Intercom System Requirement Equipment Listing.xlsx
XLSX spreadsheet 17 KB Posted
- Attached to
- CDC Intercom System Federal contract opportunity
- Solicitation number
- FA281623Q0002
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Building 281 Labeled Plan_Intercom System.pdf | ||
| Design Requirements ADAL Youth Center___231_ Section 15.6 Intercom System_1.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Description | Qty | Unit of Issue |
| 5GUH9 EMT CONDUIT, STANDARD STEEL GALVANIZED 3 IN TRADE SIZE 10 FT NOMINAL LENGTH | 1 | Each |
| SW-610-48P-F 48-PORT GB POE+ L2 L3 MANAGED SWITCH WITH 4 SFP+ US POWER CORD | 1 | Each |
| OBRK SERIES OAK LAMINATE RACK, 12 RU | 1 | Each |
| 12 SPACE SMOKED TEMPERED GLASS DOOR FOR RK, BRK | 1 | Each |
| 2 SPACE (3 1/2') RACKSHELF | 1 | Each |
| PD-915R, POWER DISTRIBUTION (NOT TO FEED MODULAR RACEWAY MOUNT DIRECTLY ABOVE 2-BAY WORK SURFACE) | 1 | Each |
| HORIZONTAL LACING BARS, 10 PK | 1 | Each |
| CASTERS LAMINATE RACKS HEAVY DUTY | 1 | Each |
| EB1-CP12, 1 RU BLANK RACK PANEL, 12 PC. CONTACTOR PACK | 1 | Each |
| 10 FT 12 GAUGE HALF SLOTTED METAL FRAMING STRUT CHANNEL SILVER GALVANIZED | 1 | Each |
| ZU501EG-10 CHANNEL TO BEAM STRUT CLAMP WITH U-BOLT SILVER GALVANIZED | 4 | Each |
| Z702 3EG-10, 3 IN PIPE STRAP SILVER GALVANIZED (STRUT FITTING) | 2 | Each |
| WL-IPD-SPKR-510-CAR-F, CARINA SMALL IP DISPLAY | 18 | Each |
| WL-EM-CAR-LITE-CARINA EVENT MANAGER LITE | 1 | Each |
| WL-PBX-XAR-LITE CARINA PBX LITE | 1 | Each |
| WL-SPKR-RB-W, PANIC/CALL BUTTON WALL PLATE | 12 | Each |
| WL-CLD-CAR-LITE-3, CARINA CLOUD 3 YEAR TERM LIT | 1 | Each |
| WL-SPKR-OF-CAR, CARINA OUTDOOR IP SPEAKER | 4 | Each |
| CAT 6 PREMIUM BLACK CABLE 1000 | 5000 | Each |
| SIP-T57W, IP PHONE, 16 VOIP ACCT 1 INCH ADJ COLOR TOUCH SCREEN. USB 2.0 802.11AC WI-FI- DUAL PORT GIGABIT ETHERNET, 802.3AF POE POWER ADPT NOT INCLUDED | 1 | Each |
| CONSUMABLES | 1 | Each |
| LABOR | 1 | Each |
| ADMINISTRATION- CAD CONTROL PROGRAMMING, DSP PROGRAMING, PROJECT MANAGEMENT , TRAINING, SHIPPING/ OTHER ADMIN COSTS | 1 | Each |
File details come from the government source that posted it. Updated .