Key Personnel Attachment for Evaluation 02.docx

DOCX document 18 KB Posted

Attached to
3960--654-22-1-6059-0005 Replace Elevators Building 1. Please Federal contract opportunity
Solicitation number
36C26122R0018
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 21

About this file

This document contains a template for key personnel resumes to be submitted in response to solicitation number 36C26122R0018 from the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 21. The solicitation is for project to replace elevators in Building 1 at the location. The resume template requires offerors to provide information on proposed key personnel including their name, proposed assignment, experience with the offering firm and other firms, education, professional registration or training, familiarity with safety compliance and sustainability, and details on up to five relevant projects completed in the past six years including contract number, title, value, dates, and the personnel's role. Personnel experience must be clearly indicated as project manager, project superintendent or combined experience.

View the file

Other files for this federal contract opportunity

Other files attached to 3960--654-22-1-6059-0005 Replace Elevators Building 1. Please, newest first.
File Type Posted
B1 1945 D1-26 Arch Grd Flr Plan.pdf PDF
S02 - Past Performance Questionnaire Elevators.docx DOCX document
S02 Price Breakdown by Division.docx DOCX document
01.45.00 Quality Control.docx DOCX document
01.35.26 Safety Requirements.docx DOCX document
PG 18-10 - Elevator Design Manual.pdf PDF
01.57.19 Temporary Environmental Controls.doc DOC document
Appendix 1.docx DOCX document
01.32.16-16 Network Analysis Schedules.docx DOCX document
36C26122R0018.docx DOCX document
01.00.00 General Requirments.pdf PDF
01.42.19 Reference Standards.docx DOCX document
01.33.23.submittals.docx DOCX document
Checklist QC Plan Review.pdf PDF
Wage Determination NV20210040 12.03.21.pdf PDF
CONTRACTOR CERTIFICATION REGARDING SAFETY AND ENVIRONMENTAL.docx DOCX document
S02 - RFI FORM.docx DOCX document
Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C26122R0018

ATTACHMENT: PERSONNEL RESUMES EVALUATION

OFFERORS’s NAME: ________________________________

OFFEROR’S KEY PERSONNEL

EXPERIENCE/QUALIFICATIONS

Replace and Modernize Elevators

Provide the following information, on separate sheets, to demonstrate the key personnel's experience (one for each: Elevator Design Project Manager, Elevator Project Superintendent, Elevator Project Engineer, Elevator Safety Officer, and Elevator QC Manager).

Name:

Proposed Assignment to this Project:

Name of Firm, Position held, Dates of Employment:

Number of Years with other Firms, Position held, dates of employment:

Educational Background: (Year, Degree, Specialization, Name of U.S. Accredited University)

Professional Registration (if any): (Year, State, Discipline)

Training Course Completed: (COE construction quality management, Safety, etc.)

Familiar with Safety Compliance and Sustainability:

Provide a list of projects on a maximum of five projects that were completed by the key personnel within the past six years:

PROJECT 1:

Contract No:

Title:

Contract Amount:

Contract Start/Completion Date:

Role in Project (PM, Sup, QC, Safety):

Description of Work (Description shall adequately describe building construction):

PROJECT 2:

Contract No:

Title:

Contract Amount:

Contract Start/Completion Date:

PROJECT 3:

Contract No:

Title:

Contract Amount:

Contract Start/Completion Date:

Role in Project (PM, Sup, QC, Safety):

Description of Work (Description shall adequately describe building construction):

PROJECT 4:

Contract No:

Title:

Contract Amount:

Contract Start/Completion Date:

Role in Project (PM, Sup, QC, Safety): .

Description of Work (Description shall adequately describe building construction):

PROJECT 5:

Contract No:

Title:

Contract Amount:

Contract Start/Completion Date:

IF it is not clear from the information provided on the five projects described above, the proposal shall clearly indicate the number of years of Project Manager and Project Superintendent experience and shall NOT show combined experience, for example, Project Manager/Project Engineer for three years.

File details come from the government source that posted it. Updated .