6M and ASTM A570/A570M.

C. Bolts shall be grade 5 minimum, washers, lock nuts and nuts shall be cadmium plated, stainless steel or galvanized.

D. Painting:

1. Paint shall be a commercially available polyamide epoxy system.

2. All paint shall be lead free.

E. Fabrication:

1. Water troughs shall be fabricated as shown on the drawings. All welding processes shall meet the requirements of AWS D 1.1 and AWS D 1.3.

2. Water troughs shall be watertight.

F. Surface Preparation:

1. Sandblasting shall be done in accordance with SSPC-SP6 on the interior and exterior surfaces of the tanks.

L15PS00369-000001

Document Title

2015 Pecos Water System Supply Page 8 of 46

2. Cleaning and surface preparation shall meet the requirements of ASTM D 2092 and ASTM D 2200.

3. All surfaces to be painted shall be clean. Any cleaning solvents shall be removed completely by washing with clear, hot water.

G. Shop Painting:

1. After sandblasting, paint shall be applied on the inside of the trough before oxidation occurs, not to exceed 24 hours. Surface preparation and painting the inside of the tank shall conform to NSF 61 and SSPC Manual, Good Painting Practices, Volume 1, Chapter 14.

2. Applications of primers and finish coats shall follow the manufacturer's recommendations for drying time between coats of paint. Color shall meet the requirements of Federal Standard 595a, paint color 30475, or Munsel Soil Colors Desert Brown 10YR6/3, or Carlsbad Canyon 2.5Y6/2 for the entire trough with exception of the float box which shall be painted flat black with a polyamide epoxy system. Total thickness of all painted surfaces shall have a minimum dryfilm thickness of [7 mils] and free from runs or drips.

H. Weather Conditions:

1. Paint shall not be applied when the ambient temperature is 50 degrees Fahrenheit and falling or when the ambient temperature is 90 degrees Fahrenheit and rising.

2. Paint shall not be applied when there is any precipitation, unless the surface to be painted is protected from the precipitation.

3. Paint shall not be applied over any wet surface.

Bid Item 11: Solar Pump Grundfos 6SQF3, or equivalent, submersible motor/pump unit:

Motor/Pump unit shall be AC/DC multistage, helical type, brushless motor, capable of operating as per specifications stated in work data.

1. Pump and motor materials exposed to water shall be corrosion resistant, and require a minimum of maintenance for a 10 year period or more.

2. The pump shall be internally threaded and have a built in check valve and pump inlet screen.

3. Pump shall have dry-running and overload protection.

4. Pump shall have over and under voltage protection with a wide voltage range.

5. Pump shall have a high efficiency permanent-magnetic motor (PM motor) with maximum power point tracking (MPPT).

Bid Item 12: General: PV Pumping System shall meet the requirements of the NEC articles 690 and all other applicable articles to ensure installer/operator safety. Equipment shall be UL listed where available. All equipment and conductors shall be capable of operating in temperatures of 0oF to 120oF. PV pumping system shall also include the following:

L15PS00369-000001

Document Title

2015 Pecos Water System Supply Page 9 of 46

1. A manual electrical disconnect (safety switch) that shuts off power from the PV Power Supply designed to be attached to the array support pole above or below the pump controller.

2. Furnish grounding rod, wire, and attachments according to the NEC articles 250 and 690.

A. Photovoltaic Power Supply: Power supply shall be complete with PV array, mounting structure, controller, and any balance of system hardware and conductors required for “above ground” installation. The power supply shall be sized by supplier and be capable of supplying the pump controller proper current and voltage to pump from 550 feet of depth, anticipated wattage is 1000.

1. Photovoltaic modules shall be UL listed and include a minimum 10-year 90% power rating warranty.

2. Bypass diodes shall be installed in modules according to module manufacturers’ requirements.

3. Power supplies must display hazard-warning signs where there is a high voltage danger to the installer/operator.

4. Controller shall be designed to work specifically with manufacturers motor/pump unit. Controller shall include hardware required to mount directly to array support pole and shall be in a rain tight NEMA enclosure.

