J.2 Statement of Work (2 Pages).pdf
PDF 119 KB Posted
- Attached to
- HARRINGTON FORK BRIDGE REPLACEMENT Federal contract opportunity
- Solicitation number
- 1240LT23R0041
- Issued by
- Department of Agriculture Forest Service
About this file
This statement of work describes a bridge replacement project on National Forest lands in Idaho. The project scope involves removing an existing burned bridge, installing a new prefabricated steel bridge superstructure on treated timber abutments, constructing new approach roads, and other site work. The staging area and campsite for contractors is designated. Administrative work will begin in June 2023 with on-site construction from September 2023 to November 2023 and bridge installation in 2024. The estimated budget is $250,000 to $1,000,000. Applicable specifications include the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects and the Forest Service Supplemental Specifications.
The related federal contract opportunity is seeking proposals for the Harrington Fork Bridge Replacement project located in Cassia County, Idaho. The estimated magnitude of construction is $250,000 to $500,000. A site visit is scheduled for June 6, 2023. This project is set aside for small businesses with an industry size standard of $45 million. The soliciting agency is the US Department of Agriculture Forest Service.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 0_PreBidSignInSheet_HarringtonFork.pdf | ||
| 1240LT23R0041.0001 - HARRINGTON FORK BRIDGE REPLACEMENT.pdf | ||
| J.3 Forest Service Supplemental Specifications (REV 2) (78 Pages).pdf | ||
| J.2 Statement of Work (REV.2) (2 Pages).pdf | ||
| J.3 Forest Service Supplemental Specifications (79 Pages).pdf | ||
| J.1 Wage Determinations (Cassia County, ID) (ID20230077) (01.06.2023) (7 Pages).pdf | ||
| 1240LT23R0041 - Harrington Fork Bridge Replacement.pdf | ||
| J.4 Final Drawings (8 Pages).pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION ‘C’ - DESCRIPTION/SPECIFICATIONS/STATEMENT OF
WORK
Harrington Fork Bridge Replacement
Project Description:
Furnish all labor, equipment and materials necessary to accomplish the work under this contract.
This project will construct a new road bridge in the same location as the existing one that was burned up a few years back with the Badger Fire. Construction will consist of 1) removing/disposing of existing bridge material, asphalt material, and other debris that still exists onsite; 2) installing a new approximately 16’ wide by 40’ long prefabricated steel bridge superstructure set on new treated timber abutments including construction of new abutment riprap armoring material and placement of new asphalt wear surface; 3) removing the existing asphalt road approaches and installing new; and 4) performing other miscellaneous improvements as required.
Project Location:
From Hansen, Idaho, proceed south on Rock Creek Road for approximately 16.9 miles to the junction with Forest Road 70520A. Turn left and arrive at the project location.
Use of Premises (Staging Area & Camping):
The upper parking lot for the Harrington Fork Picnic Area will be made available for use as both a Staging Area for required construction materials/equipment and camping for contract personnel, limited to a maximum of two camp trailers. This upper parking lot is located approximately 0.2 miles south of the new bridge location. If this site is used, then the Contractor shall supply the number of toilet facilities (porta-potty) necessary to serve the personnel who will be camping at this location. Disturbance to the site shall be minimized, weed-free prevention practices shall be followed, and appropriate camp site cleanliness/etiquette shall be met. Lastly, if this site is used, trail access shall be maintained as required.
Start Date:
June 5, 2023 – anticipated start date for administrative and construction preparation tasks.
September 11, 2023 – anticipated start date for on-the-ground construction.
End Date:
The Project End Date will be November 3, 2023
Estimated Price Range:
$250,000 to $1 Million
Specifications:
Standard Specifications (FP-14) and attached Forest Service Supplemental Specifications (FSSS) are applicable to this Public Works contract. All applicable FSSS are included in full text. All specifications not included in the specification listing but referenced by listed specifications are applicable. Standard Specifications (FP-14) are available in pdf format on-line at https://highways.dot.gov/federal-lands/specs https://highways.dot.gov/federal-lands/specs
| Project Description: |