IFB No. 22039 Drawings 22 x 34.pdf
PDF 6 MB Posted
- Attached to
- Carlson Activity Center Mechanical Controls Upgrade State and local contract opportunity
- Solicitation number
- 22039
- Issued by
- Fairbanks North Star Borough, Alaska
About this file
The document is a comprehensive set of architectural and mechanical engineering drawings for the Carlson Activity Center Mechanical Controls Upgrade project, prepared by Design Alaska for the Fairbanks North Star Borough. The project involves a detailed mechanical and electrical system upgrade for the Carlson Activity Center, located in Fairbanks, Alaska. The drawings cover multiple levels including arena, concourse, and mezzanine, and include extensive documentation for mechanical, electrical, and architectural modifications. The scope encompasses replacing existing control systems, upgrading ventilation and heating systems, renovating equipment locations, and performing comprehensive mechanical and electrical system upgrades across different building zones.
The drawings provide intricate technical details for multiple air handling units (AHU-1 through AHU-8), exhaust fans, glycol circulation pumps, and various mechanical and electrical systems. The project includes replacing control devices, updating ventilation control systems, modifying existing equipment locations, and upgrading electrical panels and distribution systems. Key components include new variable frequency drives (VFDs), control sensors, heating and cooling system replacements, and electrical panel modifications. The technical specifications suggest a comprehensive modernization effort focused on improving energy efficiency, system control, and overall mechanical and electrical infrastructure of the Carlson Activity Center.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| Addendum One.pdf | ||
| IFB No. 22039 Bid Documents.pdf | ||
| Q&A Document 1.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FAIRBANKS, ALASKA
CARLSON ACTIVITY CENTER
MECHANICAL CONTROLS UPGRADE
FAIRBANKS NORTH STAR BOROUGH
OWNERS REPRESENTATIVE
FAIRBANKS NORTH STAR BOROUGH
DAMON ZIMMERMAN
PROJECT MANAGER
907 459-1261 dzimmerman@fnsb.us
DESIGN LEAD
DESIGN ALASKA
ROBIN RADER
PROJECT MANAGER
907 452-1241 robin@designalaska.com
BASE BID
ALL WORK IS BASE BID UNLESS NOTED OTHERWISE
ALTERNATE 1 POWER FACTOR REDUCTION.
ALTERNATE 2 DDC HEAT TRACE CONTROL.
ALTERNATE 3 AIRFLOW MEASURING STATIONS.
SEE DIVISION 01 23 00 FOR ADDITIONAL
INFORMATION ON ALTERNATES
SEE DISCIPLINES FOR SPECIFIC SYMBOLS
GENERAL
G001 GENERAL INFORMATION
G002 PHASING PLAN ARENA FLOOR LEVEL
G003 PHASING PLAN CONCOURSE LEVEL
G004 MEZZANINE LEVEL EXISTING EQUIPMENT
AND DEMOLITION
G101 GENERAL PLAN - ARENA LEVEL
G102 GENERAL PLAN - CONCOURSE LEVEL
ARCHITECTURAL
A001 ARCHITECTURAL INFORMATION
A101 DEMOLITION PLAN - ARENA LEVEL
A201 RENOVATION PLAN - ARENA LEVEL
A500 EXTERIOR DETAILS AND ASSEMBLY TYPES
A621 INTERIOR PLAN - CEILING - ARENA LEVEL
A622 INTERIOR PLAN - CEILING - CONCOURSE LEVEL
A800 INTERIOR DETAILS AND ASSEMBLY TYPES
ELECTRICAL
E001 ELECTRICAL SYMBOL LEGEND & PARTIAL RISER DIAGRAM
E100 ARENA FLOOR LEVEL ELECTRICAL PLAN
E200 CONCOURSE FLOOR LEVEL ELECTRICAL PLAN
E300 MEZZANINE FLOOR LEVEL ELECTRICAL PLAN
NUMBER
NAME
SHEET LOCATION
SCALE
TRUE NORTH
PLAN NORTH
GRID LINE
REVISION
ROOM NAME
ROOM NUMBER
1/8"=1'-0"
ROOM
NAME
A
GOVERNING CODES
INTERNATIONAL BUILDING CODE (IBC) 2018
INTERNATIONAL EXISTING BUILDING CODE (IEBC) 2018
INTERNATIONAL MECHANICAL CODE (IMC) 2018
NATIONAL ELECTRICAL CODE (NEC) 2020
UNIFORM PLUMBING CODE (UPC) 2018
AUTHORITY HAVING JURISDICTION
CITY OF FAIRBANKS
IFB NO.: 22039 PROJECT NO.: 16-CACPRJ-2
MECHANICAL
M001 MECHANICAL LEGEND
M002 MECHANICAL SCHEDULE
M100 ARENA FLOOR LEVEL EXISTING EQUIPMENT LOCATION AND DEMOLITION
M100A ARENA FLOOR LEVEL EQUIPMENT DEMOLITION
M101 CONCOURSE LEVEL EXISTING EQUIPMENT LOCATION AND DEMOLITION
M102 MEZZANINE LEVEL EXISTING EQUIPMENT LOCATION AND DEMOLITION
M200 ARENA LEVEL PLAN
M200A PIONEER ROOM LARGE SCALE PLAN
M200B PROW LARGE SCALE PLAN
M201 ADMIN AREA RENOVATION
M202 AHU-1 & 2 LARGE SCALE PLAN
M300 ARENA VENTILATION CONTROL REPLACEMENT DIAGRAMS
M301 VENTILATION CONTROL REPLACEMENT DIAGRAMS
M302 VENTILATION CONTROL REPLACEMENT DIAGRAMS
M303 HEATING AND COOLING SYSTEM CONTROL REPLACEMENT DIAGRAMS
M304 MISC CONTROL REPLACEMENT DIAGRAMS
2010 2ND AVE
CONTRACTOR
STAGING AREA
PE
G
ER
R
D
PHILLIPS FIELD RD
2ND AVE
M O
O R
E
ST
AIRPORT WAY
W
IL
BU
R
S T
PROJECT
LOCATION
CONTRACTOR
STAGING AREA
James D. Bartlett
No. A 10413
01-DEC-2021
12/1/2021 3:27 PM G001.DWG
101805
1 DEC 2021
COMM. NUMBER
ISSUE DATE
DESIGNED BY
DRAWN BY
1"0" SCALE
601 College Road Fairbanks AK 99701 907.452.1241
Architects SurveyorsEngineers
AECC511 designalaska.com
CARLSON
ACTIVITY CENTER
MECHANICAL
CONTROLS
UPGRADE
PROJECT NO.: 16-CACPRJ-2
IFB NO.: 22039
G001
GENERAL
INFORMATION
G
12 11 10 9 8 7 6 5 4 3 2 1
H
G
F
E
D
C
B
H
F
D
E
B
C
12 11 10 9
8 7 6
5 4 3 2 11314
12/21/2021 9:54 AM G002.DWG
101805
1 DEC 2021
COMM. NUMBER
ISSUE DATE
DESIGNED BY
DRAWN BY
1"0" SCALE
601 College Road Fairbanks AK 99701 907.452.1241
Architects SurveyorsEngineers
AECC511 designalaska.com
CARLSON
ACTIVITY CENTER
MECHANICAL
CONTROLS
UPGRADE
PROJECT NO.: 16-CACPRJ-2
IFB NO.: 22039
G002
BAB
RJR
PHASING PLAN
ARENA FLOOR
LEVEL
AutoCAD SHX Text
PROW 1ST AND 2ND FLOOR
AutoCAD SHX Text
LOCKER ROOM/NORTHEAST AREA
AutoCAD SHX Text
PIONEER ROOM
AutoCAD SHX Text
PROW
AutoCAD SHX Text
KITCHEN
AutoCAD SHX Text
BOILER ROOM
AutoCAD SHX Text
LOCKER ROOM/NORTHEAST AREA
AutoCAD SHX Text
%%UAREA/LOCATION
AutoCAD SHX Text 5/16/22
AutoCAD SHX Text 5/16/22
AutoCAD SHX Text
%%UACCESS START
AutoCAD SHX Text
%%UWORK COMPLETE
AutoCAD SHX Text 8/1/22
AutoCAD SHX Text 8/29/22
AutoCAD SHX Text
1. FIRST DAY OF CONTRACTOR ACCESS TO SITE AND WORK AREA IS MAY 16, 2022. 2. IN AREAS OCCUPIED BY OWNER, MANUALLY CONTROL AIR HANDLING UNITS AS REQUIRED TO MAINTAIN CONDITIONS WITHIN 68F TO 76F IF REQUIRED DURING CONTROL SYSTEM SWITCHOVER PERIODS FROM EXISTING CONTROL SYSTEM.
AutoCAD SHX Text
%%UNOTES
AutoCAD SHX Text
CARLSON ADDITION
AutoCAD SHX Text
PIONEER ROOM
AutoCAD SHX Text
BOILER ROOM
AutoCAD SHX Text
KITCHEN
AutoCAD SHX Text
CARLSON ADDITION
AutoCAD SHX Text
ICE MAKING EQUIPMENT
AutoCAD SHX Text
ICE MAKING EQUIPMENT
A1
12 11 10 9 8 7 6 5 4 3 2 1
H
G
F
E
D
C
B
H
F
D
E
B
C
12 11 10 9
8 7 6
5 4 3 2 11314
12/16/2021 4:16 PM G003.DWG
101805
1 DEC 2021
COMM. NUMBER
ISSUE DATE
DESIGNED BY
DRAWN BY
1"0" SCALE
601 College Road Fairbanks AK 99701 907.452.1241
Architects SurveyorsEngineers
AECC511 designalaska.com
CARLSON
ACTIVITY CENTER
MECHANICAL
CONTROLS
UPGRADE
PROJECT NO.: 16-CACPRJ-2
IFB NO.: 22039
G003
BAB
RJR
PHASING PLAN
CONCOURSE
LEVEL
AutoCAD SHX Text
ADMIN AREA
AutoCAD SHX Text
%%UAREA/LOCATION
AutoCAD SHX Text 5/16/22
AutoCAD SHX Text 5/16/22
AutoCAD SHX Text
%%UACCESS START
AutoCAD SHX Text
%%UWORK COMPLETE
AutoCAD SHX Text 8/1/22
AutoCAD SHX Text 8/29/22
AutoCAD SHX Text
%%UNOTES
AutoCAD SHX Text
PROW
AutoCAD SHX Text
AREA SERVED BY AHU-1
AutoCAD SHX Text
AREA SERVED BY AHU-2
AutoCAD SHX Text
ADMIN
AutoCAD SHX Text
1. FIRST DAY OF CONTRACTOR ACCESS TO SITE AND WORK AREA IS MAY 16, 2022. 2. IN AREAS OCCUPIED BY OWNER, MANUALLY CONTROL AIR HANDLING UNITS AS REQUIRED TO MAINTAIN CONDITIONS WITHIN 68F TO 76F IF REQUIRED DURING CONTROL SYSTEM SWITCHOVER PERIODS FROM EXISTING CONTROL SYSTEM. 3. LIMIT DURATION OF WORK WITHIN ADMIN TO THREE CONSECUTIVE WEEKS.
AutoCAD SHX Text
PROW 1ST AND 2ND FLOOR
AutoCAD SHX Text
AREA SERVED BY AHU-1
AREA SERVED BY AHU-2
H
G
F
E
D
C
B
H
F
D
E
B
C
12 11 10 9
8 7 6
5 4 3 2 11314
12/16/2021 4:10 PM G004.DWG
101805
1 DEC 2021
COMM. NUMBER
ISSUE DATE
DESIGNED BY
DRAWN BY
1"0" SCALE
601 College Road Fairbanks AK 99701 907.452.1241
Architects SurveyorsEngineers
AECC511 designalaska.com
CARLSON
ACTIVITY CENTER
MECHANICAL
CONTROLS
UPGRADE
PROJECT NO.: 16-CACPRJ-2
IFB NO.: 22039
G004
BAB
RJR
PHASING PLAN
MEZZANINE LEVEL
AutoCAD SHX Text
%%UAREA/LOCATION
AutoCAD SHX Text 5/16/22
AutoCAD SHX Text
%%UACCESS START
AutoCAD SHX Text
%%UWORK COMPLETE
AutoCAD SHX Text 8/1/22
AutoCAD SHX Text
%%UNOTES
AutoCAD SHX Text 5/16/22
AutoCAD SHX Text 8/29/22
AutoCAD SHX Text
1. FIRST DAY OF CONTRACTOR ACCESS TO SITE AND WORK AREA IS MAY 16, 2022. 2. IN AREAS OCCUPIED BY OWNER, MANUALLY CONTROL AIR HANDLING UNITS AS REQUIRED TO MAINTAIN CONDITIONS WITHIN 68F TO 76F IF REQUIRED DURING CONTROL SYSTEM SWITCHOVER PERIODS FROM EXISTING CONTROL SYSTEM.
AutoCAD SHX Text
AHU-1
AutoCAD SHX Text
AHU-2
AutoCAD SHX Text
AHU-3
AutoCAD SHX Text
AHU-1
AutoCAD SHX Text
AHU-5
AutoCAD SHX Text
AHU-3
AutoCAD SHX Text
AHU-2
AHU-5
MECH
GARAGE ENTRY
REFRIG
ENTRY
CONC. OFFICE
BREAK RM.
CORR.
KIT. STOR.
KITCHEN
MEETING RM.MEETING RM.WOMEN
TICKETS
ENTRY
VEST.
MEN
SECURITY
STORAGE
STORAGE
FOYER
ELECTRICAL RM.
STORAGE
DRESSING
XFMR
RR
RR
GREEN RM.
GREEN RM.
14B
CO-1RBPT-APT-APT-APT-AET20'-0";-
14B
CO-1RBPT-APT-APT-APT-AET20'-0";-
CO-1RBPT-APT-APT-APT-AET20'-0";-
CO-1RBPT-APT-APT-APT-AET20'-0";-
3E
CO-1RBPT-APT-APT-APT-AET20'-0";-
CO-1RBPT-APT-APT-APT-AET20'-0";-
CO-1RBPT-APT-APT-APT-AET20'-0";-
40D
CO-1RB
PT-APT-APT-APT-AET20'-0";-
14A
CO-1RBPT-APT-APT-APT-AET20'-0";-
CO-1RB
PT-APT-APT-APT-AET20'-0";-
4A
CO-1RBPT-APT-APT-APT-AET20'-0";-
4B
CO-1RBPT-APT-APT-APT-AET20'-0";-
5F
CO-1RBPT-APT-APT-APT-AET20'-0";-
7A
CO-1RBPT-APT-APT-APT-AET20'-0";-
3A
CO-1RB
PT-APT-APT-APT-AET20'-0";-
3B
CO-1RBPT-APT-APT-APT-AET20'-0";-
5E
CO-1RBPT-APT-APT-APT-AET20'-0";-
CO-1RBPT-APT-APT-APT-AET20'-0";-
14C
CO-1RBPT-APT-APT-APT-AET20'-0";-
15C
CO-1RBPT-APT-APT-APT-AET20'-0";-
CO-1RBPT-APT-APT-APT-AET20'-0";-
23/24
CO-1RBPT-APT-APT-APT-AET20'-0";-
15B
CO-1RBPT-APT-APT-APT-AET20'-0";-
CO-1RBPT-APT-APT-APT-AET20'-0";-
11E
CO-1RB
PT-APT-APT-APT-AET20'-0";-
11C
CO-1RBPT-APT-APT-APT-AET20'-0";-
11A
CO-1RBPT-APT-APT-APT-AET20'-0";-
11B
CO-1RBPT-APT-APT-APT-AET20'-0";-
8A
CO-1RBPT-APT-APT-APT-AET20'-0";-
11A
CO-1RB
PT-A
PT-APT-APT-AET20'-0";-
ALASKA
MEDIA ROOM
COACHES
LOCKER
COACHES
MEETING
PLAYERS
LOUNGE
MEDIA
PRODUCTION
REST
ROOM
DRY
TEAM
DRESSING
STICK
ROOM
REST
ROOM
NANOOKS
LOCKER
MEDICAL LAUNDRY
EQUIPMENT
LOCKER
ROOM 1/MPR
LOCKER
ROOM 2/MPR
PHYS
THERAPY
REST
ROOM
REST
ROOM
REST
ROOM
ELEC
NORTHERN LIGHTS VISITOR
LOCKER ROOM/MPR
CORRIDORCORRIDOR
VESTIBULE
SOUTH
LOBBY
LOCKER
ROOM 3/MPR
LOCKER
ROOM 4/MPR
GEAR
ROOM
NORTH
TICKET BOOTH
EXISTING
BOILER ROOM
VESTIBULE
NORTH
LOBBY
REST
ROOM
REST
ROOM
ARENA
CORRIDOR
PLAYERS
LOUNGE
HALL
EQUIP
CLOSET
ARENA
108 107
128 131
127125
140 145
138 142
120.1
FE
FE
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:
clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:
clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:
clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:
clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:
clg hght
N WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
12 11 10 9 8 7 6 5 4 3 2 1
H
G
F
E
D
C
B
H
G
F
E
D
C
B
12 11 10 9
8 7 6
5 4 3 2 11314
GENERAL LEGEND
1 HOUR OCCUPANCY SEPARATION
2 HOUR AREA SEPARATION
GENERAL FLOOR PLAN NOTES
A.
B.
C.
FIRE RATED WALLS SHOWN ON THE PLANS ARE PER THE
ORIGINAL 1988 AS-BUILT DRAWINGS.
SOME WALLS THAT WERE ORIGINALLY SHOWN AS 1 HOUR
SEPARATED IN THE 1988 AS-BUILTS MAY HAVE BEEN
REDUCED AND ARE NO LONGER RATED ENCLOSURES.
PROVIDE 2 HOUR PROTECTED PENETRATIONS AT 2 HOUR
RATED WALLS SHOWN ON THE PLANS.
ISSUE DATE
COMM. NUMBER
DESIGNED BY
DRAWN BY
SCALE 0" 1"
Architects Engineers Surveyors 601 College Road Fairbanks AK 99701
907.452.1241 designalaska.com
01 DEC 2021
CARLSON
ACTIVITY CENTER
MECHANICAL
CONTROLS
UPGRADE
101805
AECC511
IFB NO.: 22039
PROJECT NO.: 16-CACPRJ-2
12/2/2021 2:54:22 PM
ENS
ENS
GENERAL PLAN -
ARENA LEVEL
G101 1/16" = 1'-0"G101
1 GENERAL PLAN - ARENA LEVEL
AKAF AL
TS
TA E O
49 TH
S
JAMES D. BARTLETT
No. A10413
REGISTEREDPROFESSIONALARCHIT
EC
T01-DEC-2021
STORAGE STR MEN STR WOMEN
JAN.
CONCESSION
STR
ENTRY
FOYER
BOX OFFICE
CONFERENCE
BREAK RM.
RR RR
OFFICE
OFFICE
MANAGER'S OFFICE
STORAGE
MECH. RM.
STAIRS
CONCESSIONJAN
STR
WOMEN
STR
MEN
STR
CONCESSION
CONCESSION
TICKET
TICKET
OFFICE
6E
CO-1RBPT-APT-APT-APT-AET20'-0";- 10
CO-1RB
PT-APT-APT-APT-AET20'-0";-
5D
CO-1RBPT-APT-APT-APT-AET20'-0";- 8
CO-1RB
PT-APT-APT-APT-AET20'-0";-
5B
CO-1RBPT-APT-APT-APT-AET20'-0";-
8C
CO-1RBPT-APT-APT-APT-AET20'-0";- 6B
CO-1RB
PT-APT-APT-APT-AET20'-0";-
CO-1RB
PT-APT-APT-APT-AET20'-0";-
6I
CO-1RBPT-APT-APT-APT-AET20'-0";-
3G
CO-1RBPT-APT-APT-APT-AET20'-0";-
CO-1RB
PT-A
PT-APT-APT-AET20'-0";-
CO-1RBPT-APT-APT-APT-AET20'-0";-
CO-1RBPT-APT-APT-APT-AET20'-0";-
35B
CO-1RBPT-APT-APT-APT-AET20'-0";-
35A
CO-1RB
PT-A
PT-APT-APT-AET20'-0";-
CO-1RBPT-APT-APT-APT-AET20'-0";-
CO-1RBPT-APT-APT-APT-AET20'-0";-
6B
CO-1RBPT-APT-APT-APT-AET20'-0";-
15D
CO-1RBPT-APT-APT-APT-AET20'-0";-
25A
CO-1RBPT-APT-APT-APT-AET20'-0";-
CO-1RBPT-APT-APT-APT-AET20'-0";-
6A
CO-1RBPT-APT-APT-APT-AET20'-0";-8D
CO-1RBPT-APT-APT-APT-AET20'-0";-
42A
CO-1RBPT-APT-APT-APT-AET20'-0";-
CO-1RBPT-APT-APT-APT-AET20'-0";-
5A
CO-1RBPT-APT-APT-APT-AET20'-0";-
CO-1RBPT-APT-APT-APT-AET20'-0";-
5C
CO-1RBPT-APT-APT-APT-AET20'-0";-
CO-1RBPT-APT-APT-APT-AET20'-0";-
6D
CO-1RB
PT-APT-APT-APT-AET20'-0";-
6C
CO-1RBPT-APT-APT-APT-AET20'-0";-
7B
CO-1RBPT-APT-APT-APT-AET20'-0";-
7C
CO-1RBPT-APT-APT-APT-AET20'-0";-
3F
CO-1RBPT-APT-APT-APT-AET20'-0";-
3H
CO-1RB
PT-APT-APT-APT-AET20'-0";-
CO-1RBPT-APT-APT-APT-AET20'-0";-
CO-1RBPT-APT-APT-APT-AET20'-0";-
CO-1RBPT-APT-APT-APT-AET20'-0";-
CO-1RBPT-APT-APT-APT-AET20'-0";-
41C
CO-1RB
PT-APT-APT-APT-AET20'-0";-
41A
CO-1RBPT-APT-APT-APT-AET20'-0";-
41A
CO-1RBPT-APT-APT-APT-AET20'-0";-
41C
CO-1RB
PT-APT-APT-APT-AET20'-0";-
A1
12 11 10 9 8 7 6 5 4 3 2 1
H
G
F
E
D
C
B
H
G
F
E
D
C
B
12 11 10 9
8 7 6
5 4 3 2 11314
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:
clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:
clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:
clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:
clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:
clg hght
N WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS: FLOORING:B-BOARD:
clg hght
N WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:
clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:
clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:
clg hght
N WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS: FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:
clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS: FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:
clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
GENERAL LEGEND
1 HOUR OCCUPANCY SEPARATION
2 HOUR AREA SEPARATION
GENERAL FLOOR PLAN NOTES
A. SEE G100 FOR GENERAL FLOOR PLAN NOTES.
ISSUE DATE
COMM. NUMBER
DESIGNED BY
DRAWN BY
SCALE 0" 1"
Architects Engineers Surveyors 601 College Road Fairbanks AK 99701
907.452.1241 designalaska.com
01 DEC 2021
CARLSON
ACTIVITY CENTER
MECHANICAL
CONTROLS
UPGRADE
101805
AECC511
IFB NO.: 22039
PROJECT NO.: 16-CACPRJ-2
12/2/2021 2:54:24 PM
ENS
ENS
GENERAL PLAN -
CONCOURSE
LEVEL
G102 1/16" = 1'-0"G102
1 GENERAL PLAN - CONCOURSE LEVEL
AKAF AL
TS
TA E O
49 TH
S
JAMES D. BARTLETT
No. A10413
REGISTEREDPROFESSIONALARCHIT
CONCRETE
GYPSUM
RIGID INSULATION
MASONRY CONCRETE
MATERIAL LEGEND
BATT INSULATION
MASONRY BRICK
EXISTING
CONSTRUCTION
TEMPORARY
CONSTRUCTION
BATT/BLOWN INSULATION
ARCHITECTURAL SYMBOL LEGEND
150 SF
Room Name
DETAIL NAME
DETAIL NUMBER
SHEET LOCATION
DETAIL SCALE
TRUE NORTH
GRID LINE
ROOM NAME
ROOM NUMBER
PLAN NORTH
DETAIL NUMBER
SHEET LOCATION
SIMILAR
REVISION
SPOT ELEVATION
SEE OTHER DISCIPLINES FOR ADDITIONAL SYMBOLS
KEYED NOTE
A100
A100
EXTERIOR ELEVATION
SHEET LOCATION
DETAIL NUMBER
INTERIOR ELEVATION
SHEET LOCATION
DETAIL NUMBER
DETAIL NUMBER 4
BUILDING SECTION
DETAIL NUMBER
SHEET LOCATION
SIMILAR
WALL SECTION
ROOM AREA
1/8" = 1'-0"A101 View Name
1/4" / 1'-0"
.SPOT SLOPE
101ROOM NUMBER
A
A101
SIM
A101
SIM
SEE OTHER DISCIPLINES FOR ADDITIONAL ABBREVIATIONS.
SOME ABBREVIATIONS MAY NOT BE USED IN THIS PROJECT.
(E) EXISTING
ACT ACOUSTICAL CEILING TILE
ADA AMERICAN DISABILITIES ACT
AFF ABOVE FINISHED FLOOR
CFCI CONTRACTOR FURNISHED CONTRACTOR INSTALLED
CFOI CONTRACTOR FURNISHED OWNER INSTALLED
CMU CONCRETE MASONRY UNIT
CONC CONCRETE
ELEC ELECTRICAL
FRP FIBERGLASS REINFORCED PANEL
GYP GYPSUM BOARD
HM HOLLOW METAL
IBC INTERNATIONAL BUILDING CODE
INHM INSULATED HOLLOW METAL
INSUL INSULATION
ITSP INSULATED TRANSLUCENT SANDWICH PANEL
MAX MAXIMUM
MECH MECHANICAL
MFSD MANUFACTURER'S STANDARD
MIN MINIMUM
NIC NOT IN CONTRACT
OC ON CENTER
OD OVERFLOW DRAIN
OFOI OWNER FURNISHED OWNER INSTALLED
OFCI OWNER FURNISHED CONTRACTOR INSTALLED
OSB ORIENTED STRAND BOARD
PLAM PLASTIC LAMINATES
PLY PLYWOOD
RD ROOF DRAIN
SIP STRUCTURAL INSULATED PANEL
SPEC SPECIFICATION
STC SOUND TRANSMISSION CLASS
STRUC STRUCTURAL
SV STAIN/ VARNISH
TYP TYPICAL
UL UNDERWRITERS LABORATORY
VCT VINYL COMPOSITION TILE
VTR VENT THROUGH ROOF
ARCHITECTURAL STANDARD ABBREVIATIONS
ARCHITECTURAL PROJECT SPECIFIC ABBREVIATIONS
NA NOT APPLICABLE
A.
B.
C.
D.
E.
F.
G.
H.
COORDINATE ARCHITECTURAL WORK WITH MECHANICAL,
ELECTRICAL, AND OTHER DISCIPLINES WORK.
ANY FURNITURE SHOWN IS FOR COORDINATION
PURPOSES ONLY. FURNITURE IS OWNER FURNISHED AND
OWNER INSTALLED UNLESS NOTED OTHERWISE.
PATCH, REPAIR, AND REFINISH EXISTING SURFACES TO
REMAIN, AFFECTED BY WORK.
FIELD VERIFY DIMENSIONS SHOWN TO EXISTING
CONSTRUCTION. NOTIFY ENGINEER WHERE
DISCREPANCIES AFFECT DESIGN.
DIMENSIONS AT EXISTING CONSTRUCTION ARE
MEASURED FROM FACE OF EXISTING FINISH UNLESS
NOTED OTHERWISE.
DIMENSIONS AT NEW CONSTRUCTION ARE MEASURED
FROM FACE OF FRAMING UNLESS NOTED OTHERWISE.
DIMENSIONS INDICATED AS 'CLEAR' REQUIRE MINIMUM
CLEARANCE MEASURED TO FINISHED FACES, UNLESS
NOTED OTHERWISE.
SEE DETAIL FOR DIMENSION REFERENCE POINT
CONVENTIONS.
ARCHITECTURAL NOTES
A001
THIS REFERENCE IS INTENDED TO ASSIST WITH THE LOCATION OF
INFORMATION IN A TYPICAL PROJECT. THIS PROJECT MAY VARY
FROM THE REPRESENTATION BELOW. SEE THE SHEET INDEX FOR
SPECIFIC SHEET SEQUENCE.
A0 SHEETS ARCHITECTURAL INFORMATION
A1 SHEETS ARCHITECTURAL DEMOLITION
A2 SHEETS ARCHITECTURAL RENOVATION
A3 SHEETS EXTERIOR ELEVATIONS (NOT USED)
A4 SHEETS SECTIONS AND VERTICAL CIRCULATION (NOT USED)
A5 SHEETS EXTERIOR DETAILS AND ASSEMBLIES
A6 SHEETS ENLARGED INTERIOR PLANS (NOT USED)
A7 SHEETS INTERIOR ELEVATIONS (NOT USED)
A8 SHEETS INTERIOR DETAILS AND ASSEMBLIES (NOT USED)
A9 SHEETS SCHEDULES
THE TWO CHARACTER ALPHANUMERIC DESIGNATIONS
REPRESENT ALL SHEETS IN THE SERIES. FOR EXAMPLE, 'A1
SHEETS' DESCRIBES A100 THROUGH A199.
ARCHITECTURAL SHEET SEQUENCE
1'-0"
1'-0"
GRID
1'-0"
CLEAR
8 3/8" 1'-0"
GRID TO GRID
GRID TO WALL
NEW WALL STUD TO
NEW WALL STUD
NEW WALL STUD TO
EXISTING WALL FINISH
EXISTING WALL FINISH TO
EXISTING WALL FINISH.
FIELD VERIFY.
REQUIRED CLEARANCE TO
FINISHED FACES, MINIMUM
UNLESS NOTED OTHERWISE
FIELD VERIFY EXISTING
CONDITIONS
WX-3A
WALL ASSEMBLY CATEGORY - FUNCTION
WALL FRAMING MEMBER SIZE
WALL ASSEMBLY MODIFIER
WALL ASSEMBLY CATEGORY - FUNCTION
PROJECTS MAY NOT INCLUDE ALL ASSEMBLY CATEGORIES.
WF WALL - FOUNDATION
WR WALL - RETAINING
WX WALL - EXTERIOR
WALL FRAMING MEMBER SIZE
ASSEMBLIES MAY NOT INCLUDE A FRAMING MEMBER SIZE.
FURRING AND METAL STUDS
0 7/8" FURRING CHANNELS
1 1 5/8" METAL STUDS
2 2 1/2" METAL STUDS
3 3 5/8" METAL STUDS
4 4" METAL STUDS
6 6" METAL STUDS
8 8" METAL STUDS
SHAFT WALLS
2 2 1/2" METAL CH STUDS
4 4" METAL CH STUDS
6 4" METAL CH STUDS
WOOD STUDS
4 2x4 WOOD STUDS 6 2x6 WOOD STUDS 8 2x8 WOOD STUDS
CMU
2 1 5/8" CMU
4 3 5/8" CMU
6 5 5/8" CMU
8 7 5/8" CMU
10 9 5/8" CMU
12 11 5/8" CMU
CONCRETE
# CONCRETE THICKNESS
WALL ASSEMBLY MODIFIER
LETTERS A THRU Z REPRESENT DESCRIPTIONS OF ASSEMBLY
TYPES. THE BELOW ARE COMMONLY USED EXAMPLES SEE
ASSEMBLY TYPES FOR ADDITIONAL INFORMATION. SEE
ASSEMBLY TYPES FOR ADDITIONAL MODIFIERS.
A TYPICAL
F FIRE RATED
ASSEMBLY TAG LEGEND - WALL EXTERIOR
W01-3A
WALL ASSEMBLY CATEGORY - FUNCTION
WALL SHEATHING DESIGNATION
WALL FRAMING MEMBER SIZE
WALL ASSEMBLY MODIFIER
WALL ASSEMBLY CATEGORY - FUNCTION
PROJECTS MAY NOT INCLUDE ALL ASSEMBLY CATEGORIES.
W WALL - INTERIOR
WALL SHEATHING DESIGNATION
ASSEMBLIES MAY NOT INCLUDE A SHEATHING DESIGNATION.
THE SHEATHING DESIGNATION REFERS TO THE NUMBER OF
SHEATHING LAYERS ON EACH SIDE OF THE FRAMING MEMBER.
00 FIRST SIDE (0 LAYERS) + SECOND SIDE (0 LAYERS)
01 FIRST SIDE (0 LAYERS) + SECOND SIDE (1 LAYERS)
02 FIRST SIDE (0 LAYERS) + SECOND SIDE (2 LAYERS)
03 FIRST SIDE (0 LAYERS) + SECOND SIDE (3 LAYERS)
04 FIRST SIDE (0 LAYERS) + SECOND SIDE (4 LAYERS)
11 FIRST SIDE (1 LAYERS) + SECOND SIDE (1 LAYERS)
12 FIRST SIDE (1 LAYERS) + SECOND SIDE (2 LAYERS)
13 FIRST SIDE (1 LAYERS) + SECOND SIDE (3 LAYERS)
14 FIRST SIDE (1 LAYERS) + SECOND SIDE (4 LAYERS)
22 FIRST SIDE (2 LAYERS) + SECOND SIDE (2 LAYERS)
23 FIRST SIDE (2 LAYERS) + SECOND SIDE (3 LAYERS)
24 FIRST SIDE (2 LAYERS) + SECOND SIDE (4 LAYERS)
33 FIRST SIDE (3 LAYERS) + SECOND SIDE (3 LAYERS)
34 FIRST SIDE (3 LAYERS) + SECOND SIDE (4 LAYERS)
44 FIRST SIDE (4 LAYERS) + SECOND SIDE (4 LAYERS)
WALL FRAMING MEMBER SIZE
FURRING AND METAL STUDS
0 7/8" FURRING CHANNELS
1 1 5/8" METAL STUDS
2 2 1/2" METAL STUDS
3 3 5/8" METAL STUDS
4 4" METAL STUDS
6 6" METAL STUDS
8 8" METAL STUDS
SHAFT WALLS
2 2 1/2" METAL CH STUDS
4 4" METAL CH STUDS
6 4" METAL CH STUDS
WOOD STUDS
4 2x4 WOOD STUDS 6 2x6 WOOD STUDS 8 2x8 WOOD STUDS
CMU
2 1 5/8" CMU
4 3 5/8" CMU
6 5 5/8" CMU
8 7 5/8" CMU
10 9 5/8" CMU
12 11 5/8" CMU
CONCRETE
# CONCRETE THICKNESS
WALL ASSEMBLY MODIFIER
LETTERS A THRU Z REPRESENT DESCRIPTIONS OF ASSEMBLY
TYPES. THE BELOW ARE COMMONLY USED EXAMPLES. SEE
ASSEMBLY TYPES FOR ADDITIONAL MODIFIERS.
A TYPICAL
F FIRE RATED
G FIRE AND SOUND RATED
H FIRE AND SOUND RATED WITH TILE
K TILE
L TILE AND SOUND RATED
P PLYWOOD
S SOUND RATED
W WOOD STUD
X WOOD STUD, FIRE RATED
Y WOOD STUD, FIRE AND SOUND RATED
Z WOOD STUD, SOUND RATED
LETTERS AA THRU ZZ REPRESENT DESCRIPTIONS OF
ASSEMBLY TYPES FOR CHASE WALLS. THE BELOW ARE
COMMONLY USED EXAMPLES. SEE ASSEMBLY TYPES FOR
ADDITIONAL MODIFIERS.
FF FIRE RATED
GG FIRE AND SOUND RATED
HH FIRE AND SOUND RATED WITH TILE
LL TILE AND SOUND RATED
SS SOUND RATED
XX WOOD STUD, FIRE RATED
YY WOOD STUD, FIRE AND SOUND RATED
ZZ WOOD STUD, SOUND RATED
ASSEMBLY TAG LEGEND - WALL INTERIOR
WB-1 LINE WITH ONE DASH
WB-2 LINE WITH TWO DASHES
WB-3 LINE WITH THREE DASHES
WB-4 LINE WITH FOUR DASHES
DESCRIBES THE DIRECTION OF AIRFLOW
IN A VENTED OR VENTILATED ASSEMBLY
ASSEMBLY LEGEND - BARRIERS AND AIRFLOW
WB-5 LINE WITH FIVE DASHES
SEE EXTERIOR ASSEMBLY NOTES FOR THE MATERIAL
DESCRIBED BY WEATHER BARRIER INDICATED BELOW:
DESCRIBES THE DIRECTION AN
ASSEMBLY WILL DRY. PERMEABLE
MATERIALS REQUIRED TO DRY AS
SHOWN
DIRECTION
OF DRYING
ISSUE DATE
COMM. NUMBER
DESIGNED BY
DRAWN BY
SCALE 0" 1"
Architects Engineers Surveyors 601 College Road Fairbanks AK 99701
907.452.1241 designalaska.com
01 DEC 2021
CARLSON
ACTIVITY CENTER
MECHANICAL
CONTROLS
UPGRADE
101805
AECC511
IFB NO.: 22039
PROJECT NO.: 16-CACPRJ-2
12/2/2021 2:54:14 PM
ENS
ENS
ARCHITECTURAL
INFORMATION
A001 1 1/2" = 1'-0"A001
1 INTERIOR FRAMING DETAIL - DIMENSION REFERENCE POINT CONVENTIONS
AKAF AL
TS
TA E O
49 TH
S
JAMES D. BARTLETT
No. A10413
REGISTEREDPROFESSIONALARCHIT
REFRIG
ENTRY
CONC. OFFICE
BREAK RM.
CORR.
KIT. STOR.
KITCHEN
MEETING RM.MEETING RM.WOMEN
TICKETS
ENTRY
VEST.
MEN
SECURITY
STORAGE
STORAGE
FOYER
ELECTRICAL RM.
STORAGE
DRESSING
XFMR
RR
RR
GREEN RM.
GREEN RM.
14B
CO-1RBPT-APT-APT-APT-AET20'-0";-
14B
CO-1RBPT-APT-APT-APT-AET20'-0";-
CO-1RBPT-APT-APT-APT-AET20'-0";-
CO-1RBPT-APT-APT-APT-AET20'-0";-
3E
CO-1RBPT-APT-APT-APT-AET20'-0";-
CO-1RBPT-APT-APT-APT-AET20'-0";-
CO-1RBPT-APT-APT-APT-AET20'-0";-
40D
CO-1RB
PT-APT-APT-APT-AET20'-0";-
14A
CO-1RBPT-APT-APT-APT-AET20'-0";-
CO-1RB
PT-APT-APT-APT-AET20'-0";-
4A
CO-1RBPT-APT-APT-APT-AET20'-0";-
4B
CO-1RBPT-APT-APT-APT-AET20'-0";-
5F
CO-1RBPT-APT-APT-APT-AET20'-0";-
7A
CO-1RBPT-APT-APT-APT-AET20'-0";-
3A
CO-1RB
PT-APT-APT-APT-AET20'-0";-
3B
CO-1RBPT-APT-APT-APT-AET20'-0";-
5E
CO-1RBPT-APT-APT-APT-AET20'-0";-
CO-1RBPT-APT-APT-APT-AET20'-0";-
14C
CO-1RBPT-APT-APT-APT-AET20'-0";-
15C
CO-1RBPT-APT-APT-APT-AET20'-0";-
CO-1RBPT-APT-APT-APT-AET20'-0";-
23/24
CO-1RBPT-APT-APT-APT-AET20'-0";-
15B
CO-1RBPT-APT-APT-APT-AET20'-0";-
CO-1RBPT-APT-APT-APT-AET20'-0";-
11E
CO-1RB
PT-APT-APT-APT-AET20'-0";-
11C
CO-1RBPT-APT-APT-APT-AET20'-0";-
11A
CO-1RBPT-APT-APT-APT-AET20'-0";-
11B
CO-1RBPT-APT-APT-APT-AET20'-0";-
8A
CO-1RBPT-APT-APT-APT-AET20'-0";-
11A
CO-1RB
PT-A
PT-APT-APT-AET20'-0";-
ALASKA
MEDIA ROOM
COACHES
LOCKER
COACHES
MEETING
PLAYERS
LOUNGE
MEDIA
PRODUCTION
REST
ROOM
DRY
TEAM
DRESSING
STICK
ROOM
REST
ROOM
NANOOKS
LOCKER
MEDICAL LAUNDRY
EQUIPMENT
LOCKER
ROOM 1/MPR
LOCKER
ROOM 2/MPR
PHYS
THERAPY
REST
ROOM
REST
ROOM
REST
ROOM
ELEC
NORTHERN LIGHTS VISITOR
LOCKER ROOM/MPR
CORRIDORCORRIDOR
VESTIBULE
SOUTH
LOBBY
LOCKER
ROOM 3/MPR
LOCKER
ROOM 4/MPR
GEAR
ROOM
NORTH
TICKET BOOTH
EXISTING
BOILER ROOM
VESTIBULE
NORTH
LOBBY
REST
ROOM
REST
ROOM
ARENA
CORRIDOR
PLAYERS
LOUNGE
HALL
EQUIP
CLOSET
ARENA
108 107
128 131
127125
140 145
138 142
120.1
FE
FE
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:
clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:
clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:
clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:
clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:
clg hght
N WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
12 11 10 9 8 7 6 5 4 3 2 1
H
G
F
E
D
C
B
H
G
F
E
D
C
B
12 11 10 9
8 7 6
5 4 3 2 11314
A.
B.
C.
D.
PROVIDE DEMOLITION REQUIRED TO ACCOMMODATE NEW
WORK.
SEE ELECTRICAL AND MECHANICAL DOCUMENTS FOR
ADDITIONAL DEMOLITION REQUIREMENTS.
EXISTING STRUCTURAL SYSTEMS INCLUDING COLUMNS,
BEAMS, AND STRUCTURAL WALLS TO REMAIN UNLESS
OTHERWISE INDICATED.
REMOVE EXISTING LOOSE LAID CARPETS AND MATS WITHIN
THE WORK AREA FOR DURATION OF WORK AND REINSTALL.
DEMOLITION NOTES
DEMOLITION KEYNOTES
DEMOLITION REQUIRED AT EXISTING INTERIOR CMU WALL
FOR TRANSFER AIR OPENING, SEE DETAIL
CEILING MODIFICATION REQUIRED TO ACCOMMODATE
MECHANICAL CHASE, FOR ADDITIONAL INFORMATION SEE
SHEETS AND
REMOVE AND SALVAGE FOR REINSTALLATION: EXISTING
WALL MOUNTED TV, TV BRACKET, AND SEMI RECESSED FIRE
EXTINGUISHER CABINET. SEE E100 FOR ADDITIONAL
ELECTRICAL REQUIREMENTS.
A800
A621
A622
DEMOLITION LEGEND
NO ARCHITECTURAL WORK THIS AREA,
SEE A620 FOR CEILING DEMOLITION
ISSUE DATE
COMM. NUMBER
DESIGNED BY
DRAWN BY
SCALE 0" 1"
Architects Engineers Surveyors 601 College Road Fairbanks AK 99701
907.452.1241 designalaska.com
01 DEC 2021
CARLSON
ACTIVITY CENTER
MECHANICAL
CONTROLS
UPGRADE
101805
AECC511
IFB NO.: 22039
PROJECT NO.: 16-CACPRJ-2
12/2/2021 2:54:15 PM
ENS
ENS
DEMOLITION PLAN
- ARENA LEVEL
A101 1/16" = 1'-0"A101
1 DEMOLITION PLAN - ARENA LEVEL
AKAF AL
TS
TA E O
49 TH
S
JAMES D. BARTLETT
No. A10413
REGISTEREDPROFESSIONALARCHIT
REFRIG
ENTRY
CONC. OFFICE
BREAK RM.
CORR.
KIT. STOR.
KITCHEN
MEETING RM.MEETING RM.WOMEN
TICKETS
ENTRY
VEST.
MEN
SECURITY
STORAGE
STORAGE
FOYER
ELECTRICAL RM.
STORAGE
DRESSING
XFMR
RR
RR
GREEN RM.
GREEN RM.
14B
CO-1RBPT-APT-APT-APT-AET20'-0";-
14B
CO-1RBPT-APT-APT-APT-AET20'-0";-
CO-1RBPT-APT-APT-APT-AET20'-0";-
CO-1RBPT-APT-APT-APT-AET20'-0";-
3E
CO-1RBPT-APT-APT-APT-AET20'-0";-
CO-1RBPT-APT-APT-APT-AET20'-0";-
CO-1RBPT-APT-APT-APT-AET20'-0";-
40D
CO-1RB
PT-APT-APT-APT-AET20'-0";-
14A
CO-1RBPT-APT-APT-APT-AET20'-0";-
CO-1RB
PT-APT-APT-APT-AET20'-0";-
4A
CO-1RBPT-APT-APT-APT-AET20'-0";-
4B
CO-1RBPT-APT-APT-APT-AET20'-0";-
5F
CO-1RBPT-APT-APT-APT-AET20'-0";-
7A
CO-1RBPT-APT-APT-APT-AET20'-0";-
3A
CO-1RB
PT-APT-APT-APT-AET20'-0";-
3B
CO-1RBPT-APT-APT-APT-AET20'-0";-
5E
CO-1RBPT-APT-APT-APT-AET20'-0";-
CO-1RBPT-APT-APT-APT-AET20'-0";-
14C
CO-1RBPT-APT-APT-APT-AET20'-0";-
15C
CO-1RBPT-APT-APT-APT-AET20'-0";-
CO-1RBPT-APT-APT-APT-AET20'-0";-
23/24
CO-1RBPT-APT-APT-APT-AET20'-0";-
15B
CO-1RBPT-APT-APT-APT-AET20'-0";-
CO-1RBPT-APT-APT-APT-AET20'-0";-
11E
CO-1RB
PT-APT-APT-APT-AET20'-0";-
11C
CO-1RBPT-APT-APT-APT-AET20'-0";-
11A
CO-1RBPT-APT-APT-APT-AET20'-0";-
11B
CO-1RBPT-APT-APT-APT-AET20'-0";-
8A
CO-1RBPT-APT-APT-APT-AET20'-0";-
11A
CO-1RB
PT-A
PT-APT-APT-AET20'-0";-
ALASKA
MEDIA ROOM
COACHES
LOCKER
COACHES
MEETING
PLAYERS
LOUNGE
MEDIA
PRODUCTION
REST
ROOM
DRY
TEAM
DRESSING
STICK
ROOM
REST
ROOM
NANOOKS
LOCKER
MEDICAL LAUNDRY
EQUIPMENT
LOCKER
ROOM 1/MPR
LOCKER
ROOM 2/MPR
PHYS
THERAPY
REST
ROOM
REST
ROOM
REST
ROOM
ELEC
NORTHERN LIGHTS VISITOR
LOCKER ROOM/MPR
CORRIDORCORRIDOR
VESTIBULE
SOUTH
LOBBY
LOCKER
ROOM 3/MPR
LOCKER
ROOM 4/MPR
GEAR
ROOM
NORTH
TICKET BOOTH
EXISTING
BOILER ROOM
VESTIBULE
NORTH
LOBBY
REST
ROOM
REST
ROOM
ARENA
CORRIDOR
PLAYERS
LOUNGE
HALL
EQUIP
CLOSET
ARENA
108 107
128 131
127125
140 145
138 142
120.1
FE
FE
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:
clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:
clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:
clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:
clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:
clg hght
N WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
12 11 10 9 8 7 6 5 4 3 2 1
H
G
F
E
D
C
B
H
G
F
E
D
C
B
12 11 10 9
8 7 6
5 4 3 2 11314
FLOOR PLAN LEGEND
NO ARCHITECTURAL WORK THIS AREA
FLOOR PLAN NOTES
A.
B.
SEE A001 FOR ARCHITECTURAL NOTES.
SEE A101 FOR DEMOLITION NOTES.
FLOOR PLAN KEYNOTES
MECHANICAL DUCT CHASE, SEE DETAILS AND
PATCH AND REPAIR WALL SURFACE AT DEMOLISHED
ITEMS AND SEAL AIR TIGHT
INTERIOR MECHANICAL PENETRATION. SEE DETAIL
A800
A800
A800
SIMILAR
3 3
W01-3A
W01-3A
W01-3A
10'-6" +/-
A800
SIMILAR
SIMILAR
A800
A800
A800
5 2
ISSUE DATE
COMM. NUMBER
DESIGNED BY
DRAWN BY
SCALE 0" 1"
Architects Engineers Surveyors 601 College Road Fairbanks AK 99701
907.452.1241 designalaska.com
01 DEC 2021
CARLSON
ACTIVITY CENTER
MECHANICAL
CONTROLS
UPGRADE
101805
AECC511
IFB NO.: 22039
PROJECT NO.: 16-CACPRJ-2
12/2/2021 2:54:16 PM
ENS
ENS
RENOVATION
PLAN - ARENA
LEVEL
A201
ALIGN FINISH FACE OF CHASE CONSTRUCTION
WITH EXISTING FINISH FACE OF ADJACENT
WALL ASSEMBLY, TYPICAL
1/16" = 1'-0"A201
1 RENOVATION PLAN - ARENA LEVEL
AKAF AL
TS
TA E O
49 TH
S
JAMES D. BARTLETT
No. A10413
REGISTEREDPROFESSIONALARCHIT
A.
B.
C.
A.
B.
C.
D.
A.
B.
C.
D.
A.
A.
B.
1 - TYPICAL
ASSEMBLIES ARE DIAGRAMS ONLY, DO NOT SCALE.
ASSEMBLIES ARE INTENDED TO DESCRIBE MATERIALS
AND THEIR RELATIONSHIP WITHIN A GIVEN CEILING,
FLOOR, ROOF, OR WALL. PENETRATIONS, JOINTS,
FINISHES, AND INTERSECTIONS BETWEEN ASSEMBLIES
ARE NOT SHOWN.
SEE A0 SHEETS FOR ARCHITECTURAL NOTES, SHEET
SEQUENCE, AND ASSEMBLY TAG LEGENDS.
2 - FRAMING
PROVIDE 20 GAGE METAL STUDS AT 24" ON CENTER FOR
INTERIOR NON-BEARING WALLS UNLESS NOTED
OTHERWISE, OR PER STUD MANUFACTURER.
EXTEND CONTINUOUS STUDS FROM FLOOR TO
STRUCTURE ABOVE UNLESS NOTED OTHERWISE.
PROVIDE MANUFACTURERS STANDARD DEFLECTION
TRACK AT NON-BEARING STUD WALLS EXTENDING TO
STRUCTURE.
PROVIDE BACKING AT ASSEMBLY MOUNTED
ACCESSORIES, EQUIPMENT, AND FIXTURES.
3 - SHEATHING
PROVIDE CONTINUOUS GYPSUM BOARD FROM FLOOR TO
STRUCTURE ABOVE UNLESS NOTED OTHERWISE.
PROVIDE GAP AT DEFLECTION TRACK PER
MANUFACTURER RECOMMENDATION. COORDINATE FIRE
RATED AND SOUND RATED CONDITIONS.
SEAL THROUGH WALL PENETRATIONS AT BOTH ABOVE
CEILING AND BELOW CEILING CONDITIONS.
PROVIDE CONTROL JOINTS IN GYPSUM BOARD AT 30'-0"
MAXIMUM SPACING OR PER UNITED STATES GYPSUM
ASSOCIATION.
4 - EXTERIOR FINISHES
ALL EXTERIOR MATERIALS AND FINISHES TO MATCH
EXISTING TO THE GREATEST EXTENT POSSIBLE.
5 - WEATHER BARRIERS
BARRIER / RETARDER CONTINUITY IS CRITICAL FOR THE
PERFORMANCE AND DURABILITY OF THE ASSEMBLY.
FLASHING, SEALING, AND INSULATING TRANSITION
SPACES ARE CRITICAL COMPONENTS OF WATER, AIR,
AND THERMAL BARRIER CONTINUITY.
WB-3 VAPOR RETARDER
WALLS: POLYETHYLENE FILM
OPENINGS: SELF ADHERED FLEXIBLE FLASHING
SEAM AND PERIMETER: TAPE, SEALANT, BACKER ROD
FLASHING: PRE-FINISHED METAL
EXTERIOR ASSEMBLY NOTES
WX-8A
EXISTING EXTERIOR WALL -
CMU WITH 6" FURRED WALL
8" CMU BLOCK
1/2" THERMAL BREAK
BATT INSULATION
6" METAL STUD
5/8" GYPSUM BOARD
INTERIOR EXTERIOR
VAPOR BARRIER
WX-8A
M
IN2"
LOUVER AND DUCT
PER MECHANICAL
SECURE LOUVER PER
MANUFACTURER'S
INSTRUCTIONS
CONTINUOUS SEALANT
AND BACKER ROD
PRE-FINISHED METAL
FLASHING WITH BACK AND
SIDE DAMS AND DRIP EDGE
FILL SHIM SPACE WITH SPRAY FOAM
PROVIDE METAL TRACK SILL
REMOVE AND REPLACE GYPSUM BOARD
FINISH AS REQUIRED TO ACCOMMODATE
WORK. TEXTURE AND FINISH COLOR TO
MATCH ADJACENT WALL
O
PE
N
IN
G S
IZ
E
PE
R
M
H
AN
IC
AL
M
IN2"
PROVIDE VAPOR BARRIER SEALED TO
EXISTING BARRIER AND EXTEND INTO
OPENING
PROVIDE 1/2" TREATED PLYWOOD
SAW CUT CMU AS REQUIRED TO
ACCOMMODATE WORK
SAW CUT CMU WALL OPENING TO
ACCOMMODATE INSTALLATION OF
MECHANICAL EQUIPMENT
WX-8A
REMOVE AND REPLACE GYPSUM BOARD
AS REQUIRED TO ACCOMMODATE WORK
PROVIDE VAPOR BARRIER SEALED TO EXISTING
BARRIER AND EXTENDED INTO OPENING
PROVIDE BOX HEADER WITH FULL THICK
FIBERGLASS INSULATION
M
IN2"
1/2" TREATED PLYWOOD, PERIMETER OF OPENING
CONTINUOUS SEALANT AND BACKER ROD
PRE-FINISHED METAL FLASHING WITH BACK
DAM AND DRIP EDGE
FILL SHIM SPACE WITH SPRAY FOAM
INSULATION
LOUVER AND DUCT PER MECHANICAL
O
PE
N
IN
G S
IZ
E
PE
R
M
H
AN
IC
AL
EXTERIOR DETAIL NOTES
A.
B.
C.
D.
SEE MECHANICAL FOR EXTERIOR PENETRATIONS
INCLUDING BUT NOT LIMITED TO LOUVERS, FLUES, AND
UTILITIES. PROVIDE TREATED BLOCKING, ATTACH TO
PRIMARY FRAMING MEMBER, AND WEATHER SEAL.
PROVIDE PRE-FINISHED METAL FLASHING UNLESS NOTED
OTHERWISE. PERFORATE AT VENTED ASSEMBLIES.
PROVIDE TREATED 2x WOOD BLOCKING AT ROUGH
OPENINGS UNLESS NOTED OTHERWISE.
PROVIDE MOISTURE RESISTANT GYPSUM BOARD AT
WINDOW, DOOR, AND OTHER OPENINGS AT HEAD, JAMB,
AND SILL CONDITIONS UNLESS NOTED OTHERWISE.
ISSUE DATE
COMM. NUMBER
DESIGNED BY
DRAWN BY
SCALE 0" 1"
Architects Engineers Surveyors 601 College Road Fairbanks AK 99701
907.452.1241 designalaska.com
01 DEC 2021
CARLSON
ACTIVITY CENTER
MECHANICAL
CONTROLS
UPGRADE
101805
AECC511
IFB NO.: 22039
PROJECT NO.: 16-CACPRJ-2
12/2/2021 2:54:17 PM
ENS
ENS
EXTERIOR
DETAILS AND
ASSEMBLY TYPES
A500 3" = 1'-0"A500
2 EXTERIOR SECTION DETAIL - MECHANICAL PENETRATION SILL - CMU WALL
3" = 1'-0"A500
1 EXTERIOR SECTION DETAIL - MECHANICAL PENETRATION HEAD - CMU WALL
AKAF AL
TS
TA E O
49 TH
S
JAMES D. BARTLETT
No. A10413
REGISTEREDPROFESSIONALARCHIT
REFRIGENTRY
CONC. OFFICE
BREAK RM.
CORR.
KIT. STOR.
KITCHEN
MEETING RM.MEETING RM.
WOMEN
WOMEN
TICKETS
ENTRY
VEST.
MEN
SECURITY
STORAGE
STORAGE
FOYER
ELECTRICAL RM.
STORAGE
DRESSING
XFMR
RR
RR
GREEN RM.
MEN
GREEN RM.
14B
CO-1RBPT-APT-APT-APT-AET20'-0";-
14B
CO-1RBPT-APT-APT-APT-AET20'-0";-
CO-1RBPT-APT-APT-APT-AET20'-0";-
CO-1RBPT-APT-APT-APT-AET20'-0";-
3E
CO-1RBPT-APT-APT-APT-AET20'-0";-
CO-1RBPT-APT-APT-APT-AET20'-0";-
CO-1RBPT-APT-APT-APT-AET20'-0";-
40D
CO-1RBPT-APT-APT-APT-AET20'-0";-
14A
CO-1RBPT-APT-APT-APT-AET20'-0";-
CO-1RBPT-APT-APT-APT-AET20'-0";-
4A
CO-1RBPT-APT-APT-APT-AET20'-0";-4B
CO-1RBPT-APT-APT-APT-AET20'-0";-
40A
CO-1RBPT-APT-APT-APT-AET20'-0";-
5F
CO-1RBPT-APT-APT-APT-AET20'-0";-
7A
CO-1RBPT-APT-APT-APT-AET20'-0";-
3A
CO-1RBPT-APT-APT-APT-AET20'-0";-
3B
CO-1RBPT-APT-APT-APT-AET20'-0";-
5E
CO-1RBPT-APT-APT-APT-AET20'-0";-
CO-1RBPT-APT-APT-APT-AET20'-0";-
14C
CO-1RBPT-APT-APT-APT-AET20'-0";-
15C
CO-1RBPT-APT-APT-APT-AET20'-0";-
CO-1RBPT-APT-APT-APT-AET20'-0";-
23/24
CO-1RBPT-APT-APT-APT-AET20'-0";-
15B
CO-1RBPT-APT-APT-APT-AET20'-0";-
CO-1RBPT-APT-APT-APT-AET20'-0";-
11D
CO-1RBPT-APT-APT-APT-AET20'-0";-
11C
CO-1RBPT-APT-APT-APT-AET20'-0";-
11A
CO-1RBPT-APT-APT-APT-AET20'-0";-
B
CO-1RBPT-APT-APT-APT-AET20'-0";-
40B
CO-1RBPT-APT-APT-APT-AET20'-0";-
8A
CO-1RBPT-APT-APT-APT-AET20'-0";-
A
CO-1RBPT-APT-APT-APT-AET20'-0";-
558 SF
106 SF 173 SF
383 SF
66 SF
65 SF
115 SF
75 SF
227 SF
103 SF
109 SF
1038 SF
150 SF
335 SF
253 SF 253 SF
469 SF
98 SF 102 SF
73 SF
62 SF 53 SF
145 SF
38 SF
1029 SF
445 SF
659 sf
101 SF
750 SF
239 SF 271 SF
103 SF 183 SF
1033 SF
78 SF
611 SF
74 SF 76 SF
105 SF
314 SF
321 SF
45 SF
174 SF
74 SF
51 SF
29 SF 29 SF
ALASKA
MEDIA ROOM
COACHES
LOCKER
COACHES
MEETING
PLAYERS
LOUNGE
MEDIA
PRODUCTION
REST
ROOM
SHOWER
DRY
TEAM
DRESSING
STICK
ROOM
REST
ROOM
NANOOKS
LOCKER
MEDICAL
LAUNDRY
EQUIPMENT
LOCKER
ROOM 1/MPR
LOCKER
ROOM 2/MPR
PHYS
THERAPY
REST
ROOM
REST
ROOM
SHOWER
SHOWER SHOWER
REST
ROOM
ELEC
NORTHERN LIGHTS VISITOR
LOCKER ROOM/MPR
CORRIDOR
CORRIDOR
VESTIBULE
SOUTH
LOBBY
LOCKER
ROOM 3/MPR
LOCKER
ROOM 4/MPR
GEAR
ROOM
NORTH
TICKET BOOTH
EXISTING
BOILER ROOM
VESTIBULE
NORTH
LOBBY
REST
ROOM
REST
ROOM
ARENA ARENA
TEAM
VESTIBULE
CORRIDOR
PLAYERS
LOUNGE
LOUNGE
VESTIBULE
NANOOKS
VESTIBULE
NANOOKS
SINK
HALL
SHOWER SHOWER
EQUIP
CLOSET
108 107
128 131
129 132
130 133
137 141
140 145
138 142
100 100
139 143
120.1
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
12 11 10 9 8 7 6 5 4 3 2 1
H
G
F
E
D
C
B
H
G
F
E
D
C
B
12 11 10 9
8 7 6
5 4 3 2 11314
1 1
A800
A800
A800
A800
CEILING PLAN NOTES
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
PROVIDE CEILING TILE AND GRID DEMOLITION AS
REQUIRED TO ACCOMMODATE NEW WORK.
CAREFULLY REMOVE AND SALVAGE CEILING TILES AND
GRID FOR REINSTALLATION.
PROVIDE NEW CEILING TILES TO MATCH EXISTING WHERE
TILES ARE DAMAGED DURING CONSTRUCTION.
APPROXIMATE SQUARE FOOTAGE OF TILE REMOVAL IS
3,900 SF. ASSUME 10% OF TILES WILL NEED REPLACED.
IF ANY CEILING MOUNTED EQUIPMENT OR ITEMS ARE
TEMPORARILY REMOVED FOR CEILING ACCESS, CLEAN,
WIPE DOWN, AND DRY PRIOR TO REINSTALLATION.
PATCH, REPAIR, AND REFINISH ALL EXISTING SURFACES
TO REMAIN THAT ARE AFFECTED BY WORK.
COORDINATE ALL MECHANICAL ELEMENTS INCLUDING
SPRINKLERS, DIFFUSERS, RETURN AIR SLOTS, ACCESS
PANELS, AND EQUIPMENT WITH MECHANICAL
DOCUMENTS.
COORDINATE ALL ELECTRICAL ELEMENTS INCLUDING
SMOKE DETECTOR, LIGHTING, SENSORS, SIGNAGE,
ACCESS PANELS, AND EQUIPMENT WITH ELECTRICAL
DOCUMENTS.
CENTER CEILING ELEMENTS, INCLUDING SPRINKLER
HEADS, IN CEILING TILE UNLESS NOTED OTHERWISE.
SUSPENDED CEILING AREAS 144 SF OR LESS ARE EXEMPT
FROM COMPLIANCE WITH ASTM E580/E580M.
SUSPENDED CEILING AREAS GREATER THAN 144 SF BUT
LESS THAN 1,000 SF MUST COMPLY WITH ASTM
E580/E580M BUT ARE EXEMPT FROM LATERAL FORCE
BRACING.
SUSPENDED CEILING AREAS GREATER THAN 1,000 SF
MUST COMPLY WITH ASTM E580/E580M INCLUDING
LATERAL FORCE BRACING.
CEILING LEGEND
EXISTING ACOUSTIC CEILING
TILE TO REMAIN
OPEN TO STRUCTURE (OTS)
NO CEILING WORK THIS AREA
CEILING KEYNOTES
ABOVE CEILING WORK. SOME WORK
AREAS ARE ABOVE EXISTING CEILING
TILES AND GRID TO REMAIN HOWEVER
TEMPORARILY REMOVE AND/OR MODIFY
EXISTING GRID SYSTEM TO
ACCOMMODATE NEW WORK.
ISSUE DATE
COMM. NUMBER
DESIGNED BY
DRAWN BY
SCALE 0" 1"
Architects Engineers Surveyors 601 College Road Fairbanks AK 99701
907.452.1241 designalaska.com
01 DEC 2021
CARLSON
ACTIVITY CENTER
MECHANICAL
CONTROLS
UPGRADE
101805
AECC511
IFB NO.: 22039
PROJECT NO.: 16-CACPRJ-2
12/2/2021 2:54:19 PM
ENS
MLM
INTERIOR PLAN -
CEILING - ARENA
LEVEL
A621 1/16" = 1'-0"A621
1 INTERIOR PLAN - CEILING - ARENA LEVEL
AKAF AL
TS
TA E O
49 TH
S
JAMES D. BARTLETT
No. A10413
REGISTEREDPROFESSIONALARCHIT
STORAGE STR
MEN
STR WOMEN JAN. CONCESSIONSTR
ENTRY
FOYER
BOX OFFICE
OFFICE
CONFERENCE
BREAK RM.
RR RR
OFFICE
OFFICE
MANAGER'S OFFICE
STORAGE
MECH. RM.
STAIRS
CONCESSIONJANSTR
WOMENSTR
MEN
STR
CONCESSION
CONCESSION
TICKET
TICKET
6E
CO-1RBPT-APT-APT-APT-AET20'-0";-
CO-1RBPT-APT-APT-APT-AET20'-0";-
5D
CO-1RBPT-APT-APT-APT-AET20'-0";-
CO-1RBPT-APT-APT-APT-AET20'-0";-
5B
CO-1RBPT-APT-APT-APT-AET20'-0";- 8C
CO-1RBPT-APT-APT-APT-AET20'-0";-
6B
CO-1RBPT-APT-APT-APT-AET20'-0";-6
CO-1RBPT-APT-APT-APT-AET20'-0";-
6I
CO-1RBPT-APT-APT-APT-AET20'-0";-
3G
CO-1RBPT-APT-APT-APT-AET20'-0";-
CO-1RBPT-APT-APT-APT-AET20'-0";-
6B
CO-1RBPT-APT-APT-APT-AET20'-0";-
CO-1RBPT-APT-APT-APT-AET20'-0";-
CO-1RBPT-APT-APT-APT-AET20'-0";-
35B
CO-1RBPT-APT-APT-APT-AET20'-0";-
35A
CO-1RBPT-APT-APT-APT-AET20'-0";-
CO-1RBPT-APT-APT-APT-AET20'-0";-
CO-1RBPT-APT-APT-APT-AET20'-0";-
6B
CO-1RBPT-APT-APT-APT-AET20'-0";-
15D
CO-1RBPT-APT-APT-APT-AET20'-0";-
25A
CO-1RBPT-APT-APT-APT-AET20'-0";-
CO-1RBPT-APT-APT-APT-AET20'-0";-
6A
CO-1RBPT-APT-APT-APT-AET20'-0";-8D
CO-1RBPT-APT-APT-APT-AET20'-0";-
42A
CO-1RBPT-APT-APT-APT-AET20'-0";-
CO-1RBPT-APT-APT-APT-AET20'-0";-
5A
CO-1RBPT-APT-APT-APT-AET20'-0";-7
CO-1RBPT-APT-APT-APT-AET20'-0";-
5C
CO-1RBPT-APT-APT-APT-AET20'-0";-
CO-1RBPT-APT-APT-APT-AET20'-0";-
6D
CO-1RBPT-APT-APT-APT-AET20'-0";-
6C
CO-1RBPT-APT-APT-APT-AET20'-0";-
7B
CO-1RBPT-APT-APT-APT-AET20'-0";-
7C
CO-1RBPT-APT-APT-APT-AET20'-0";-
3F
CO-1RBPT-APT-APT-APT-AET20'-0";-
12 11 10 9 8 7 6 5 4 3 2 1
H
G
F
E
D
C
B
H
G
F
E
D
C
B
12 11 10 9
8 7 6
5 4 3 2 11314
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS: FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
FLOORING:B-BOARD:clg hghtN WALL:E WALL:S WALL:W WALL:CEILING:REMARKS:
CEILING PLAN NOTES
A. SEE A620 FOR CEILING PLAN NOTES.
CEILING LEGEND
EXISTING ACOUSTIC CEILING
TILE TO REMAIN
OPEN TO STRUCTURE (OTS)
NO CEILING WORK THIS AREA
CEILING KEYNOTES
ABOVE CEILING WORK. SOME WORK
AREAS ARE ABOVE EXISTING CEILING
TILES AND GRID TO REMAIN HOWEVER
TEMPORARILY REMOVE AND/OR MODIFY
EXISTING GRID SYSTEM TO
ACCOMMODATE NEW WORK.
ISSUE DATE
COMM. NUMBER
DESIGNED BY
DRAWN BY
SCALE 0" 1"
Architects Engineers Surveyors 601 College Road Fairbanks AK 99701
907.452.1241 designalaska.com
01 DEC 2021
CARLSON
ACTIVITY CENTER
MECHANICAL
CONTROLS
UPGRADE
101805
AECC511
IFB NO.: 22039
PROJECT NO.: 16-CACPRJ-2
12/2/2021 2:54:20 PM
ENS
MLM
INTERIOR PLAN -
CEILING -
CONCOURSE
LEVEL
A622 1/16" = 1'-0"A622
1 INTERIOR PLAN - CEILING - CONCOURSE LEVEL
AKAF AL
TS
TA E O
49 TH
S
JAMES D. BARTLETT
No. A10413
REGISTEREDPROFESSIONALARCHIT
A.
B.
C.
A.
1 - TYPICAL
SEE A5 SHEETS EXTERIOR ASSEMBLY NOTES - TYPICAL
SEE A5 SHEETS FOR EXTERIOR ASSEMBLIES AND
EXTERIOR DETAILS.
COORDINATE ABOVE CEILING WORK.
2 - INTERIOR FINISHES
ALL INTERIOR FINISHES AND MATERIALS TO MATCH
EXISTING ADJACENT MATERIALS TO REMAIN.
INTERIOR ASSEMBLY NOTES
W01-3A
WALL INTERIOR 3 5/8" STUD
GYPSUM BOARD ONE SIDE
3 5/8" METAL STUDS
5/8" GYPSUM BOARD
W11-3A
WALL INTERIOR 3 5/8" STUD
GYPSUM BOARD BOTH SIDES
5/8" GYPSUM BOARD
3 5/8" METAL STUDS
BATT INSULATION
5/8" GYPSUM BOARD
W00-8A INTERIOR CMU WALL
8" CMU BLOCK
CORE SPACE FILLED
WITH SAND AT ROOMS
REQUIRING ACOUSTIC
CONSIDERATIONS
10"
4' -2
W01-3A
CONTINUOUS SEALANT
A800
CONTINUOUS SEALANT TO
EXISTING DECK AND/OR
STRUCTURE ABOVE
CONTINUOUS SEALANT
EXISTING FLOOR TO REMAIN
10"
CONTINUOUS SEALANT
AT DUCT PENETRATION
MECHANICAL DUCT,
SEE 2/M200B
W01-3A
A800
REMOVE CARPET AND RUBBER
BASE AT CHASE/PLENUM FRAMING
AND AT INTERIOR OF CHASE,
TYPICAL ALL CHASE LOCATIONS
PROVIDE RUBBER BASE TO
MATCH ADJACENT
PAINT WALL TO MATCH
ADJACENT FINISH AND COLOR
INTERIOR DETAIL NOTES
A.
B.
C.
SEE A0 SHEETS FOR ASSEMBLY TAG LEGEND.
SEE A5 SHEETS FOR EXTERIOR ASSEMBLIES AND
DETAILS.
PROVIDE FINISHES TO FULL HEIGHT OF WALL UNLESS
NOTED OTHERWISE.
FRICTION FIT FIBERGLASS BATT
INSULATION TO FILL CAVITY
WHERE METAL DECK FLUTES
ARE…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .