KKE_PLANS_Final_1.pdf

PDF 8 MB Posted

Attached to
KENO, KENNEDY, & ELEVATION AREA ROAD MAINTENANCE Federal contract opportunity
Solicitation number
140L3623R0011
Issued by
Department of the Interior Bureau of Land Management

About this file

This pre-solicitation notice announces a forthcoming request for proposal for road maintenance services. The Bureau of Land Management will solicit proposals for maintenance of roads Keno #405, Kennedy #2817, and Elevation #2819 in Montana, with optional items for additional area roads. Work includes clearing, road reconstruction, widening, dip construction, and culvert installation. The estimated value is $250,000 to $500,000. Proposals will be due April 24, 2023 and evaluated using lowest price technically acceptable criteria. A firm-fixed price contract will be awarded on or around June 18, 2023 for work to begin within 10 days of notice and be complete by October 15, 2024. The solicitation will be set aside for small businesses and utilize the System for Award Management and Invoice Processing Platform.

View the file

Other files for this federal contract opportunity

Other files attached to KENO, KENNEDY, & ELEVATION AREA ROAD MAINTENANCE, newest first.
File Type Posted
KKE_FP14-BLM_Supplemental_Specs_1.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IDAHO

CANADA

UNITED STATES

SASKATC

H

EW

AN

ALBERTA

B R

ITIS

H

C O

LU

M

B

IA

N O

R T

H

D

A K

O T

A

S O

U T

H

D

A K

O T

A

WYOMING

ALT

MISSOULA

KALISPELL

GREAT FALLS

HAVRE

HELENA

BUTTE

BILLINGS

MILES CITY

LEWISTOWN

MONTANACHOTEAU

MALTA

GLASGOW

CHESTER

FT BENTON

STATE REFERENCE MAP

(N.T.S)

UNITED STATES DEPARTMENT OF THE INTERIOR

BUREAU OF LAND MANAGEMENT

KENO, KENNEDY & ELEVATION AREA ROAD MAINTENANCE

MISSOULA AND POWELL COUNTIES

MISSOULA FIELD OFFICE

VICINITY MAP

(N.T.S)

DIRECTIONS TO SITE:

TAKE MT-200 E 28 MI TO GARNET RANGE ROAD. TURN RIGHT FOLLOW GARNET RANGE

ROAD IN ABOUT 10 MILES. TURN LEFT TO STAY ON GARNET RANGE ROAD ANOTHER

2.5 MILES TOWARD ELK CREEK. TAKE A LEFT AT THE INTERSECTION OF RANGE ROAD

AND ELK CREEK. KENO CREEK WILL BE ON THE RIGHT IN 1 MILE.

NOTE: THE PROJECT AREA CAN ALSO BE REACHED VIA SUNSET HILL ROAD AND

COMING UP ELK CREEK HOWEVER THIS ROUTE IS NOT RECOMMENDED FOR VEHICLES

THAN A PICKUP AT THIS TIME.

\\ILMMTBF3DS1\BF\USERS\BJONES\MY DOCUMENTS\DWG\DWT\IMPROVEMENT SHEETS\#### - COVR.DWG

GENERAL ENGINEER'S NOTES

1. THE CONTRACTOR IS RESPONSIBLE FOR ALL METHODS, SEQUENCING, AND SAFETY

CONCERNS ASSOCIATED WITH THIS PROJECT DURING CONSTRUCTION, UNLESS

SPECIFICALLY ADDRESSED OTHERWISE IN THIS PLAN OR ELSEWHERE IN THE

CONTRACT DOCUMENTS.

2. THE CONTRACTOR IS TO COMPLY WITH ALL LOCAL, STATE, AND FEDERAL LAWS AND

REGULATIONS APPLICABLE TO THE CONSTRUCTION COVERED BY THIS PLAN.

3. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING AND COMPLYING WITH ALL

PERMITS REQUIRED TO COMPLETE ALL WORK COVERED BY THIS PLAN.

4. THE QUANTITIES AND SITE CONDITIONS DEPICTED IN THIS PLAN ARE FOR

INFORMATIONAL PURPOSES ONLY AND ARE SUBJECT TO ERROR AND OMISSION.

CONTRACTOR SHALL SATISFY THEMSELVES AS TO ACTUAL QUANTITIES AND SITE

CONDITIONS PRIOR TO BIDDING THE WORK FOR THE CONSTRUCTION COVERED BY

THIS PLAN.

5 A REASONABLE EFFORT HAS BEEN MADE TO SHOW THE LOCATIONS OF EXISTING

PUBLIC OR PRIVATE UNDERGROUND FACILITIES AND UTILITIES IN THE

CONSTRUCTION AREA. THE CONTRACT IS RESPONSIBLE FOR ANY DAMAGE TO

UTILITIES AND/OR FACILITES CAUSED DURING THEIR CONSTRUCTION OPERATIONS.

THE CONTRACTOR SHALL CALL 48 HOURS IN ADVANCE FOR LOCATION OF

UNDERGROUND UTILITES (811) PRIOR TO ANY EXCAVATION.

6. THE CONTRACTOR IS TO VERIFY THE LOCATION AND THE ELEVATIONS OF ALL

EXISTING UTILITIES AT POINTS OF TIE-IN PRIOR TO COMMENCING ANY NEW

CONSTRUCTION. SHOULD ANY LOCATION OR ELEVATION DIFFER FROM THAT SHOWN

ON THESE PLANS, THE CONTRACTOR SHALL CONTACT THE CONTRACTING OFFICER

WITH ANY DISCREPANCIES.

7. THE CONTRACTOR IS TO VERIFY AND COORDINATE ALL DIMENSIONS AND SITE

LAYOUT WITH THE FINAL SITE PLAN PRIOR TO CONSTRUCTION AND CONTACT

CONTRACTING OFFICER WITH ANY DISCREPANCIES.

8. COORDINATION BETWEEN ALL PARTIES INVOLVED IS ESSENTIAL TO THE CONTRACT.

9. THE CONTRACTOR IS RESPONSIBLE FOR PROJECT AND SITE CONDITIONS, AND TO

WORK WITH WEATHER CONDITIONS, AS THE SITE MAY BE LOCATED IN AN AREA WITH

EXTREME WEATHER CONDITIONS OR WITHIN A FLOOD PRONE AREA.

10. THE CONTRACTOR IS TO VERIFY THE LOCATION, ELEVATION, CONDITION, AND

FINISHED GRADE CROSS-SLOPE OF ALL EXISTING SURFACES AT POINTS OF TIE-IN

AND MATCHING PRIOR TO COMMENCEMENT OF GRADING, PAVING, INSTALLATION OF

CURB & GUTTER, SIDEWALK, OR OTHER SURFACE CONSTRUCTION. SHOULD THE

EXISTING LOCATIONS, ELEVATION, CONDITION, OR FINISHED GRADE CROSS-SLOPE

DIFFER FROM THAT SHOWN ON THESE PLANS AND RESULTS IN THE DESIGN INTENT

OF THESE PLANS NOT ABLE TO BE CONSTRUCTED, THE CONTRACTOR SHALL NOTIFY

THE CONTRACTING OFFICER OF DISCREPANCIES AND SEEK DIRECTION ON HOW TO

PROCEED.THE CONTRACTOR ACCEPTS RESPONSIBILITY FOR ALL COSTS

ASSOCIATED WITH CORRECTIVE ACTION IF THESE PROCEDURES ARE NOT

FOLLOWED.

11. THE CONTRACTOR IS TO CONSTRUCT RETENTION BASINS TO PROVIDE VOLUMES

SHOWN ON PLAN SET AND SCARIFY BOTTOMS OF BASINS TWO FEET DEEP.

COMPACTION OF BASIN BOTTOMS NOT TO EXCEED 80%.

12. FOR PROJECTS INVOLVING STORM DRAINS AND/OR CULVERTS: THE CONTRACTOR IS

REQUIRED TO PROVIDE ONGOING MAINTENANCE OF THE DESIGNED DRAINAGE

SYSTEM(S) DURING CONSTRUCTION TO PRESERVE THE DESIGN INTEGRITY AND THE

ABILITY OF THE SYSTEM TO PERFORM ITS OPERATIONAL INTENT. FAILURE TO

PROVIDE MAINTENANCE WILL JEOPARDIZE THE DRAINAGE SYSTEM(S)'

PERFORMANCE.

13. DRAWINGS HAVE BEEN PREPARED ON AN ORIGINAL SHEET SIZE OF 34" X 22"

RECOMMENDED BY:

FIRST MI. LAST

REVIEWED BY:

FIRST MI. LAST

APPROVED BY:

FIRST MI. LAST

PROJECT DESCRIPTION

C O

V E

R

K E

N O

K

E N

N E

D Y

E

L E

V

A

R E

A

R

D

M

A I N

T

B U

R E

A U

O

F

L

A N

D

M

A N

A G

E M

N E

T

I S

S U

E

D

A T

E

M A

R K

R E

V I S

I O

N D

A T

E A

P P

R O

V E

D

___ OF ___

SHEET

U S

D

E P

A R

T M

E N

T

O

F

T

H

I N

T E

R I O

R

(DESIGNED BY: KCM DRAWN BY: KCM CHECKED BY: GLA APPROVED BY: EC

D I S

T R

I C

T

D E

S I G

N

O

F F

I C

E

I S

S U

R

C

O N

S T

R U

C T

I O

N

W E

S T

E R

N

M

O N

T A

S

T R

I C

T

M I S

S O

U L

A

F

I E

F

I C

E

THIS PROJECT WILL PERFORM ROAD MAINTENANCE ON ROADS IN THE VACINITY OF

BLM ROADS KENO #405, KENNEDY #2817 AND ELEVATION #2819. ROAD MAINTENANCE

INCLUDES BRUSHING, ROADWAY RECONDITIONING, DRAINAGE CONSTRCTION AND

MAINTENANCE,

Drawing Index Sheet Number Sheet Title

COVER

1 COVER

NOTES & QUANTITIES

2 GENERAL NOTES

3 AREAMAP

4 ROADWORK SUMMARY

WORKLISTS

5 WORKLIST 404 ELK CR & 405 KENO CR 1 OF 2

6 WORKLIST 404 ELK CR & 405 KENO CR 2 OF 2

7 WORKLIST 2817 KENNEDY CR 1 OF 2

8 WORKLIST 2817 KENNEDY CR 2 OF 2

9 WORKLIST 2819 ELEVATION MTN & OTHER

DETAILS

10 CLEARING AND GRUBBING

11 ROADWAY RECOND

12 SWITCHBACK

13 TURNOUTS

14 CULVERT TYP

15 SEDIMENT TRAP

16 DIP

17 HEAVY GATE 1 OF 3

18 HEAVY GATE 2 OF 3

19 HEAVY GATE 3 OF 3

PayItem Discription

Unit

A L

L

Grand

Total

15101. Mobilization Lum Sum 1.0 1.0

15710.

Sediment traps

Each 4.0 5.0 9.0

20203A

Selective Clearing and Grubbing-Lite-Med, disposal method (c)(e)(f)(g)(i)(j) or

(k)

Mile 4.2 3.6 7.8

20203B

Selective Clearing and Grubbing-Heavy, disposal method (c)(e)(f)(g)(i)(j) or (k)

Mile 2.6 5.1 0.5 8.2

20203B-Option Selective Clearing and Grubbing-Heavy, disposal method (c)(e)(f)(g)(i)(j) or (k)

Mile 1.1 0.8 0.9 1.3 1.8 1.7 2.2 5.7 4.0 19.5

20207.

Removal of Individual Trees, disposal method (c)(e)(f)(g)(i)(j) or (k)

Each 7.0 9.0 16.0

20301.

Removal of rubber belt, disposal method (a) Lump Sum

9.0 9.0

20402A

Roadway excavation and embankment,To Widen, compaction placement method 2, tolerance class D

Mile 0.4 2.0 1.5 3.9

20402B

Roadway excavation and embankment,To Widen, compaction placement method 3, tolerance class F

Cubic Yard 20.0 130.0 150.0

20403.

Roadway excavation and embankment, Unclassified Borrow, compaction placement method 3. Contract Quantity.

Cubic Yard 100.0 20.0 90.0 50.0 260.0

20424A

Drainage Excavation, Type Construct Ditch

Foot 5645.0 190.0 50.0 3450.0 9335.0

20424B

Drainage Excavation, Type Construct Lead-out Ditch

Foot 95.0 110.0 35.0 240.0

20425A

Drainage Excavation, Type Construct Drain Dip

Each 11.0 1.0 5.0 17.0

20425B

Drainage Excavation, Type Reshape Drain Dip

Each 6.0 1.0 10.0 17.0

20425C

Drainage Excavation, Type Construct Catch Basin

Each 1.0 3.0 4.0

20425D

Drainage Excavation, Type Reshape Catch Basin

Each 17.0 11.0 28.0

20425E

Drainage Excavation, Type Construct Drivable Waterbar

Each 2.0 10.0 12.0

25104

Keyed riprap, class 4. Government furnished.

Cubic Yard 6.0 6.0

30315A

Roadway reconditioning, compaction Placement Method 2

Mile 3.0 2.4 5.4

30315B

Roadway reconditioning, compacti

Mile 1.3 1.9 3.2

30319.

Construct 4% Outslope for 50' with 25' Tapers

Each 16.0 11.0 22.0 49.0

60201A

18 inch pipe culvert, Type CMP

Foot 160.0 40.0 356.0 556.0

60201C

53"x41" inch pipe-arch culvert, Type CMP

Foot 50.0 50.0

60708.

Cleaning culverts in place

Each 23.0 26.0 49.0

61902.

Gate, Contractor Furnish with Sign Package, Post Anchor Method 2

Each 1.0 2.0 1.0 1.0 1.0 6.0

62201A

Rental Equipment, Hydraulic Excavator

Hour 4.3 1.0 8.0 5.3 16.0 34.5

62201B

Rental Equipment, Dump Truck

Hour 8.0 8.0

62201C

Rental Equipment, Grader

Hour 3.0 5.0 9.0 17.0

63302

Sign system, government furnished

Each 1.0 1.0

C:\TMP\_WMD_DESIGNPROJECTS\20221207_KENOKENNEDYELEVATION\06_IMPROVEMENT

SHEETS\20221207_GENNOTESWORKLIST.DWG

PUBLIC SAFETY & TRAFFIC CONTROL NOTES

1. CONTRACTOR TO TAKE ALL NECESSARY PRECAUTIONS TO ENSURE PROTECTION OF

THE PUBLIC AND SAFE GUARDING OF WORK.

2. PLACE ROAD BARRIER(S) & ROAD CLOSURE SIGNAGE AT THE SITE ENTRANCE IN

ACCORDANCE WITH FHA FP-14 SPECIFICATION SECTIONS 635.04, 635.05, & 635.07. NO

CONSTRUCTION SHALL OCCUR UNTIL THE PROPER TRAFFIC CONTROL DEVICES FOR

WARNING, CHANNELING, AND PROVIDING SAFETY FOR MOTORISTS ARE IN PLACE.

MAINTAIN THE CONDITION, OPERATION AND EFFECTIVENESS OF ALL TRAFFIC

CONTROL DEVICES UNTIL NO LONGER NEEDED. REMOVE ALL TRAFFIC CONTROL

DEVICES UPON PROJECT COMPLETION.

SITE LAYOUT NOTES

1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD MEASUREMENT OF ALL

PROPOSED FENCES AND GATES.

2 THE LAYOUT OF SITE AMENITIES AND FENCES MUST BE APPROVED BY THE

GOVERNMENT PRIOR TO INSTALLATION.

GRADING & DRAINAGE NOTES

1. PROVIDE POSITIVE DRAINAGE AWAY FROM ALL STRUCTURES AT ALL LOCATIONS.

2. PITCH EVENLY BETWEEN CONTOUR LINES AND BETWEEN SPOT ELEVATIONS.

3. THE CONTRACTOR SHALL VERIFY EXISTING GRADES IN THE FIELD AND REPORT ANY

DISCREPANCIES TO THE CONTRACTING OFFICER PRIOR TO COMMENCING

CONSTRUCTION.

4. REFER TO THE EARTHWORK SECTION OF THE SPECIFICATIONS FOR BACKFILL AND

GRADING PROCEDURES.

5. EXCESS MATERIALS SHALL NOT BE REMOVED FROM THE SITE UNLESS DIRECTED BY

THE GOVERNMENT. SEE EARTHWORK SPECIFICATIONS FOR DETAILS

6. ANY WORK OUTSIDE THE EXISTING CUT AND FILL MUST BE APPROVED BY THE COR

AND ENSURED THAT IT IS CLEARED OF ANY CULTURAL. THIS INCLUDES ANY NEW

TURNOUTS OR SWITCHBACK WIDENING.

ROADWAY & PATHWAY NOTES

1. ALL STATIONING IS BASED ON CENTERLINE OF ROADWAY(S) & PATHWAY(S) UNLESS

OTHERWISE NOTED

2. ROADWAYS SHALL NOT BE CONSTUCTED UNTIL ALL CULVERTS, STORM DRAIN, &

UNDERGROUND UTILITIES HAVE BEEN INSTALLED AND ACCEPTED BY THE

GOVERNMENT.

3. IT SHALL BE THE RESPONSIBILTY OF THE CONTRACTOR TO SUPERVISE AND

CERTIFY THAT PROPER COMPACTION HAS BEEN OBTAINED.

4. ALL PROPOSED ROADWAYS & PATHWAYS SHALL MEET THE LINE AND GRADE OF

EXISTING ADJACENT ROADWAY SURFACES.

DEMOLITION NOTES

1. ANY AREA OUTSIDE THE LIMIT OF WORK THAT IS DISTURBED SHALL BE RESTORED

TO ITS ORIGINAL CONDITION AT NO ADDITIONAL COST TO THE GOVERNMENT.

2. EXCAVATION AND FINISH GRADE AREAS, TO BE COVERED BY EMBANKMENTS, SHALL

BE THOROUGHLY CLEARED AND STRIPPED OF VEGETATIVE MATTER, BRUSH, TREES,

STUMPS, ROOTS, AND ROCK AS INDICATED ON THE PLAN. CLEARING AND GRUBBING

MATERIAL SHALL BE WASTED IN DESIGNATED AREAS IDENTIFIED ON THE PLAN OR

ON SITE PER THE GOVERNMENTS DIRECTIONS.

3. EXCAVATION MATERIAL NOT USED FOR THE CONSTRUCTION OF EMBANKMENTS

SHALL BE WASTED IN DESIGNATED WASTE AREA(S) AS IDENTIFIED ON THE PLANS

OR AS DIRECTED BY GOVERNMENT. WASTE MATERIAL SHALL BE SHAPED AND

BLENDED INTO THE SURROUNDING TERRAIN AND SHALL NOT EXCEED 3:1 SLOPES

UNLESS OTHERWISE SPECIFIED BY THE GOVERNMENT.

4. CONTRACTOR TO SEPARATE ANY SALVAGEABLE TOPSOIL AND USE MATERIAL TO

CAP WASTE SITE DURING EXCAVATION AND CLEARING.

5. CARE SHOULD BE TAKEN IN ALL EXCAVATION DUE TO POSSIBLE EXISTENCE OF

UNRECORED ARCHEOLOGY.

6. CONSULT ALL DRAWING AND SPECIFICATIONS FOR COORDINATION PRIOR TO

COMMENCING DEMOLITION.

G E

N E

R A

L

N

O T

E S

K E

N O

K

E N

N E

E

V

A

R E

A

R

D

M

A I N

T

B U

R E

L

A N

D

M

A N

A G

E M

N E

T

I S

S U

E

D

A T

E

M A

R K

R E

V I S

I O

N D

A T

E A

P P

R O

V E

D

___ OF ___

SHEET

U S

D

E P

A R

T M

E N

T

O

F

T

T E

R I O

R

(DESIGNED BY: KCM DRAWN BY: KCM CHECKED BY: GLA APPROVED BY: EC

D I S

T R

I C

T

D E

S I G

N

O

F F

I C

E

I S

S U

R

C

O N

S T

R U

C T

I O

N

W E

S T

E R

N

M

O N

T A

S

T R

I C

T

M I S

S O

U L

A

F

I E

F

I C

C:\TMP\_WMD_DESIGNPROJECTS\20221207_KENOKENNEDYELEVATION\06_IMPROVEMENT

SHEETS\20221207_GENNOTESWORKLIST.DWG

V I C

I N

I T

Y

M

A P

K E

N O

K

E N

N E

E

V

A

R E

A

R

D

M

A I N

T

B U

R E

L

A N

D

M

A N

A G

E M

N E

T

I S

S U

E

D

A T

E

M A

R K

R E

V I S

I O

N D

A T

E A

P P

R O

V E

D

___ OF ___

SHEET

U S

D

E P

A R

T M

E N

T

O

F

T

T E

R I O

R

(DESIGNED BY: KCM DRAWN BY: KCM CHECKED BY: GLA APPROVED BY: EC

D I S

T R

I C

T

D E

S I G

N

O

F F

I C

E

I S

S U

R

C

O N

S T

R U

C T

I O

N

W E

S T

E R

N

M

O N

T A

S

T R

I C

T

M I S

S O

U L

A

F

I E

F

I C

Road BMP EMP

Unit

Actual

QTY

404 -0.01 . 20424A

Drainage Excavation, Type Construct Ditch

Foot 50

60201A

18 inch pipe culvert, Type CMP

Foot 40

0.01 . 25104

Keyed riprap, class 4. Government furnished.

Cubic Yard 6

60201C

53"x41" inch pipe-arch culvert, Type CMP

Foot 50

62201A

Rental Equipment, Hydraulic Excavator

Hour 8

0.03 . 20403.

Roadway excavation and embankment, Unclassified Borrow, compaction placement method 3. Contract Quantity.

Cubic Yard 90

404 Total

405 0.00 2.35 30315A

Roadway reconditioning, compaction Placement Method 2

Mile 2.35

3.64 20203A

Selective Clearing and Grubbing-Lite-Med, disposal method (c)(e)(f)(g)(i)(j) or

(k)

Mile 3.6

0.01 . 63302

Sign system, government furnished

Each 1

63306

Post, 4x4

Each 1

0.02 . 20424A

Drainage Excavation, Type Construct Ditch

Foot 100

0.05 . 60201A

18 inch pipe culvert, Type CMP

Foot 40

0.11 . 60708.

Cleaning culverts in place

Each 1

0.12 . 20424A

Drainage Excavation, Type Construct Ditch

Foot 50

0.15 . 20207.

Removal of Individual Trees, disposal method (c)(e)(f)(g)(i)(j) or (k)

Each 1

0.23 . 60708.

Cleaning culverts in place

Each 1

0.23 . 20424A

Drainage Excavation, Type Construct Ditch

Foot 150

0.25 . 20424A

Drainage Excavation, Type Construct Ditch

Foot 150

0.29 . 20425D

Drainage Excavation, Type Reshape Catch Basin

Each 1

0.30 . 60708.

Cleaning culverts in place

Each 1

0.35 . 20424A

Drainage Excavation, Type Construct Ditch

Foot 150

60201A

18 inch pipe culvert, Type CMP

Foot 50

0.36 . 60708.

Cleaning culverts in place

Each 1

0.39 . 20425C

Drainage Excavation, Type Construct Catch Basin

Each 1

0.40 . 60708.

Cleaning culverts in place

Each 1

0.48 . 20425D

Drainage Excavation, Type Reshape Catch Basin

Each 1

0.49 . 60708.

Cleaning culverts in place

Each 1

0.49 . 20403.

Roadway excavation and embankment, Unclassified Borrow, compaction placement method 3. Contract Quantity.

Cubic Yard 30

0.51 . 20425C

Drainage Excavation, Type Construct Catch Basin

Each 1

0.51 . 60708.

Cleaning culverts in place

Each 1

0.52 . 20424A

Drainage Excavation, Type Construct Ditch

Foot 200

0.56 . 20424A

Drainage Excavation, Type Construct Ditch

Foot 300

0.56 . 62201C

Rental Equipment, Grader

Hour 1

0.58 . 60201A

18 inch pipe culvert, Type CMP

Foot 40

0.59 . 60708.

Cleaning culverts in place

Each 1

0.60 . 30319.

Construct 4% Outslope for 50' with 25' Tapers

Each 1

62201C

Rental Equipment, Grader

Hour 2

0.63 . 20403.

Roadway excavation and embankment, Unclassified Borrow, compaction placement method 3. Contract Quantity.

Cubic Yard 20

0.64 . 20425C

Drainage Excavation, Type Construct Catch Basin

Each 1

60708.

Cleaning culverts in place

Each 1

0.65 . 20424A

Drainage Excavation, Type Construct Ditch

Foot 150

0.70 . 20207.

Removal of Individual Trees, disposal method (c)(e)(f)(g)(i)(j) or (k)

Each 3

0.73 . 20424A

Drainage Excavation, Type Construct Ditch

Foot 100

Road BMP EMP

PayItem Discription

Unit

Actual

QTY

0.74 . 20425D

Drainage Excavation, Type Reshape Catch Basin

Each 1

60708.

Cleaning culverts in place

Each 1

0.76 . 30319.

Construct 4% Outslope for 50' with 25' Tapers

Each 1

0.79 . 20425D

Drainage Excavation, Type Reshape Catch Basin

Each 1

0.80 . 60708.

Cleaning culverts in place

Each 1

0.81 . 30319.

Construct 4% Outslope for 50' with 25' Tapers

Each 1

0.81 . 62201A

Rental Equipment, Hydraulic Excavator

Hour 1

0.83 . 20424A

Drainage Excavation, Type Construct Ditch

Foot 100

20425D

Drainage Excavation, Type Reshape Catch Basin

Each 1

60708.

Cleaning culverts in place

Each 1

0.86 . 30319.

Construct 4% Outslope for 50' with 25' Tapers

Each 1

0.87 . 60708.

Cleaning culverts in place

Each 1

0.88 . 60708.

Cleaning culverts in place

Each 1

0.90 . 60708.

Cleaning culverts in place

Each 1

0.92 . 62201A

Rental Equipment, Hydraulic Excavator

Hour 1

0.94 . 60708.

Cleaning culverts in place

Each 1

0.94 . 20425D

Drainage Excavation, Type Reshape Catch Basin

Each 1

0.98 . 20425B

Drainage Excavation, Type Reshape Drain Dip

Each 1

0.99 . 20425D

Drainage Excavation, Type Reshape Catch Basin

Each 1

0.99 . 60708.

Cleaning culverts in place

Each 1

1.01 . 20424A

Drainage Excavation, Type Construct Ditch

Foot 100

1.01 . 62201A

Rental Equipment, Hydraulic Excavator

Hour 0.5

1.02 . 20424A

Drainage Excavation, Type Construct Ditch

Foot 150

20425D

Drainage Excavation, Type Reshape Catch Basin

Each 1

60708.

Cleaning culverts in place

Each 1

1.09 . 30319.

Construct 4% Outslope for 50' with 25' Tapers

Each 1

1.09 . 20424A

Drainage Excavation, Type Construct Ditch

Foot 100

1.10 . 62201C

Rental Equipment, Grader

Hour 1

1.10 . 60708.

Cleaning culverts in place

Each 1

1.10 . 20425D

Drainage Excavation, Type Reshape Catch Basin

Each 1

1.14 . 60708.

Cleaning culverts in place

Each 1

1.14 . 20425D

Drainage Excavation, Type Reshape Catch Basin

Each 1

1.16 . 30319.

Construct 4% Outslope for 50' with 25' Tapers

Each 1

1.22 . 30319.

Construct 4% Outslope for 50' with 25' Tapers

Each 1

1.23 . 20424B

Drainage Excavation, Type Construct Lead-out Ditch

Foot 15

1.25 . 20424A

Drainage Excavation, Type Construct Ditch

Foot 150

1.28 . 30319.

Construct 4% Outslope for 50' with 25' Tapers

Each 1

1.33 . 60201A

18 inch pipe culvert, Type CMP

Foot 40

1.34 . 15710.

Sediment traps

Each 1

1.34 . 20424A

Drainage Excavation, Type Construct Ditch

Foot 150

1.38 . 30319.

Construct 4% Outslope for 50' with 25' Tapers

Each 1

1.42 . 62201C

Rental Equipment, Grader

Hour 1

1.45 . 30319.

Construct 4% Outslope for 50' with 25' Tapers

Each 1

1.48 . 20425D

Drainage Excavation, Type Reshape Catch Basin

Each 1

1.50 . 60708.

Cleaning culverts in place

Each 1

1.59 . 60201A

18 inch pipe culvert, Type CMP

Foot 40

C:\TMP\_WMD_DESIGNPROJECTS\20221207_KENOKENNEDYELEVATION\06_IMPROVEMENT

SHEETS\20221207_WORKLIST.DWG

G E

N E

R A

L

N

O T

E S

K

E Y

M A

P

Q

A

N T

I T

I E

S

K E

N O

K

E N

N E

E

V

A

R E

A

R

D

M

A I N

T

B U

R E

L

A N

D

M

A N

A G

E M

N E

T

I S

S U

E

D

A T

E

M A

R K

R E

V I S

I O

N D

A T

E A

P P

R O

V E

D

___ OF ___

SHEET

U S

D

E P

A R

T M

E N

T

O

F

T

T E

R I O

R

(DESIGNED BY: KCM DRAWN BY: KCM CHECKED BY: GLA APPROVED BY: EC

D I S

T R

I C

T

D E

S I G

N

O

F F

I C

E

I S

S U

R

C

O N

S T

R U

C T

I O

N

W E

S T

E R

N

M

O N

T A

S

T R

I C

T

M I S

S O

U L

A

F

I E

F

I C

Unit

Actual

QTY

1.59 . 20424A

Drainage Excavation, Type Construct Ditch

Foot 200

1.76 . 60201A

18 inch pipe culvert, Type CMP

Foot 34

1.78 . 20425B

Drainage Excavation, Type Reshape Drain Dip

Each 1

1.87 . 30319.

Construct 4% Outslope for 50' with 25' Tapers

Each 1

1.90 . 62201A

Rental Equipment, Hydraulic Excavator

Hour 0.25

1.90 . 20424A

Drainage Excavation, Type Construct Ditch

Foot 100

1.94 . 20425A

Drainage Excavation, Type Construct Drain Dip

Each 1

1.94 . 30319.

Construct 4% Outslope for 50' with 25' Tapers

Each 1

1.98 . 30319.

Construct 4% Outslope for 50' with 25' Tapers

Each 1

2.03 . 60201A

18 inch pipe culvert, Type CMP

Foot 40

2.03 . 60708.

Cleaning culverts in place

Each 1

2.04 2.31 20424A

Drainage Excavation, Type Construct Ditch

Foot 400

2.09 . 30319.

Construct 4% Outslope for 50' with 25' Tapers

Each 1

2.15 . 30319.

Construct 4% Outslope for 50' with 25' Tapers

Each 1

2.17 . 20301.

Removal of rubber belt, disposal method (a) Lump Sum

60201A

18 inch pipe culvert, Type CMP

Foot 40

2.24 . 30319.

Construct 4% Outslope for 50' with 25' Tapers

Each 1

2.25 . 20207.

Removal of Individual Trees, disposal method (c)(e)(f)(g)(i)(j) or (k)

Each 1

60708.

Cleaning culverts in place

Each 1

2.28 . 20207.

Removal of Individual Trees, disposal method (c)(e)(f)(g)(i)(j) or (k)

Each 1

20402B

Roadway excavation and embankment,To Widen, compaction placement method 3, tolerance class F

Cubic Yard 20

2.31 . 62201A

Rental Equipment, Hydraulic Excavator

Hour 1

2.32 . 20425E

Drainage Excavation, Type Construct Drivable Waterbar

Each 1

2.32 . 20301.

Removal of rubber belt, disposal method (a) Lump Sum

2.35 2.75 30315B

Roadway reconditioning, compaction Placement Method 2

Mile 1.91

2.38 . 20425E

Drainage Excavation, Type Construct Drivable Waterbar

Each 1

2.41 . 20301.

Removal of rubber belt, disposal method (a) Lump Sum

2.41 . 20425E

Drainage Excavation, Type Construct Drivable Waterbar

Each 1

2.44 . 60708.

Cleaning culverts in place

Each 1

2.44 . 20425E

Drainage Excavation, Type Construct Drivable Waterbar

Each 1

2.50 . 20425E

Drainage Excavation, Type Construct Drivable Waterbar

Each 1

2.50 . 20301.

Removal of rubber belt, disposal method (a) Lump Sum

2.60 . 30319.

Construct 4% Outslope for 50' with 25' Tapers

Each 1

2.63 . 20425A

Drainage Excavation, Type Construct Drain Dip

Each 1

2.64 . 20402B

Roadway excavation and embankment,To Widen, compaction placement method 3, tolerance class F

Cubic Yard 20

2.67 . 20425E

Drainage Excavation, Type Construct Drivable Waterbar

Each 1

2.72 . 20301.

Removal of rubber belt, disposal method (a) Lump Sum

20425E

Drainage Excavation, Type Construct Drivable Waterbar

Each 1

2.75 4.25 20402A

Roadway excavation and embankment,To Widen, compaction placement method 2, tolerance class D

Mile 1.5

2.75 . 15710.

Sediment traps

Each 1

2.76 . 20424A

Drainage Excavation, Type Construct Ditch

Foot 100

2.77 . 20424A

Drainage Excavation, Type Construct Ditch

Foot 150

2.78 . 20402B

Roadway excavation and embankment,To Widen, compaction placement method 3, tolerance class F

Cubic Yard 20

Road BMP EMP

PayItem Discription

Unit

Actual

QTY

2.83 . 30319.

Construct 4% Outslope for 50' with 25' Tapers

Each 1

2.84 . 62201A

Rental Equipment, Hydraulic Excavator

Hour 0.5

2.87 . 60201A

18 inch pipe culvert, Type CMP

Foot 32

2.87 . 60708.

Cleaning culverts in place

Each 1

2.88 . 20425A

Drainage Excavation, Type Construct Drain Dip

Each 1

2.89 . 30319.

Construct 4% Outslope for 50' with 25' Tapers

Each 1

2.93 . 20402B

Roadway excavation and embankment,To Widen, compaction placement method 3, tolerance class F

Cubic Yard 40

2.96 . 20301.

Removal of rubber belt, disposal method (a) Lump Sum

20425E

Drainage Excavation, Type Construct Drivable Waterbar

Each 1

3.00 . 20207.

Removal of Individual Trees, disposal method (c)(e)(f)(g)(i)(j) or (k)

Each 1

3.03 . 30319.

Construct 4% Outslope for 50' with 25' Tapers

Each 1

3.04 . 20207.

Removal of Individual Trees, disposal method (c)(e)(f)(g)(i)(j) or (k)

Each 2

60708.

Cleaning culverts in place

Each 1

3.08 . 20425E

Drainage Excavation, Type Construct Drivable Waterbar

Each 1

3.12 . 20301.

Removal of rubber belt, disposal method (a) Lump Sum

3.16 . 20425E

Drainage Excavation, Type Construct Drivable Waterbar

Each 1

3.17 . 20402B

Roadway excavation and embankment,To Widen, compaction placement method 3, tolerance class F

Cubic Yard 10

3.20 . 20424A

Drainage Excavation, Type Construct Ditch

Foot 100

3.20 . 15710.

Sediment traps

Each 1

3.25 . 20425A

Drainage Excavation, Type Construct Drain Dip

Each 1

3.26 . 20301.

Removal of rubber belt, disposal method (a) Lump Sum

3.36 . 20301.

Removal of rubber belt, disposal method (a) Lump Sum

20425A

Drainage Excavation, Type Construct Drain Dip

Each 1

3.39 . 20424A

Drainage Excavation, Type Construct Ditch

Foot 100

3.39 . 15710.

Sediment traps

Each 1

3.39 . 61902.

Gate, Contractor Furnish with Sign Package, Post Anchor Method 2

Each 1

3.41 . 20424A

Drainage Excavation, Type Construct Ditch

Foot 100

3.46 . 20425B

Drainage Excavation, Type Reshape Drain Dip

Each 1

3.54 . 20425B

Drainage Excavation, Type Reshape Drain Dip

Each 1

3.62 4.12 20203B

Selective Clearing and Grubbing-Heavy, disposal method (c)(e)(f)(g)(i)(j) or (k)

Mile 0.5

3.64 . 20425B

Drainage Excavation, Type Reshape Drain Dip

Each 1

3.71 . 15710.

Sediment traps

Each 1

3.71 . 62201A

Rental Equipment, Hydraulic Excavator

Hour 1

3.71 . 20424A

Drainage Excavation, Type Construct Ditch

Foot 100

3.74 . 30319.

Construct 4% Outslope for 50' with 25' Tapers

Each 1

3.77 . 20425B

Drainage Excavation, Type Reshape Drain Dip

Each 1

3.82 . 30319.

Construct 4% Outslope for 50' with 25' Tapers

Each 1

3.89 . 20425B

Drainage Excavation, Type Reshape Drain Dip

Each 1

3.95 . 20425B

Drainage Excavation, Type Reshape Drain Dip

Each 1

3.98 . 20402B

Roadway excavation and embankment,To Widen, compaction placement method 3, tolerance class F

Cubic Yard 20

4.03 . 20425B

Drainage Excavation, Type Reshape Drain Dip

Each 1

4.08 . 20424B

Drainage Excavation, Type Construct Lead-out Ditch

Foot 20

20425B

Drainage Excavation, Type Reshape Drain Dip

Each 1

C:\TMP\_WMD_DESIGNPROJECTS\20221207_KENOKENNEDYELEVATION\06_IMPROVEMENT

SHEETS\20221207_WORKLIST.DWG

G E

N E

R A

L

N

O T

E S

K

E Y

M A

A

N T

I T

I E

S

K E

N O

K

E N

N E

E

V

A

R E

A

R

D

M

A I N

T

B U

R E

L

A N

D

M

A N

A G

E M

N E

T

I S

S U

E

D

A T

E

M A

R K

R E

V I S

I O

N D

A T

E A

P P

R O

V E

D

___ OF ___

SHEET

U S

D

E P

A R

T M

E N

T

O

F

T

T E

R I O

R

(DESIGNED BY: KCM DRAWN BY: KCM CHECKED BY: GLA APPROVED BY: EC

D I S

T R

I C

T

D E

S I G

N

O

F F

I C

E

I S

S U

R

C

O N

S T

R U

C T

I O

N

W E

S T

E R

N

M

O N

T A

S

T R

I C

T

M I S

S O

U L

A

F

I E

F

I C

Unit

Actual

QTY

2817 0.00 2.20 20203B

Selective Clearing and Grubbing-Heavy, disposal method (c)(e)(f)(g)(i)(j) or (k)

Mile 2.2

4.15 20203A

Selective Clearing and Grubbing-Lite-Med, disposal method (c)(e)(f)(g)(i)(j) or

(k)

Mile 4.2

0.01 . 63306

Post, 4x4

Each 1.0

0.01 . 20424A

Drainage Excavation, Type Construct Ditch

Foot 370.0

0.01 . 60708.0000

Cleaning culverts in place

Each 1.0

0.01 0.05 20403.0000

Roadway excavation and embankment, Unclassified Borrow, compaction placement method 3. Contract Quantity.

Cubic Yard 100.0

. 20425D

Drainage Excavation, Type Reshape Catch Basin

Each 1.0

0.05 3.00 30315A

Roadway reconditioning, compaction Placement Method 2

Mile 3.0

4.30 62201C

Rental Equipment, Grader

Hour 3.0

0.07 . 60201A

18 inch pipe culvert, Type CMP

Foot 40.0

0.08 . 60201A

18 inch pipe culvert, Type CMP

Foot 40.0

0.11 . 20425A

Drainage Excavation, Type Construct Drain Dip

Each 1.0

0.15 . 30319.0000

Construct 4% Outslope for 50' with 25' Tapers

Each 1.0

0.18 . 60708.0000

Cleaning culverts in place

Each 1.0

0.27 . 20424A

Drainage Excavation, Type Construct Ditch

Foot 250.0

20425D

Drainage Excavation, Type Reshape Catch Basin

Each 1.0

0.27 . 60708.0000

Cleaning culverts in place

Each 1.0

0.29 . 30319.0000

Construct 4% Outslope for 50' with 25' Tapers

Each 1.0

0.37 . 30319.0000

Construct 4% Outslope for 50' with 25' Tapers

Each 1.0

0.45 . 20425D

Drainage Excavation, Type Reshape Catch Basin

Each 1.0

0.45 . 60708.0000

Cleaning culverts in place

Each 1.0

0.48 . 20425A

Drainage Excavation, Type Construct Drain Dip

Each 1.0

0.48 . 20424A

Drainage Excavation, Type Construct Ditch

Foot 50.0

0.55 . 20425D

Drainage Excavation, Type Reshape Catch Basin

Each 1.0

0.55 . 60708.0000

Cleaning culverts in place

Each 1.0

0.60 . 20424A

Drainage Excavation, Type Construct Ditch

Foot 150.0

0.63 . 60201A

18 inch pipe culvert, Type CMP

Foot 40.0

0.65 . 62201A

Rental Equipment, Hydraulic Excavator

Hour 0.5

0.67 . 20425D

Drainage Excavation, Type Reshape Catch Basin

Each 1.0

0.67 . 60708.0000

Cleaning culverts in place

Each 1.0

0.69 . 20424A

Drainage Excavation, Type Construct Ditch

Foot 150.0

0.74 . 20425D

Drainage Excavation, Type Reshape Catch Basin

Each 1.0

0.75 . 62201A

Rental Equipment, Hydraulic Excavator

Hour 0.3

0.80 . 20207.0000

Removal of Individual Trees, disposal method (c)(e)(f)(g)(i)(j) or (k)

Each 1.0

60708.0000

Cleaning culverts in place

Each 1.0

0.86 . 60708.0000

Cleaning culverts in place

Each 1.0

0.86 . 20425D

Drainage Excavation, Type Reshape Catch Basin

Each 1.0

0.89 . 20425E

Drainage Excavation, Type Construct Drivable Waterbar

Each 1.0

0.92 . 20424A

Drainage Excavation, Type Construct Ditch

Foot 100.0

0.94 . 30319.0000

Construct 4% Outslope for 50' with 25' Tapers

Each 1.0

1.01 . 265

Drainage Excavation, Type Reshape Catch Basin

Each 1.0

60708.

