Justification and Approval.pdf
PDF 295 KB Posted
- Attached to
- Electronic Security System Federal contract opportunity
- Solicitation number
- FA5606-20-Q-2052
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions and Answers.pdf | ||
| Combo - Amend 2.pdf | ||
| Combo - Amend 1.pdf | ||
| Attachment 1 Spangdahlem Air Base B125 Duress Concept.pdf | ||
| Combo.pdf | ||
| Statement of Work.pdf | ||
| Attachment 2 Spangdahlem Air Base B108109 IDS Concept.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Limited Sources Justification and Approval (J&A)
FOR OFFICIAL USE ONLY
March 2018 FOR OFFICIAL USE ONLY Page 2 of 7
( See guidance at the end of this document for completing the following sections. )
I. Contracting Activity.
52nd Contracting Squadron Spangdahlem Air Base, Germany
II. Nature and/or description of the action being processed.
Brand-name justification for the proposed contractual action pursuant to FAR 16.505(a) as the particular brand-name, product, or feature is essential to the Government's requirements, and market research indicates other companies' similar products, or products lacking the particular feature, do not meet, or cannot be modified to meet, the agency's needs.
III. Description of supplies/services required to meet agency needs.
Inovonics Duress Receiver
Inovonics Duress Receiver Enclosure Innovonics High Power Repeater Inovonics PDA Buttons 1k Ohm Resistor Pack Hoffman Enclosure, Wall Mount, 24" x 20" x 8" Hoffman 24" x 20" panel Hoffman Enclosure handle Honeywell/Vindicator AES-1500 Security Device, Wire/RJ45 Honeywell Enclosure Tamper Switch LifeSafety Power Distribution Module LifeSafety Power Battery Disconnect Module PowerSonic 12 VDC 20AH Battery LifeSafety Power 75W Power Supply/Charger, 6A/12V or 3A/24V Wuerth 220V AC Single outlet with cover Weiland Terminal board Omron Relay RS Electronics Battery Test Switch Comnet 1 Channel Fiber Media Converter, single-mode, A-side Comnet 1 Channel Fiber Media Converter, single-mode, B-side, Small Lenel Input Control Module Lenel Output Control Module Lenel Command Keypad (Arming Control Unit) RS Electronics Tamper Switch for [use w/ Lenel ACU] Bosch Security 360 Degree PIR & MW Magnasphere High Security Dual Switch Level 2 (Entry Doors), 1k EOLs Magnasphere High Security Dual Switch Level 2 (Emergency Exit Doors), No End of Line Resistor Magnet Bracket, Adjustable Kit for Magnasphere BMS Corby Arming Control Unit
March 2018 FOR OFFICIAL USE ONLY Page 3 of 7
IV. Identification of the justification/rationale for limiting sources and demonstration of the contractor's unique qualifications to provide the required supply/service.
The US Air Force (AF) and USAFE must purchase components listed on the AEL. The AEL lists all equipment included in the following categories: Command, Control Display Equipment (CCDE), Assessment Subsystems, Assessment Cameras, Interior Sensors, Exterior Sensors, and Wide Area Detection/Approach Zone Sensors. NIWC Atlantic must design systems based on the approval list updated approximately twice a year.
V. Determination by the ordering activity Contracting Officer that the order represents the best value consistent with
FAR 8.404(d).
VI. Description of the market research conducted and the results, or explain why market research was not conducted.
Cost estimates were prepared using past material contracts and web searches for costs. All material listed can be procured from open market vendors and are non-proprietary to one vendor which would create a disadvantage for bidding on solicitations. All components can be procured for a lower cost than previously installed items for US AF/USAFE and carry greater UL certifications.
Based on current market research, it has been determined that the brand-name products provide in the bill of material can fully support the Governments requirements for EAL and lifecycle sustainability. Parts and components are available via open market sources and will not limit solicitations from GSA vendors.
VII. Other facts supporting the justification.
Items not specified on the EAL but listed as non-substitute items on the SOW are items that are in the Government's best interest to purchase. This is due to rigorous engineering design analysis for installation compatibility, Underwriters Laboratories (UL) approvals, and lifecycle management. NIWC Atlantic has designed a uniform set of system components across sensor platforms to ensure that the Government is receiving the same high quality product for every installation. In the Multiple Award Contract (MAC) and General Services Administration (GSA) contract environment the likelihood of installation contracts being awarded to multiple contractors is a real and valid situation. In order to reduce the likelihood of error in system installation, programming, and testing NIWC Atlantic has standardized the equipment designs and installation practices. New installations are transitioned to the USAFE sustainment program after successful phase testing. The sustainment contractor is required to maintain 10% spares of all components installed across eighteen (18) USAFE bases. Having a common set of components reduces the amount and type of components on the shelf and reduces the overall material cost and labor cost of maintaining a knowledge base of multiple devices.
VIII. Actions the agency may take to remove or overcome any barriers that led to the restricted consideration before any subsequent acquisition for the supplies or services.
Lifecycle of the current architecture per US AF/USAFE AEL. The O&M provider contract when rebid will revisit the Manufactures that can be supported and the options for widening the variety of spares maintained. This will be revisited at that time to weigh the advantages/disadvantages of life cycle and shelf life of current in stock spares versus availability/interoperability of other manufactures (COTS)
March 2018 FOR OFFICIAL USE ONLY Page 4 of 7
IX. Certification by the Contracting Officer.
As evidenced by my signature above, I have determined this document to be both accurate and complete to the best of my knowledge and belief.
X. Certification by the technical/requirements personnel.
As evidenced by my (our) signature(s) above, I (we) certify that any supporting data contained herein, which is my (our) responsibility, is both accurate and complete.
March 2018 FOR OFFICIAL USE ONLY Page 5 of 7
GUIDANCE
I. Contracting Activity.
Fully identify the contracting activity responsible for the proposed contracting action. Include the name/phone number of the Contracting Officer. Specifically identify as a “Limited Sources” Justification. Identify purchase request number, if applicable.
II. Nature and/or description of the action being processed.
State whether the action is a new order or by modification to an existing order. Identify the GSA schedule number, the Blanket Purchase Agreement (BPA) number, the order number for the current action, and the Contactor(s). Indicate the Period of Performance (PoP). Also identify the type of the order/line items on the order (e.g. Firm Fixed Price, Labor Hour, etc).
III. Description of the supplies/services required to meet agency needs.
Specifically describe the supplies and/or services to be acquired including the price and quantity of each item in the order and state the total estimated value of the order. For services, state whether the services are performance-based and, if not, provide rationale for not being performance based. Also state the delivery/performance schedule/period for the items under the order.
IV. Identification of the justification/rationale for limiting sources and demonstration of the contractor's unique qualifications to provide the required supply/service.
This section is normally the most detailed part of the justification. To assist you in preparing this justification, an introductory sentence and the four circumstances of FAR 8.405-6 that justify restricting the number of schedule holders are provided below. Select the appropriate cite, then provide, in narrative form, a detailed explanation supporting the specific circumstance cited for limiting the number of schedule holders.
(Introductory sentence) FAR 8.405-6 requires an ordering activity to justify its actions when restricting consideration of schedule contractors to fewer than required in FAR 8.405-1 or 8.405-2.
After selecting the appropriate cite, next select one of the four sentences below and provide a detailed explanation supporting the specific circumstance cited.
FAR 8.405-6(a)(1)(i)(B), “Only one source is capable of responding due to the unique or specialized nature of the work”. (Provide a detailed justification with supporting documentation, as evidence of the “unique or highly specialized” nature of the procurement.
The user/customer typically provides this supporting information. Recommend attaching supporting documentation to the back of the document. General statements are not acceptable.)
FAR 8.405-6(a)(1)(i)(C), “The new work is a logical follow-on to an original Federal Supply Schedule order provided that the original order was placed in accordance with the applicable Federal Supply Schedule ordering procedures.” The original order was not issued under sole source or limited source procedures. (Provide details on the previously competed order and explain how this order is a logical follow-on to that order. Explain fully the connection between the previous work/order and the current one.
The user/customer typically provides this supporting information. General statements are not acceptable.)
FAR 8.405-6(a)(1)(i)(A), “An urgent and compelling need exists, and following the ordering procedures would result in unacceptable delays.” (Provide a detailed justification with supporting documentation that explains the exact urgency of the requirement and the schedule impact if time were to be taken to follow FSS ordering procedures. The user/customer typically provides this supporting information. Recommend attaching supporting documentation to the back of the document. General statements of urgency are not acceptable.)
FAR 8.405-6(b)(1), “The item is peculiar to one manufacturer. A brand name item, whether available on one or more schedule contracts, is an item peculiar to one manufacturer.” (Brand name specifications should not be used unless the particular brand name, product or feature is essential to the Government's requirements. Therefore, explain why the particular brand item is essential to the Government's requirements, and why other companies' similar items, or products lacking the particular feature, do not meet, or
March 2018 FOR OFFICIAL USE ONLY Page 6 of 7 cannot meet, or cannot be modified to meet, the agency's need. The user/customer typically provides this supporting information.
General statements are not acceptable.)
V. Determination by the ordering activity Contracting Officer that the order represents the best value consistent with
FAR 8.404(d).
This section needs to be tailored based upon whether the order is for supplies/services not requiring a statement of work (FAR 8.405-1) or if the order is for services requiring a statement of work (FAR 8.405-2).
For FAR 8.405-1 orders the best value determination needs to be based upon the supply or service offered under MAS contracts by surveying at least three schedule contractors through the GSA Advantage! on-line shopping service, or by reviewing the catalogs or price lists of at least three schedule contractors. The ordering Contracting Officer's review of the Contractor's price list(s) and any price reductions sought is also required. (Contracting Officer should seek additional price discounts/concessions based on the specific order requirements on all orders over the micro-purchase threshold.) In addition to price, when determining best value, the ordering activity may consider, among other factors, past performance, special features of the supply or service required for effective program performance, trade-in considerations, probable life of the item selected as compared with that of a comparable item, warranty considerations, maintenance availability, environmental and energy efficiency considerations, and delivery terms.
When an order contains brand name specifications, the Contracting Officer shall post the Request for Quote (RFQ) along with the basis of the justification as required by FAR 8.405-6(b)(3).
For FAR 8.405-2 orders for services requiring a statement of work, FAR 8.405-2(d) requires that an evaluation be performed based on the criteria provided to the schedule contractors. Therefore, the justification must address how the FAR 8.404(d) requirement for an evaluation of the proposed level of effort and mix of labor will be conducted and include a statement that the Contracting Officer will perform a price reasonableness determination as part of the best value determination.
VI. Description of the market research conducted and the results, or explain why market research was not conducted.
Discuss market research that was conducted among schedule holders and the market research results that led to the conclusion to go sole source or to limit the number of schedule holders to be solicited. The narrative in this section should provide a high level of confidence that the requirements of 8.405-1 and 8.405-2 could not be met. If no market research was conducted, state so and provide the rationale.
VII. Other facts supporting the justification.
When FAR 8.405-6(a)(1)(i)(C) is cited for an follow-on acquisition as the basis for the justification, include an estimate of the cost that would be duplicated and the basis and derivation of the estimate, or provide details on why a delay to solicit additional schedule holders would be unacceptable.
Provide any other facts supporting the Limited Sources Justification.
VIII. Actions the agency may take to remove or overcome any barriers that led to the restricted consideration before any subsequent acquisition for the supplies or services.
Describe all efforts to be taken to remove or overcome any barriers that preclude the agency from meeting the requirements of FAR 8.405-1and FAR 8.405-2 before any subsequent acquisition for the supplies or services is made. If no actions are planned, so state and provide reasons.
IX. Certification by the Contracting Officer.
The contracting officer's signature on the signature page evidences that he/she has determined this document to be both accurate and complete to the best of his/her knowledge and belief.
X. Certification by the technical/requirements personnel
March 2018 FOR OFFICIAL USE ONLY Page 7 of 7
As evidenced by their signatures on the signature page, the technical/requirements personnel have certified that any supporting data contained herein which is their responsibility is both accurate and complete.
File details come from the government source that posted it. Updated .