About this file

The document is a comprehensive set of architectural and mechanical engineering drawings for the Carlson Activity Center Mechanical Controls Upgrade project, prepared by Design Alaska for the Fairbanks North Star Borough. The project involves a detailed mechanical and electrical system upgrade for the Carlson Activity Center, located in Fairbanks, Alaska. The drawings cover multiple levels including arena, concourse, and mezzanine, and include extensive documentation for mechanical, electrical, and architectural modifications. The scope encompasses replacing existing control systems, upgrading ventilation and heating systems, renovating equipment locations, and performing comprehensive mechanical and electrical system upgrades across different building zones.

The drawings provide intricate technical details for multiple air handling units (AHU-1 through AHU-8), exhaust fans, glycol circulation pumps, and various mechanical and electrical systems. The project includes replacing control devices, updating ventilation control systems, modifying existing equipment locations, and upgrading electrical panels and distribution systems. Key components include new variable frequency drives (VFDs), control sensors, heating and cooling system replacements, and electrical panel modifications. The technical specifications suggest a comprehensive modernization effort focused on improving energy efficiency, system control, and overall mechanical and electrical infrastructure of the Carlson Activity Center.

View the file

Other files for this state and local contract opportunity

Other files attached to Carlson Activity Center Mechanical Controls Upgrade, newest first.
File Type Posted
Addendum One.pdf PDF
IFB No. 22039 Bid Documents.pdf PDF
Q&A Document 1.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FAIRBANKS, ALASKA

CARLSON ACTIVITY CENTER

MECHANICAL CONTROLS UPGRADE

FAIRBANKS NORTH STAR BOROUGH

OWNERS REPRESENTATIVE

FAIRBANKS NORTH STAR BOROUGH

DAMON ZIMMERMAN

PROJECT MANAGER

907 459-1261 dzimmerman@fnsb.us

DESIGN LEAD

DESIGN ALASKA

ROBIN RADER

PROJECT MANAGER

907 452-1241 robin@designalaska.com

BASE BID

ALL WORK IS BASE BID UNLESS NOTED OTHERWISE

ALTERNATE 1 POWER FACTOR REDUCTION.

ALTERNATE 2 DDC HEAT TRACE CONTROL.

ALTERNATE 3 AIRFLOW MEASURING STATIONS.

SEE DIVISION 01 23 00 FOR ADDITIONAL

INFORMATION ON ALTERNATES

SEE DISCIPLINES FOR SPECIFIC SYMBOLS

GENERAL

G001 GENERAL INFORMATION

G002 PHASING PLAN ARENA FLOOR LEVEL

G003 PHASING PLAN CONCOURSE LEVEL

G004 MEZZANINE LEVEL EXISTING EQUIPMENT

AND DEMOLITION

G101 GENERAL PLAN - ARENA LEVEL

G102 GENERAL PLAN - CONCOURSE LEVEL

ARCHITECTURAL

A001 ARCHITECTURAL INFORMATION

A101 DEMOLITION PLAN - ARENA LEVEL

A201 RENOVATION PLAN - ARENA LEVEL

A500 EXTERIOR DETAILS AND ASSEMBLY TYPES

A621 INTERIOR PLAN - CEILING - ARENA LEVEL

A622 INTERIOR PLAN - CEILING - CONCOURSE LEVEL

A800 INTERIOR DETAILS AND ASSEMBLY TYPES

ELECTRICAL

E001 ELECTRICAL SYMBOL LEGEND & PARTIAL RISER DIAGRAM

E100 ARENA FLOOR LEVEL ELECTRICAL PLAN

E200 CONCOURSE FLOOR LEVEL ELECTRICAL PLAN

E300 MEZZANINE FLOOR LEVEL ELECTRICAL PLAN

NUMBER

NAME

SHEET LOCATION

SCALE

TRUE NORTH

PLAN NORTH

GRID LINE

REVISION

ROOM NAME

ROOM NUMBER

1/8"=1'-0"

ROOM

NAME

A

GOVERNING CODES

INTERNATIONAL BUILDING CODE (IBC) 2018

INTERNATIONAL EXISTING BUILDING CODE (IEBC) 2018

INTERNATIONAL MECHANICAL CODE (IMC) 2018

NATIONAL ELECTRICAL CODE (NEC) 2020

UNIFORM PLUMBING CODE (UPC) 2018

AUTHORITY HAVING JURISDICTION

CITY OF FAIRBANKS

IFB NO.: 22039 PROJECT NO.: 16-CACPRJ-2

MECHANICAL

M001 MECHANICAL LEGEND

M002 MECHANICAL SCHEDULE

M100 ARENA FLOOR LEVEL EXISTING EQUIPMENT LOCATION AND DEMOLITION

M100A ARENA FLOOR LEVEL EQUIPMENT DEMOLITION

M101 CONCOURSE LEVEL EXISTING EQUIPMENT LOCATION AND DEMOLITION

M102 MEZZANINE LEVEL EXISTING EQUIPMENT LOCATION AND DEMOLITION

M200 ARENA LEVEL PLAN

M200A PIONEER ROOM LARGE SCALE PLAN

M200B PROW LARGE SCALE PLAN

M201 ADMIN AREA RENOVATION

M202 AHU-1 & 2 LARGE SCALE PLAN

M300 ARENA VENTILATION CONTROL REPLACEMENT DIAGRAMS

M301 VENTILATION CONTROL REPLACEMENT DIAGRAMS

M302 VENTILATION CONTROL REPLACEMENT DIAGRAMS

M303 HEATING AND COOLING SYSTEM CONTROL REPLACEMENT DIAGRAMS

M304 MISC CONTROL REPLACEMENT DIAGRAMS

2010 2ND AVE

CONTRACTOR

STAGING AREA

PE

G

ER

R

D

PHILLIPS FIELD RD

2ND AVE

M O

O R

E

ST

AIRPORT WAY

W

IL

BU

R

S T

PROJECT

LOCATION

CONTRACTOR

STAGING AREA

James D. Bartlett

No. A 10413

01-DEC-2021

12/1/2021 3:27 PM G001.DWG

101805

1 DEC 2021

COMM. NUMBER

ISSUE DATE

DESIGNED BY

DRAWN BY

1"0" SCALE

601 College Road Fairbanks AK 99701 907.452.1241

Architects SurveyorsEngineers

AECC511 designalaska.com

CARLSON

ACTIVITY CENTER

MECHANICAL

CONTROLS

UPGRADE

PROJECT NO.: 16-CACPRJ-2

IFB NO.: 22039

G001

GENERAL

INFORMATION

G

12 11 10 9 8 7 6 5 4 3 2 1

H

G

F

E

D

C

B

H

F

D

E

B

C

12 11 10 9

8 7 6

5 4 3 2 11314

12/21/2021 9:54 AM G002.DWG

101805

1 DEC 2021

COMM. NUMBER

ISSUE DATE

DESIGNED BY

DRAWN BY

1"0" SCALE

601 College Road Fairbanks AK 99701 907.452.1241

Architects SurveyorsEngineers

AECC511 designalaska.com

CARLSON

ACTIVITY CENTER

MECHANICAL

CONTROLS

UPGRADE

PROJECT NO.: 16-CACPRJ-2

IFB NO.: 22039

G002

BAB

RJR

PHASING PLAN

ARENA FLOOR

LEVEL

AutoCAD SHX Text

PROW 1ST AND 2ND FLOOR

AutoCAD SHX Text

LOCKER ROOM/NORTHEAST AREA

AutoCAD SHX Text

PIONEER ROOM

AutoCAD SHX Text

PROW

AutoCAD SHX Text

KITCHEN

AutoCAD SHX Text

BOILER ROOM

AutoCAD SHX Text

LOCKER ROOM/NORTHEAST AREA

AutoCAD SHX Text

%%UAREA/LOCATION

AutoCAD SHX Text 5/16/22

AutoCAD SHX Text 5/16/22

AutoCAD SHX Text

%%UACCESS START

AutoCAD SHX Text

%%UWORK COMPLETE

AutoCAD SHX Text 8/1/22

AutoCAD SHX Text 8/29/22

AutoCAD SHX Text

1. FIRST DAY OF CONTRACTOR ACCESS TO SITE AND WORK AREA IS MAY 16, 2022. 2. IN AREAS OCCUPIED BY OWNER, MANUALLY CONTROL AIR HANDLING UNITS AS REQUIRED TO MAINTAIN CONDITIONS WITHIN 68F TO 76F IF REQUIRED DURING CONTROL SYSTEM SWITCHOVER PERIODS FROM EXISTING CONTROL SYSTEM.

AutoCAD SHX Text

%%UNOTES

AutoCAD SHX Text

CARLSON ADDITION

AutoCAD SHX Text

PIONEER ROOM

AutoCAD SHX Text

BOILER ROOM

AutoCAD SHX Text

KITCHEN

AutoCAD SHX Text

CARLSON ADDITION

AutoCAD SHX Text

ICE MAKING EQUIPMENT

AutoCAD SHX Text

ICE MAKING EQUIPMENT

A1

12 11 10 9 8 7 6 5 4 3 2 1

H

G

F

E

D

C

B

H

F

D

E

B

C

12 11 10 9

8 7 6

5 4 3 2 11314

12/16/2021 4:16 PM G003.DWG

101805

1 DEC 2021

COMM. NUMBER

ISSUE DATE

DESIGNED BY

DRAWN BY

1"0" SCALE

601 College Road Fairbanks AK 99701 907.452.1241

Architects SurveyorsEngineers

AECC511 designalaska.com

CARLSON

ACTIVITY CENTER

MECHANICAL

CONTROLS

UPGRADE

PROJECT NO.: 16-CACPRJ-2

IFB NO.: 22039

G003

BAB

RJR

PHASING PLAN

CONCOURSE

LEVEL

AutoCAD SHX Text

ADMIN AREA

AutoCAD SHX Text

%%UAREA/LOCATION

AutoCAD SHX Text 5/16/22

AutoCAD SHX Text 5/16/22

AutoCAD SHX Text

%%UACCESS START

AutoCAD SHX Text

%%UWORK COMPLETE

AutoCAD SHX Text 8/1/22

AutoCAD SHX Text 8/29/22

AutoCAD SHX Text

%%UNOTES

AutoCAD SHX Text

PROW

AutoCAD SHX Text

AREA SERVED BY AHU-1

AutoCAD SHX Text

AREA SERVED BY AHU-2

AutoCAD SHX Text

ADMIN

AutoCAD SHX Text

1. FIRST DAY OF CONTRACTOR ACCESS TO SITE AND WORK AREA IS MAY 16, 2022. 2. IN AREAS OCCUPIED BY OWNER, MANUALLY CONTROL AIR HANDLING UNITS AS REQUIRED TO MAINTAIN CONDITIONS WITHIN 68F TO 76F IF REQUIRED DURING CONTROL SYSTEM SWITCHOVER PERIODS FROM EXISTING CONTROL SYSTEM. 3. LIMIT DURATION OF WORK WITHIN ADMIN TO THREE CONSECUTIVE WEEKS.

AutoCAD SHX Text

PROW 1ST AND 2ND FLOOR

AutoCAD SHX Text

AREA SERVED BY AHU-1

AREA SERVED BY AHU-2

H

G

F

E

D

C

B

H

F

D

E

B

C

12 11 10 9

8 7 6

5 4 3 2 11314

12/16/2021 4:10 PM G004.DWG

101805

1 DEC 2021

COMM. NUMBER

ISSUE DATE

DESIGNED BY

DRAWN BY

1"0" SCALE

601 College Road Fairbanks AK 99701 907.452.1241

Architects SurveyorsEngineers

AECC511 designalaska.com

CARLSON

ACTIVITY CENTER

MECHANICAL

CONTROLS

UPGRADE

PROJECT NO.: 16-CACPRJ-2

IFB NO.: 22039

G004

BAB

RJR

PHASING PLAN

MEZZANINE LEVEL

AutoCAD SHX Text

%%UAREA/LOCATION

AutoCAD SHX Text 5/16/22

AutoCAD SHX Text

%%UACCESS START

AutoCAD SHX Text

%%UWORK COMPLETE

AutoCAD SHX Text 8/1/22

AutoCAD SHX Text

%%UNOTES

AutoCAD SHX Text 5/16/22

AutoCAD SHX Text 8/29/22

AutoCAD SHX Text

1. FIRST DAY OF CONTRACTOR ACCESS TO SITE AND WORK AREA IS MAY 16, 2022. 2. IN AREAS OCCUPIED BY OWNER, MANUALLY CONTROL AIR HANDLING UNITS AS REQUIRED TO MAINTAIN CONDITIONS WITHIN 68F TO 76F IF REQUIRED DURING CONTROL SYSTEM SWITCHOVER PERIODS FROM EXISTING CONTROL SYSTEM.

AutoCAD SHX Text

AHU-1

AutoCAD SHX Text

AHU-2

AutoCAD SHX Text

AHU-3

AutoCAD SHX Text

AHU-1

AutoCAD SHX Text

AHU-5

AutoCAD SHX Text

AHU-3

AutoCAD SHX Text

AHU-2

AHU-5

MECH

GARAGE ENTRY

REFRIG

ENTRY

CONC. OFFICE

BREAK RM.

CORR.

KIT. STOR.

KITCHEN

MEETING RM.MEETING RM.WOMEN

TICKETS

ENTRY

VEST.

MEN

SECURITY

STORAGE

STORAGE

FOYER

ELECTRICAL RM.

STORAGE

DRESSING

XFMR

RR

RR

GREEN RM.

GREEN RM.

14B

CO-1RBPT-APT-APT-APT-AET20'-0";-

14B

CO-1RBPT-APT-APT-APT-AET20'-0";-

CO-1RBPT-APT-APT-APT-AET20'-0";-

CO-1RBPT-APT-APT-APT-AET20'-0";-

3E

CO-1RBPT-APT-APT-APT-AET20'-0";-

CO-1RBPT-APT-APT-APT-AET20'-0";-

CO-1RBPT-APT-APT-APT-AET20'-0";-

40D

CO-1RB

PT-APT-APT-APT-AET20'-0";-

14A

CO-1RBPT-APT-APT-APT-AET20'-0";-

CO-1RB

PT-APT-APT-APT-AET20'-0";-

4A

CO-1RBPT-APT-APT-APT-AET20'-0";-

4B

CO-1RBPT-APT-APT-APT-AET20'-0";-

5F

CO-1RBPT-APT-APT-APT-AET20'-0";-

7A

CO-1RBPT-APT-APT-APT-AET20'-0";-

3A

CO-1RB

PT-APT-APT-APT-AET20'-0";-

3B

CO-1RBPT-APT-APT-APT-AET20'-0";-

5E

CO-1RBPT-APT-APT-APT-AET20'-0";-

CO-1RBPT-APT-APT-APT-AET20'-0";-

14C

CO-1RBPT-APT-APT-APT-AET20'-0";-

15C

CO-1RBPT-APT-APT-APT-AET20'-0";-

CO-1RBPT-APT-APT-APT-AET20'-0";-

23/24

CO-1RBPT-APT-APT-APT-AET20'-0";-

15B

CO-1RBPT-APT-APT-APT-AET20'-0";-

CO-1RBPT-APT-APT-APT-AET20'-0";-

11E

CO-1RB

PT-APT-APT-APT-AET20'-0";-

11C

CO-1RBPT-APT-APT-APT-AET20'-0";-

11A

CO-1RBPT-APT-APT-APT-AET20'-0";-

11B

CO-1RBPT-APT-APT-APT-AET20'-0";-

8A

CO-1RBPT-APT-APT-APT-AET20'-0";-

11A

CO-1RB

PT-A

PT-APT-APT-AET20'-0";-

ALASKA

MEDIA ROOM

COACHES

LOCKER

COACHES

MEETING

PLAYERS

LOUNGE

MEDIA

PRODUCTION

REST

ROOM

DRY

TEAM

DRESSING

STICK

ROOM

REST

ROOM

NANOOKS

LOCKER

MEDICAL LAUNDRY

EQUIPMENT

LOCKER

ROOM 1/MPR

LOCKER

ROOM 2/MPR

PHYS

THERAPY

REST

ROOM

REST

ROOM

REST

ROOM

ELEC

NORTHERN LIGHTS VISITOR

LOCKER ROOM/MPR

CORRIDORCORRIDOR

VESTIBULE

SOUTH

LOBBY

LOCKER

ROOM 3/MPR

LOCKER

ROOM 4/MPR

GEAR

ROOM

NORTH

TICKET BOOTH

EXISTING

BOILER ROOM

VESTIBULE

NORTH

LOBBY

REST

ROOM

REST

ROOM

ARENA

CORRIDOR

PLAYERS

LOUNGE

HALL

EQUIP

CLOSET

ARENA

108 107

128 131

127125

140 145

138 142

120.1

FE

FE

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:

clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:

clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:

clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:

clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:

clg hght

N WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

12 11 10 9 8 7 6 5 4 3 2 1

H

G

F

E

D

C

B

H

G

F

E

D

C

B

12 11 10 9

8 7 6

5 4 3 2 11314

GENERAL LEGEND

1 HOUR OCCUPANCY SEPARATION

2 HOUR AREA SEPARATION

GENERAL FLOOR PLAN NOTES

A.

B.

C.

FIRE RATED WALLS SHOWN ON THE PLANS ARE PER THE

ORIGINAL 1988 AS-BUILT DRAWINGS.

SOME WALLS THAT WERE ORIGINALLY SHOWN AS 1 HOUR

SEPARATED IN THE 1988 AS-BUILTS MAY HAVE BEEN

REDUCED AND ARE NO LONGER RATED ENCLOSURES.

PROVIDE 2 HOUR PROTECTED PENETRATIONS AT 2 HOUR

RATED WALLS SHOWN ON THE PLANS.