Cleaning culverts in place

Each 1.0

1.07 . 265

Drainage Excavation, Type Reshape Catch Basin

Each 1.0

Road BMP EMP

PayItem Discription

Unit

Actual

QTY

60708.

Cleaning culverts in place

Each 1.0

1.10 . 20424A

Drainage Excavation, Type Construct Ditch

Foot 200.0

1.19 . 60708.0000

Cleaning culverts in place

Each 1.0

1.27 . 62201A

Rental Equipment, Hydraulic Excavator

Hour 0.3

1.32 . 20424A

Drainage Excavation, Type Construct Ditch

Foot 950.0

1.32 . 20425D

Drainage Excavation, Type Reshape Catch Basin

Each 1.0

1.32 . 60708.0000

Cleaning culverts in place

Each 1.0

1.45 . 20425D

Drainage Excavation, Type Reshape Catch Basin

Each 1.0

1.45 . 60708.0000

Cleaning culverts in place

Each 1.0

1.48 . 62201A

Rental Equipment, Hydraulic Excavator

Hour 1.0

1.48 . 20424A

Drainage Excavation, Type Construct Ditch

Foot 50.0

1.49 . 60708.0000

Cleaning culverts in place

Each 1.0

1.55 . 20425D

Drainage Excavation, Type Reshape Catch Basin

Each 1.0

1.56 . 60708.0000

Cleaning culverts in place

Each 1.0

1.60 . 20424A

Drainage Excavation, Type Construct Ditch

Foot 150.0

1.68 . 20425D

Drainage Excavation, Type Reshape Catch Basin

Each 1.0

1.68 . 60708.0000

Cleaning culverts in place

Each 1.0

1.75 . 20424A

Drainage Excavation, Type Construct Ditch

Foot 50.0

1.78 . 60708.0000

Cleaning culverts in place

Each 1.0

1.90 . 20425D

Drainage Excavation, Type Reshape Catch Basin

Each 1.0

1.90 . 60708.0000

Cleaning culverts in place

Each 1.0

2.01 . 20425D

Drainage Excavation, Type Reshape Catch Basin

Each 1.0

2.01 . 60708.0000

Cleaning culverts in place

Each 1.0

2.04 . 20424A

Drainage Excavation, Type Construct Ditch

Foot 100.0

2.09 . 60708.0000

Cleaning culverts in place

Each 1.0

2.21 . 60201A

18 inch pipe culvert, Type CMP

Foot 40.0

2.21 . 20424A

Drainage Excavation, Type Construct Ditch

Foot 150.0

2.24 . 30319.0000

Construct 4% Outslope for 50' with 25' Tapers

Each 1.0

2.28 . 30319.0000

Construct 4% Outslope for 50' with 25' Tapers

Each 1.0

2.29 . 20424A

Drainage Excavation, Type Construct Ditch

Foot 150.0

2.29 . 20425A

Drainage Excavation, Type Construct Drain Dip

Each 1.0

2.29 . 60708.0000

Cleaning culverts in place

Each 1.0

C:\TMP\_WMD_DESIGNPROJECTS\20221207_KENOKENNEDYELEVATION\06_IMPROVEMENT

SHEETS\20221207_WORKLIST.DWG

G E

N E

R A

L

N

O T

E S

K

E Y

M A

A

N T

I T

I E

S

K E

N O

K

E N

N E

E

V

A

R E

A

R

D

M

A I N

T

B U

R E

L

A N

D

M

A N

A G

E M

N E

T

I S

S U

E

D

A T

E

M A

R K

R E

V I S

I O

N D

A T

E A

P P

R O

V E

D

___ OF ___

SHEET

U S

D

E P

A R

T M

E N

T

O

F

T

T E

R I O

R

(DESIGNED BY: KCM DRAWN BY: KCM CHECKED BY: GLA APPROVED BY: EC

D I S

T R

I C

T

D E

S I G

N

O

F F

I C

E

I S

S U

R

C

O N

S T

R U

C T

I O

N

W E

S T

E R

N

M

O N

T A

S

T R

I C

T

M I S

S O

U L

A

F

I E

F

I C

Unit

Actual

QTY

2.39 . 2.0425E+04

Drainage Excavation, Type Construct Drivable Waterbar

Each 1.0

2.49 . 20424B

Drainage Excavation, Type Construct Lead-out Ditch

Foot 15.0

2.50 . 20424A

Drainage Excavation, Type Construct Ditch

Foot 150.0

2.56 . 60708.

Cleaning culverts in place

Each 1.0

2.56 . 20207.0000

Removal of Individual Trees, disposal method (c)(e)(f)(g)(i)(j) or (k)

Each 3.0

20424A

Drainage Excavation, Type Construct Ditch

Foot 150.0

2.56 . 20425D

Drainage Excavation, Type Reshape Catch Basin

Each 1.0

2.56 . 20424B

Drainage Excavation, Type Construct Lead-out Ditch

Foot 20.0

2.62 . 20425B

Drainage Excavation, Type Reshape Drain Dip

Each 1.0

2.62 . 20424A

Drainage Excavation, Type Construct Ditch

Foot 150.0

2.70 . 20424A

Drainage Excavation, Type Construct Ditch

Foot 200.0

2.73 . 20424A

Drainage Excavation, Type Construct Ditch

Foot 600.0

2.73 . 30319.0000

Construct 4% Outslope for 50' with 25' Tapers

Each 1.0

2.74 . 15710.

Sediment traps

Each 1.0

2.75 . 20425A

Drainage Excavation, Type Construct Drain Dip

Each 1.0

2.90 . 30319.0000

Construct 4% Outslope for 50' with 25' Tapers

Each 1.0

2.90 . 62201A

Rental Equipment, Hydraulic Excavator

Hour 0.3

2.94 . 20207.0000

Removal of Individual Trees, disposal method (c)(e)(f)(g)(i)(j) or (k)

Each 1.0

2.94 . 20424A

Drainage Excavation, Type Construct Ditch

Foot 250.0

2.94 . 265

Drainage Excavation, Type Reshape Catch Basin

Each 1.0

2.94 . 60708.

Cleaning culverts in place

Each 1.0

3.00 4.30 30315B

Roadway reconditioning, compaction Placement Method 2

Mile 1.3

3.02 . 30319.0000

Construct 4% Outslope for 50' with 25' Tapers

Each 1.0

3.07 . 20425B

Drainage Excavation, Type Reshape Drain Dip

Each 1.0

3.24 . 20424A

Drainage Excavation, Type Construct Ditch

Foot 150.0

3.30 . 20425B

Drainage Excavation, Type Reshape Drain Dip

Each 1.0

3.32 . 20424A

Drainage Excavation, Type Construct Ditch

Foot 150.0

3.34 . 20424A

Drainage Excavation, Type Construct Ditch

Foot 125.0

3.34 . 15710.

Sediment traps

Each 1.0

3.35 . 62201A

Rental Equipment, Hydraulic Excavator

Hour 2.0

3.39 . 30319.0000

Construct 4% Outslope for 50' with 25' Tapers

Each 1.0

3.41 . 30319.

Construct 4% Outslope for 50' with 25' Tapers

Each 1.0

Road BMP EMP

PayItem Discription

Unit

Actual

QTY

3.46 . 20425A

Drainage Excavation, Type Construct Drain Dip

Each 1.0

3.47 . 20424A

Drainage Excavation, Type Construct Ditch

Foot 150.0

3.47 . 15710.

Sediment traps

Each 1.0

3.60 . 20425B

Drainage Excavation, Type Reshape Drain Dip

Each 1.0

3.67 . 30319.0000

Construct 4% Outslope for 50' with 25' Tapers

Each 1.0

3.71 . 20425B

Drainage Excavation, Type Reshape Drain Dip

Each 1.0

3.75 . 30319.0000

Construct 4% Outslope for 50' with 25' Tapers

Each 1.0

3.79 . 20425A

Drainage Excavation, Type Construct Drain Dip

Each 1.0

3.83 . 20425A

Drainage Excavation, Type Construct Drain Dip

Each 1.0

3.84 . 20425C

Drainage Excavation, Type Construct Catch Basin

Each 1.0

3.87 . 20424A

Drainage Excavation, Type Construct Ditch

Foot 100.0

3.89 . 30319.

Construct 4% Outslope for 50' with 25' Tapers

Each 1.0

3.99 . 20425B

Drainage Excavation, Type Reshape Drain Dip

Each 1.0

4.05 . 30319.0000

Construct 4% Outslope for 50' with 25' Tapers

Each 1.0

4.10 . 20207.

Removal of Individual Trees, disposal method (c)(e)(f)(g)(i)(j) or (k)

Each 2.0

4.15 . 30319.0000

Construct 4% Outslope for 50' with 25' Tapers

Each 1.0

4.30 4.70 20203B

Selective Clearing and Grubbing-Heavy, disposal method (c)(e)(f)(g)(i)(j) or (k)

Mile 0.4

20402A

Roadway excavation and embankment,To Widen, compaction placement method 2, tolerance class D

Mile 0.4

4.31 . 20424A

Drainage Excavation, Type Construct Ditch

Foot 150.0

4.41 . 20424A

Drainage Excavation, Type Construct Ditch

Foot 150.0

4.46 . 20424B

Drainage Excavation, Type Construct Lead-out Ditch

Foot 15.0

20425A

Drainage Excavation, Type Construct Drain Dip

Each 1.0

4.50 . 20425A

Drainage Excavation, Type Construct Drain Dip

Each 1.0

4.50 . 20424B

Drainage Excavation, Type Construct Lead-out Ditch

Foot 15.0

4.55 . 15710.

Sediment traps

Each 1.0

20424A

Drainage Excavation, Type Construct Ditch

Foot 300.0

4.62 . 20425A

Drainage Excavation, Type Construct Drain Dip

Each 1.0

4.62 . 20424B

Drainage Excavation, Type Construct Lead-out Ditch

Foot 15.0

4.67 . 20424B

Drainage Excavation, Type Construct Lead-out Ditch

Foot 15.0

4.67 . 20425A

Drainage Excavation, Type Construct Drain Dip

Each 1.0

Total

C:\TMP\_WMD_DESIGNPROJECTS\20221207_KENOKENNEDYELEVATION\06_IMPROVEMENT

SHEETS\20221207_WORKLIST.DWG

G E

N E

R A

L

N

O T

E S

K

E Y

M A

A

N T

I T

I E

S

K E

N O

K

E N

N E

E

V

A

R E

A

R

D

M

A I N

T

B U

R E

L

A N

D

M

A N

A G

E M

N E

T

I S

S U

E

D

A T

E

M A

R K

R E

V I S

I O

N D

A T

E A

P P

R O

V E

D

___ OF ___

SHEET

U S

D

E P

A R

T M

E N

T

O

F

T

T E

R I O

R

(DESIGNED BY: KCM DRAWN BY: KCM CHECKED BY: GLA APPROVED BY: EC

D I S

T R

I C

T

D E

S I G

N

O

F F

I C

E

I S

S U

R

C

O N

S T

R U

C T

I O

N

W E

S T

E R

N

M

O N

T A

S

T R

I C

T

M I S

S O

U L

A

F

I E

F

I C

Unit

Actual

QTY

2819 0.00 3.14 20203B

Selective Clearing and Grubbing-Heavy, disposal method (c)(e)(f)(g)(i)(j) or (k)

Mile 3.1

3.14 5.11 20402A

Roadway excavation and embankment,To Widen, compaction placement method 2, tolerance class D

Mile 2.0

3.15 . 63306

Post, 4x4

Each 1.0

3.15 . 30319.

