Evaluation Factors Criteria
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_L15PS00238_Amd_000004.pdf | ||
| Bid_Schedule_Revision_4-14-15.pdf | ||
| Sol_L15PS00238_Amd_000003.pdf | ||
| Paving_Specs_Final__REV_14Apr2015.pdf | ||
| Questions_and_Answers_-_SCL_Paving_project_4-13-15.pdf | ||
| Pavement_Extents-Guard_Rail_extents-Concrete_Extents_Drawings_4-15-15.pdf | ||
| Prebid_Meeting_and_Site_Visit_notes.pdf | ||
| Sign-In_sheet_Site_Visit_SCL_Paving_Project.pdf | ||
| Bid_schedule_SCL_paving_project-_FINAL.pdf | ||
| Sol_L15PS00238_Amd_000002.pdf | ||
| Sol_L15PS00238_Amd_000001.pdf | ||
| WD_Rates__NM48_SCL_Paving_Project.pdf | ||
| DAY_USE_PARKING_CURB_AND_GUTTER_PLAN.pdf | ||
| BLM_Paving_Drawings.pdf | ||
| Paving_Specs_Final_REV24Feb2015.doc | DOC document | |
| BOAT_PARKING_CURB_AND_GUTTER_PLAN.pdf | ||
| Santa_Cruz_Lake_Project_Site_Map.pdf | ||
| Sol_L15PS00238.pdf | ||
| SCL_Paving_BID_SCHEDULE_2-24-15.pdf |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Evaluation Criteria for Pavement work and Guard Rail work at Santa Cruz Lake Recreation Area
FACTOR 1 – EXPERIENCE
Provide a list of at least three (3) projects completed in the past seven (7) years in which you acted as a General Contractor or Sub-Contractor responsible for the completion of projects similar in nature. Each project description must contain the following information:
· The name of the project
· The project start and end dates
· A brief description of project (no more than one (1) page)
· The owner of project
· The owner’s contact information
· The total dollar value of the project
· The project performance evaluation
FACTOR 2 – PAST PERFORMANCE
The Offeror shall submit at least two (2) references for each project listed in its response to Factor 1, Experience. Each reference is to be submitted on a past performance questionnaire information sheet provided in Section J. The identified reference should be able to address the following aspects of the contractor’s past performance regarding construction projects that are similar in nature. One sheet is to be filled out for each reference.
FACTOR 3 – SCHEDULE
The Offeror shall submit a project schedule reflecting the estimated construction completion time. Schedule shall include a hypothetical start date and end date.
FACTOR 4 – KEY PERSONNEL
(a) For purposes of this RFP, Key Personnel are defined as follows:
· Project Manager
· Site Superintendant
(b) The Offeror shall include a resume for each proposed key personnel that includes the information described below. (Note: Offerors should clearly note in their proposal if any of the positions identified as Key Personnel will be performed by the same individual.)
· Name
· Proposed Key Personnel position
· Current employer
· Education and training
· Professional licensing; and
· Relevant work experience – The offeror shall demonstrate that each proposed key personnel meets the requirements described below.
(c) Key Personnel Requirements
i. Project Manager: At a minimum, the Project Manager shall have five (5) years’ experience on projects similar in nature, and shall have acted in the Project Manager capacity on at least one previous project. For the project on which the proposed Project Manager served as the Project Manager, the offeror shall provide, in writing, verification of the following: project summary, date of project completion, location of project, owner of project, total dollar value of project, and the Project Manager status of the individual identified as the proposed Project Manager for this project.
ii. Site Superintendent: At a minimum, the Site Superintendent, shall have five (5) years’ experience on projects similar in nature, and shall have acted in the Site Superintendent’s capacity on at least one project. For the project on which the proposed Site Superintendent served as a Site Superintendent, the offeror shall provide, in writing, verification of the following: project summary, date of project completion, location of project, owner of project, total dollar value of project, and the Superintendent status of the individual identified as the proposed Superintendent for this project.