Controller shall include on/off switch and wired connection for a generator sufficient to run the pump as a back-up.

5. Module interconnections and output shall be sunlight resistant cable or in flexible conduit.

Bid item 13: 4 Panel pole mount kit. Module support structures shall mount on top of a SCH 40 steel pipe. Modules must be able to withstand a minimum wind load of 100 mph.

Bid Item 14: Control wire kit. Controller shall be designed to work specifically with manufacturers motor/pump unit. Controller shall include hardware required to mount directly to array support pole and shall be in a rain tight NEMA enclosure. Controller shall include on/off switch and wired connection for a generator sufficient to run the pump as a back-up. Electrical generator plug and 20 feet of wire to be compatible with typical generator sufficient to operate the pump shall be supplied.

Bid Item 15: IO 101-115V switchbox interface, or compatible equal, which will allow pump to operate with solar and generator capabilities.

Bid Item 16: 8/3 Flat double jacket PVC pump wire. The power supply shall be sized by supplier and be capable of supplying the pump controller proper current and voltage. Drop cable safety/rope is required to connect pump to PV system, to be sized by supplier. Safety rope appropriate to pull the drop pipe and pump in case of emergency or failure of drop pipe.

Bid Item 17: Drop Pipe will be threaded schedule 120 PVC in 20’ lengths and shall be complete with 1.25” stainless steel drop pipe couplings. Threaded pipe requires a 50% reduction in the pressure ratings stated, therefore the pressure rating is reduced from 600 psi to 300 psi at 73 degrees Fahrenheit in threaded pipe. Shall conform to ASTM D1785-12.

L15PS00369-000001

Document Title

2015 Pecos Water System Supply Page 10 of 46

Bid Item 18: 1.25” (1 ¼”) Mpt NPT (tapered threads) stainless steel drop pipe couplings for submersible well. Shall conform to ASTM A312/A312-14b.

3. DELIVERY NOTIFICATION

The Contractor shall notify the COR (Contracting Officer's Representative) or the PI (Project Inspector) at least 5 working days prior to delivery, to arrange for inspection and acceptance at destinations.

4. DELIVERY TIMES

Delivery shall be made between the hours of 8:30 a.m. and 3:30 p.m., Monday through Friday, holidays excluded. All delivery times shall be coordinated between the Contractor and Contracting Officer Representative.

5. RESPONSIBILITY FOR UNLOADING AT DESTINATIONS

a. The Contractor shall be responsible for unloading at destinations cited below. The BLM will not have any vehicle or fork-lift on site to unload the materials.

b. The Contractor shall load and unload products in such a manner that protects them from damage until accepted by the Contracting Officer.

6. TRANSPORTATION/FREIGHT CHARGES

All costs of transportation/freight, from shipping points to the destinations shall be paid by the Contractor and included in his unit price quoted for the items. FAR Clause 52.247-34 – F. O. B.

Destination shall apply to this requirement.

7. DELIVERY DESTINATIONS

Quantities of fencing materials/supplies shall be delivered in the amounts shown below to each delivery site/location.

1. Corn headquarters delivery. Please see attached 2015 Corn headquarters delivery map.

Mike and BA Corn delivery Line Item Description Quantity Units

1 DR-9 250 psi 1.25" PE pipe (2,000' rolls) 25600 Foot 4 8' rubber tire trough, 22.5" max height ~500 gallons 8 Each 6 3,000 gallon PE storage (desert tan, or light brown in color) 2 Each 9 Sackcrete 336 Each

L15PS00369-000001

Document Title

2015 Pecos Water System Supply Page 11 of 46

2. Fort Stanton Delivery Location. Please see map.

Fort Stanton Delivery Line Item Description Quantity Units

4 8' rubber tire trough, 22.5" max height ~500 gallons 6 Each 5 1,500 gallon PE storage (desert tan, or light brown in color) 2 Each 9 Sackcrete 252 Each

3. CFO/BOR/BLM Wareyard Hwy 62 and Orchard Lane

Carlsbad, New Mexico Please see attached delivery maps for BOR yard.