Construct 4% Outslope for 50' with 25' Tapers

Each 1.0

3.15 . 20424B

Drainage Excavation, Type Construct Lead-out Ditch

Foot 15.0

3.16 . 20424A

Drainage Excavation, Type Construct Ditch

Foot 50.0

3.20 . 20424B

Drainage Excavation, Type Construct Lead-out Ditch

Foot 15.0

3.28 5.11 20203B

Selective Clearing and Grubbing-Heavy, disposal method (c)(e)(f)(g)(i)(j) or (k)

Mile 2.0

3.35 . 30319.

Construct 4% Outslope for 50' with 25' Tapers

Each 4.0

3.41 . 61902.

Gate, Contractor Furnish with Sign Package, Post Anchor Method 2

Each 1.0

62201A

Rental Equipment, Hydraulic Excavator

Hour 1.0

3.47 . 30319.

Construct 4% Outslope for 50' with 25' Tapers

Each 1.0

3.54 . 30319.

Construct 4% Outslope for 50' with 25' Tapers

Each 1.0

3.57 . 20403.

Roadway excavation and embankment, Unclassified Borrow, compaction placement method 3. Contract Quantity.

Cubic Yard 20.0

3.63 . 20425B

Drainage Excavation, Type Reshape Drain Dip

Each 1.0

3.81 . 30319.

Construct 4% Outslope for 50' with 25' Tapers

Each 1.0

3.87 . 30319.

Construct 4% Outslope for 50' with 25' Tapers

Each 1.0

3.95 . 20424A

Drainage Excavation, Type Construct Ditch

Foot 100.0

4.06 . 20424B

Drainage Excavation, Type Construct Lead-out Ditch

Foot 20.0

4.12 . 20425A

Drainage Excavation, Type Construct Drain Dip

Each 1.0

4.13 . 20402B

Roadway excavation and embankment,To Widen, compaction placement method 3, tolerance class F

Cubic Yard 20.0

4.18 . 20424B

Drainage Excavation, Type Construct Lead-out Ditch

Foot 15.0

4.37 . 20424B

Drainage Excavation, Type Construct Lead-out Ditch

Foot 15.0

4.72 . 20424B

Drainage Excavation, Type Construct Lead-out Ditch

Foot 15.0

30319.

Construct 4% Outslope for 50' with 25' Tapers

Each 1.0

4.77 . 20424B

Drainage Excavation, Type Construct Lead-out Ditch

Foot 15.0

30319.

Construct 4% Outslope for 50' with 25' Tapers

Each 1.0

4.96 . 20424A

Drainage Excavation, Type Construct Ditch

Foot 40.0

2819 Total

Road BMP EMP

PayItem Discription

Unit

Actual

QTY

ALL 0.01 . 15101. Mobilization Lum Sum 1

62201A

Rental Equipment, Hydraulic Excavator

Hour 16

62201B

Rental Equipment, Dump Truck

Hour 8

62201C

Rental Equipment, Grader

Hour 9

63304

Sign, Mile D10-1 panel, Type retroreflective sheeting

Each 36

ALL Total

402 5.90 9.9

20203B-Option Selective Clearing and Grubbing-Heavy, disposal method (c)(e)(f)(g)(i)(j) or (k)

Mile 4

402 Total

2840 0.00 5.7

20203B-Option Selective Clearing and Grubbing-Heavy, disposal method (c)(e)(f)(g)(i)(j) or (k)

Mile 5.7

. 63306

Post, 4x4

Each 1

0.02 . 61902.

Gate, Contractor Furnish with Sign Package, Post Anchor Method 2

Each 1

2840 Total

2823 0.00 2.2

20203B-Option Selective Clearing and Grubbing-Heavy, disposal method (c)(e)(f)(g)(i)(j) or (k)

Mile 2.2

2823 Total

2822 0.00 1.7

20203B-Option Selective Clearing and Grubbing-Heavy, disposal method (c)(e)(f)(g)(i)(j) or (k)

Mile 1.7

. 61902.

Gate, Contractor Furnish with Sign Package, Post Anchor Method 2

Each 1

2822 Total

2821 0.00 1.8

20203B-Option Selective Clearing and Grubbing-Heavy, disposal method (c)(e)(f)(g)(i)(j) or (k)

Mile 1.8

. 61902.

Gate, Contractor Furnish with Sign Package, Post Anchor Method 2

Each 2

2821 Total

2818 0.00 1.3

20203B-Option Selective Clearing and Grubbing-Heavy, disposal method (c)(e)(f)(g)(i)(j) or (k)

Mile 1.3

2818 Total

2815 0.00 0.9

20203B-Option Selective Clearing and Grubbing-Heavy, disposal method (c)(e)(f)(g)(i)(j) or (k)

Mile 0.9

2815 Total

2814 0.00 0.8

20203B-Option Selective Clearing and Grubbing-Heavy, disposal method (c)(e)(f)(g)(i)(j) or (k)

Mile 0.8

. 63306

Post, 4x4

Each 1

2814 Total

2813 0.00 1.1

20203B-Option Selective Clearing and Grubbing-Heavy, disposal method (c)(e)(f)(g)(i)(j) or (k)

Mile 1.1

2813 Total

Grand

Total

C:\TMP\_WMD_DESIGNPROJECTS\20221207_KENOKENNEDYELEVATION\06_IMPROVEMENT

SHEETS\20221207_WORKLIST.DWG

G E

N E

R A

L

N

O T

E S

K

E Y

M A

A

N T

I T

I E

S

K E

N O

K

E N

N E

E

V

A

R E

A

R

D

M

A I N

T

B U

R E

L

A N

D

M

A N

A G

E M

N E

T

I S

S U

E

D

A T

E

M A

R K

R E

V I S

I O

N D

A T

E A

P P

R O

V E

D

___ OF ___

SHEET

U S

D

E P

A R

T M

E N

T

O

F

T

T E

R I O

R

(DESIGNED BY: KCM DRAWN BY: KCM CHECKED BY: GLA APPROVED BY: EC

D I S

T R

I C

T

D E

S I G

N

O

F F

I C

E

I S

S U

R

C

O N

S T

R U

C T

I O

N

W E

S T

E R

N

M

O N

T A

S

T R

I C

T

M I S

S O

U L

A

F

I E

F

I C

CLEARING AND GRUBBING NOTES

1. ALL CONIFERS, HARDWOODS AND BRUSH WITHIN 5 FEET OF THE SHOULDERS OF THE ROAD

OR THE BOTTOM OF THE DITCH SHALL BE REMOVED. EXISTING WIDTHS INCLUDE TURNOUTS

AND ALL AS BUILT CURVE AND FILL WIDENING. EDGE OF ROAD WHERE DITCH IS NOT

PRESENT EXTENDS TO THE TOE OF THE CUT SLOPE. GRUB ALL STUMPS WITHIN THE ROAD

BED AND DITCH LINE. DO NOT GRUB TREES ON THE CUT AND FILL SLOPES.

2. THE AREA OF SIGHT DISTANCE CLEARING WILL BE FROM THE ROADSIDE CLEARING LIMIT TO

A LINE OF SIGHT BETWEEN THE BEGINNING AND ENDING STATIONS MARKED ON THE

GROUND. CONIFERS WITHIN THIS AREA SHALL BE THINNED TO APPROXIMATELY A 2 FOOT

TRUNK SPACING, EXCEPT WHERE MARKED WITH PAINT OR FLAGGING FOR REMOVAL TO AN

ALTERNATE SPACING. ALL HARDWOODS AND BRUSH WITHIN THERE LIMITS SHALL BE

REMOVED.

3. BRANCHES ON REMAINING CONIFERS SHALL BE TRIMMED FROM GROUND LEVEL TO A

CLEARING HEIGHT LIMIT 12 FEET ABOVE THE ROADBED OR TO A LIMIT OF 60% OF THE TREE'S

HEIGHT, WHICHEVER IS LESS. LIMBS OF VEGETATION SHALL BE CUT SO AS NOT TO

PROTRUDE WITHIN THE CLEARING (ROADSIDE AND HEIGHT) LIMITS. DOWNED TREES AND JILL

POKES EXTENDING INTO THE BRUSHING LIMITS WILL BE CUT OFF AT THE TOP OF THE CUT,

AND DISPOSED OF IN ACCORDANCE WITH SPECIFICATIONS.

4. DISPOSAL OF VEGETATION:

1.1. BRUSH AND SLASH DISPOSE PER 203.05 (f) SCATTERING AND (k) PILING

1.2. NON-SAW LOGS SHALL BE PROPERTY OF CONTRACTOR OR DISPOSED BY 203.05 (f)

SCATTERING AND (k) PILING.

1.3. SAWLOG TO BE DECKED FOR OPTIONAL SMALL SALE TO CONTRACTOR OUTSIDE OF THIS

CONTRACT.

5. SELECTIVE CLEARING AND GRUBBING LEVEL DEFINITIONS:LEVEL SHALL BE DETERMINED ON

A PER MILE OR PER ROAD BASIS BY BLM AT TIME OF IMPLEMENTATION.

2.1. LIGHT- FEW TREES AND BRUSH SCATTERED ALONG THE SHOULDERS OF THE ROADWAY.

PRODUCTION APPROXIMATELY 1000 FT PER HOUR.

2.2. MEDIUM- TREES AND BRUSH ALONG THE ENTIRE LENGTH OF THE ROADWAY.

PRODUCTION RATE APPROXIMATELY 750 FT PER HOUR.

2.3. HEAVY- TREES AND BRUSH SCATTERED THROUGHOUT THE ENTIRE ROADWAY. COST

INCLUDES GRUBBING OF ROADBED. PRODUCTION RATE APPROXIMATELY 400 FT PER HOUR.

CLEARING AND GRUBBING DETAILS

NOT TO SCALE

SIGHT

DISTANCE

FILL SLOPE

ROAD SHOULDERS

C L E

A R

I

G

I G

H T

F

T

CLEARING LIMITS TYPICAL

SEE NOTES

2 & 3

SEE NOTES 2 & 3

ROADSIDE CLEARING

LIMITS. SEE NOTE 1

SIGHT DISTANCE

BEGINNING

MARKED STATION

F

T

ENDING

MARKED STATION

CUT SLOPE

TOP OF CUT

TOE OF FILL

GRUB ANY STUMPS

OR ROOTS IN ROAD

SURFACE OR DITCH

\\ILMMTBF3DS1\BF\USERS\BJONES\MY DOCUMENTS\DWG\DWT\IMPROVEMENT SHEETS\#### - COVR.DWG

C L E

A R

I N

G

A

R U

B B

I N

G

D

E T

A I L S

K E

N O

K

E N

N E

E

V

A

R E

A

R

D

M

A I N

T

B U

R E

L A

M

N

A G

E M

N E

T

I S

S U

E

D

A T

E

M A

R K

R E

V I S

I O

N D

A T

E A

P P

R O

V E

D

___ OF ___

SHEET

U S

D

E P

A R

T M

E N

T

O

F

T

T E

R I O

R

(DESIGNED BY: KCM DRAWN BY: KCM CHECKED BY: GLA APPROVED BY: EC

D I S

T R

I C

T

D E

S I G

N

O

F F

I C

E

I S

S U

R

C

O N

S T

R U

C T

I O

N

W E

S T

E R

N

M

O N

T A

S

T R

I C

T

M I S

S O

U

E

F

I C

ROADWAY RECONDITIONING DETAIL

(N.T.S.)

ROADWAY RECONDITIONING NOTES

1. PERFORM CLEARING AND GRUBBING PER FHA FP-14

SPEC SEC 201.

2. RECONDITION EXISTING ROADWAY DITCHES PER FHA

FP-14 SPEC SEC 303.03.

3. RECONDITION EXISTING ROADBED PER FHA FP-14 SPEC

SEC 303.04

4. RESURFACE EXISTING ROADBED, WITH SURFACE

COURSE AGGREGATE, PER FHA FP-14 SPEC SEC 301.

5. ORGANIC AND OTHER NATIVE DEBRIS LARGER THAN 6

IMCHES SHALL BE WASTED ON SITE IN DESIGNATED

AREAS PER FHA FP-14 SPEC SEC 203.05 (C).

6. NON-NATIVE AND HAZARDOUS MATERIAL SHALL BE

REMOVED FROM THE SITE PER FHA FP-14 SPEC SEC

203.05 (A) AND 203.05 (D).

ROADWAY RESURFACING SECTION & WIDTH

PER PLAN

EXISTING SUBGRADE

EXISTING ROADBED

S U

R F

A C

E

C

O U

R S

E

D E

P T

H

P

A

N

RESURFACING COURSE

EXISTING DITCH

CLEARING AND GRUBBING LIMITS PER PLAN

14' PROPOSED ROADWAY

DAYLIGHT TO EXISTING GRADE

CONSTRUCT ROADWAY EMBANKMENT

AS REQUIRED REFERENCE PLAN FOR

GRADING AND TIE IN LOCATIONS.

[6]

EXISTING GRADE

FINISHED GRADE

2%

14' TYPICAL ROADWAY SECTION

WITHOUT DITCH

N.T.S.

C

12' MIN ROADWAY

3'

DAYLIGHT TO EXISTING GRADE

EXCAVATE AS REQUIRED.

REFERENCE PLAN FOR GRADING

AND TIE IN LOCATIONS.

[6]

DAYLIGHT TO EXISTING GRADE

CONSTRUCT ROADWAY EMBANKMENT

AS REQUIRED REFERENCE PLAN FOR

GRADING AND TIE IN LOCATIONS.

[6]

EXISTING GRADE

EXISTING GRADE

FINISHED GRADE

IN-SITU

2%

12' TYPICAL ROADWAY SECTION

WITH DITCH

N.T.S.

N

ROADWAY SECTION NOTES

[1]

CONTRACTOR TO PREPARE NATIVE SUBGRADE PER

FHA FP-14 SPEC SECTION 204.11.

[2]

CONTRACTOR TO CONSTRUCT 6 IN AGGREGATE

SURFACE COURSE PER FHA FP-14 301.

[3]

CONTRACTOR TO CONSTRUCT 6 IN STABILIZED

SURFACE COURSE PER FHA FP-14 SPEC. SEC. 311.

WHEN PAID AS OPTION ITEM.

[4]

CONTRACTOR TO CONSTRUCT ROAD SIDE DRAINAGE

DITCHES PER FHA FP-14 SPEC SEC 204.12. DITCH

DIMENSIONS PER PLAN. DITCH DEPTH INCREASED 0.5

FT IF STABILIZED SURFACE COURSE NOT EXERCISED.

[5]

CONTRACTOR TO CONSTRUCT 6" MIN UNCLASSIFIED

BORROW. SOURCE IS WASTE FROM ROAD

REALIGNMENT PER FHA FP-14 SPEC. SEC. 204 AND

704.06. OTHER EXCESS & UNUSABLE EXCAVATION

MATERIAL SHALL BE WASTED ON SITE IN DESIGNATED

AREAS PER FHA FP-14 SPEC SEC 204.14.

[6]

REFERENCE ROADWAY EMBANKMENT & EXCAVATION

14' MIN ROADWAY

EXISTING DITCH

IN-SITU

2%

14' TYPICAL CROWN (TURNPIKE) SECTION

N.T.S.

F

2%

DAYLIGHT TO EXISTING GRADE DAYLIGHT TO EXISTING GRADE

N

\\ILMMTBF3DS1\BF\USERS\BJONES\MY DOCUMENTS\DWG\DWT\IMPROVEMENT SHEETS\#### - COVR.DWG

R O

A D

W A

Y

R

E C

O N

D I T

I O

N I N

G

D

E T

A I L S

K E

N O

K

E N

N E

E

V

A

R E

A

R

D

M

A I N

T

B U

R E

L A

N

A G

E M

N E

T

I S

S U

E

D

A T

E

M A

R K

R E

V I S

I O

N D

A T

E A

P P

R O

V E

D

___ OF ___

SHEET

U S

D

E P

A R

T M

E N

T

O

F

T

T E

R I O

R

(DESIGNED BY: KCM DRAWN BY: KCM CHECKED BY: GLA APPROVED BY: EC

D I S

T R

I C

T

D E

S I G

N

O

F F

I C

E

I S

S U

R

C

O N

S T

R U

C T

I O

N

W E

S T

E R

N

M

O N

T A

S

T R

I C

T

M I S

S O

U

E

F

I C

7'

7'-

TAPER

TO 43'

Match Existing%

A

A

C

C

B

B

C

L

5'

ROADSIDE CLEARING

OUTER LIMITS

5'

ROADSIDE CLEARING

OUTER LIMITS

C

L

5'

ROADSIDE CLEARING

OUTER LIMITS

5'

ROADSIDE CLEARING

OUTER LIMITS

7'

TAPER

TO AND

FROM

43'

7'

TAPER

FROM

43'7'

C

L

5'

ROADSIDE CLEARING

OUTER LIMITS

5'

ROADSIDE CLEARING

OUTER LIMITS

-OUTSIDE EDGE OF CURVE SHOULD TAPER IN AND OUT OF A 50FT WIDTH. WITH THE

WIDEST DOWNHILL OF THE WIDEST PART OF THE CURVE.

-ROAD GRADE THROUGH CURVE TO MATCH EXISTING

-CROSS SLOPE SHOULD BE 1% OUT-SLOPE ON TANGENTS AND 0% (FLAT) THROUGH

THE CURVE.

WIDEST PART OF CURVE

EXISTING SWITCHBACK

NTS

SECTION C-C SWITCHBACK

NTS

SECTION B-B SWITCHBACK

NTS

SECTION A-A SWITCHBACK

NTS

RECONSTRUCTION EXISTING SWITCHBACK

\\ILMMTBF3DS1\BF\USERS\BJONES\MY DOCUMENTS\DWG\DWT\IMPROVEMENT SHEETS\#### - COVR.DWG

S W

I T

C H

B A

C K

T

A I L S

K E

N O

K

E N

N E

E

V

A

R E

A

R

D

M

A I N

T

B U

R E

L A

N

A G

E M

N E

T

I S

S U

E

D

A T

E

M A

R K

R E

V I S

I O

N D

A T

E A

P P

R O

V E

D

___ OF ___

SHEET

U S

D

E P

A R

T M

E N

T

O

F

T

T E

R I O

R

(DESIGNED BY: KCM DRAWN BY: KCM CHECKED BY: GLA APPROVED BY: EC

D I S

T R

I C

T

D E

S I G

N

O

F F

I C

E

I S

S U

R

C

O N

S T

R U

C T

I O

N

W E

S T

E R

N

M

O N

T A

S

T R

I C

T

M I S

S O

U

E

F

I C

NOTES:

1. J-HOLE SHALL BE CONSTRUCTED ON CUT OR FILL SIDE

AS SHOWN ON THE PLAN AND PROFILE SHEETS.

2. BACK SLOPE AND/OR FILL SLOPE SHALL CONFORM TO

ADJACENT ROADWAY SLOPES AND SEEDED IN

ACCORDANCE WITH SECTION 625.

3. EARTHWORK IS INCLUDED IN EXCAVATION AND

EMBANKMENT QUANTITIES.

WIDTH

NORMAL

"T"

TAPER

LENGTH "L"

EXTRA WIDTH

EXTRA WIDTH

DOUBLETRACK ROADWAY

LENGTHS "T" AND "L" AS SHOWN ON

PLAN-PROFILE SHEETS AND/OR STAKED

TURNOUT AREA

STANDARD TURNOUT

LEFT OR RIGHT

LENGTH "L"

TAPER

"T"

NORMAL

WIDTH

LENGTHS "T" AND "L" AS SHOWN ON

PLAN-PROFILE SHEETS AND/OR STAKED

LOG DECKING

AREA

TYPICAL LOG DECKING AREA

J-HOLE TURNAROUND DETAIL

X

I M

U

M

35' MINIMUM

SECTION A-A

PLAN VIEW

NTS

EDGE OF SUBGRADE

EXISTING

GROUND

25 FT R

25 FT R

ROADWAY LIMITS

10' 50'

NTS

NTS

NTS

\\ILMMTBF3DS1\BF\USERS\BJONES\MY DOCUMENTS\DWG\DWT\IMPROVEMENT SHEETS\#### - COVR.DWG

T U

R N

O U

T

D

E T

A I L S

K E

N O

K

E N

N E

E

V

A

R E

A

R

D

M

A I N

T

B U

R E

L A

N

A G

E M

N E

T

I S

S U

E

D

A T

E

M A

R K

R E

V I S

I O

N D

A T

E A

P P

R O

V E

D

___ OF ___

SHEET

U S

D

E P

A R

T M

E N

T

O

F

T

T E

R I O

R

(DESIGNED BY: KCM DRAWN BY: KCM CHECKED BY: GLA APPROVED BY: EC

D I S

T R

I C

T

D E

S I G

N

O

F F

I C

E

I S

S U

R

C

O N

S T

R U

C T

I O

N

W E

S T

E R

N

M

O N

T A

S

T R

I C

T

M I S

S O

U

E

F

I C

E

AutoCAD SHX Text C

AutoCAD SHX Text L

AutoCAD SHX Text C

AutoCAD SHX Text L

AutoCAD SHX Text C

AutoCAD SHX Text L

AutoCAD SHX Text C

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text

TYPICAL INSTALLATION IN STREAM CHANNELTYPICAL DITCH RELIEF INSTALLATION

CULVERT HEADWALL OF HAND PLACED RIPRAP ARMOR

NO SCALENO SCALE

NO SCALE

NOTE: LAY CULVERT ON NATURAL FLOWLINE

C

L

RD.

RD.

L

C

RD.

L

C

NO SCALE

A

NO SCALE

NO SCALE

DITCH BLOCK DETAILS

SECTION A-A

CATCH BASIN WITH DITCH BLOCK TYPICAL SECTION PLAN

NO SCALE

ROCK BUTTRESS AND OUTLET RIPRAP ARMOR DETAIL

TYPICAL INSTALLATION IN EMBANKMENT

A

B

B

A

NOTE: *DEPTH DIMENSIONS WILL VARY TO CONFORM WITH NATURAL DRAINAGE ELEVATION.

EXCAVATION

EMBANKMENT

TYPICAL LEAD OUT DITCH

NO SCALE

NO SCALE

CATCH BASIN TYPICAL SECTION PLAN

NOTE: CULVERT GRADE SHOULD BE AT LEAST 2% MORE THAN DITCH GRADE. SKEW CULVERT

AS STAKED. MINIMUM COVER OF 6 IN AT INLET END AND 1 FT WITHIN TRAVELWAY.

RIPRAP ARMOR (CLASS 1&2)

OUTLET FILL SLOPE WHEN

IDENTIFIED IN WORKLIST

RIPRAP ARMOR (CLASS I)

OUTLET DRAIN LINE WHEN

IDENTIFIED IN WORKLIST

RIPRAP ARMOR WHEN

IDENTIFIED IN WORKLIST

NATURAL GROUND

EMBANKMENT

NATURAL

GROUND

TOP OF SUBGRADE

RIPRAP ARMOR WHEN

IDENTIFIED IN

WORKLIST

TOP OF CUT SLOPE

ROAD SHOULDER

TOP OF CUT SLOPE

STREAM

CHANNEL

TOP OF SUBGRADE

RIPRAP WHEN IDENTIFIED

IN WORKLIST

ROAD SHOULDER

TRANSITION

25 FT. OR AS STAKED

TRANSITION

AS STAKED

TRANSITION 25 FT.

OR AS STAKED

TRANSITION 25 FT.

OR AS STAKED

DITCH BLOCK WHEN SPECIFIED ON

WORKLIST OR DWG

A MIN. OF 1 FT. OR

1/2 DIA. ABOVE TOP

OF PIPE-WHICHEVER

IS GREATER

GEOTEXTILE WHEN

SPECIFIED

TOP OF SUBGRADE

BOTTOM OF CATCH BASIN

DITCH DIKE

NATURAL

GROUND

NORMAL CUT SLOPE

CATCH BASIN SLOPE AS STAKED

DITCH BLOCK

2:1 SLOPE OR AS STAKED

4' MIN OR

AS STAKED

FINISHED GRADE

1' MIN

FINISHED GRADE

1' MIN

1' MIN*

EXISTING

GROUND

1 FT.

6 IN.

5 FT OR

AS STAKED

HAND PLACED RIPRAP

(CLASS 1&2)

LENGTH 7-15 FT

HEIGHT 1.5-2 FT

THICKNESS 0.7-1.5 FT

HAND PLACED RIPRAP

(CLASS 1&2)

LENGTH 5 FT

HEIGHT FILL DEPTH

THICKNESS 0.7-1 FT

DIA.

F

I

S

O

P

E

T

A

K

E

D

NORMAL

DITCHLINE

NORMAL DITCHLINE

SECTION B-B

6 FT OR AS

STAKED TO UTILIZE

SPECIFIED RIPRAP

1.5 FT OR

AS STAKED

F

T O

R

A S

S T

A K

E D

CULVERT INLET

CULVERT OUTLET

ROAD SURFACE

FILL SLOPE

AS STAKED

CULVERT OUTLET

\\ILMMTBF3DS1\BF\USERS\BJONES\MY DOCUMENTS\DWG\DWT\IMPROVEMENT SHEETS\#### - COVR.DWG

C U

L V

E R

T

D

E T

A I L S

K E

N O

K

E N

N E

E

V

A

R E

A

R

D

M

A I N

T

B U

R E

L A

N

A G

E M

N E

T

I S

S U

E

D

A T

E

M A

R K

R E

V I S

I O

N D

A T

E A

P P

R O

V E

D

___ OF ___

SHEET

U S

D

E P

A R

T M

E N

T

O

F

T

T E

R I O

R

(DESIGNED BY: KCM DRAWN BY: KCM CHECKED BY: GLA APPROVED BY: EC

D I S

T R

I C

T

D E

S I G

N

O

F F

I C

E

I S

S U

R

C

O N

S T

R U

C T

I O

N

W E

S T

E R

N

M

O N

T A

S

T R

I C

T

M I S

S O

U

E

F

I C

SEDIMENT TRAP-PROFILES

(N.T.S.)

NOTES

1. SEDIMENT TRAP PAID UNDER ITEM 20409.

C M

P

5'

WASHED ROCK

ONLY IF SPECIFIED

C M

P , O

R D

IT

C

H L

IN

E

WASHED ROCK, ONLY IF

SPECIFIED IN PAYITEM

SEDIMENT TRAP-PLAN

(N.T.S.)

ROAD SURFACE

\\ILMMTBF3DS1\BF\USERS\BJONES\MY DOCUMENTS\DWG\DWT\IMPROVEMENT SHEETS\#### - COVR.DWG

S E

D I M

E N

T

T

R A

P

D

E T

A I L S

K E

N O

K

E N

N E

E

V

A

R E

A

R

D

M

A I N

T

B U

R E

L A

N

A G

E M

N E

T

I S

S U

E

D

A T

E

M A

R K

R E

V I S

I O

N D

A T

E A

P P

R O

V E

D

___ OF ___

SHEET

U S

D

E P

A R

T M

E N

T

O

F

T

T E

R I O

R

(DESIGNED BY: KCM DRAWN BY: KCM CHECKED BY: GLA APPROVED BY: EC

D I S

T R

I C

T

D E

S I G

N

O

F F

I C

E

I S

S U

R

C

O N

S T

R U

C T

I O

N

W E

S T

E R

N

M

O N

T A

S

T R

I C

T

M I S

S O

U

E

F

I C

DRAINAGE DIP CONSTRUCTION NOTES

1. DIPS SHALL BE CONSTUCTED IN THE SUBGRADE PRIOR TO PLACEMENT OF ANY

SPECIFIED BASE OR SURFACE COURSE.

2. THE ELEVATION TOLERANCE SHALL BE +- 0.2 FT

3. THE LOCATION AND TYPE OF DRAIN DIP SHALL BE SHOWN ON THE DRAWINGS OR

DESIGNATED ON THE GROUND BY THE ENGINEER.

4. SUITABLE EXCESS MATERIAL SHALL BE UNIFORMLY SPREAD ON THE ADJACENT

ROADBED AND NOT SIDECAST ON THE FILL SLOPE.

5. WORK REQUIRED UNDER RESHAPING OF DRAIN DIPS MAY VARY FROM A SIMPLE

BLADE JOB TO UTILIZATION OF A DOZER TO MOVE LARGE QUANTITIES OF MATERIAL

M

I N

R

B B

A(ft)

B(ft) R(ft)

GRADE LOWBOY

LOG TRUCK 4X4 (FIRE ENGINE)

LENGTH TAPER ROUNDING

0-5

6-9

10-12

LENGTH TAPER ROUNDING LENGTH TAPER ROUNDING

GRADE

0-5

6-9

10-12

GRADE

0-5

6-9

10-12

30 30

30 50

30 60

20 25

20 40

20 50

CHORD LENGTH

FOR ROUNDING

15 5

A(ft)

B(ft)

R(ft) A(ft)

B(ft)

R(ft)

A

R

TYPE I DRAIN DIP

N

O

R

M

A

D

E

45°

NO SCALE

E

F

I

O

P

E

F

A

CUT SLOPE

B

A

D

E

N

O

R

M

TYPE II DRAIN DIP

B

N

O

R

M

A

D

E

F

I

O

P

E

A

C

T

O

P

E

B

NO SCALE

Riprap when specified in work list

A

D

E

N

O

R

M

C

C

Road Width

= W

A-B LENGTH

DEPTH BELOW NORMAL GRADE

≥ 12' W ≤ 14' 50' 0.7 1.2

B E

>14' W ≤ 16' 50' 0.7 1.3

>16' W ≤ 18' 55' 0.7 1.4

>18' W ≤ 20' 55' 0.7 1.5

>20' W ≤ 22' 60' 0.7 1.55

22' W ≤ 24' 60' 0.7 1.6 i n i n

TYPE I DRAINAGE DIP NOTES

14 FT ROAD WITHOUT DITCH POINT B SHALL BE 0.7FT BELOW NORMAL GRADE.

POINT E SHALL BE 1.2 FT BELOW NORMAL GRADE.

ROAD WITH DITCH POINTS B AND E SHALL BE REVERSED SO THAT THE DIP

DRAINS INTO THE DITCH.

NOTE: SEE TABLE BELOW FOR DIFFERENCE IN ELEVATION

BETWEEN POINTS B AND E AS ROAD WIDTH INCREASES.

TYPE II DRAINAGE DIP NOTES

14 FT ROAD WITHOUT DITCH THE SUBGRADE SHALL BE OUTSLOPED 4-6% AT THE LOW POINT OF THE DIP.

ROAD WITH DITCH THE SUBGRADE SHALL BE INSLOPED 4-6% AT THE LOW POINT OF THE DIP. BOTTOM

OF DITCHLINE SHALL BE A MINIMUM OF 0.5 FT BELOW THE LOW POINT OF THE DIP.

NOTES: SKEW OF DRAINLINE SHALL BE 0-35 DEGREES. .

WHEN RIPRAP IS…

This is the start of the file's text. The full file is on GovTribe.