QA_Answers.pdf
PDF 107 KB Posted
- Attached to
- S&RTS BAR, MONTENEGRO Federal contract opportunity
- Solicitation number
- HTC71121QR013
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| HTC71121QR013_Amd 4.pdf | ||
| Atch_2_SORv3 - Bar Montenegro_3-16-21.xlsx | XLSX spreadsheet | |
| HTC71121QR013_Amd 3.pdf | ||
| Atch_2_SORv3 - Bar Montenegro_3-11-21.xlsx | XLSX spreadsheet | |
| HTC71121QR013_amd 2.pdf | ||
| Atch_4_Technical Evaluation Criteria (Bar) 3-2-21.docx | DOCX document | |
| Atch_2_SORv2 - Bar Montenegro_3-2-21.xlsx | XLSX spreadsheet | |
| HTC71121QR013_Amd 1.pdf | ||
| Synopsis_Bar Montenegro.pdf | ||
| Bar Montenegro_QASP_Final_LH_5Feb2021.pdf | ||
| HTC71121QR013.pdf | ||
| Atch_1_PWS-v2 Bar Montenegro_2-4-21 (1).pdf | ||
| Atch_4_Technical Evaluation Criteria (Bar) 2-4-21.docx | DOCX document | |
| Atch_3_RFQ Information Sheet.docx | DOCX document | |
| Atch_2_SORv2 - Bar Montenegro_2-4-21.xlsx | XLSX spreadsheet |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP Citation, if provided QUESTIONS ANSWERS
1 SF1149, page 15 of 40, para 3. (3)
In Section SF1149, page 15 of 40, para 3. (3) states that following provisions must be included in our SAM record or submitted separately. At this point we are not able to update our SAM record, can we submit required info separately?
Yes, quoters may submit information typically entered into SAM separately, however the information must be in SAM prior to award.
2 FAR 52.204-24 and FAR 52.209-7 are not included by full text in the solicitation. Should we find them in the web, print them, fill in whatever is needed and send them as an attachment?
FAR 52.204-24 has now been updated as full text. FAR 52.209-7 is not required to be in full text, therefore has not been updated. You can view all provisions and clauses at https://www.acquisition.gov/
3 SF1149, page 19 of 40, Under the same para, FAR 52.212-3 is listed twice with different dates (NOV 2017) and (Alt I) (Oct 2014), whereas same number FAR 52.212-3 is listed in the solicitation in page 19 of 40 with date (JAN 2021).
FAR 52.212-3 has been updated to Feb 2021. FAR 52.212-3 (Alt I) is required for all DoD contracts, and reflects the correct date.
4 Technical Worksheet Technical Worksheet, para 3a: It is erroneously noted the Port of Esbjerg. The Technical Worksheet has been corrected to read Bar, Montenegro.
5 SOR
Section SOR, schedule 3C , Line item 192 thru 199 states Guarantee Time, whereas there is no such a term in the PWS. Assume it should state shift differential.
There is no guaranteed time, the schedule has been removed.
6 SOR Section SOR, schedule 3B, description of services is listed twice. Schedule 3B is listed twice to reflect overtime differential for regular Overtime AND Holiday Overtime.
7 SOR
Section SOR, schedule 6, Line item 231 states combination of both… Please clarify if you mean 20’and 40’ container. Price should be separated by 20’ and 40’, as there is a big difference, due to the cubic difference.
Schedule 6, line item 231 has been corrected to read 20' box.
S&RTS BAR, MONTENEGRO
QUESTIONS AND ANSWERS
Request for Quote (HTC711-21-Q-R013)
Sheet1
File details come from the government source that posted it. Updated .