CFO/BOR yard Delivery Line Item Description Quantity Units

1 DR-9 250 psi 1.25" PE pipe (2,000' rolls) 75500 Foot 4 8' rubber tire trough, 22.5" max height ~500 gallons 2 Each 8 10,000 gallon PE storage (black in color) 5 Each 10 Steel troughs 18 Each

4. Speedy delivery location. Please see attached 2015 Speedy Solar delivery map for delivery instructions of the following items.

Speedy delivery Line Item Description Quantity Units 11 Solar Pump Grundfos 6SQF3 1 Each 12 Solar Panel 250 watt 4 Each 13 4 panel pole mount 1 Each 14 control wire kit 1 Each 15 101-115V Interface 1 Each 16 8/3 Flat Double Jacket PVC pump wire 575 Feet 17 1.25" PVC pipe schedule 120, 20' lengths 550 Feet 18 1.25" stainless steel drop pipe couplers 27 Each

5. Diamond Mound delivery location. Please see attached 2015 Diamond Mound map.

Diamond Mound delivery Line Item Description Quantity Units

4 8' rubber tire trough, 22.5" max height ~500 gallons 2 Each 7 Sackcrete 84 Each

6. Russell Leonard Delivery. Please see attached 2015 Russell Leonard Delivery map.

L15PS00369-000001

Document Title

2015 Pecos Water System Supply Page 12 of 46

Russell Leonard delivery Line Item Description Quantity Units 7 5,000 gallon PE storage (green in color) 1 Each

7. Roswell Field Office (RFO) BLM wareyard delivery location.

2909 West Second Street Roswell, NM 88201

RFO wareyard delivery Line Item

Description Quantity Units

2 DR-9 250 psi 2.00" PE pipe (100' rolls) 100 Foot 3 Valve Box, 24" length by 24" diameter riser and septic lid 1 Each 4 8' rubber tire trough, 22.5" max height ~500 gallons 4 Each 6 3,000 gallon PE storage (desert tan, or light brown in color) 3 Each 7 5,000 gallon PE storage (green in color) 2 Each 9 Sackcrete 168 Each

SECTION D - Packaging and Marking

(No Clauses)

SECTION E - Inspection and Acceptance

All services performed shall be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Government Location The Government Government Location The Government NOTE: Government location are defined above in Section C and shown on Attachment 1 (minus Roswell Field Office as this is a physical address located in town).

SECTION F - Deliveries or Performance

See SECTION C - Description/Specifications numbers three (3) through seven (7).

52.247-34 F.o.b. Destination. (NOV 1991)

(a) The term "f.o.b. destination," as used in this clause, means -

(1) Free of expense to the Government, on board the carrier's conveyance, at a specified delivery point where the consignee's facility (plant, warehouse, store, lot, or other location to which shipment can be made) is located; and

(2) Supplies shall be delivered to the destination consignee's wharf (if destination is a port city and supplies are for export), warehouse unloading platform, or receiving dock, at the expense of the Contractor. The Government shall not be liable for any delivery, L15PS00369-000001

Document Title

2015 Pecos Water System Supply Page 13 of 46 storage, demurrage, accessorial, or other charges involved before the actual delivery (or "constructive placement" as defined in carrier tariffs) of the supplies to the destination, unless such charges are caused by an act or order of the Government acting in its contractual capacity. If rail carrier is used, supplies shall be delivered to the specified unloading platform of the consignee. If motor carrier (including "piggyback") is used, supplies shall be delivered to truck tailgate at the unloading platform of the consignee, except when the supplies delivered meet the requirements of Item 568 of the National Motor Freight Classification for "heavy or bulky freight." When supplies meeting the requirements of the referenced Item 568 are delivered, unloading (including movement to the tailgate) shall be performed by the consignee, with assistance from the truck driver, if requested. If the contractor uses rail carrier or freight forwarded for less than carload shipments, the contractor shall ensure that the carrier will furnish tailgate delivery, when required, if transfer to truck is required to complete delivery to consignee.

(b) The Contractor shall -

(1)(i) Pack and mark the shipment to comply with contract specifications; or

(ii) In the absence of specifications, prepare the shipment in conformance with carrier requirements;

(2) Prepare and distribute commercial bills of lading;

(3) Deliver the shipment in good order and condition to the point of delivery specified in the contract;

(4) Be responsible for any loss of and/or damage to the goods occurring before receipt of the shipment by the consignee at the delivery point specified in the contract;

(5) Furnish a delivery schedule and designate the mode of delivering carrier; and

(6) Pay and bear all charges to the specified point of delivery.

(End of clause)

SECTION G - Contract Administration Data

DOI ELECTRONIC INVOICING Electronic Invoicing and Payment Requirements - Invoice Processing Platform (IPP) (April 2013)

Payment requests must be submitted electronically through the U. S. Department of the Treasury's Invoice Processing Platform System (IPP).

"Payment request" means any request for contract financing payment or invoice payment by the Contractor.

To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions - Commercial Items included in commercial item contracts. The IPP website address is:

https://www.ipp.gov.

https://www.ipp.gov/

L15PS00369-000001

Document Title

2015 Pecos Water System Supply Page 14 of 46

Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice:

COPY OF VENDOR INVOICE

The Contractor must use the IPP website to register, access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in SAM will receive enrollment instructions via email from the Federal Reserve Bank of Boston (FRBB) within 3 – 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email ippgroup@bos.frb.org or phone (866) 973-3131.

If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.

DOI AUTHORITIES AND DELEGATIONS AUTHORITIES AND DELEGATIONS (MAY 2010)

(a) The Contracting Officer is the only individual authorized to enter into or terminate this contract, modify any term or condition of this contract, waive any requirement of this contract, or accept nonconforming work.

(b) The Contracting Officer will designate a Contracting Officer’s Representative (COR) at time of award.

The COR will be responsible for technical monitoring of the contractor’s performance and deliveries. The COR will be appointed in writing, and a copy of the appointment will be furnished to the Contractor.

Changes to this delegation will be made by written changes to the existing appointment or by issuance of a new appointment. The COR for this contract will be:

NAME ORGANIZATIONAL ADDRESS TELEPHONE

To be filled in at Bureau of Land Management (575) Contract award

EMAIL

@blm.gov

© The COR is not authorized to perform, formally or informally, any of the following actions:

(1) Promise, award, agree to award, or execute any contract, contract modification, or notice of intent that changes or may change this contract;

(2) Waive or agree to modification of the delivery schedule;

(3) Make any final decision on any contract matter subject to the Disputes Clause;

(4) Terminate, for any reason, the Contractor’s right to proceed;

(5) Obligate in any way, the payment of money by the Government.

(d) The Contractor shall comply with the written or oral direction of the Contracting Officer or authorized representative(s) acting within the scope and authority of the appointment memorandum. The Contractor need not proceed with direction that it considers to have been issued without proper authority. The Contractor shall notify the Contracting Officer in writing, with as much detail as possible, when the COR has taken an action or has issued direction (written or oral) that the Contractor considers to exceed the

L15PS00369-000001

Document Title

2015 Pecos Water System Supply Page 15 of 46

COR¿s appointment, within 3 days of the occurrence. Unless otherwise provided in this contract, the Contractor assumes all costs, risks, liabilities, and consequences of performing any work it is directed to perform that falls within any of the categories defined in paragraph © prior to receipt of the Contracting Officer’s response issued under paragraph © of this clause.

© The Contracting Officer shall respond in writing within 30 days to any notice made under paragraph (d) of this clause. A failure of the parties to agree upon the nature of a direction, or upon the contract action to be taken with respect thereto, shall be subject to the provisions of the Disputes clause of this contract.

(f) The Contractor shall provide copies of all correspondence to the Contracting Officer and the COR.

(g) Any action(s) taken by the Contractor, in response to any direction given by any person acting on behalf of the Government or any Government official other than the Contracting Officer or the COR acting within his or her appointment, shall be at the Contractor’s risk.

(End of notice)

SECTION H – Special Contract Requirements

DOI AGENCY PROTESTS Agency Protests

(a) Interested parties may request an independent review at a level above the Contracting Officer of protests filed directly with the agency. This review is available as an alternative to consideration of the protest by the Contracting Officer or as an appeal of the Contracting Officer’s response to the protest. An interested party may:

(1) Protest to the Contracting Officer;

(2) Protest directly to the Bureau Procurement Chief without first protesting to the Contracting Officer; or

(3) Appeal a contracting officer¿s decision to the Bureau Procurement Chief.

(b) Requests for Bureau Procurement Chief review should be addressed to:

Bureau of Land Management Albuquerque District Office Attn: Reb H. Conn, Supervisory Procurement Analyst 435 Montano Road NE Albuquerque, NM 87107-4935

© Requesting independent agency review will not extend the Government Accountability Office¿s (GAO¿s) timeliness requirements. Any subsequent protest to the GAO must be filed within ten days of knowledge of initial adverse agency action (see 4 CFR 21.2(a)(3).)

(End of Clause)

L15PS00369-000001

Document Title

2015 Pecos Water System Supply Page 16 of 46

SECTION I – Contract Clauses

CLAUSES INCORPORATED BY REFERENCE

52.203-3 Gratuities. (APR 1984)

52.203-6 Restrictions on Subcontractor Sales to the Government. (SEP 2006) – Alternate I (OCT 1995)

52.204-7 System for Award Management. (JUL 2013)

52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards. (JUL 2013)

52.209-6 Protecting the Government’s Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment. (AUG 2013)

52.212-4 Contract Terms and Conditions – Commercial Items. (DEC 2014)

52.219-6 Notice of Total Small Business Set-Aside

52.222-3 Convict Labor. (JUN 2003)

52.222-19 Child Labor – Cooperation with Authorities and Remedies. (JAN 2014)

52.222-21 Prohibition of Segregated Facilities. (FEB 1999)

52.222-26 Equal Opportunity. (MAR 2007)

52.222-35 Equal Opportunity for Veterans. (JUL 2014)

52.222-36 Equal Opportunity for Workers with Disabilities. (JUL 2014)

52.222-37 Employment Reports on Veterans. (JUL 2014)

52.222-50 Combating Trafficking in Persons. (MAR 2015)

52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving. (AUG 2011)

52.225-13 Restrictions on Certain Foreign Purchases. (JUN 2008)

52.228-5 Insurance – Work on a Government Installation. (JAN 1997)

52.229-10 State of New Mexico Gross Receipts and Compensating Tax. (APR 2003)

52.232-17 Interest. (MAY 2014)

52.232-33 Payment by Electronic Funds Transfer – System for Award Management. (JUL 2013)

52.233-3 Protest after Award. (AUG 1996)

L15PS00369-000001

Document Title

2015 Pecos Water System Supply Page 17 of 46

52.237-2 Protection of Government Buildings, Equipment, and Vegetation. (APR 1984)

52.242-13 Bankruptcy. (JUL 1995)

52.253-1 Computer Generated Forms. (JAN 1991)

CLAUSES INCORPORATED BY FULL TEXT

52.212-5 Contract Terms and Conditions Required To Implement Statutes or Executive Orders – Commercial Items. (MAR 2015)

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:

(1) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (DEC 2014)

(2) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).

(3) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Public Laws 108-77 and 108-78 (19 U.S.C. 3805 note)).

(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items: (Contracting Officer check as appropriate.)

[ ] (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (SEP 2006), with Alternate I (OCT 1995) (41 U.S.C. 4704 and 10 U.S.C. 2402).

[ ] (2) 52.203-13, Contractor Code of Business Ethics and Conduct (APR 2010) (41 U.S.C. 3509).

[ ] (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (JUN 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)

[ ] (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (JUL 2013) (Pub. L. 109-282) (31 U.S.C. 6101 note).

(5) (Reserved)

[ ] (6) 52.204-14, Service Contract Reporting Requirements (JAN 2014) (Pub. L. 111- 117, section 743 of Div. C).

[ ] (7) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (JAN 2014) (Pub. L. 111-117, section 743 of Div. C).

L15PS00369-000001

Document Title

2015 Pecos Water System Supply Page 18 of 46

[X] (8) 52.209-6, Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (AUG 2013) (31 U.S.C.

6101 note).

[ ] (9) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (JUL 2013) (41 U.S.C. 2313).

[ ] (10) (Reserved)

[ ] (11)(i) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (NOV 2011) (15 U.S.C. 657a).

[ ] (ii) Alternate I (NOV 2011) of 52.219-3.

[ ] (12)(i) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (OCT 2014) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).

[ ] (ii) Alternate I (JAN 2011) of 52.219-4.

[ ] (13) (Reserved)

[X] (14)(i) 52.219-6, Notice of Total Small Business Set-Aside (NOV 2011) (15 U.S.C.

644).

[ ] (ii) Alternate I (NOV 2011).

[ ] (iii) Alternate II (NOV 2011).

[ ] (15)(i) 52.219-7, Notice of Partial Small Business Set-Aside (JUN 2003) (15 U.S.C.

644).

[ ] (ii) Alternate I (OCT 1995) of 52.219-7.

[ ] (iii) Alternate II (MAR 2004) of 52.219-7.

[ ] (16) 52.219-8, Utilization of Small Business Concerns (OCT 2014) (15 U.S.C.

637(d)(2) and (3)).

[ ] (17)(i) 52.219-9, Small Business Subcontracting Plan (OCT 2014) (15 U.S.C.

637(d)(4)).

[ ] (ii) Alternate I (OCT 2001) of 52.219-9.

[ ] (iii) Alternate II (OCT 2001) of 52.219-9.

[ ] (iv) Alternate III (OCT 2014) of 52.219-9.

[ ] (18) 52.219-13, Notice of Set-Aside of Orders (NOV 2011) (15 U.S.C. 644©).

L15PS00369-000001

Document Title

2015 Pecos Water System Supply Page 19 of 46

[ ] (19) 52.219-14, Limitations on Subcontracting (NOV 2011) (15 U.S.C. 637(a)(14)).

[ ] (20) 52.219-16, Liquidated Damages-Subcontracting Plan (JAN 1999) (15 U.S.C.

637(d)(4)(F)(i)).

[ ] (21) 52.219-27, Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (NOV 2011) (15 U.S.C. 657f).

[ ] (22) 52.219-28, Post Award Small Business Program Representation (JUL 2013) (15 U.S.C. 632(a)(2)).

[ ] (23) 52.219-29, Notice of Set-Aside for Economically Disadvantaged Women-Owned Small Business (EDWOSB) Concerns (JUL 2013) (15 U.S.C. 637(m)).

[ ] (24) 52.219-30, Notice of Set-Aside for Women-Owned Small Business (WOSB) Concerns Eligible Under the WOSB Program (JUL 2013) (15 U.S.C. 637(m)).

[X] (25) 52.222-3, Convict Labor (JUN 2003) (E.O. 11755).

[X] (26) 52.222-19, Child Labor-Cooperation with Authorities and Remedies (JAN 2014) (E.O. 13126).

[X] (27) 52.222-21, Prohibition of Segregated Facilities (FEB 1999).

[X] (28) 52.222-26, Equal Opportunity (MAR 2007) (E.O. 11246).

[X] (29) 52.222-35, Equal Opportunity for Veterans (JUL 2014) (38 U.S.C. 4212).

[X] (30) 52.222-36, Equal Opportunity for Workers with Disabilities (JUL 2014) (29 U.S.C. 793).

[X] (31) 52.222-37, Employment Reports on Veterans (JUL 2014) (38 U.S.C. 4212).

[ ] (32) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (DEC 2010) (E.O. 13496).

[X] (33)(i) 52.222-50, Combating Trafficking in Persons (MAR 2015) (22 U.S.C. chapter 78 and E.O. 13627).

[ ] (ii) Alternate I (MAR 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O.

13627).

[ ] (34) 52.222-54, Employment Eligibility Verification (AUG 2013). (Executive Order 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial items as prescribed in 22.1803.)

[ ] (35)(i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA- Designated Items (MAY 2008) (42 U.S.C. 6962©(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

L15PS00369-000001

Document Title

2015 Pecos Water System Supply Page 20 of 46

[ ] (ii) Alternate I (MAY 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)©). (Not applicable to the acquisition of commercially available off-the-shelf items.)

[ ] (36)(i) 52.223-13, Acquisition of EPEAT®-Registered Imaging Equipment (JUN 2014) (E.O.s 13423 and 13514).

(ii) Alternate I (JUN 2014) of 52.223-13.

[ ] (37)(i) 52.223-14, Acquisition of EPEAT®-Registered Televisions (JUN 2014) (E.O.s 13423 and 13514).

(ii) Alternate I (JUN 2014) of 52.223-14.

[ ] (38) 52.223-15, Energy Efficiency in Energy-Consuming Products (DEC 2007) (42 U.S.C. 8259b).

[ ] (39)(i) 52.223-16, Acquisition of EPEAT®-Registered Personal Computer Products (JUN 2014) (E.O.s 13423 and 13514).

[ ](ii) Alternate I (JUN 2014) of 52.223-16.

[X] (40) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving (AUG 2011)

[X] (41) 52.225-1, Buy American-Supplies (MAY 2014) (41 U.S.C. chapter 83).

[ ] (42)(i) 52.225-3, Buy American-Free Trade Agreements-Israeli Trade Act (MAY 2014) (41 U.S.C. chapter 83, 19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, Pub. L. 103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, and 112-43.

[ ] (ii) Alternate I (MAY 2014) of 52.225-3.

[ ] (iii) Alternate II (MAY 2014) of 52.225-3.

[ ] (iv) Alternate III (MAY 2014) of 52.225-3.

[ ] (43) 52.225-5, Trade Agreements (NOV 2013) (19 U.S.C. 2501, et seq., 19 U.S.C.

3301 note).

[X] (44) 52.225-13, Restrictions on Certain Foreign Purchases (JUN 2008) (E.O.’s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).

[ ] (45) 52.225-26, Contractors Performing Private Security Functions Outside the United States (JUL 2013) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).

[ ] (46) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (NOV 2007) (42 U.S.C. 5150).

L15PS00369-000001

Document Title

2015 Pecos Water System Supply Page 21 of 46

[ ] (47) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area

(NOV 2007) (42 U.S.C. 5150).

[ ] (48) 52.232-29, Terms for Financing of Purchases of Commercial Items (FEB 2002) (41 U.S.C. 4505, 10 U.S.C. 2307(f)).

[ ] (49) 52.232-30, Installment Payments for Commercial Items (OCT 1995) (41 U.S.C.

4505, 10 U.S.C. 2307(f)).

[X] (50) 52.232-33, Payment by Electronic Funds Transfer-System for Award Management (JUL 2013) (31 U.S.C. 3332).

[ ] (51) 52.232-34, Payment by Electronic Funds Transfer – Other than System for Award Management (JUL 2013) (31 U.S.C. 3332).

[ ] (52) 52.232-36, Payment by Third Party (MAY 2014) (31 U.S.C. 3332).

[ ] (53) 52.239-1, Privacy or Security Safeguards (AUG 1996) (5 U.S.C. 552a).

[ ] (54)(i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (FEB 2006) (46 U.S.C. Appx. 1241(b) and 10 U.S.C. 2631).

[ ] (ii) Alternate I (APR 2003) of 52.247-64.

© The Contractor shall comply with the FAR clauses in this paragraph ©, applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items: (Contracting Officer check as appropriate.)

[ ] (1) 52.222-41, Service Contract Labor Standards (MAY 2014) (41 U.S.C. chapter 67).

[ ] (2) 52.222-42, Statement of Equivalent Rates for Federal Hires (MAY 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67).

[ ] (3) 52.222-43, Fair Labor Standards Act and Service Contract Labor Standards-Price Adjustment (Multiple Year and Option Contracts) (MAY 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67).

[ ] (4) 52.222-44, Fair Labor Standards Act and Service Contract Labor Standards-Price Adjustment (MAY 2014) (29 U.S.C 206 and 41 U.S.C. chapter 67).

[ ] (5) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment-Requirements (MAY 2014) (41 U.S.C. chapter 67).

[ ] (6) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services-Requirements (MAY 2014) (41 U.S.C. chapter 67).

[ ] (7) 52.222-17, Nondisplacement of Qualified Workers (MAY 2014) (E.O. 13495).

L15PS00369-000001

Document Title

2015 Pecos Water System Supply Page 22 of 46

[ ] (8) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (MAY 2014) (42 U.S.C. 1792).

[ ] (9) 52.237-11, Accepting and Dispensing of $1 Coin (SEP 2008) (31 U.S.C.

5112(p)(1)).

[ ] (10) 52.222-55, Minimum Wages Under Executive Order 13658 (DEC 2014) (Executive Order 13658).

(d) Comptroller General Examination of Record. The Contractor shall comply with the provisions of this paragraph (d) if this contract was awarded using other than sealed bid, is in excess of the simplified acquisition threshold, and does not contain the clause at 52.215-2, Audit and Records – Negotiation.

(1) The Comptroller General of the United States, or an authorized representative of the Comptroller General, shall have access to and right to examine any of the Contractor’s directly pertinent records involving transactions related to this contract.

(2) The Contractor shall make available at its offices at all reasonable times the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR Subpart 4.7, Contractor Records Retention, of the other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement. Records relating to appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved.

(3) As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and regardless of form. This does not require the Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law.

©(1) Notwithstanding the requirements of the clauses in paragraphs (a), (b), (c), and (d) of this clause, the Contractor is not required to flow down any FAR clause, other than those in this paragraph ©(1) of this paragraph in a subcontract for commercial items. Unless otherwise indicated below, the extent of the flow down shall be as required by the clause-

(i) 52.203-13, Contractor Code of Business Ethics and Conduct (APR 2010) (41 U.S.C. 3509).

(ii) 52.219-8, Utilization of Small Business Concerns (OCT 2014) (15 U.S.C.

637(d)(2) and (3)), in all subcontracts that offer further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds $650,000 ($1.5 million for construction of any public facility), the subcontractor must include 52.219-8 in lower tier subcontracts that offer subcontracting opportunities.

(iii) 52.222-17, Nondisplacement of Qualified Workers (MAY 2014) (E.O.

13495). Flow down required in accordance with paragraph (l) of FAR clause 52.222-17.

L15PS00369-000001

Document Title

2015 Pecos Water System Supply Page 23 of 46

(iv) 52.222-26, Equal Opportunity (MAR 2007) (E.O. 11246).

(v) 52.222-35, Equal Opportunity for Veterans (JUL 2014) (38 U.S.C. 4212).

(vi) 52.222-36, Equal Opportunity for Workers with Disabilities (JUL 2014) (29 U.S.C. 793).

(vii) 52.222-37, Employment Reports on Veterans (JUL 2014) (38 U.S.C. 4212).

(viii) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (DEC 2010) (E.O. 13496). Flow down required in accordance with paragraph (f) of FAR clause 52.222-40.

(ix) 52.222-41, Service Contract Labor Standards (MAY 2014) (41 U.S.C.

chapter 67).

(x) __ (A) 52.222-50, Combating Trafficking in Persons (MAR 2015) (22 U.S.C. chapter 78 and E.O. 13627).

__ (B) Alternate I (MAR 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).

(xi) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .