SPECIFICATIONS_PROJECT__8173326_IFB_HSCGG1-17-B-PFA005_REPLACE_ELECTRICAL_BREAKERS_SMITH_HALL_USCG_ACADEMY.pdf
PDF 224 KB Posted
- Attached to
- REPLACE BREAKERS AT SMITH HALL, USCG ACADEMY, NEW LONDON, CT PROJECT #8173326 Federal contract opportunity
- Solicitation number
- HSCGG1-17-B-PFA005
About this file
SPECIFICATIONS IFB HSCGG1-17-B-PFA005 REPLACE ELECTRICAL BREAKERS SMITH HALL USCG ACADEMY PROJECT 8173326
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| ABSTRACT_OF_OFFERS_17-B-PFA005_SMITH_HALL_REPLACE_ELECTRICAL_BREAKERS_PROJECT__8173326.pdf | ||
| SOLICITATION_AMENDMENT_0001_HSCGG117BPFA005_REPLACE_ELECTRICAL_BREAKERS_SMITH_HALL _USCG_ACADEMY _PROJECT__8173326.pdf | ||
| WAGE_DETERMINATION_CT_24 _IFB_HSCGG1-17-B-PFA002_REPLACE_ELECTRICAL_BREAKERS_SMITH_HALL_USCG_ACADEMY_PROJECT__8173326.pdf | ||
| SF_24_BID_BOND_-_IFB_HSCGG1-17-B-PFA005_REPLACE_ELECTRICAL_BREAKERS_SMITH_HALL_USCG_ACADEMY_PROJECT__8173326.pdf | ||
| SOLICITATION_IFB_HSCGG1-17-B-PFA005_REPLACE_ELECTRICAL_BREAKERS_SMITH_HALL_USCG_ACADEMY_PROJECT__8173326.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCOPE OF SERVICES
FOR
Replace Breakers Smith Hall
AT
U.S. COAST GUARD ACADEMY
NEW LONDON, CT 06320
Project # 8173326
September 2016
G. J. Carabine G. J. Carabine Date: 8 Sept 2016
September 9, 2016 2 of 9
SCOPE OF SERVICES
Project # 8173326
1.0 SITE BACKGROUND
The U.S. Coast Guard Academy is located on the westerly shore of the Thames River in New London, CT. The Coast Guard Academy was constructed in 1932 and is comprised of over 23 major structures. Smith Hall was constructed in 1964 as a science center for Academy curricula. Today, Smith Hall is the Academy’s distinct science building for required Cadet Courses; Science Majors and Staff research and development projects.
2.0 REQUIREMENTS
The project scope will be as described below to remove existing circuit breakers; remanufacture and re-install the circuit breakers for the Main Distribution Switchgear in Smith Hall. Smith Hall is the Science building at the US Coast Guard Academy and power disruptions to the facility shall be carefully co-ordinated as to not interrupt class curriculum course work, labs and experiments. Contractor shall plan to perform work outside of normal working hours and on weekends (normal working hours – 0730 to 1600, M-F):
1. Provide services to remove, remanufacture and re-install (15) Federal Pacific Electric (FPE) FM-25, 600A, rack-out air circuit breakers in the Main Distribution Switchgear.
2. Provide services to remove, remanufacture and re-install (3) Federal Pacific
Electric (FPE) FP-50, 1600A, rack-out air circuit breakers in the Main Distribution Switchgear.
3. Remove and dispose of existing ABB K-800 breaker in the Main Distribution
Switchgear and replace with remanufactured FM-25 rack-out air breaker.
4. Provide (1) Federal Pacific Electric (FPE) FP-100, 4000A, rack-out air circuit breaker. Remove and dispose of existing main breaker in the Main Distribution Switchgear. The existing breaker is an ABB K-4000 type rack-out breaker.
5. A breaker overhaul will be performed on these breakers increasing the breaker longevity and reliability. Breaker overhaul includes but is not limited to the following:
a. Remove the operating mechanism from the circuit breaker.
b. Totally disassemble the operating mechanism and breaker frame components.
c. Check all parts for damage or excessive wear.
d. Clean all parts of old grease and dirt.
e. Polish all machined pins and parts
September 9, 2016 3 of 9
f. Re-plate all previously plated parts with new plating.
g. Bead blast, prime and repaint all previously painted parts.
h. Disassemble and clean the current path.
i. Re-assemble all parts, install on breaker and make all adjustments as per manufacturer’s specifications.
j. Retrofit each circuit breaker with an AC Pro Trip Unit; convert existing breaker settings to the AC Pro Trip Unit. Test each of the breakers at proper settings.
k. Complete production tests to NETA standards will be performed to insure safe and proper operation. A test report with all test results and a description of repairs shall be provided.
6. Provide laminated plastic nameplates for each circuit breaker. Each nameplate inscription shall identify the function and, when applicable, the position.
Nameplates shall be melamine plastic, 0.125 inch thick, white with black center core. Surface shall be matte finish. Corners shall be square. Accurately align lettering and engrave into the core. Minimum size of nameplates shall be one by
2.5 inches. Lettering shall be a minimum of 0.25 inch high normal block style.
Contractor shall trace all branch circuits from main gear to distribution panel-boards to ensure proper labeling.
7. Contractor shall furnish the services of competent instructors to give full instruction to designated Government personnel in the adjustment, operation, and maintenance of the specified breakers, including pertinent safety requirements as required. Instructors shall be thoroughly familiar with all parts of the installation and shall be trained in operating theory as well as practical operation and maintenance work. Instruction shall be given during the first regular work week after the equipment or system has been accepted and turned over to the Government for regular operation.
Out of cell time for each circuit breaker shall not exceed 2 hours. The contractor shall provide temporary power to affected areas if breaker out-of-cell time exceeds 2 hours. The breakers shall be installed by licensed electricians, those qualified to perform power equipment replacement work and familiar with installing and operating draw-out circuit breakers. Provide minimum of five (5) year warranty for all circuit breakers installed.
The Coast Guard Academy currently has a base-wide power metering system to monitor energy use throughout the facility. Contractor shall ensure that the VERIS meter current transformers are installed in the main gear and are reporting to the MODHOPPER receiving unit. Contractor shall verify metering information is being reported to the OBVIUS data collection site. Both VERIS meters and MODHOPPER systems are currently working properly.
The contractor shall have full access to record (as-built) construction drawings on file at the Academy but shall be responsible for field verifying existing conditions and dimensions for the project.
September 9, 2016 4 of 9
MDP equipment layout
FM-25 Nameplate Data
September 9, 2016 5 of 9
FP-50 Nameplate Data
K-4000 Main Breaker Nameplate Data
September 9, 2016 6 of 9
3.0 SUBMITTALS
Switchgear , circuit breaker and any field drawings shall be prepared using CGA CAD drafting standards (see Appendix A) and the 24”x36” (D size) Coast Guard standard drawing format in AutoCAD 2014 or older:
a. Provide one (1) copy of all studies and breaker test reports (as applicable).
b. Provide two (2) copies (D size) and two (2) sets of 11x17 drawings of the Switchgear configuration and breaker diagrams/schematics for review.
e. Provide three (3) set(s) of Operational and Maintenance Manuals for each type of circuit breaker being installed.
4.0 DELIVERY SCHEDULE
The milestones for receipt of submittals and construction services are provided below. All days are calendar days, unless otherwise stated. The government review time for submittals will be 5 business days.
Circuit breaker submittals: 3 weeks after award of contract.
Construction schedule: 2 weeks after award of contract. Breaker installation shall take place during off hours and weekends so as not to disturb class-work, labs and research experimentation.
Project Duration
a. Submittals 3 Weeks
b. Construction Schedule 2 Weeks
c. Breaker Change-Out 12 Weeks*
d. Close-out Documents 2 Weeks
Total Project Timeline 19 weeks
*Breaker Change –out based on removal and installation of (5) breakers per visit with approximately three week lead time for breaker refurbishing.
-END OF SECTION-
September 9, 2016 7 of 9
APPENDIX A
CGA AUTOCAD STANDARDS
Coast Guard Academy CAD Drawing Standards
Updated: 31 APR 2016
United States Coast Guard requires delivery of CAD data to be in compliance with the National CAD Standard (NCS) published by the National Institute of Building Sciences (NIBS). The current version of the published standard can be obtained from the following web site:
http://www.buildingsmartalliance.org/ncs/
U.S. Coast Guard supports the use of the National Cad Standard. The U.S. Coast Guard Academy provides the following implementation guidelines for deliverables. Guidelines will address implementing the NCS in what is considered critical areas.
1. All drawing deliverables to the U.S. Coast Guard Academy are to be provided in AutoCAD .DWG format, compatible with the U.S. Coast Guard’s current version 2014 of AutoCAD.
2. File naming format: CAD files will be named and delivered using U.S. Coast Guard plan and project numbers provided by the U.S. Coast Guard Academy Facilities Engineering Division.
3. Template files: Template files will be provided by the U.S. Coast Guard Academy Facilities Engineering Division and contracted delivered CAD files will use only title blocks that are included in the USCG CAD template files. Title blocks include fields with attributes that are used for the U.S. Coast Guard drawing data base. Double clicking an attribute entry in field will allow editing of that field. Please DO NOT EXPLODE or ALTER the title block fields. Cover sheet may be modified to add contractor logos and seals.
4. General text shall be set to plot at a 0.125 inch text height when plotted at contract document intended scale.
5. All text should use the standard AutoCAD provided fonts, preferably ROMANS.
6. Line-weights shall be stored in the entity or layer definition (line, point, arc etc.) and not require the use of external files to achieve desired results. (Example AutoCAD drawings cannot use PLT or Plot style references on delivered sheet CAD files.)
7. Layer names should follow the AIA naming convention, see i.e., http://www.caddee.com/layerlist.html and as follows:
Layer Name Formatting As recommended by the 1997 AIA CAD Layer Guidelines, layer names may be as short as six characters (discipline code + major group) or as long as sixteen characters (discipline code + http://www.buildingsmartalliance.org/ncs/ http://www.caddee.com/layerlist.html
September 9, 2016 8 of 9 major group + minor group + status). Here are the four examples of acceptable formula variations, with explanations of formula variables found below:
# 1: A-WALL = discipline code + major group # 2: A-WALL-FULL = discipline code + major group + minor group # 3: A-WALL-DEMO = discipline code + major group + status code # 4: A-WALL-FULL-DEMO = discipline code + major group + minor group + status
Discipline Code:
The discipline code is a two-character field with the second character either a hyphen or a user-defined modifier. The predefined discipline codes are the same for both layer names and file names. For a complete list of discipline codes, see Naming Construction Drawings under File Name Conventions.
Major Group:
The major group designation is a four-character field that identifies the building system, such as doors, walls, windows, etc. Although most major groups are logically associated with specific discipline codes, it is possible to combine major group codes with any of the discipline codes.
For example, AWALL or I-WALL.
Minor Group:
This is an optional, four-character field for further differentiation of major groups. For example, partial height walls (A-WALL-PART) might be differentiated from full height walls (A-WALL- FULL). The following common modifiers defined by the AIA can also be used in the minor group field:
IDEN identification tags example: A-DOOR-IDEN PATT cross hatching, poche example: A-WALL-PATT If necessary, the minor group field may also be defined by the user, allowing additional layers to be added to accommodate special project requirements. However, this should only be done after checking the Master Layer List in the 1997 AIA CAD Layer Guidelines to see if any of the predefined layer names in that list would meet the special project requirements.
Status Field:
The status field is an optional four-character designator that differentiates new construction from remodeling and existing to remain. It is only needed when phases of work must be differentiated, and can be used in place of or in addition to a minor group designation, such as A-WALL- NEWW or AWALL-FULL-NEWW. In either case, the status field is always the last four-characters of the layer name. Defined values for this field as defined by the AIA are as follows:
NEWW new work EXST existing to remain DEMO existing to demolish FUTR future work TEMP temporary work MOVE items to be moved RELO relocated items NICN not in contract PHS1-9 phase numbers (1-9)
September 9, 2016 9 of 9
8. All sheets, details and viewports should include a graphic scale.
9. All external references must be bound to drawing before delivering to U.S. Coast Guard Academy.
10. All attached image files are to be provided with the AutoCAD drawings and named systematically; i.e., if the drawing number is CC-0102 and 2 images are used on sheet 12 of the drawing set, the image files would be named CC-0102-12-1.jpg and CC-0102-12-2.jpg
11. Avoid using Layer “0”, except in the creation of blocks, and “Defpoints’, which is created automatically with dimensions.
12. There is to be one drawing for each sheet of the drawing set.
13. On final submittal and as-built versions, PDF files are to also be provided for each sheet of the drawing set.
| SOW Smith Hall Breakers |
| SCOPE OF SERVICES |
| The U.S. Coast Guard Academy is located on the westerly shore of the Thames River in New London, CT. The Coast Guard Academy was constructed in 1932 and is comprised of over 23 major structures. Smith Hall was constructed in 1964 as a science center f... |