ISSUE DATE

COMM. NUMBER

DESIGNED BY

DRAWN BY

SCALE 0" 1"

Architects Engineers Surveyors 601 College Road Fairbanks AK 99701

907.452.1241 designalaska.com

01 DEC 2021

CARLSON

ACTIVITY CENTER

MECHANICAL

CONTROLS

UPGRADE

101805

AECC511

IFB NO.: 22039

PROJECT NO.: 16-CACPRJ-2

12/2/2021 2:54:22 PM

ENS

ENS

GENERAL PLAN -

ARENA LEVEL

G101 1/16" = 1'-0"G101

1 GENERAL PLAN - ARENA LEVEL

AKAF AL

TS

TA E O

49 TH

S

JAMES D. BARTLETT

No. A10413

REGISTEREDPROFESSIONALARCHIT

EC

T01-DEC-2021

STORAGE STR MEN STR WOMEN

JAN.

CONCESSION

STR

ENTRY

FOYER

BOX OFFICE

CONFERENCE

BREAK RM.

RR RR

OFFICE

OFFICE

MANAGER'S OFFICE

STORAGE

MECH. RM.

STAIRS

CONCESSIONJAN

STR

WOMEN

STR

MEN

STR

CONCESSION

CONCESSION

TICKET

TICKET

OFFICE

6E

CO-1RBPT-APT-APT-APT-AET20'-0";- 10

CO-1RB

PT-APT-APT-APT-AET20'-0";-

5D

CO-1RBPT-APT-APT-APT-AET20'-0";- 8

CO-1RB

PT-APT-APT-APT-AET20'-0";-

5B

CO-1RBPT-APT-APT-APT-AET20'-0";-

8C

CO-1RBPT-APT-APT-APT-AET20'-0";- 6B

CO-1RB

PT-APT-APT-APT-AET20'-0";-

CO-1RB

PT-APT-APT-APT-AET20'-0";-

6I

CO-1RBPT-APT-APT-APT-AET20'-0";-

3G

CO-1RBPT-APT-APT-APT-AET20'-0";-

CO-1RB

PT-A

PT-APT-APT-AET20'-0";-

CO-1RBPT-APT-APT-APT-AET20'-0";-

CO-1RBPT-APT-APT-APT-AET20'-0";-

35B

CO-1RBPT-APT-APT-APT-AET20'-0";-

35A

CO-1RB

PT-A

PT-APT-APT-AET20'-0";-

CO-1RBPT-APT-APT-APT-AET20'-0";-

CO-1RBPT-APT-APT-APT-AET20'-0";-

6B

CO-1RBPT-APT-APT-APT-AET20'-0";-

15D

CO-1RBPT-APT-APT-APT-AET20'-0";-

25A

CO-1RBPT-APT-APT-APT-AET20'-0";-

CO-1RBPT-APT-APT-APT-AET20'-0";-

6A

CO-1RBPT-APT-APT-APT-AET20'-0";-8D

CO-1RBPT-APT-APT-APT-AET20'-0";-

42A

CO-1RBPT-APT-APT-APT-AET20'-0";-

CO-1RBPT-APT-APT-APT-AET20'-0";-

5A

CO-1RBPT-APT-APT-APT-AET20'-0";-

CO-1RBPT-APT-APT-APT-AET20'-0";-

5C

CO-1RBPT-APT-APT-APT-AET20'-0";-

CO-1RBPT-APT-APT-APT-AET20'-0";-

6D

CO-1RB

PT-APT-APT-APT-AET20'-0";-

6C

CO-1RBPT-APT-APT-APT-AET20'-0";-

7B

CO-1RBPT-APT-APT-APT-AET20'-0";-

7C

CO-1RBPT-APT-APT-APT-AET20'-0";-

3F

CO-1RBPT-APT-APT-APT-AET20'-0";-

3H

CO-1RB

PT-APT-APT-APT-AET20'-0";-

CO-1RBPT-APT-APT-APT-AET20'-0";-

CO-1RBPT-APT-APT-APT-AET20'-0";-

CO-1RBPT-APT-APT-APT-AET20'-0";-

CO-1RBPT-APT-APT-APT-AET20'-0";-

41C

CO-1RB

PT-APT-APT-APT-AET20'-0";-

41A

CO-1RBPT-APT-APT-APT-AET20'-0";-

41A

CO-1RBPT-APT-APT-APT-AET20'-0";-

41C

CO-1RB

PT-APT-APT-APT-AET20'-0";-

A1

12 11 10 9 8 7 6 5 4 3 2 1

H

G

F

E

D

C

B

H

G

F

E

D

C

B

12 11 10 9

8 7 6

5 4 3 2 11314

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:

clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:

clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:

clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:

clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:

clg hght

N WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS: FLOORING:B-BOARD:

clg hght

N WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:

clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:

clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:

clg hght

N WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS: FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:

clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS: FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:

clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

GENERAL LEGEND

1 HOUR OCCUPANCY SEPARATION

2 HOUR AREA SEPARATION

GENERAL FLOOR PLAN NOTES

A. SEE G100 FOR GENERAL FLOOR PLAN NOTES.

ISSUE DATE

COMM. NUMBER

DESIGNED BY

DRAWN BY

SCALE 0" 1"

Architects Engineers Surveyors 601 College Road Fairbanks AK 99701

907.452.1241 designalaska.com

01 DEC 2021

CARLSON

ACTIVITY CENTER

MECHANICAL

CONTROLS

UPGRADE

101805

AECC511

IFB NO.: 22039

PROJECT NO.: 16-CACPRJ-2

12/2/2021 2:54:24 PM

ENS

ENS

GENERAL PLAN -

CONCOURSE

LEVEL

G102 1/16" = 1'-0"G102

1 GENERAL PLAN - CONCOURSE LEVEL

AKAF AL

TS

TA E O

49 TH

S

JAMES D. BARTLETT

No. A10413

REGISTEREDPROFESSIONALARCHIT

CONCRETE

GYPSUM

RIGID INSULATION

MASONRY CONCRETE

MATERIAL LEGEND

BATT INSULATION

MASONRY BRICK

EXISTING

CONSTRUCTION

TEMPORARY

CONSTRUCTION

BATT/BLOWN INSULATION

ARCHITECTURAL SYMBOL LEGEND

150 SF

Room Name

DETAIL NAME

DETAIL NUMBER

SHEET LOCATION

DETAIL SCALE

TRUE NORTH

GRID LINE

ROOM NAME

ROOM NUMBER

PLAN NORTH

DETAIL NUMBER

SHEET LOCATION

SIMILAR

REVISION

SPOT ELEVATION

SEE OTHER DISCIPLINES FOR ADDITIONAL SYMBOLS

KEYED NOTE

A100

A100

EXTERIOR ELEVATION

SHEET LOCATION

DETAIL NUMBER

INTERIOR ELEVATION

SHEET LOCATION

DETAIL NUMBER

DETAIL NUMBER 4

BUILDING SECTION

DETAIL NUMBER

SHEET LOCATION

SIMILAR

WALL SECTION

ROOM AREA

1/8" = 1'-0"A101 View Name

1/4" / 1'-0"

.SPOT SLOPE

101ROOM NUMBER

A

A101

SIM

A101

SIM

SEE OTHER DISCIPLINES FOR ADDITIONAL ABBREVIATIONS.

SOME ABBREVIATIONS MAY NOT BE USED IN THIS PROJECT.

(E) EXISTING

ACT ACOUSTICAL CEILING TILE

ADA AMERICAN DISABILITIES ACT

AFF ABOVE FINISHED FLOOR

CFCI CONTRACTOR FURNISHED CONTRACTOR INSTALLED

CFOI CONTRACTOR FURNISHED OWNER INSTALLED

CMU CONCRETE MASONRY UNIT

CONC CONCRETE

ELEC ELECTRICAL

FRP FIBERGLASS REINFORCED PANEL

GYP GYPSUM BOARD

HM HOLLOW METAL

IBC INTERNATIONAL BUILDING CODE

INHM INSULATED HOLLOW METAL

INSUL INSULATION

ITSP INSULATED TRANSLUCENT SANDWICH PANEL

MAX MAXIMUM

MECH MECHANICAL

MFSD MANUFACTURER'S STANDARD

MIN MINIMUM

NIC NOT IN CONTRACT

OC ON CENTER

OD OVERFLOW DRAIN

OFOI OWNER FURNISHED OWNER INSTALLED

OFCI OWNER FURNISHED CONTRACTOR INSTALLED

OSB ORIENTED STRAND BOARD

PLAM PLASTIC LAMINATES

PLY PLYWOOD

RD ROOF DRAIN

SIP STRUCTURAL INSULATED PANEL

SPEC SPECIFICATION

STC SOUND TRANSMISSION CLASS

STRUC STRUCTURAL

SV STAIN/ VARNISH

TYP TYPICAL

UL UNDERWRITERS LABORATORY

VCT VINYL COMPOSITION TILE

VTR VENT THROUGH ROOF

ARCHITECTURAL STANDARD ABBREVIATIONS

ARCHITECTURAL PROJECT SPECIFIC ABBREVIATIONS

NA NOT APPLICABLE

A.

B.

C.

D.

E.

F.

G.

H.

COORDINATE ARCHITECTURAL WORK WITH MECHANICAL,

ELECTRICAL, AND OTHER DISCIPLINES WORK.

ANY FURNITURE SHOWN IS FOR COORDINATION

PURPOSES ONLY. FURNITURE IS OWNER FURNISHED AND

OWNER INSTALLED UNLESS NOTED OTHERWISE.

PATCH, REPAIR, AND REFINISH EXISTING SURFACES TO

REMAIN, AFFECTED BY WORK.

FIELD VERIFY DIMENSIONS SHOWN TO EXISTING

CONSTRUCTION. NOTIFY ENGINEER WHERE

DISCREPANCIES AFFECT DESIGN.

DIMENSIONS AT EXISTING CONSTRUCTION ARE

MEASURED FROM FACE OF EXISTING FINISH UNLESS

NOTED OTHERWISE.

DIMENSIONS AT NEW CONSTRUCTION ARE MEASURED

FROM FACE OF FRAMING UNLESS NOTED OTHERWISE.

DIMENSIONS INDICATED AS 'CLEAR' REQUIRE MINIMUM

CLEARANCE MEASURED TO FINISHED FACES, UNLESS

NOTED OTHERWISE.

SEE DETAIL FOR DIMENSION REFERENCE POINT

CONVENTIONS.

ARCHITECTURAL NOTES

A001

THIS REFERENCE IS INTENDED TO ASSIST WITH THE LOCATION OF

INFORMATION IN A TYPICAL PROJECT. THIS PROJECT MAY VARY

FROM THE REPRESENTATION BELOW. SEE THE SHEET INDEX FOR

SPECIFIC SHEET SEQUENCE.

A0 SHEETS ARCHITECTURAL INFORMATION

A1 SHEETS ARCHITECTURAL DEMOLITION

A2 SHEETS ARCHITECTURAL RENOVATION

A3 SHEETS EXTERIOR ELEVATIONS (NOT USED)

A4 SHEETS SECTIONS AND VERTICAL CIRCULATION (NOT USED)

A5 SHEETS EXTERIOR DETAILS AND ASSEMBLIES

A6 SHEETS ENLARGED INTERIOR PLANS (NOT USED)

A7 SHEETS INTERIOR ELEVATIONS (NOT USED)

A8 SHEETS INTERIOR DETAILS AND ASSEMBLIES (NOT USED)

A9 SHEETS SCHEDULES

THE TWO CHARACTER ALPHANUMERIC DESIGNATIONS

REPRESENT ALL SHEETS IN THE SERIES. FOR EXAMPLE, 'A1

SHEETS' DESCRIBES A100 THROUGH A199.

ARCHITECTURAL SHEET SEQUENCE

1'-0"

1'-0"

GRID

1'-0"

CLEAR

8 3/8" 1'-0"

GRID TO GRID

GRID TO WALL

NEW WALL STUD TO

NEW WALL STUD

NEW WALL STUD TO

EXISTING WALL FINISH

EXISTING WALL FINISH TO

EXISTING WALL FINISH.

FIELD VERIFY.

REQUIRED CLEARANCE TO

FINISHED FACES, MINIMUM

UNLESS NOTED OTHERWISE

FIELD VERIFY EXISTING

CONDITIONS

WX-3A

WALL ASSEMBLY CATEGORY - FUNCTION

WALL FRAMING MEMBER SIZE

WALL ASSEMBLY MODIFIER

WALL ASSEMBLY CATEGORY - FUNCTION

PROJECTS MAY NOT INCLUDE ALL ASSEMBLY CATEGORIES.

WF WALL - FOUNDATION

WR WALL - RETAINING

WX WALL - EXTERIOR

WALL FRAMING MEMBER SIZE

ASSEMBLIES MAY NOT INCLUDE A FRAMING MEMBER SIZE.

FURRING AND METAL STUDS

0 7/8" FURRING CHANNELS

1 1 5/8" METAL STUDS

2 2 1/2" METAL STUDS

3 3 5/8" METAL STUDS

4 4" METAL STUDS

6 6" METAL STUDS

8 8" METAL STUDS

SHAFT WALLS

2 2 1/2" METAL CH STUDS

4 4" METAL CH STUDS

6 4" METAL CH STUDS

WOOD STUDS

4 2x4 WOOD STUDS 6 2x6 WOOD STUDS 8 2x8 WOOD STUDS

CMU

2 1 5/8" CMU

4 3 5/8" CMU

6 5 5/8" CMU

8 7 5/8" CMU

10 9 5/8" CMU

12 11 5/8" CMU

CONCRETE

# CONCRETE THICKNESS

WALL ASSEMBLY MODIFIER

LETTERS A THRU Z REPRESENT DESCRIPTIONS OF ASSEMBLY

TYPES. THE BELOW ARE COMMONLY USED EXAMPLES SEE

ASSEMBLY TYPES FOR ADDITIONAL INFORMATION. SEE

ASSEMBLY TYPES FOR ADDITIONAL MODIFIERS.

A TYPICAL

F FIRE RATED

ASSEMBLY TAG LEGEND - WALL EXTERIOR

W01-3A

WALL ASSEMBLY CATEGORY - FUNCTION

WALL SHEATHING DESIGNATION

WALL FRAMING MEMBER SIZE

WALL ASSEMBLY MODIFIER

WALL ASSEMBLY CATEGORY - FUNCTION

PROJECTS MAY NOT INCLUDE ALL ASSEMBLY CATEGORIES.

W WALL - INTERIOR

WALL SHEATHING DESIGNATION

ASSEMBLIES MAY NOT INCLUDE A SHEATHING DESIGNATION.

THE SHEATHING DESIGNATION REFERS TO THE NUMBER OF

SHEATHING LAYERS ON EACH SIDE OF THE FRAMING MEMBER.

00 FIRST SIDE (0 LAYERS) + SECOND SIDE (0 LAYERS)

01 FIRST SIDE (0 LAYERS) + SECOND SIDE (1 LAYERS)

02 FIRST SIDE (0 LAYERS) + SECOND SIDE (2 LAYERS)

03 FIRST SIDE (0 LAYERS) + SECOND SIDE (3 LAYERS)

04 FIRST SIDE (0 LAYERS) + SECOND SIDE (4 LAYERS)

11 FIRST SIDE (1 LAYERS) + SECOND SIDE (1 LAYERS)

12 FIRST SIDE (1 LAYERS) + SECOND SIDE (2 LAYERS)

13 FIRST SIDE (1 LAYERS) + SECOND SIDE (3 LAYERS)

14 FIRST SIDE (1 LAYERS) + SECOND SIDE (4 LAYERS)

22 FIRST SIDE (2 LAYERS) + SECOND SIDE (2 LAYERS)

23 FIRST SIDE (2 LAYERS) + SECOND SIDE (3 LAYERS)

24 FIRST SIDE (2 LAYERS) + SECOND SIDE (4 LAYERS)

33 FIRST SIDE (3 LAYERS) + SECOND SIDE (3 LAYERS)

34 FIRST SIDE (3 LAYERS) + SECOND SIDE (4 LAYERS)

44 FIRST SIDE (4 LAYERS) + SECOND SIDE (4 LAYERS)

WALL FRAMING MEMBER SIZE

FURRING AND METAL STUDS

0 7/8" FURRING CHANNELS

1 1 5/8" METAL STUDS

2 2 1/2" METAL STUDS

3 3 5/8" METAL STUDS

4 4" METAL STUDS

6 6" METAL STUDS

8 8" METAL STUDS

SHAFT WALLS

2 2 1/2" METAL CH STUDS

4 4" METAL CH STUDS

6 4" METAL CH STUDS

WOOD STUDS

4 2x4 WOOD STUDS 6 2x6 WOOD STUDS 8 2x8 WOOD STUDS

CMU

2 1 5/8" CMU

4 3 5/8" CMU

6 5 5/8" CMU

8 7 5/8" CMU

10 9 5/8" CMU

12 11 5/8" CMU

CONCRETE

# CONCRETE THICKNESS

WALL ASSEMBLY MODIFIER

LETTERS A THRU Z REPRESENT DESCRIPTIONS OF ASSEMBLY

TYPES. THE BELOW ARE COMMONLY USED EXAMPLES. SEE

ASSEMBLY TYPES FOR ADDITIONAL MODIFIERS.

A TYPICAL

F FIRE RATED

G FIRE AND SOUND RATED

H FIRE AND SOUND RATED WITH TILE

K TILE

L TILE AND SOUND RATED

P PLYWOOD

S SOUND RATED

W WOOD STUD

X WOOD STUD, FIRE RATED

Y WOOD STUD, FIRE AND SOUND RATED

Z WOOD STUD, SOUND RATED

LETTERS AA THRU ZZ REPRESENT DESCRIPTIONS OF

ASSEMBLY TYPES FOR CHASE WALLS. THE BELOW ARE

COMMONLY USED EXAMPLES. SEE ASSEMBLY TYPES FOR

ADDITIONAL MODIFIERS.

FF FIRE RATED

GG FIRE AND SOUND RATED

HH FIRE AND SOUND RATED WITH TILE

LL TILE AND SOUND RATED

SS SOUND RATED

XX WOOD STUD, FIRE RATED

YY WOOD STUD, FIRE AND SOUND RATED

ZZ WOOD STUD, SOUND RATED

ASSEMBLY TAG LEGEND - WALL INTERIOR

WB-1 LINE WITH ONE DASH

WB-2 LINE WITH TWO DASHES

WB-3 LINE WITH THREE DASHES

WB-4 LINE WITH FOUR DASHES

DESCRIBES THE DIRECTION OF AIRFLOW

IN A VENTED OR VENTILATED ASSEMBLY

ASSEMBLY LEGEND - BARRIERS AND AIRFLOW

WB-5 LINE WITH FIVE DASHES

SEE EXTERIOR ASSEMBLY NOTES FOR THE MATERIAL

DESCRIBED BY WEATHER BARRIER INDICATED BELOW:

DESCRIBES THE DIRECTION AN

ASSEMBLY WILL DRY. PERMEABLE

MATERIALS REQUIRED TO DRY AS

SHOWN

DIRECTION

OF DRYING

ISSUE DATE

COMM. NUMBER

DESIGNED BY

DRAWN BY

SCALE 0" 1"

Architects Engineers Surveyors 601 College Road Fairbanks AK 99701

907.452.1241 designalaska.com

01 DEC 2021

CARLSON

ACTIVITY CENTER

MECHANICAL

CONTROLS

UPGRADE

101805

AECC511

IFB NO.: 22039

PROJECT NO.: 16-CACPRJ-2

12/2/2021 2:54:14 PM

ENS

ENS

ARCHITECTURAL

INFORMATION

A001 1 1/2" = 1'-0"A001

1 INTERIOR FRAMING DETAIL - DIMENSION REFERENCE POINT CONVENTIONS

AKAF AL

TS

TA E O

49 TH

S

JAMES D. BARTLETT

No. A10413

REGISTEREDPROFESSIONALARCHIT

REFRIG

ENTRY

CONC. OFFICE

BREAK RM.

CORR.

KIT. STOR.

KITCHEN

MEETING RM.MEETING RM.WOMEN

TICKETS

ENTRY

VEST.

MEN

SECURITY

STORAGE

STORAGE

FOYER

ELECTRICAL RM.

STORAGE

DRESSING

XFMR

RR

RR

GREEN RM.

GREEN RM.

14B

CO-1RBPT-APT-APT-APT-AET20'-0";-

14B

CO-1RBPT-APT-APT-APT-AET20'-0";-

CO-1RBPT-APT-APT-APT-AET20'-0";-

CO-1RBPT-APT-APT-APT-AET20'-0";-

3E

CO-1RBPT-APT-APT-APT-AET20'-0";-

CO-1RBPT-APT-APT-APT-AET20'-0";-

CO-1RBPT-APT-APT-APT-AET20'-0";-

40D

CO-1RB

PT-APT-APT-APT-AET20'-0";-

14A

CO-1RBPT-APT-APT-APT-AET20'-0";-

CO-1RB

PT-APT-APT-APT-AET20'-0";-

4A

CO-1RBPT-APT-APT-APT-AET20'-0";-

4B

CO-1RBPT-APT-APT-APT-AET20'-0";-

5F

CO-1RBPT-APT-APT-APT-AET20'-0";-

7A

CO-1RBPT-APT-APT-APT-AET20'-0";-

3A

CO-1RB

PT-APT-APT-APT-AET20'-0";-

3B

CO-1RBPT-APT-APT-APT-AET20'-0";-

5E

CO-1RBPT-APT-APT-APT-AET20'-0";-

CO-1RBPT-APT-APT-APT-AET20'-0";-

14C

CO-1RBPT-APT-APT-APT-AET20'-0";-

15C

CO-1RBPT-APT-APT-APT-AET20'-0";-

CO-1RBPT-APT-APT-APT-AET20'-0";-

23/24

CO-1RBPT-APT-APT-APT-AET20'-0";-

15B

CO-1RBPT-APT-APT-APT-AET20'-0";-

CO-1RBPT-APT-APT-APT-AET20'-0";-

11E

CO-1RB

PT-APT-APT-APT-AET20'-0";-

11C

CO-1RBPT-APT-APT-APT-AET20'-0";-

11A

CO-1RBPT-APT-APT-APT-AET20'-0";-

11B

CO-1RBPT-APT-APT-APT-AET20'-0";-

8A

CO-1RBPT-APT-APT-APT-AET20'-0";-

11A

CO-1RB

PT-A

PT-APT-APT-AET20'-0";-

ALASKA

MEDIA ROOM

COACHES

LOCKER

COACHES

MEETING

PLAYERS

LOUNGE

MEDIA

PRODUCTION

REST

ROOM

DRY

TEAM

DRESSING

STICK

ROOM

REST

ROOM

NANOOKS

LOCKER

MEDICAL LAUNDRY

EQUIPMENT

LOCKER

ROOM 1/MPR

LOCKER

ROOM 2/MPR

PHYS

THERAPY

REST

ROOM

REST

ROOM

REST

ROOM

ELEC

NORTHERN LIGHTS VISITOR

LOCKER ROOM/MPR

CORRIDORCORRIDOR

VESTIBULE

SOUTH

LOBBY

LOCKER

ROOM 3/MPR

LOCKER

ROOM 4/MPR

GEAR

ROOM

NORTH

TICKET BOOTH

EXISTING

BOILER ROOM

VESTIBULE

NORTH

LOBBY

REST

ROOM

REST

ROOM

ARENA

CORRIDOR

PLAYERS

LOUNGE

HALL

EQUIP

CLOSET

ARENA

108 107

128 131

127125

140 145

138 142

120.1

FE

FE

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:

clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:

clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:

clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:

clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:

clg hght

N WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

12 11 10 9 8 7 6 5 4 3 2 1

H

G

F

E

D

C

B

H

G

F

E

D

C

B

12 11 10 9

8 7 6

5 4 3 2 11314

A.

B.

C.

D.

PROVIDE DEMOLITION REQUIRED TO ACCOMMODATE NEW

WORK.

SEE ELECTRICAL AND MECHANICAL DOCUMENTS FOR

ADDITIONAL DEMOLITION REQUIREMENTS.

EXISTING STRUCTURAL SYSTEMS INCLUDING COLUMNS,

BEAMS, AND STRUCTURAL WALLS TO REMAIN UNLESS

OTHERWISE INDICATED.

REMOVE EXISTING LOOSE LAID CARPETS AND MATS WITHIN

THE WORK AREA FOR DURATION OF WORK AND REINSTALL.

DEMOLITION NOTES

DEMOLITION KEYNOTES

DEMOLITION REQUIRED AT EXISTING INTERIOR CMU WALL

FOR TRANSFER AIR OPENING, SEE DETAIL

CEILING MODIFICATION REQUIRED TO ACCOMMODATE

MECHANICAL CHASE, FOR ADDITIONAL INFORMATION SEE

SHEETS AND

REMOVE AND SALVAGE FOR REINSTALLATION: EXISTING

WALL MOUNTED TV, TV BRACKET, AND SEMI RECESSED FIRE

EXTINGUISHER CABINET. SEE E100 FOR ADDITIONAL

ELECTRICAL REQUIREMENTS.

A800

A621

A622

DEMOLITION LEGEND

NO ARCHITECTURAL WORK THIS AREA,

SEE A620 FOR CEILING DEMOLITION

ISSUE DATE

COMM. NUMBER

DESIGNED BY

DRAWN BY

SCALE 0" 1"

Architects Engineers Surveyors 601 College Road Fairbanks AK 99701

907.452.1241 designalaska.com

01 DEC 2021

CARLSON

ACTIVITY CENTER

MECHANICAL

CONTROLS

UPGRADE

101805

AECC511

IFB NO.: 22039

PROJECT NO.: 16-CACPRJ-2

12/2/2021 2:54:15 PM

ENS

ENS

DEMOLITION PLAN

- ARENA LEVEL

A101 1/16" = 1'-0"A101

1 DEMOLITION PLAN - ARENA LEVEL

AKAF AL

TS

TA E O

49 TH

S

JAMES D. BARTLETT

No. A10413

REGISTEREDPROFESSIONALARCHIT

REFRIG

ENTRY

CONC. OFFICE

BREAK RM.

CORR.

KIT. STOR.

KITCHEN

MEETING RM.MEETING RM.WOMEN

TICKETS

ENTRY

VEST.

MEN

SECURITY

STORAGE

STORAGE

FOYER

ELECTRICAL RM.

STORAGE

DRESSING

XFMR

RR

RR

GREEN RM.

GREEN RM.

14B

CO-1RBPT-APT-APT-APT-AET20'-0";-

14B

CO-1RBPT-APT-APT-APT-AET20'-0";-

CO-1RBPT-APT-APT-APT-AET20'-0";-

CO-1RBPT-APT-APT-APT-AET20'-0";-

3E

CO-1RBPT-APT-APT-APT-AET20'-0";-

CO-1RBPT-APT-APT-APT-AET20'-0";-

CO-1RBPT-APT-APT-APT-AET20'-0";-

40D

CO-1RB

PT-APT-APT-APT-AET20'-0";-

14A

CO-1RBPT-APT-APT-APT-AET20'-0";-

CO-1RB

PT-APT-APT-APT-AET20'-0";-

4A

CO-1RBPT-APT-APT-APT-AET20'-0";-

4B

CO-1RBPT-APT-APT-APT-AET20'-0";-

5F

CO-1RBPT-APT-APT-APT-AET20'-0";-

7A

CO-1RBPT-APT-APT-APT-AET20'-0";-

3A

CO-1RB

PT-APT-APT-APT-AET20'-0";-

3B

CO-1RBPT-APT-APT-APT-AET20'-0";-

5E

CO-1RBPT-APT-APT-APT-AET20'-0";-

CO-1RBPT-APT-APT-APT-AET20'-0";-

14C

CO-1RBPT-APT-APT-APT-AET20'-0";-

15C

CO-1RBPT-APT-APT-APT-AET20'-0";-

CO-1RBPT-APT-APT-APT-AET20'-0";-

23/24

CO-1RBPT-APT-APT-APT-AET20'-0";-

15B

CO-1RBPT-APT-APT-APT-AET20'-0";-

CO-1RBPT-APT-APT-APT-AET20'-0";-

11E

CO-1RB

PT-APT-APT-APT-AET20'-0";-

11C

CO-1RBPT-APT-APT-APT-AET20'-0";-

11A

CO-1RBPT-APT-APT-APT-AET20'-0";-

11B

CO-1RBPT-APT-APT-APT-AET20'-0";-

8A

CO-1RBPT-APT-APT-APT-AET20'-0";-

11A

CO-1RB

PT-A

PT-APT-APT-AET20'-0";-

ALASKA

MEDIA ROOM

COACHES

LOCKER

COACHES

MEETING

PLAYERS

LOUNGE

MEDIA

PRODUCTION

REST

ROOM

DRY

TEAM

DRESSING

STICK

ROOM

REST

ROOM

NANOOKS

LOCKER

MEDICAL LAUNDRY

EQUIPMENT

LOCKER

ROOM 1/MPR

LOCKER

ROOM 2/MPR

PHYS

THERAPY

REST

ROOM

REST

ROOM

REST

ROOM

ELEC

NORTHERN LIGHTS VISITOR

LOCKER ROOM/MPR

CORRIDORCORRIDOR

VESTIBULE

SOUTH

LOBBY

LOCKER

ROOM 3/MPR

LOCKER

ROOM 4/MPR

GEAR

ROOM

NORTH

TICKET BOOTH

EXISTING

BOILER ROOM

VESTIBULE

NORTH

LOBBY

REST

ROOM

REST

ROOM

ARENA

CORRIDOR

PLAYERS

LOUNGE

HALL

EQUIP

CLOSET

ARENA

108 107

128 131

127125

140 145

138 142

120.1

FE

FE

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:

clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:

clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:

clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:

clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:

clg hght

N WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

12 11 10 9 8 7 6 5 4 3 2 1

H

G

F

E

D

C

B

H

G

F

E

D

C

B

12 11 10 9

8 7 6

5 4 3 2 11314

FLOOR PLAN LEGEND

NO ARCHITECTURAL WORK THIS AREA

FLOOR PLAN NOTES

A.

B.

SEE A001 FOR ARCHITECTURAL NOTES.

SEE A101 FOR DEMOLITION NOTES.

FLOOR PLAN KEYNOTES

MECHANICAL DUCT CHASE, SEE DETAILS AND

PATCH AND REPAIR WALL SURFACE AT DEMOLISHED

ITEMS AND SEAL AIR TIGHT

INTERIOR MECHANICAL PENETRATION. SEE DETAIL

A800

A800

A800

SIMILAR

3 3

W01-3A

W01-3A

W01-3A

10'-6" +/-

A800

SIMILAR

SIMILAR

A800

A800

A800

5 2

ISSUE DATE

COMM. NUMBER

DESIGNED BY

DRAWN BY

SCALE 0" 1"

Architects Engineers Surveyors 601 College Road Fairbanks AK 99701

907.452.1241 designalaska.com

01 DEC 2021

CARLSON

ACTIVITY CENTER

MECHANICAL

CONTROLS

UPGRADE

101805

AECC511

IFB NO.: 22039

PROJECT NO.: 16-CACPRJ-2

12/2/2021 2:54:16 PM

ENS

ENS

RENOVATION

PLAN - ARENA

LEVEL

A201

ALIGN FINISH FACE OF CHASE CONSTRUCTION

WITH EXISTING FINISH FACE OF ADJACENT

WALL ASSEMBLY, TYPICAL

1/16" = 1'-0"A201

1 RENOVATION PLAN - ARENA LEVEL

AKAF AL

TS

TA E O

49 TH

S

JAMES D. BARTLETT

No. A10413

REGISTEREDPROFESSIONALARCHIT

A.

B.

C.

A.

B.

C.

D.

A.

B.

C.

D.

A.

A.

B.

1 - TYPICAL

ASSEMBLIES ARE DIAGRAMS ONLY, DO NOT SCALE.

ASSEMBLIES ARE INTENDED TO DESCRIBE MATERIALS

AND THEIR RELATIONSHIP WITHIN A GIVEN CEILING,

FLOOR, ROOF, OR WALL. PENETRATIONS, JOINTS,

FINISHES, AND INTERSECTIONS BETWEEN ASSEMBLIES

ARE NOT SHOWN.

SEE A0 SHEETS FOR ARCHITECTURAL NOTES, SHEET

SEQUENCE, AND ASSEMBLY TAG LEGENDS.

2 - FRAMING

PROVIDE 20 GAGE METAL STUDS AT 24" ON CENTER FOR

INTERIOR NON-BEARING WALLS UNLESS NOTED

OTHERWISE, OR PER STUD MANUFACTURER.

EXTEND CONTINUOUS STUDS FROM FLOOR TO

STRUCTURE ABOVE UNLESS NOTED OTHERWISE.

PROVIDE MANUFACTURERS STANDARD DEFLECTION

TRACK AT NON-BEARING STUD WALLS EXTENDING TO

STRUCTURE.

PROVIDE BACKING AT ASSEMBLY MOUNTED

ACCESSORIES, EQUIPMENT, AND FIXTURES.

3 - SHEATHING

PROVIDE CONTINUOUS GYPSUM BOARD FROM FLOOR TO

STRUCTURE ABOVE UNLESS NOTED OTHERWISE.

PROVIDE GAP AT DEFLECTION TRACK PER

MANUFACTURER RECOMMENDATION. COORDINATE FIRE

RATED AND SOUND RATED CONDITIONS.

SEAL THROUGH WALL PENETRATIONS AT BOTH ABOVE

CEILING AND BELOW CEILING CONDITIONS.

PROVIDE CONTROL JOINTS IN GYPSUM BOARD AT 30'-0"

MAXIMUM SPACING OR PER UNITED STATES GYPSUM

ASSOCIATION.

4 - EXTERIOR FINISHES

ALL EXTERIOR MATERIALS AND FINISHES TO MATCH

EXISTING TO THE GREATEST EXTENT POSSIBLE.

5 - WEATHER BARRIERS

BARRIER / RETARDER CONTINUITY IS CRITICAL FOR THE

PERFORMANCE AND DURABILITY OF THE ASSEMBLY.

FLASHING, SEALING, AND INSULATING TRANSITION

SPACES ARE CRITICAL COMPONENTS OF WATER, AIR,

AND THERMAL BARRIER CONTINUITY.

WB-3 VAPOR RETARDER

WALLS: POLYETHYLENE FILM

OPENINGS: SELF ADHERED FLEXIBLE FLASHING

SEAM AND PERIMETER: TAPE, SEALANT, BACKER ROD

FLASHING: PRE-FINISHED METAL

EXTERIOR ASSEMBLY NOTES

WX-8A

EXISTING EXTERIOR WALL -

CMU WITH 6" FURRED WALL

8" CMU BLOCK

1/2" THERMAL BREAK

BATT INSULATION

6" METAL STUD

5/8" GYPSUM BOARD

INTERIOR EXTERIOR

VAPOR BARRIER

WX-8A

M

IN2"

LOUVER AND DUCT

PER MECHANICAL

SECURE LOUVER PER

MANUFACTURER'S

INSTRUCTIONS

CONTINUOUS SEALANT

AND BACKER ROD

PRE-FINISHED METAL

FLASHING WITH BACK AND

SIDE DAMS AND DRIP EDGE

FILL SHIM SPACE WITH SPRAY FOAM

PROVIDE METAL TRACK SILL

REMOVE AND REPLACE GYPSUM BOARD

FINISH AS REQUIRED TO ACCOMMODATE

WORK. TEXTURE AND FINISH COLOR TO

MATCH ADJACENT WALL

O

PE

N

IN

G S

IZ

E

PE

R

M

H

AN

IC

AL

M

IN2"

PROVIDE VAPOR BARRIER SEALED TO

EXISTING BARRIER AND EXTEND INTO

OPENING

PROVIDE 1/2" TREATED PLYWOOD

SAW CUT CMU AS REQUIRED TO

ACCOMMODATE WORK

SAW CUT CMU WALL OPENING TO

ACCOMMODATE INSTALLATION OF

MECHANICAL EQUIPMENT

WX-8A

REMOVE AND REPLACE GYPSUM BOARD

AS REQUIRED TO ACCOMMODATE WORK

PROVIDE VAPOR BARRIER SEALED TO EXISTING

BARRIER AND EXTENDED INTO OPENING

PROVIDE BOX HEADER WITH FULL THICK

FIBERGLASS INSULATION

M

IN2"

1/2" TREATED PLYWOOD, PERIMETER OF OPENING

CONTINUOUS SEALANT AND BACKER ROD

PRE-FINISHED METAL FLASHING WITH BACK

DAM AND DRIP EDGE

FILL SHIM SPACE WITH SPRAY FOAM

INSULATION

LOUVER AND DUCT PER MECHANICAL

O

PE

N

IN

G S

IZ

E

PE

R

M

H

AN

IC

AL

EXTERIOR DETAIL NOTES

A.

B.

C.

D.

SEE MECHANICAL FOR EXTERIOR PENETRATIONS

INCLUDING BUT NOT LIMITED TO LOUVERS, FLUES, AND

UTILITIES. PROVIDE TREATED BLOCKING, ATTACH TO

PRIMARY FRAMING MEMBER, AND WEATHER SEAL.

PROVIDE PRE-FINISHED METAL FLASHING UNLESS NOTED

OTHERWISE. PERFORATE AT VENTED ASSEMBLIES.

PROVIDE TREATED 2x WOOD BLOCKING AT ROUGH

OPENINGS UNLESS NOTED OTHERWISE.

PROVIDE MOISTURE RESISTANT GYPSUM BOARD AT

WINDOW, DOOR, AND OTHER OPENINGS AT HEAD, JAMB,

AND SILL CONDITIONS UNLESS NOTED OTHERWISE.

ISSUE DATE

COMM. NUMBER

DESIGNED BY

DRAWN BY

SCALE 0" 1"

Architects Engineers Surveyors 601 College Road Fairbanks AK 99701

907.452.1241 designalaska.com

01 DEC 2021

CARLSON

ACTIVITY CENTER

MECHANICAL

CONTROLS

UPGRADE

101805

AECC511

IFB NO.: 22039

PROJECT NO.: 16-CACPRJ-2

12/2/2021 2:54:17 PM

ENS

ENS

EXTERIOR

DETAILS AND

ASSEMBLY TYPES

A500 3" = 1'-0"A500

2 EXTERIOR SECTION DETAIL - MECHANICAL PENETRATION SILL - CMU WALL

3" = 1'-0"A500

1 EXTERIOR SECTION DETAIL - MECHANICAL PENETRATION HEAD - CMU WALL

AKAF AL

TS

TA E O

49 TH

S

JAMES D. BARTLETT

No. A10413

REGISTEREDPROFESSIONALARCHIT

REFRIGENTRY

CONC. OFFICE

BREAK RM.

CORR.

KIT. STOR.

KITCHEN

MEETING RM.MEETING RM.

WOMEN

WOMEN

TICKETS

ENTRY

VEST.

MEN

SECURITY

STORAGE

STORAGE

FOYER

ELECTRICAL RM.

STORAGE

DRESSING

XFMR

RR

RR

GREEN RM.

MEN

GREEN RM.

14B

CO-1RBPT-APT-APT-APT-AET20'-0";-

14B

CO-1RBPT-APT-APT-APT-AET20'-0";-

CO-1RBPT-APT-APT-APT-AET20'-0";-

CO-1RBPT-APT-APT-APT-AET20'-0";-

3E

CO-1RBPT-APT-APT-APT-AET20'-0";-

CO-1RBPT-APT-APT-APT-AET20'-0";-

CO-1RBPT-APT-APT-APT-AET20'-0";-

40D

CO-1RBPT-APT-APT-APT-AET20'-0";-

14A

CO-1RBPT-APT-APT-APT-AET20'-0";-

CO-1RBPT-APT-APT-APT-AET20'-0";-

4A

CO-1RBPT-APT-APT-APT-AET20'-0";-4B

CO-1RBPT-APT-APT-APT-AET20'-0";-

40A

CO-1RBPT-APT-APT-APT-AET20'-0";-

5F

CO-1RBPT-APT-APT-APT-AET20'-0";-

7A

CO-1RBPT-APT-APT-APT-AET20'-0";-

3A

CO-1RBPT-APT-APT-APT-AET20'-0";-

3B

CO-1RBPT-APT-APT-APT-AET20'-0";-

5E

CO-1RBPT-APT-APT-APT-AET20'-0";-

CO-1RBPT-APT-APT-APT-AET20'-0";-

14C

CO-1RBPT-APT-APT-APT-AET20'-0";-

15C

CO-1RBPT-APT-APT-APT-AET20'-0";-

CO-1RBPT-APT-APT-APT-AET20'-0";-

23/24

CO-1RBPT-APT-APT-APT-AET20'-0";-

15B

CO-1RBPT-APT-APT-APT-AET20'-0";-

CO-1RBPT-APT-APT-APT-AET20'-0";-

11D

CO-1RBPT-APT-APT-APT-AET20'-0";-

11C

CO-1RBPT-APT-APT-APT-AET20'-0";-

11A

CO-1RBPT-APT-APT-APT-AET20'-0";-

B

CO-1RBPT-APT-APT-APT-AET20'-0";-

40B

CO-1RBPT-APT-APT-APT-AET20'-0";-

8A

CO-1RBPT-APT-APT-APT-AET20'-0";-

A

CO-1RBPT-APT-APT-APT-AET20'-0";-

558 SF

106 SF 173 SF

383 SF

66 SF

65 SF

115 SF

75 SF

227 SF

103 SF

109 SF

1038 SF

150 SF

335 SF

253 SF 253 SF

469 SF

98 SF 102 SF

73 SF

62 SF 53 SF

145 SF

38 SF

1029 SF

445 SF

659 sf

101 SF

750 SF

239 SF 271 SF

103 SF 183 SF

1033 SF

78 SF

611 SF

74 SF 76 SF

105 SF

314 SF

321 SF

45 SF

174 SF

74 SF

51 SF

29 SF 29 SF

ALASKA

MEDIA ROOM

COACHES

LOCKER

COACHES

MEETING

PLAYERS

LOUNGE

MEDIA

PRODUCTION

REST

ROOM

SHOWER

DRY

TEAM

DRESSING

STICK

ROOM

REST

ROOM

NANOOKS

LOCKER

MEDICAL

LAUNDRY

EQUIPMENT

LOCKER

ROOM 1/MPR

LOCKER

ROOM 2/MPR

PHYS

THERAPY

REST

ROOM

REST

ROOM

SHOWER

SHOWER SHOWER

REST

ROOM

ELEC

NORTHERN LIGHTS VISITOR

LOCKER ROOM/MPR

CORRIDOR

CORRIDOR

VESTIBULE

SOUTH

LOBBY

LOCKER

ROOM 3/MPR

LOCKER

ROOM 4/MPR

GEAR

ROOM

NORTH

TICKET BOOTH

EXISTING

BOILER ROOM

VESTIBULE

NORTH

LOBBY

REST

ROOM

REST

ROOM

ARENA ARENA

TEAM

VESTIBULE

CORRIDOR

PLAYERS

LOUNGE

LOUNGE

VESTIBULE

NANOOKS

VESTIBULE

NANOOKS

SINK

HALL

SHOWER SHOWER

EQUIP

CLOSET

108 107

128 131

129 132

130 133

137 141

140 145

138 142

100 100

139 143

120.1

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

12 11 10 9 8 7 6 5 4 3 2 1

H

G

F

E

D

C

B

H

G

F

E

D

C

B

12 11 10 9

8 7 6

5 4 3 2 11314

1 1

A800

A800

A800

A800

CEILING PLAN NOTES

A.

B.

C.

D.

E.

F.

G.

H.

I.

J.

K.

PROVIDE CEILING TILE AND GRID DEMOLITION AS

REQUIRED TO ACCOMMODATE NEW WORK.

CAREFULLY REMOVE AND SALVAGE CEILING TILES AND

GRID FOR REINSTALLATION.

PROVIDE NEW CEILING TILES TO MATCH EXISTING WHERE

TILES ARE DAMAGED DURING CONSTRUCTION.

APPROXIMATE SQUARE FOOTAGE OF TILE REMOVAL IS

3,900 SF. ASSUME 10% OF TILES WILL NEED REPLACED.

IF ANY CEILING MOUNTED EQUIPMENT OR ITEMS ARE

TEMPORARILY REMOVED FOR CEILING ACCESS, CLEAN,

WIPE DOWN, AND DRY PRIOR TO REINSTALLATION.

PATCH, REPAIR, AND REFINISH ALL EXISTING SURFACES

TO REMAIN THAT ARE AFFECTED BY WORK.

COORDINATE ALL MECHANICAL ELEMENTS INCLUDING

SPRINKLERS, DIFFUSERS, RETURN AIR SLOTS, ACCESS

PANELS, AND EQUIPMENT WITH MECHANICAL

DOCUMENTS.

COORDINATE ALL ELECTRICAL ELEMENTS INCLUDING

SMOKE DETECTOR, LIGHTING, SENSORS, SIGNAGE,

ACCESS PANELS, AND EQUIPMENT WITH ELECTRICAL

DOCUMENTS.

CENTER CEILING ELEMENTS, INCLUDING SPRINKLER

HEADS, IN CEILING TILE UNLESS NOTED OTHERWISE.

SUSPENDED CEILING AREAS 144 SF OR LESS ARE EXEMPT

FROM COMPLIANCE WITH ASTM E580/E580M.

SUSPENDED CEILING AREAS GREATER THAN 144 SF BUT

LESS THAN 1,000 SF MUST COMPLY WITH ASTM

E580/E580M BUT ARE EXEMPT FROM LATERAL FORCE

BRACING.

SUSPENDED CEILING AREAS GREATER THAN 1,000 SF

MUST COMPLY WITH ASTM E580/E580M INCLUDING

LATERAL FORCE BRACING.

CEILING LEGEND

EXISTING ACOUSTIC CEILING

TILE TO REMAIN

OPEN TO STRUCTURE (OTS)

NO CEILING WORK THIS AREA

CEILING KEYNOTES

ABOVE CEILING WORK. SOME WORK

AREAS ARE ABOVE EXISTING CEILING

TILES AND GRID TO REMAIN HOWEVER

TEMPORARILY REMOVE AND/OR MODIFY

EXISTING GRID SYSTEM TO

ACCOMMODATE NEW WORK.

ISSUE DATE

COMM. NUMBER

DESIGNED BY

DRAWN BY

SCALE 0" 1"

Architects Engineers Surveyors 601 College Road Fairbanks AK 99701

907.452.1241 designalaska.com

01 DEC 2021

CARLSON

ACTIVITY CENTER

MECHANICAL

CONTROLS

UPGRADE

101805

AECC511

IFB NO.: 22039

PROJECT NO.: 16-CACPRJ-2

12/2/2021 2:54:19 PM

ENS

MLM

INTERIOR PLAN -

CEILING - ARENA

LEVEL

A621 1/16" = 1'-0"A621

1 INTERIOR PLAN - CEILING - ARENA LEVEL

AKAF AL

TS

TA E O

49 TH

S

JAMES D. BARTLETT

No. A10413

REGISTEREDPROFESSIONALARCHIT

STORAGE STR

MEN

STR WOMEN JAN. CONCESSIONSTR

ENTRY

FOYER

BOX OFFICE

OFFICE

CONFERENCE

BREAK RM.

RR RR

OFFICE

OFFICE

MANAGER'S OFFICE

STORAGE

MECH. RM.

STAIRS

CONCESSIONJANSTR

WOMENSTR

MEN

STR

CONCESSION

CONCESSION

TICKET

TICKET

6E

CO-1RBPT-APT-APT-APT-AET20'-0";-

CO-1RBPT-APT-APT-APT-AET20'-0";-

5D

CO-1RBPT-APT-APT-APT-AET20'-0";-

CO-1RBPT-APT-APT-APT-AET20'-0";-

5B

CO-1RBPT-APT-APT-APT-AET20'-0";- 8C

CO-1RBPT-APT-APT-APT-AET20'-0";-

6B

CO-1RBPT-APT-APT-APT-AET20'-0";-6

CO-1RBPT-APT-APT-APT-AET20'-0";-

6I

CO-1RBPT-APT-APT-APT-AET20'-0";-

3G

CO-1RBPT-APT-APT-APT-AET20'-0";-

CO-1RBPT-APT-APT-APT-AET20'-0";-

6B

CO-1RBPT-APT-APT-APT-AET20'-0";-

CO-1RBPT-APT-APT-APT-AET20'-0";-

CO-1RBPT-APT-APT-APT-AET20'-0";-

35B

CO-1RBPT-APT-APT-APT-AET20'-0";-

35A

CO-1RBPT-APT-APT-APT-AET20'-0";-

CO-1RBPT-APT-APT-APT-AET20'-0";-

CO-1RBPT-APT-APT-APT-AET20'-0";-

6B

CO-1RBPT-APT-APT-APT-AET20'-0";-

15D

CO-1RBPT-APT-APT-APT-AET20'-0";-

25A

CO-1RBPT-APT-APT-APT-AET20'-0";-

CO-1RBPT-APT-APT-APT-AET20'-0";-

6A

CO-1RBPT-APT-APT-APT-AET20'-0";-8D

CO-1RBPT-APT-APT-APT-AET20'-0";-

42A

CO-1RBPT-APT-APT-APT-AET20'-0";-

CO-1RBPT-APT-APT-APT-AET20'-0";-

5A

CO-1RBPT-APT-APT-APT-AET20'-0";-7

CO-1RBPT-APT-APT-APT-AET20'-0";-

5C

CO-1RBPT-APT-APT-APT-AET20'-0";-

CO-1RBPT-APT-APT-APT-AET20'-0";-

6D

CO-1RBPT-APT-APT-APT-AET20'-0";-

6C

CO-1RBPT-APT-APT-APT-AET20'-0";-

7B

CO-1RBPT-APT-APT-APT-AET20'-0";-

7C

CO-1RBPT-APT-APT-APT-AET20'-0";-

3F

CO-1RBPT-APT-APT-APT-AET20'-0";-

12 11 10 9 8 7 6 5 4 3 2 1

H

G

F

E

D

C

B

H

G

F

E

D

C

B

12 11 10 9

8 7 6

5 4 3 2 11314

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS: FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:

CEILING PLAN NOTES

A. SEE A620 FOR CEILING PLAN NOTES.

CEILING LEGEND

EXISTING ACOUSTIC CEILING

TILE TO REMAIN

OPEN TO STRUCTURE (OTS)

NO CEILING WORK THIS AREA

CEILING KEYNOTES

ABOVE CEILING WORK. SOME WORK

AREAS ARE ABOVE EXISTING CEILING

TILES AND GRID TO REMAIN HOWEVER

TEMPORARILY REMOVE AND/OR MODIFY

EXISTING GRID SYSTEM TO

ACCOMMODATE NEW WORK.

ISSUE DATE

COMM. NUMBER

DESIGNED BY

DRAWN BY

SCALE 0" 1"

Architects Engineers Surveyors 601 College Road Fairbanks AK 99701

907.452.1241 designalaska.com

01 DEC 2021

CARLSON

ACTIVITY CENTER

MECHANICAL

CONTROLS

UPGRADE

101805

AECC511

IFB NO.: 22039

PROJECT NO.: 16-CACPRJ-2

12/2/2021 2:54:20 PM

ENS

MLM

INTERIOR PLAN -

CEILING -

CONCOURSE

LEVEL

A622 1/16" = 1'-0"A622

1 INTERIOR PLAN - CEILING - CONCOURSE LEVEL

AKAF AL

TS

TA E O

49 TH

S

JAMES D. BARTLETT

No. A10413

REGISTEREDPROFESSIONALARCHIT

A.

B.

C.

A.

1 - TYPICAL

SEE A5 SHEETS EXTERIOR ASSEMBLY NOTES - TYPICAL

SEE A5 SHEETS FOR EXTERIOR ASSEMBLIES AND

EXTERIOR DETAILS.

COORDINATE ABOVE CEILING WORK.

2 - INTERIOR FINISHES

ALL INTERIOR FINISHES AND MATERIALS TO MATCH

EXISTING ADJACENT MATERIALS TO REMAIN.

INTERIOR ASSEMBLY NOTES

W01-3A

WALL INTERIOR 3 5/8" STUD

GYPSUM BOARD ONE SIDE

3 5/8" METAL STUDS

5/8" GYPSUM BOARD

W11-3A

WALL INTERIOR 3 5/8" STUD

GYPSUM BOARD BOTH SIDES

5/8" GYPSUM BOARD

3 5/8" METAL STUDS

BATT INSULATION

5/8" GYPSUM BOARD

W00-8A INTERIOR CMU WALL

8" CMU BLOCK

CORE SPACE FILLED

WITH SAND AT ROOMS

REQUIRING ACOUSTIC

CONSIDERATIONS

10"

4' -2

W01-3A

CONTINUOUS SEALANT

A800

CONTINUOUS SEALANT TO

EXISTING DECK AND/OR

STRUCTURE ABOVE

CONTINUOUS SEALANT

EXISTING FLOOR TO REMAIN

10"

CONTINUOUS SEALANT

AT DUCT PENETRATION

MECHANICAL DUCT,

SEE 2/M200B

W01-3A

A800

REMOVE CARPET AND RUBBER

BASE AT CHASE/PLENUM FRAMING

AND AT INTERIOR OF CHASE,

TYPICAL ALL CHASE LOCATIONS

PROVIDE RUBBER BASE TO

MATCH ADJACENT

PAINT WALL TO MATCH

ADJACENT FINISH AND COLOR

INTERIOR DETAIL NOTES

A.

B.

C.

SEE A0 SHEETS FOR ASSEMBLY TAG LEGEND.

SEE A5 SHEETS FOR EXTERIOR ASSEMBLIES AND

DETAILS.

PROVIDE FINISHES TO FULL HEIGHT OF WALL UNLESS

NOTED OTHERWISE.

FRICTION FIT FIBERGLASS BATT

INSULATION TO FILL CAVITY

WHERE METAL DECK FLUTES

ARE…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .