This amendment to a solicitation provides responses to contractor questions and modifies drawings and specifications for a federal dredging project. The U.S. Army Corps of Engineers, Baltimore District, seeks maintenance dredging of the York Spit Channel in the Chesapeake Bay in Virginia. The amendment clarifies that unexploded ordnance technicians will only be required if ordnance is discovered during dredging, and related costs would be addressed in a change order. It also explains terminology, confirms the dredging prism refers to designated areas in contract drawings, and replaces an attachment. Offerors must acknowledge any amendments prior to the amended deadline.
The related opportunity is for maintenance dredging of the York Spit Channel by the Army Corps of Engineers, Baltimore District. No other salient details are provided about response dates, award timing, pricing terms, or incumbent. The amendment provides clarification for offerors on technical requirements for the solicitation.
Solicitation Amendment 002
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| C.04.01_DR19B0012_-_Abstract_of_Bids_28_Sep_19.pdf | ||
| I.B.08.02_W912DR19B0012_Solicitation_Amendment_003.pdf | ||
| Standard_Form_LLL.PDF | ||
| Attachment_C_-_SOP_for_UXO_Techs_for_Hopper_Dredges.pdf | ||
| EFT_FORM.PDF | ||
| Attachment_A_-_UXO_Tech_Minimum_Qualifications_DDESB_TP18_122004.pdf | ||
| I.B.08.02_W912DR19B0012_Solicitation_Amendment_001.pdf | ||
| York_Spit_Signed_Plans.pdf | ||
| Specs_Fy19_20_Baltimore_Harbor_Dredging_York_Spit.pdf | ||
| I.B.08.02_W912DR19B0012_Solicitation.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
PROJECT TITLE: Baltimore Harbor Maintenance Dredging, York Spit Chanel, Chesapeake Bay, Virginia The purpose of this solicitation amendment is to add responses to Request for Information (RFI)s and to make change in draw ings section V-103 through V-119 TYPICAL CROSS SECTION and to incorporate the appropriate attachments. All other terms and conditions remain the same.
1. CONTRACT ID CODE PAGE OF PAGES
1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 23-Sep-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912DR19B0012
X 9B. DATED (SEE ITEM 11)
28-Aug-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
23-Sep-2019
CODE
U.S. ARMY CORPS OF ENGINEERS, BALTIMORE
2 HOPKINS PLAZA
BALTIMORE MD 21201
W912DR 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DR19B0012
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 10 00 - SOLICITATION
The following have been added by full text:
DRAWINGS CHANGE
Drawings V-103 through V-119 TYPICAL CROSS SECTION
Change from "DISTANCE IN FEET FROM LEFT TOE OF CHANNEL" TO "DISTANCE IN FEET FROM THE LEFT EDGE OF
CROSS SECTION".
RFIS
1) Section 01 35 30.00 10, Munitions and Explosives of Concern (MEC) Construction Support, Paragraph
1.4 Unexploded Ordnance (UXO) Technicians references a technical paper “which is included at the end of this sections, as attachment A”.
a. Attachment A is not included in the specifications. Can the USACE please provide the referenced technical paper?
Government Response: See attached Reference A document.
2) Section 01 35 30.00 10, Munitions and Explosives of Concern (MEC) Construction Support, Paragraph
1.4 Unexploded Ordnance (UXO) Technicians states “If MEC is identified as being dredged from the borrow area, the Government will determine if the following requirements are necessary. (1) Provide two Unexploded Ordnance (UXO) Technicians per dredge. The UXO Technicians shall provide 24-hour, 7-days per week, MEC support, aboard the dredge on a rotating watch basis. The UXO Technicians shall provide MEC Training and shall inspect the dragheads for damage and presence of MEC after each load has been taken aboard.”
a. When and how will the Government determine it UXO technicians are required?
b. Are UXO technicians required as specified in sub paragraph 1?
Government Response: a. This determination will be made by the Government at the time of discovery and will depend on size and frequency of MEC encountered.
b. This determination will also be based on the size and frequency of MEC encountered. However, MEC technicians will NOT be required until MEC is discovered AND the determination to require UXO technicians is made by the Government.
3) Section 01 35 30.00 10, Munitions and Explosives of Concern (MEC) Construction Support, Paragraph borrow area, the Government will determine if the following requirements are necessary… (2) UXO Technicians shall determine the classification of MEC-like objects discovered, shall dislodge MEC from the draghead(s) if required, and shall properly safeguard the MEC. The Contractor shall provide a dedicated crewboat with crew for transportation of the Technicians and MEC to a location as directed by the site OESS. The expected location is the crew boat berth at Barnegat Light. No other persons other than the boat crew and UXO Technicians shall be permitted on the crewboat during transportation of MEC.”
a. Subparagraph 2 requires a dedicated crewboat for transportation of Technicians and MEC. Please clarify if technicians will be required to be on the dredge from the start of dredging or only once MEC are discovered?
i. Would this cost be handled under a change order if MEC Technicians are required?
Government Response: a. A dedicated crew boat will only be required during active transport of MEC material. MEC technicians will NOT be required until MEC is discovered AND the determination to require UXO technicians is made by the Government.
i. Refer to section 1 35 30.00 10, Paragraph 3.4 Measurement and Payment. “The work specified in this section will not be measured for payment and all costs in connection therewith shall be included in the contract unit price per cubic yard included in the Bid Line Items that pertain to direct dredging cost.
4) Section 01 35 30.00 10, Munitions and Explosives of Concern (MEC) Construction Support, Paragraph borrow area, the Government will determine if the following requirements are necessary… (3) UXO Technicians shall comply with the "STANDARD OPERATING PROCEDURES FOR UXO TECHNICIANS PROVIDING MEC SUPPORT ABOARD HOPPER DREDGES", which is included at the end of this section, as Attachment C. Provide support to the Technicians as required and specified in this attachment.”
a. Subparagraph 3 references attachment C. This attachment is not included in the specifications.
Can the USACE please provide the referenced attachment?
Government Response: See attached Reference C document.
5) Section 01 35 30.00 10, Munitions and Explosives of Concern (MEC) Construction Support, Paragraph borrow area, the Government will determine if the following requirements are necessary… (4) Provide an on-board portable magazine/MEC containment vessel, as approved by the OESS, to securely store and transfer collected MEC items. Alternatively, if directed by the Contracting Officer, take on-board, secure and electrically ground, a portable magazine/MEC containment vessel provided by the Government, to be utilized for storage of MEC.”
a. Will dredges be required to provide MEC containment on the hopper dredge the entire contract?
Government Response: a. MEC container determination will NOT be required until MEC is discovered AND the determination to require MEC containment is made by the Government. See 01 35 30.00 10, Paragraph 1.4, (4).
6) Section 01 35 30.00 10, Munitions and Explosives of Concern (MEC) Construction Support, Paragraph borrow area, the Government will determine if the following requirements are necessary… (5) If UXO Technicians are required, do not continue/commence dredging until the UXO Technicians are on-board the dredge.
a. Are UXO personnel required on the dredge prior to commencement of dredging?
b. Will the contractors be paid standby time until UXO personnel arrive onsite?
Government Response: a. MEC technicians will NOT be required until MEC is discovered AND the determination to require UXO technicians is made by the Government.
b. See response to 3)a.i., above.
7) Section 01 35 30.00 10 Munitions and Explosive of Concern (MEC) Paragraph 1.3 MEC in Borrow Areas.
This section refers the project as dredging from a “borrow area” which refers to a beach project. However, the current project is a maintenance dredging of the York Spit Channel. Please confirm that UXO Technicians are required to be on board the hopper dredge 24-hour, 7-days per week.
Government Response: The term “BORROW AREA” in Section 01 35 30, paragraphs 1.1, 1.3, 1.4 should be changed to “CHANNEL”. As stated in Section 01 35 30, if MEC is identified as being dredged from the channel, the Government will determine if the requirements listed in paragraph 1.4 (1) through 1.4 (5) are necessary, and may include UXO Technicians on a 24 hour, 7 day a week basis.
8) Section 355 20 23 Paragraph 3.4 Required Dredging Prism, Overdepth and Side Slopes. Please confirm that the dredging prism described in this section refers only to the hatched areas in the Contract Drawings.
Government Response: The dredging prism described in Section 35 20 23 paragraph 3.4 refers to the hatched areas on the Contract Drawings.
(End of Summary of Changes)