DEFENSE LOGISTICS AGENCY

CONTRACTING SERVICES OFFICE

5404 J AVENUE, BLDG 404

NEW CUMBERLAND, PA 17070-5059

Date

Justification for Other than Full and Open Competition IAW FAR 13.5

1. Nature and/or description of the action being approved:

2. A description of the supplies or services required to meet the agency’s needs (including the estimated value):

3. An identification of the statutory authority permitting other than full and open competition:

4. A demonstration that the proposed contractor’s unique qualifications or the nature of the acquisition requires use of the authority cited:

5. A description of efforts made to ensure that offers are solicited from as many potential sources as is practicable, including whether a notice was or will be publicized as required by Subpart 5.2 and, if not, which exception under 5.202 applies:

6. A description of the market research conducted (see Part 10) and the results or a statement of the reason market research was not conducted:

7. Any other facts supporting the use of other than full and open competition, such as:

• Explanation of why technical data packages, specifications, engineering descriptions, statements of work, or purchase descriptions suitable for full and open competition have not been developed or are not available.

• When 6.302-1 is cited for follow-on acquisitions as described in 6.302-1(a)(2)(ii), an estimate of the cost to the

Government that would be duplicated and how the estimate was derived.

• Include a copy of the previous justification.

• The approval authority shall determine whether the planned actions were completed. If the actions were not completed, the justification for the follow-on acquisition shall be approved by the approval authority one-level above the approval authority for the previous justification (see FAR 6.304). If the previous justification was approved by the Senior Procurement Executive (SPE), the approval remains at the SPE level. DFARS PGI

206.304 (a)(s-70)(ii)

• When 6.302-2 is cited, data, estimated cost, or other rationale as to the extent and nature of the harm to the Government.

8. A listing of the sources, if any, that expressed, in writing, an interest in the acquisition (Include the results of the request for information or the sources sought notification in accordance with DFARS PGI 206.302-1 or include the waiver from the HCA or designee):

9. A statement of the actions, if any, the agency may take to remove or overcome any barriers to competition before any subsequent acquisition for the supplies or services required:

I certify that any supporting data that is the responsibility of technical or requirements personnel and which form a basis for the justification are complete and accurate.

Technical Personnel

Approval:

The justification, as presented above, is accurate and complete to the best of my knowledge and belief. Additionally, I have determined that the anticipated cost to the Government will be fair and reasonable.

Contracting Officer

Competition Advocate (Above $700K but not exceeding $13.5 million)

Head of the Procuring Activity (Above $13.

5 million but not exceeding $93 million)

Senior Procurement Executive (Above $93 m illion and as required by DFARS PGI 206.304(a)(S-70)(ii))

Text1: September 17, 2019
Text2: DLA Information Operations has a need to issue a sole source contract action to continue maintenance for Government owned production devices (devices) in Japan, without using competitive procedures. An award for a new maintenance contract SP7000-19-P-0077 has already been awarded with the possibility of service starting on March 31, 2019.
Text3: Continued maintenance, all consumable supplies (excluding paper), for 7 Government owned Fuji Xerox production copiers already in place for Japan.

POP: October 1, 2019 - March 30, 2019 Estimated contract value of $68,190.00.

Text4: 41 U.S.C. 1901 Simplified Acquisition Procedures; FAR 13.501(a) Sole source (including brand name) acquisitions.
Text5: Government owned Fuji Xerox equipment is currently in place in Japan. The devices must be supported by Fuji Xerox. Current equipment must be used to prevent a lapse in mission support due to the fact that the procurement of new/additional equipment will take longer than mission requirements allow. The only way to ensure the uninterrupted support to the Warfighter is to issue a contract to the current vendor.
Text6: A notice will be publicized to the GPE FedBizOpps.gov in accordance with FAR subpart 5.2.
Text7: Market research was conducted on the previous order SP7000-18-P-0101. This order is a continuation of services until the new devices on order SP7000-19-P-0077 can be tested and delivered.
Text8: Attempting to do a short-term contract via competitive procedures would result in unacceptable delays to achieve contract award. Delivery, testing, and installation of new equipment all of which would cripple the customer. The unacceptable delays would entail removal of the devices currently in place, re-competing the short term rental, and delivery of the short term rental, during which the customers will be without devices. An up to six month contract will provide adequate time for the delivery and installation of the new devices.
Text9: Fuji Xerox was the only vendor to respond to the sources sought notice posted on FedBizOpps.gov.
Text10: The subsequent acquisition for this effort was competed on FedBizOpps.gov under SP7000-19-Q-0024.
2019-09-26T09:28:35-0400
DANOWSKI.TIMOTHY.A.1292723802
2019-09-18T09:00:18+0900
NAKAMOTO.DUSTIN.R.1180065284