This pre-solicitation announcement provides notice of an upcoming solicitation for a firm-fixed price contract to perform Continuious Maintenance Availability 3A1 on the USS MOMSEN (DDG 92) from October 31st 2022 through November 18th 2022. The solicitation will be set aside 100% for small businesses under NAICS code 336611 with a size standard of 1,250 employees. The Regional Maintenance Center at Puget Sound Naval Shipyard and Intermediate Maintenance Facility in Everett, Washington intends to send solicitations to all Master Ship Repair Agreement or Agreement for Boat Repair holders with approved agreements for repair or alteration of the USS MOMSEN within the Pacific North West Region. All work must be executed at the PSNS/IMF Everett Detachment Shipyard. Respondents must be registered in the System for Award Management to receive award.

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE NAVY

NWRMC (NMD)

USS MOMSEN (DDG 92)

SPECIFICATIONS FOR WORK TO BE ACCOMPLISHED

SPECIFICATION NUMBER: TPPC-DDG92-NWRMC23-S001

SHIP CHARACTERISTICS

FEET INCHES 510 6LENGTH OVERALL

FEET INCHES 0 0MAX. BEAM AT DESIGN WATERLINE

FEET INCHESEXTREME BEAM INCLUDING APPENDAGES

FEET INCHES 31 0DRAFT (MAX. NAVIGABLE) (FWD.)

FEET INCHES 0 0DRAFT (MAX. NAVIGABLE) (AFT.)

LONG TON 0LIGHT DISPLACEMENT

9,100 LONG TONFULL LOAD DISPLACEMENT

INCHESFEET 0 0HEIGHT OF MAST ABOVE DESIGN WATERLINE

0 0

INCLUDES ALL CHANGES THROUGH 5/23/2022

INDEX

SHIP: USS MOMSEN (DDG 92) TPPC-DDG92-NWRMC23-S001

ITEMS THAT ARE STRUCK OUT IN THIS INDEX DO NOT APPLY TO THIS CONTRACT.

CATEGORY I. FY-23 STANDARD ITEMS APPLICABLE TO THIS JOB ORDER WITHOUT FURTHER REFERENCE.

ITEM_NO. TITLE CHANGE DATE CHANGE

009-01 General Criteria; accomplish 10/01/2021 Original

009-02 Environmental Compliance Report for Material Usage; accomplish 10/01/2019 Original

009-03 Toxic and Hazardous Substance; control 10/01/2019 Original

009-04 Quality Management System; provide 10/01/2021 Original

009-05 Temporary Access; accomplish 10/22/2021 CH-1

009-06 Maintaining Protection and Cleanliness from Non-Radioactive Operations;

accomplish

03/06/2020 Original

009-07 Confined Space Entry, Certification, Fire Prevention and Housekeeping;

accomplish

10/01/2021 Original

009-08 Shipboard Fire Protection and Fire Prevention; accomplish 10/01/2021 Original

009-10 Asbestos-Containing Material (ACM); control 10/01/2019 Original

009-18 Mine Warfare Ships Magnetic Material; control 10/01/2021 Original

009-19 Provisioning Technical Documentation (PTD); provide 10/01/2018 Original

009-20 Government Property; control 10/01/2021 Original

009-21 Logistics and Technical Data; provide 10/01/2018 Original

009-23 Interference; remove and install 10/01/2021 Original

009-24 Authorization, Control, Isolation, Blanking, Tagging, and Cleanliness;

accomplish

10/01/2021 Original

009-34 Fire Protection of Unmanned Vessel at Contractor Facility; accomplish 10/01/2018 Original

009-39 Technical Manual Contract Requirement (TMCR) for a New Technical Manual for Commercial Equipment/Component; accomplish

10/01/2018 Original

009-40 Contractor Crane, Multi-Purpose Machine and Material Handling Equipment at a Naval Facility; provide

10/01/2021 Original

009-60 Schedule and Associated Reports for CNO Availabilities; provide and manage 10/01/2021 Original

009-61 Shipboard Use of Fluorocarbons; control 10/01/2021 Original

009-67 Integrated Total Ship Testing; manage 10/01/2021 Original

009-69 Heavy Weather/Mooring Plan; provide 10/01/2021 Original

009-70 Confined Space Entry, Certification, Fire Protection, Fire Prevention and

Housekeeping for Unmanned Vessels; accomplish

10/01/2021 Original

009-72 Physical Security at a Private Contractor Facility; accomplish 10/01/2021 Original

009-73 Shipboard Electrical/Electronic Cable Procedure; inspect, test, install, remove, and repair

05/05/2022 CH-2

009-74 Occupational, Safety and Health Plan; accomplish 10/01/2021 Original

009-80 Ship Facilities; maintain 11/18/2016 Original

009-81 Compartment Closeout; accomplish 10/01/2019 Original

009-82 Installation of Equal Component Vice Specified Component; report 03/26/2018 Original

009-84 Threaded Fastener Requirements; accomplish 10/01/2021 Original

009-88 Collection, Holding and Transfer (CHT) and Motor Gasoline (MOGAS) Tanks, Spaces, and Piping, including Sewage or MOGAS-Contaminated Tanks, Spaces, and Piping; certify

10/22/2021 CH-1

009-93 Emergency Planning and Community Right-to-Know Act (EPCRA) and Pollution

Prevention Act (PPA) Information; provide

03/06/2018 Original

Page 1 of 4 EXECUTING WORK

ITEM_NO. TITLE CHANGE DATE CHANGE

009-99 Ship Departure Report; provide 05/05/2022 CH-2

009-100 Ship's Stability; maintain 03/06/2018 Original

009-101 Ship Transit and Berthing; accomplish 03/26/2018 Original

009-106 Work Authorization Form Coordinator (WAFCOR); provide 10/01/2017 Original

009-109 Non-SUBSAFE Work on SUBSAFE-Certified Vessel; accomplish 10/01/2017 Original

009-110 Non-Nuclear Work on a Nuclear Vessel; accomplish 11/18/2016 Original

009-111 Schedule and Associated Reports for non-CNO Availabilities; provide and manage

10/01/2021 Original

009-117 Combat Systems, Light-Off Suport; provide 10/01/2019 Original

009-118 CG Deck Loading; accomplish 07/18/2014 Original

009-120 Fact Finding and Critique of Unplanned Event; manage 10/01/2021 Original

009-122 Temporary Padeye; install and remove 10/22/2021 CH-1

009-125 Boats Less Than 65 Feet Long; accomplish 05/05/2022 CH-2

Page 2 of 4 EXECUTING WORK

CATEGORY II. FY-23 STANDARD ITEMS WHICH MAY BE INVOKED IN THE WORK ITEMS OF THIS JOB ORDER.

TITLE CHANGE DATEITEM NO. CHANGE

009-09 Process Control Procedure (PCP); provide and accomplish

10/01/2021 Original

009-11 Insulation and Lagging; accomplish 10/01/2021 Original

009-12 Weld, Fabricate, and Inspect; accomplish 10/01/2021 Original

009-25 Structural Boundary Test; accomplish 10/01/2021 Original

009-26 Deck Covering; accomplish 10/01/2021 Original

009-32 Cleaning and Painting Requirements; accomplish 05/05/2022 CH-2

Page 3 of 4 EXECUTING WORK

ITEM NO. TITLE

Administrative Purpose; accomplish000-00-001

Tank Cleaning and Pumping; accomplish123-10-001

ShipAlt DDG51-77228D, Install CRES Individual Dog Watertight Door

(Partial); accomplish

168-80-001

Firemain Piping System; repair521-11-001

Rudder Stock Bearing; inspect562-11-001

Electrical Grade Matting Deck Covering System; install634-11-001

Peel and Stick Nonskid; replace634-11-002

Antenna Array Temporary Staging for Use by Ship's Force; provide991-12-001

Temporary Staging For Bridge Window; provide991-12-002

Temporary Staging for Ship's Force Use; provide991-12-003

Wharf and Pier Laydown Area; utilize and manage992-10-001

Temporary Service; provide992-11-001

Environmental Protection and Hazardous Waste Management Program;

provide

998-31-001

Hazardous Waste Produced on Naval Vessel; control998-41-001

Page 4 of 4 EXECUTING WORK

SHIP: USS MOMSEN (DDG 92) ITEM NO: 000-00-001

COAR: 26 PCN: SERV-L285

LWT FILE NO: 000-001 CMP: NONE

REVISED: 20 MAR 2022 PLANNER: OHTOLA, LARRY

ROGERS, GARRET

SSP: TPPC-DDG92-NWRMC23-S001 1 of 1 ITEM NO: 000-00-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Administrative Purpose; accomplish

1.2 Location of Work:

1.2.1 Not Applicable

1.3 Identification:

1.3.1 Not Applicable

2. REFERENCES:

2.1 None,

3. REQUIREMENTS:

3.1 Prepare and submit each report generated by each requirement of each NAVSEA Standard Item and any other required documentation, that is not tied to a specific Work Item, to the SUPERVISOR.

4. NOTES:

4.1 None

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

5.3 KITTED MATERIAL:

1. None.

SHIP: USS MOMSEN (DDG 92) ITEM NO: 123-10-001

COAR: 26 PCN: EB14-L025

EB14-L027

EB14-L026

CSWT FILE NO: 123-133 (DDG 51) CMP: Q-12311-A0X

REVISED: 13 OCT 2021 PLANNER: DULANEY, MICHAEL

ROGERS, GARRET

SSP: TPPC-DDG92-NWRMC23-S001 1 of 5 ITEM NO: 123-10-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Tank Cleaning and Pumping; accomplish

1.2 Location of Work:

1.2.1 Fuel Service Tank (4-220-4-F)

1.2.2 Fuel Service Tank (4-300-1-F)

1.2.3 Fuel Service Tank (5-300-2-F)

1.3 Identification:

1.3.1 Not Applicable

2. REFERENCES:

2.1 Standard Items, (FY23)

2.2 167-7027483 Rev R, DDG 51 Class Manhole & Air Vent Hose Conn. List Ship Wide

2.3 S9086-T8-STM-010/CH-593 Rev 7, Pollution Control

2.4 S9086-SN-STM-010/CH-541 Rev 11, Ship Fuel and Fuel System

2.5 S9086-CM-STM-020/CH-078, Volume 2 - Gaskets and Packing

2.6 Environmental Guide for Contractors, Naval Station Everett, January

2.7 S9086-CJ-STM-010/CH-075 Rev 7, Fasteners

3. REQUIREMENTS:

3.1 Open, ventilate, empty, clean, render dry, and maintain each tank listed in 1.2.1 using 2.2 through 2.6 as guidance and in accordance with Paragraphs 541-8.4 and 541-9.1 of 2.4, within 3 days of start of availability.

3.1.1 Submit one legible copy, on a weekly basis, in approved transferrable media, of a report listing the location, origin, and quantity of each manhole and Air Ventilation Hose Connection (AVHC) cover removed in 3.1 with respect to its tank, ship's frame and distance off centerline to the SUPERVISOR.

3.2 Open, ventilate, empty, clean, render dry, and maintain each tank listed in 1.2.2 and 1.2.3 using 2.2 through 2.6 as guidance and in accordance with Paragraphs 541-8.4 and 541-9.1 of 2.4, as designated by the SUPERVISOR.

3.2.1 Submit one legible copy, on a weekly basis, in approved transferrable media, of a report listing the location, origin, and quantity of each manhole and Air Ventilation Hose Connection (AVHC)

SHIP: USS MOMSEN (DDG 92)

SSP: TPPC-DDG92-NWRMC23-S001 2 of 5 ITEM NO: 123-10-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

cover removed in 3.2 with respect to its tank, ship's frame and distance off centerline to the SUPERVISOR.

3.2.2 Prior to opening each tank in 3.2, the tank opened in 3.1 must be placed back in operation.

3.3 Pump each tank located in 1.2 to a contractor provided tank on the pier.

3.3.1 Off-loading or transferring of each petroleum product must be accomplished during daylight hours only.

3.3.2 Each hose, pump, and container must be clean and dry prior to start of off-loading.

3.3.3 Total amount of petroleum product to be transferred to the container on the pier is 6,000 gallons.

3.3.4 Submit one legible copy, in approved transferrable media, of completed Attachment A (Liquid Inventory Schedule) to the SUPERVISOR.

(V)(G) "VERIFY OFFLOAD COORDINATION"

3.4 Coordinate the off-loading or transferring of each fluid through the ship's Damage Control Assistant (DCA), via the SUPERVISOR, to maintain ship's stability and to prevent flooding.

3.4.1 Obtain a list from the SUPERVISOR of each petroleum sounding for each tank prior to start of each pumping operation.

3.5 Accomplish the following repairs for each tank closure opened in 3.2 and located in 1.2 using 2.2 for guidance.

3.5.1 Weld fill, drill, and tap a total of 10 each stripped manhole cover bolting ring holes for each tank.

3.5.2 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column A, Lines One through 7.

3.5.3 Remove paint from each seal mating surface (both cover and tank ring).

3.5.4 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface in the vicinity of tank closure, to include each manhole cover, manhole ring, sealing area, coaming and flanged area, as directed by the SUPERVISOR.

3.6 Repair and material less than the amount identified and not accomplished in 3.5 and the total transferred amount of petroleum product less than the amount identified in 3.3.3 will be subject to recoupment.

(V)(G) "INSPECT TANK CLEANLINESS AND COMPLETION OF REPAIR"

3.7 Inspect each tank for cleanliness and completion of each repair prior to final closing. Allowable foreign matter or debris: None.

3.7.1 Document the personnel who were present during the inspection and confirm that they have exited the space prior to closure of each tank.

3.7.2 Designate one person to account for personnel who may have

SSP: TPPC-DDG92-NWRMC23-S001 3 of 5 ITEM NO: 123-10-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

entered the space.

3.8 Install each manhole and AVHC cover for each tank, using new each gasket conforming to SAE-AMS-C-6183, Type II, Class 2, Grade B in accordance with Table 078-8-2 of 2.5.

3.8.1 Install new 105 each Corrosion Resistant Steel (CRES) washer and 105 each Brass Nut in accordance with 075-2.5 of 2.7.

3.8.2 Determine proper tightening sequence.

3.8.2.1 Tighten each fastener uniformly. Apply 10 percent of the specified torque first to make sure that each part is solidly together. Then, apply torque in 25 percent increments (i.e., 25, 50, 75 and 100 percent). Reverse previous sequence (i.e., 6, 5, 4, 3, 2, 1), tightening to 100 percent of required torque.

3.9 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.

4. NOTES:

4.1 Each report and inspection associated with the disposal of Oily Waste will be addressed under Work Item 998-41-001, Hazardous Waste Produced on Naval Vessel; control.

4.2 Booklet of General Plans and Tank Sounding Tables are available for review at the office of the SUPERVISOR.

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

SSP: TPPC-DDG92-NWRMC23-S001 4 of 5 ITEM NO: 123-10-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S. International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

ATTACHMENT A

INVENTORY SCHEDULE - PETROLEUM PRODUCTS

SHIP: CONTRACTOR: SUBCONTRACTOR: _______________CONTRACT NO.______LOT NO. _________

TAPE READINGTANK

NO.

TYPE OF

PETROLEUM

PRODUCT

ITEM NO.

PUMPED TO

TANK/TRUCK

BARGE NO.

DATE

REMOVED

FROM SHIP START FINISH

NUMBER

GALLONS

REMOVED

REMARKS

SIGNATURES

NFD DIRECTOR

CONTRACTOR/SUBCONTRACTOR AUTHORIZED REPRESENTATIVE

SHIP’S COMMANDING OFFICER’S AUTHORIZED REPRESENATATIVE

SSP: TPPC-DDG92-NWRMC23-S001 5 of 5 ITEM NO: 123-10-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S. International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

SHIP: USS MOMSEN (DDG 92) ITEM NO: 168-80-001

COAR: 26 PCN: ER09-L029

ER09-L030

SWT FILE NO: 000-001 CMP: NONE

REVISED: 13 OCT 2021 PLANNER: FAULKINBURY, BRIAN

SSP: TPPC-DDG92-NWRMC23-S001 1 of 3 ITEM NO: 168-80-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: ShipAlt DDG51-77228D, Install CRES Individual Dog Watertight Door (Partial); accomplish

1.2 Location of Work:

1.2.1 Fan Room (Pressure Zone Number 2) (01-200-2-Q)

1.2.2 Director Equipment Room Number 2 (04-272-0-Q)

1.3 Identification:

1.3.1 Quantity (One EA), Door, Watertight (WTRTT), 01-218-2, Individually Dogged, 26 Inch by 54 Inch, 8 Dog, Left Hand, Assembly A011 of 2.2

1.3.2 Quantity (One EA), Door, Watertight (WTRTT), 04-285-2, Individually Dogged, 18 Inch by 36 Inch, Left Hand, Assembly A003 of 2.2

2. REFERENCES:

2.1 Standard Items, (FY23)

2.2 167-8395322 Rev C, ShipAlt DDG-51-77228 Doors Watertight, All CRES Matl, Indv Dogged Arr & Ml

2.3 167-7027493 Rev R, DDG-51 Structural Door List

2.4 150-7026724 Rev M, DDG-51 Class Unit Structural Arr Dwg Assy Unit

2.5 150-7026731 Rev E, DDG-51 Class Unit Structural Arr Dwg Assy Unit

2.6 RLAR 77228/DDG51CL/1160760, Update Door PSI per SupShip Approval Letter

2.7 RLAR 77228/DDG101/1190696, Air Test Fittings: Length, Door No. and Hull Applicability

2.8 LAR 77228/DDG51CL/1160465, Applicability of 8100 Drawings

2.9 RLAR 77228/DDG51CL/1177382, Revise Material List Information for PC Nos 120,128, 129, 136 & 137

2.10 RLAR 77228/DDG62/1122471, CRES Door Manufacturing Discrepancies

2.11 RLAR 77228/DDG62/1122546, Revise References on Supersede Drawing Stamp Sh 1

2.12 RLAR 77228/DDG75/1146506, Incorrect Detail Callout in General Note

2.13 RLAR 77228/DDG78/1143900, Add Label Plate Detail for Door Info

2.14 LAR 77228/DDG62/1121747, Correct Reference for Pipe Lever

SSP: TPPC-DDG92-NWRMC23-S001 2 of 3 ITEM NO: 168-80-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

2.15 RLAR 77228/DDG62/1121292, Change Cres Door P/L and Add Ref 22

2.16 LAR 77228/DDG51CL/1152953, Deviation Request, Minor, Hot Forming of Austenitic Stainless Steel Doors

2.17 803-6397262 Rev B, Doors Watertight, Individually Dogged Sub-Assy & Details

3. REQUIREMENTS:

3.1 Accomplish the requirements of 2.2 for each door listed in 1.3 and located in 1.2, using 2.3 through 2.17 for guidance, as designated by the

SUPERVISOR.

3.1.1 Remove existing and install new each door listed in 1.3 and provided in 5.1.

3.1.1.1 Chip and grind each surface flush in way of each repair.

3.1.1.2 Template size, configuration and location from each

shipboard condition.

3.1.1.3 Install each new Hook Assembly M in accordance with 2.2, using Detail 42-E, Sheet 6 of 2.17.

3.1.2 Apply zinc dust-petrolatum antiseize compound conforming to commercial specification A-A-59313 to entire thread of each fastener.

3.1.3 Lubricate each new hinge pin, working part, gear and operating mechanism using multi-purpose water-resistant grease conforming to

MIL-PRF-24139A.

3.1.4 Accomplish the requirements of 009-12 of 2.1,including Table 2, Columns A and D, Lines One through 7.

3.2 Accomplish the requirements of 009-25 of 2.1 for a chalk test of each door installed in 3.1.2.

3.3 Accomplish the requirements of 009-25 of 2.1 for an air hose, water hose, or vacuum box test of each new weld seam. Allowable leakage: None.

3.4 Accomplish the requirements of 009-32 of 2.1, including Table 2, Line One, Columns A, B, C, E and G, for the preservation of each exterior surface to include each door, frame and 12 inches beyond the frame of each door listed in 1.3 and located in 1.2.

3.4.1 Accomplish the requirements of 009-32 of 2.1, including Table 3, Line 21, Columns A, B and D, for the preservation of each interior surface to include the door, frame and 12 inches beyond the frame of the door listed in 1.3.1 and located in 1.2.1.

3.4.2 Accomplish the requirements of 009-32 of 2.1, including Table 3, Line 6, Columns A, B and D, for the preservation of each interior surface to include the door, frame and 12 inches beyond the frame of the door listed in 1.3.2 and located in 1.2.2.

(V)(G) "OPERATIONAL TEST"

3.5 Accomplish the requirements of Test Note T-2 of 2.2.

3.5.1 Operate each door from the interior and exterior side of each door installed in 3.1.2. Operate each door through 4 complete cycles, from fully closed and dogged to fully open to fully closed and

SSP: TPPC-DDG92-NWRMC23-S001 3 of 3 ITEM NO: 168-80-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

dogged, checking for proper seating, binding or erratic operation.

Allowable binding, sticking or erratic operation: None.

3.6 Accomplish the requirements of 009-11 of 2.1 for each door installed in 3.1.

3.6.1 Accomplish the requirements of 009-12 of 2.1 for each new fastener (stud) to support insulation.

3.6.2 Accomplish the requirements of 009-32 of 2.1 for each surface to be insulated with the exception of non-ferrous and corrosion resistant steel (CRES) piping, plating, and vent ducting.

3.6.3 Accomplish the requirements of 009-32 of 2.1 for new

insulation to match surrounding area.

3.7 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.

4. NOTES:

4.1 None.

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

TOTAL

QUANTITY

PROVIDED NAME Of PART

PIECE

NO.

REF

NO.

NATIONAL

STOCK

NO.

REQ

PARA NO.

1. 1 EA

Door, 01-218-2, 26 Inch by 54 Inch, CRES, WTRTT, LH A011 2.2 N/A 3.1.1

2. 1 EA

Door, 04-285- 2,18 Inch by 36 Inch, CRES, WTRTT, LH A003 2.2 N/A 3.1.1

5.2 PUSH MATERIAL:

1. None.

SHIP: USS MOMSEN (DDG 92) ITEM NO: 521-11-001

COAR: 26 PCN: ER01-L125

CSWT FILE NO: 521-005 (DDG 51) CMP: NONE

REVISED: 13 OCT 2021 PLANNER: FEUZ, SEAN

SSP: TPPC-DDG92-NWRMC23-S001 1 of 2 ITEM NO: 521-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Firemain Piping System; repair

1.2 Location of Work:

1.2.1 Supply Department Storeroom Number 3 (4-370-5-A)

1.3 Identification:

1.3.1 Quantity (14 LF), Pipe Piece, 1-1/2 Inch, 70-30 CuNi, MIL-T- 16420, Class 200, FMD/8N582, Sheet 3T6, Plan 3T6-5A of 2.4

1.3.2 Quantity (One EA), Valve Globe, 1/4 Inch IPS, 400 PSI, FMD/V1210, (FM-V-1372), Sheet 3T6, Plan 3T6-5A of 2.4

2. REFERENCES:

2.1 Standard Items, (FY23)

2.2 521-6567421 Rev T, DDG51 Class Firemain System Diagram

2.3 521-6567421BK Rev T, DDG-51 Class Firemain System Diagram Engineering Data Booklet

2.4 505-7027459 Rev R, DDG-51 Class Instl Mchry & Pp Zone 3330

2.5 505-7027410 Rev B, DDG-51 Class Pipe Fab Details Zone 3330

2.6 802-5959353 Rev BT, MIL-STD-777D Modified for DDG-51 Class, Schedule of Piping, Valves, Fittings, and Associated Piping Components

3. REQUIREMENTS:

3.1 Remove and dispose of each system fluid from the equipment listed in

1.3 and located in 1.2 in accordance with each federal, state and local environmental requirement.

3.2 Accomplish repair of the pipe piece located in 1.2 using 2.2 through

2.5 for guidance, as designated by the SUPERVISOR.

3.2.1 Remove existing and install new the material listed in 1.3.1.

3.2.1.1 Chip and grind each surface flush in way of each repair.

3.2.1.2 Template size, configuration, and location from each

shipboard condition.

3.2.2 Accomplish the requirements of 009-12 of 2.1, including Table One, Column A, Lines One through 10.

3.2.3 Remove existing and install new the valve listed in 1.3.2 and located in 1.2.

3.2.4 Restore each piping flange mating surface exposed by

disassembly of piping system. Repair by removing each high spot, burr, abrasion, and foreign matter, where removal can be accomplished by a hand tool. Maintain phonographic finish on each flange that has it.

3.2.5 Each new material must conform to 2.6, including Category and

SSP: TPPC-DDG92-NWRMC23-S001 2 of 2 ITEM NO: 521-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

Group D-1.

(V)(G) "STRAIN FREE"

3.3 Align the piping to each flange. Piping must be supported independently and must not impose a strain. Accomplishment of alignment by adjustment of the first adjacent hanger is to be considered within the scope of the work.

3.4 Accomplish the requirements of 009-71 of 2.1 for new and disturbed piping system.

3.4.1 Ensure operating test pressure is 161 PSIG, using clean fresh water in accordance with 2.3.

3.5 Accomplish the requirements of 009-11 of 2.1 for new and disturbed lagging.

3.5.1 Accomplish the requirements of 009-32 of 2.1 for new and disturbed lagging to match each surrounding area.

3.6 Repair and material less than the amount identified and not accomplished in 3.2 and 3.5 are subject to recoupment.

3.7 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.

4. NOTES:

4.1 None.

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

SHIP: USS MOMSEN (DDG 92) ITEM NO: 562-11-001

COAR: 26 PCN: EM02-ZBO7

EM01-ZBR7

CSWT FILE NO: 562-006 (DDG 51) CMP: I-56211-A06

REVISED: 13 OCT 2021 PLANNER: DULANEY, MICHAEL

ROGERS, GARRET

SSP: TPPC-DDG92-NWRMC23-S001 1 of 3 ITEM NO: 562-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Rudder Stock Bearing; inspect

1.2 Location of Work:

1.2.1 Steering Gear Room (4-442-0-E)

1.3 Identification:

1.3.1 Quantity (One EA), Lower Rudder Stock Bearing (Port)

1.3.2 Quantity (One EA), Lower Rudder Stock Bearing (Starboard)

1.3.3 Quantity (One EA), Rudder Stock (Port)

1.3.4 Quantity (One EA), Rudder Stock (Starboard)

2. REFERENCES:

2.1 Standard Items, (FY23)

2.2 S9562-AR-MMA-010 Rev 2, Surface Ship Rudder Configurations, Inspection Criteria, and Procedures

2.3 562-6567511 Rev F, DDG-51 Class Rudder Bearing (Port and Stbd)

2.4 S9562-AF-MMC-010, Upper and Lower Lip Seals for the Upper and Lower Rudderstock Bearings

3. REQUIREMENTS:

3.1 Disassemble to the extent necessary to inspect, in place, each bearing assembly listed in 1.3.1 and 1.3.2 and each bearing surface of the equipment listed in 1.3.3 and 1.3.4, located in 1.2, in accordance with Paragraph 5-1 and 5-2.2 of 2.2, using 2.3 and Paragraph 6-2.1 through 6-2.4 of 2.4 for guidance.

(V) "VISUSAL INSPECTION"

3.1.1 Accomplish a visual inspection of the equipment listed in

1.3.1 through 1.3.4, for wear and each defect, using Chapter 4 of 2.2 for guidance. Record results on Appendix "A" of 2.2.

3.1.1.1 Submit one legible copy, in approved transferrable

media, of a report listing results of the requirements of 3.1.1 and a copy of a completed Appendix "A" of 2.2 to the SUPERVISOR.

3.2 Assemble, align, adjust and connect the equipment disassembled in 3.1, in accordance with Chapter 5-2 of 2.2 and using 2.3 and Chapter 8-7 of 2.4 for guidance.

3.2.1 Remove existing, fit and install new the following parts:

TOTAL

QUANTITY

NAME OF

PART PIECE NO. REF.NO.

FIGURE/DRAWING

NO. PART NO.

SSP: TPPC-DDG92-NWRMC23-S001 2 of 3 ITEM NO: 562-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

REQUIRED

2 EA Gasket, 1/32 Inch By 53-1/2 Inch OD by

45-58 ID

PN2 2.2 Paragraph 5- 2.2

52062-12

8 EA Nut, Hex Self Locking 5/8 Inch, 11-UNC-3B-

CU-NI

PN6 2.2 Paragraph 5- 2.2

1-1/8-

7UNC-3B

2 EA Split Sealing Ring

AM1354

6-1-12 2.4 Table 7-2 AM1354

48 EA Screw, Cap Hexagon Socket Head

6-1-14 2.4 Table 7-2 H44254- 2A05

8 EA Butt Screw 6-1-15 2.4 Table 7-2 H44254- 4A05

(V)(G) "LUBRICATION"

3.3 Lubricate the equipment listed 1.3.1 through 1.3.4 and located in

1.2 with new grease conforming to MIL-PRF-24139, in accordance with Chapter 5-2.2 and Chapter 6-3 of 2.2, General Note 3 of 2.3, and using Paragraph 8-6.1 of 2.4 for guidance.

3.3.1 Remove each grease cavity vent plug. Retain each cavity vent plug for use.

3.3.2 Inject grease into each lubrication fitting (4 fittings per bearing) while cycling each rudder to full starboard and full port, a minimum of 3 times. Allowable rubbing or binding: None.

3.3.2.1 Grease each bearing until grease is extruded from each bearing vent.

3.3.3 Install grease cavity vent plugs removed in 3.3.1.

(V)(G) "VERIFY TORQUE"

3.4 Torque each lower bearing retainer fastener to 155 foot-pounds of torque and each retainer split fastener to 25 foot-pounds of torque, in accordance with Paragraph 5-2.2.u.2 of 2.2.

3.5 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.

4. NOTES:

4.1 Reference 2.4 can be accessed and viewed at local RMC office.

Distribution Statement B.

SSP: TPPC-DDG92-NWRMC23-S001 3 of 3 ITEM NO: 562-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

SHIP: USS MOMSEN (DDG 92) ITEM NO: 634-11-001

COAR: 26 PCN: EE02-3425

SWT FILE NO: 634-003 CMP: NONE

REVISED: 13 OCT 2021 PLANNER: DOBLE, MICHAEL

ROGERS, GARRET

SSP: TPPC-DDG92-NWRMC23-S001 1 of 1 ITEM NO: 634-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Electrical Grade Matting Deck Covering System; install

1.2 Location of Work:

1.2.1 Electric Shop (2-381-1-Q)

1.3 Identification:

1.3.1 Quantity (164 SF), Electrical Grade Sheet, Conforming to MIL- DTL-15562, Type I, Blue Marbleized

1.3.1.1 Quantity (164 SF), Deck Covering Underlayment, Conforming to MIL-PRF-3135, Type III, Class 2, Grade B

2. REFERENCES:

2.1 Standard Items, (FY23)

2.2 100-7026705 Rev M, DDG51 Class Unit Structural Arr Dwg-Assy Unit

2.3 100-7026704 Rev M, DDG-51 Class Unit Strl Arr Dwg Assy Unit 3330

3. REQUIREMENTS:

3.1 Accomplish the requirements of 009-26 of 2.1, including Attachment D, for installation of new electrical grade matting deck covering system, in each location listed in 1.2, using 2.2 and 2.3 for guidance.

3.1.1 Accomplish the requirements of 009-32 of 2.1, including Table 3, Line 7, Columns A, B, and D for surface preservation to include 6 inches above the deck for each bulkhead, exposed surface of each piping support, bracket and foundation intersecting the deck.

3.2 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.

4. NOTES:

4.1 Quantities listed in 1.3 are approximate. Contractor should perform shipcheck prior to submission of bid.

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

SHIP: USS MOMSEN (DDG 92) ITEM NO: 634-11-002

COAR: 26 PCN: CG03-1915

CG03-1921

SWT FILE NO: 634-015 CMP: NONE

REVISED: 13 OCT 2021 PLANNER: DOBLE, MICHAEL

HAGEN, KEVIN

SSP: TPPC-DDG92-NWRMC23-S001 1 of 2 ITEM NO: 634-11-002

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Peel and Stick Nonskid; replace

1.2 Location of Work:

1.2.1 Weather Deck 03 Level, Frames 111-126, Centerline

1.3 Identification:

1.3.1 Quantity (150 SF), Peel and Stick Non-Skid, Type XI, MIL-PRF- 24667

2. REFERENCES:

2.1 Standard Items, (FY23)

2.2 150-7026714 Rev E, DDG51 Class Unit Structural Arr Dwg Assembly Unit

2.3 526-6567452 Rev K, DDG51 Class Weather Deck Drains Diagram

3. REQUIREMENTS:

3.1 Accomplish the requirements of 009-26 of 2.1, including Attachment G, for installation of Peel and Stick nonskid, in each location listed in

1.2 using 2.2 and 2.3 for guidance, as designated by the SUPERVISOR.

3.1.1 Accomplish the requirements of 009-32 of 2.1, including Table 2, Line One, Columns A, B, C and E, for the deck surface preservation to include 6 inches above the deck for each bulkhead and exposed surface of each piping support, bracket and foundation.

3.1.2 Accomplish the requirements of 009-32 of 2.1, including Table 2, Line 21, for the preservation of the exterior side of hatch 03- 121-2.

3.2 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.

4. NOTES:

4.1 Quantity listed in 1.3 is approximate. Contractor should perform shipcheck prior to submission of bid.

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

SSP: TPPC-DDG92-NWRMC23-S001 2 of 2 ITEM NO: 634-11-002

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

SHIP: USS MOMSEN (DDG 92) ITEM NO: 991-12-001

COAR: 26 PCN: CF01-1790

CSWT FILE NO: 991-002 (DDG 51) CMP: NONE

REVISED: 13 OCT 2021 PLANNER: BIGWARFE, JOSEPH

SIMBULAN, RODEL

SSP: TPPC-DDG92-NWRMC23-S001 1 of 3 ITEM NO: 991-12-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Antenna Array Temporary Staging for Use by Ship's Force;

provide

1.2 Location of Work:

1.2.1 Antenna Array, 03 level, Frame 128, Port

1.2.2 Antenna Array, 03 level, Frame 128, Starboard

1.2.3 Antenna Array, 03 Level, Frame 158, Port

1.2.4 Antenna Array, 03 Level, Frame 158, Starboard

1.3 Identification:

1.3.1 Quantity (4 EA), Exterior AN/SPY-1D Antenna Array

2. REFERENCES:

2.1 Standard Items, (FY23)

2.2 PM 240-0049, SURF Rev A, AEGIS Radar Spy Antenna Array Scaffolding

2.3 29 CFR PART 1915, Occupational Safety and Health Standards for Shipyard Employment

3. REQUIREMENTS:

3.1 Install and maintain light duty, steel tube and clamp type staging in accordance with 2.2 and 2.3 in each location listed in 1.2, with sufficient levels and projections to safely reach and perform each cleaning, inspection and repair to equipment listed in 1.3 and located in

1.2 for the entire contract period for use by Ship's Force. Ensure each requirement is met:

3.1.1 Install the staging within the first 5 days of the

availability.

3.1.2 Ensure each staging material does not make contact with each antenna array surface.

3.1.3 Ensure each staging level must not be spaced over 7 feet apart. Install 3 each level with a minimum clearance of 6 inches and maximum clearance of 11 inches standoff from each array face and each outboard frame member must have a minimum 18 inches clearance from any edge of array flange.

3.1.4 Ensure planking must be secured (cleated) to preclude shifting or coming loose during high winds.

3.1.5 Ensure each end of tubing resting on structure and

transmitting weight of the staging must terminate on framing immediately below and have 10.2 pound sole plate to preclude damage to structure.

3.1.6 Ensure installed scaffolding has plywood, minimum 1/2 inch

SSP: TPPC-DDG92-NWRMC23-S001 2 of 3 ITEM NO: 991-12-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

thickness, with fire retardant treatment in accordance with MIL-L- 19140, installed at the enclosure top, to protect the array and personnel from damage or injury due to falling objects. The solid top of the scaffolding must extend to the outer most edges of the top of the scaffolding so as not to make a place for catch pocket of water to collect.

3.1.6.1 Slant the top of the scaffolding away from the deckhouse so that water will not run toward the deckhouse.

3.1.7 Erect containment in the location listed in 1.2, to contain each environmental pollutant generated during the Ship's Force work.

Containment must enclose/weatherproof the platform listed in 1.2 from rain and wind blown debris.

3.1.8 Install and maintain temporary lighting in each area of the staging.

3.1.8.1 Temporary lighting must be equipped with industrial type shatterproof bulbs and protective cages conforming to Symbol 103 of MIL-F-16377/23.

3.1.8.2 Lighting must meet the following minimum standards, 42 foot candles.

3.2 Disconnect and remove each temporary service when directed by the

SUPERVISOR.

3.3 Remove staging installed in 3.1 when directed by the SUPERVISOR.

(I) "VISUAL INSPECTION"

3.3.1 Accomplish a visual inspection of each antenna array exterior surface listed in 1.3 for structural integrity, deterioration, pitting, each crack, and each area of damage or distortion, note any damage to each array window in each location listed in 1.2, prior to the start of staging removal.

3.3.1.1 Inspect for broken, cracked or each damaged array

window.

3.3.1.2 Inspect for each tear, rip, gouge, pit and each foreign object embedded in, or stuck to the array face.

3.3.1.3 Submit one legible copy, in approved transferrable

media, of a report listing results of the requirements of 3.4.1 to the SUPERVISOR.

(I)(G) "VISUAL INSPECTION"

3.4 Accomplish a visual inspection of each antenna array exterior surface listed in 1.3 for structural integrity, deterioration, pitting, each crack, and each area of damage or distortion, note any damage to each array window, with the assistance of the Ship's Force representative and the SUPERVISOR, in each location listed in 1.2, after removal of staging.

3.4.1 Inspect for broken, cracked or each damaged array window.

3.4.2 Inspect for each tear, rip, gouge, pit and each foreign object

SSP: TPPC-DDG92-NWRMC23-S001 3 of 3 ITEM NO: 991-12-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

embedded in, or stuck to the array face.

3.5 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.

4. NOTES:

4.1 None

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

SHIP: USS MOMSEN (DDG 92) ITEM NO: 991-12-002

COAR: 26 PCN: EE02-3558

CSWT FILE NO: 991-003 (DDG 51) CMP: NONE

REVISED: 13 OCT 2021 PLANNER: BIGWARFE, JOSEPH

SSP: TPPC-DDG92-NWRMC23-S001 1 of 2 ITEM NO: 991-12-002

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Temporary Staging For Bridge Window; provide

1.2 Location of Work:

1.2.1 Bridge Deckhouse, 03 Level Forward and 02 Level Port and Starboard to 05 Level at Bridge Windows, Frames 124-148, Centerline

1.3 Identification:

1.3.1 Not Applicable

2. REFERENCES:

2.1 Standard Items, (FY23)

2.2 29 CFR PART 1915, Occupational Safety and Health Standards for Shipyard Employment

3. REQUIREMENTS:

3.1 Install and maintain steel tube and clamp type light duty staging in accordance with 2.2, for Ship's Force use, with sufficient levels and projections to enable personnel to safely reach and perform repairs and preservation in each location listed in 1.2 and the following:

3.1.1 Install the staging within the first 5 days of the

availability.

3.1.2 Ensure the staging is installed so that personnel can walk around the entire area at each staging level. Each staging level must not be spaced over 7 feet apart.

3.1.3 Ensure planking is secured (cleated) to preclude shifting or coming loose during high winds.

3.1.4 Ensure each end of tubing which would be resting on the ship's structure and transmitting weight of the staging terminate on framing immediately below and have 10.2 pound sole plate to preclude damage to the superstructure.

3.1.5 Erect containment to contain all environmental pollutants generated during the Ship's Force work. Containment must enclose/weatherproof each platform located in 1.2 from rain and wind blown debris.

3.1.6 Provide and maintain clean, oil/water free low pressure (LP) air at 100 PSIG, via a filter and an oil and water separator for the staging area.

3.1.6.1 Provide, hook-up and maintain an air manifold on each staging level for Ship's Force use during the ship's availability. Locate each manifold as designated by the

SUPERVISOR.

3.1.6.2 Each manifold must be fitted with a minimum of 6 Navy type outlet adapters with a control valve for each adapter. Each

SSP: TPPC-DDG92-NWRMC23-S001 2 of 2 ITEM NO: 991-12-002

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

hose connection must be compatible with the ship's equipment.

3.1.7 Install and maintain temporary heating, supply and exhaust ventilation for each staging area.

3.1.7.1 Test each portable heating unit, demonstrating that each unit operates as designed.

3.1.7.2 Temperature must be maintained between 65 and 75 degrees Fahrenheit in the containment enclosure interior.

3.1.8 Install and maintain temporary lighting in each area of the staging containment.

3.1.8.1 Temporary lighting must be equipped with industrial type shatterproof bulbs and protective cages conforming to Symbol 103 of MIL-F-16377/23.

3.1.8.2 Lighting must meet the following minimum standards, 42 foot-candles.

3.2 Disconnect and remove each temporary service when directed by the

SUPERVISOR.

3.3 Remove staging installed in 3.1 when directed by the SUPERVISOR.

3.4 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.

4. NOTES:

4.1 None.

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

SHIP: USS MOMSEN (DDG 92) ITEM NO: 991-12-003

COAR: 26 PCN: CF02-L021

CF02-L020

CF02-L022

CSWT FILE NO: 991-001 (DDG 51) CMP: NONE

REVISED: 13 OCT 2021 PLANNER: BIGWARFE, JOSEPH

HAGEN, KEVIN

SSP: TPPC-DDG92-NWRMC23-S001 1 of 2 ITEM NO: 991-12-003

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Temporary Staging for Ship's Force Use; provide

1.2 Location of Work:

1.2.1 Weather Deck 03 Level to 05 Level, Frames 130-150, Port and Starboard, Bridge Wings

1.2.2 Weather Deck 01 Level to 04 Level, Frames 240-252, Centerline

1.3 Identification:

1.3.1 Quantity (2 EA), Camera Surveillance Platform, C-3TV-5

1.3.2 Quantity (One EA), Antenna Platform, 2-4, AS-3773B/U, 77 Feet 5 Inches Above Baseline

2. REFERENCES:

2.1 Standard Items, (FY23)

2.2 29 CFR PART 1915, Occupational Safety and Health Standards for Shipyard Employment

3. REQUIREMENTS:

3.1 Install and maintain steel tube and clamp type light duty staging in accordance with 2.2, for Ship's Force use, with sufficient levels and projections to enable personnel to safely reach and perform each repair and preservation in each location listed in 1.2 and the following:

3.1.1 Install the staging within the first 5 days of the

availability.

3.1.2 Ensure each staging is installed so that personnel can walk around the entire area at each staging level. Each staging level must not be spaced over 7 feet apart. Staging level must be installed 4 feet under each platform listed in 1.3 and located in 1.2.

3.1.3 Ensure planking is secured (cleated) to preclude shifting or coming loose during high winds.

3.1.4 Ensure each end of tubing which would be resting on the ship's structure and transmitting weight of the staging terminate on framing immediately below and have 10.2 pound sole plate to preclude damage to the superstructure.

3.1.5 Erect containment to contain all environmental pollutants generated during the Ship's Force work. Containment must enclose/weatherproof each platform located in 1.2 from rain and wind blown debris.

3.1.6 Provide and maintain clean, oil/water free low pressure (LP) air at 100 PSIG, via a filter and an oil and water separator for the

SSP: TPPC-DDG92-NWRMC23-S001 2 of 2 ITEM NO: 991-12-003

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

staging area.

3.1.6.1 Provide, hook-up and maintain an air manifold on each staging level for Ship's Force use during the ship's availability. Locate each manifold as designated by the

SUPERVISOR.

3.1.6.2 Each manifold must be fitted with a minimum of 6 Navy type outlet adapters with a control valve for each adapter. Each hose connection must be compatible with the ship's equipment.

3.1.7 Install and maintain temporary heating, supply and exhaust ventilation for each staging area.

3.1.7.1 Test each portable heating unit, demonstrating that each unit operates as designed.

3.1.7.2 Temperature must be maintained between 65 and 75 degrees Fahrenheit in the containment enclosure interior.

3.1.8 Install and maintain temporary lighting in each area of the staging containment.

3.1.8.1 Temporary lighting must be equipped with industrial type shatterproof bulbs and protective cages conforming to Symbol 103 of MIL-F-16377/23.

3.1.8.2 Lighting must meet the following minimum standards, 42 foot-candles.

3.2 Disconnect and remove each temporary service when directed by the

SUPERVISOR.

3.3 Remove staging installed in 3.1 when directed by the SUPERVISOR.

3.4 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.

4. NOTES:

4.1 None.

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

SHIP: USS MOMSEN (DDG 92) ITEM NO: 992-10-001

COAR: 26 PCN: SERV-L279

LWT FILE NO: 992-068 CMP: NONE

REVISED: 05 JAN 2022 PLANNER: OHTOLA, LARRY

ROGERS, GARRET

SSP: TPPC-DDG92-NWRMC23-S001 1 of 5 ITEM NO: 992-10-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Wharf and Pier Laydown Area; utilize and manage

1.2 Location of Work:

1.2.1 Pier "A" or "B" of Naval Station Everett

1.2.2 South Wharf of Naval Station Everett

1.3 Identification:

1.3.1 Not Applicable

2. REFERENCES:

2.1 NFPA 30, Flammable and Combustible Liquids Code, 2021

2.2 NFPA 70, National Electrical Code, International Electrical Code Series, 2020

3. REQUIREMENTS:

3.1 Accomplish pier utilization and management using Attachment A for guidance.

3.1.1 The contractor may provide a conex box for storage and

security fencing for each storage area.

3.1.1.1 Weight of each conex box and contents must not exceed a total weight of 10,000 pounds.

3.1.1.2 Location for the contractor's storage, at the location listed in 1.2.1, must be in accordance with Attachment A.

3.1.2 Contractor may provide a flammable storage cabinet, cabinet must be in accordance with 2.1.

3.1.2.1 Flammable storage cabinet must be located in an assigned area at the location listed in 1.2.2.

3.1.3 Submit one legible copy, in approved transferrable media, of the contractor's pier laydown plan, in accordance with Attachment A to the SUPERVISOR for approval, 14 days prior to availability start date.

3.2 Ensure contractor temporary electrical equipment meets the requirements of 2.2.

3.3 The Government will provide temporary service, such as potable water, low pressure air and electrical power upon request. Collection, Holding and Transfer (CHT) and Oily Waste riser will be opened upon request.

3.3.1 Submit one legible copy, in approved transferrable media, of all requests to the SUPERVISOR for the installation or removal of

SSP: TPPC-DDG92-NWRMC23-S001 2 of 5 ITEM NO: 992-10-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

each temporary service at least 3 working days in advance.

3.3.1.1 Contractor work requests of 3.3.1 must contain the

following minimum information:

a. Description of work to be accomplished including the number of installations or removals with the temporary service requirements.

b. Date and time to be accomplished.

c. Name of the contractor point of contact (POC) with phone number.

3.4 Each contractor provided sanitary facility and hand wash station for employees will only be allowed in the location listed in 1.2.1.

(V)(G) "PIER AND WHARF INSPECTION"

3.5 Accomplish an inspection of the contractor's assigned area at each location listed in 1.2 no later than…