HSCG85-17-Q-P45012_Request_for_Clarification_Answers.pdf

PDF 81 KB Posted

Attached to
USCGC SPAR FY17 DRYDOCK Federal contract opportunity
Solicitation number
HSCG85-17-Q-P45012
Issued by
Department of Homeland Security US Coast Guard

About this file

HSCG85-17-Q-P45012 Request for Clarification Answers

View the file

Other files for this federal contract opportunity

Other files attached to USCGC SPAR FY17 DRYDOCK, newest first.
File Type Posted
Amendment_0001_HSCG85-17-Q-P45012_SPAR.pdf PDF
SEAL_KIT_BOW_THRUST.pdf PDF
SPAR_(WLB_225B)_DD_Rev1(Nov2016).pdf PDF
SPAR_Pedistal_Weld_Repair.pdf PDF
Combined_Synopsis_Solicitation_USCGC_SPAR_FY_DD.pdf PDF
Attachment_3_-_Past_Performance_Information_Form.doc DOC document
Attachement_2_USCGC_SPAR_(WLB_225B)_DD.pdf PDF
Attachement_1__Schedule_B_USCGC_SPAR_(WLB_225B)_DD.xls XLS spreadsheet
Attachment_5-_USCG_Ombudsman_Notice.pdf PDF
Attachment_4_Request_for_Clarification.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Request for Clarification Answers on HSCG85-17-Q-P45012

Question

Optional Items: O-070-073, Bilges, Preserve PARA NO. 1.1, 3.2

In paragraph 3.2 of all four Work Items pertaining to Bilge Preservation, the designated areas include only bilge surfaces and adjacent structural members, but does not seem to include deck plating & deck grating as was done on Kukui HSCG85-14-R-P45004.

However, given the large approximated square footages, perhaps this was not the intent.

Answer: Current scope of work correct. This does not include deck plating and deck grating for preserve.

D-042, Sewage Piping, Clean, Flush, and Renew PARA No. 3.1,3.6

3.1 states approximately 1400 lf of piping needs to be cleaned and flushed. 3.6 indicates

350 lf of piping needs to be cleaned and flushed.

Answer: Line 3.6 should read 1,400 linear feet of sewage system piping.

O-016 Propulsion Shaft Bearing, Stave Renewal PARA No. 3.1.2 & 3.32.2.1

In paragraph 3.1.2, it states no Tech Rep is not applicable. In paragraph 3.3.2.2.1, it states that a Tech Rep shall be consulted to established the correct bore dimensions and that the Tech Rep shall be on scene during the bearing installation. Should we disregard paragraph 3.1.2?

Answer: No, Tech Rep is not required. Will make changes to spec.

D-035 Thruster units (Bow and Stern), Overhaul PARA No. 1.2

In Paragraph 1.2, The Government – Furnished Property, it only has a quantity of one (1)

Seal Kit, Bow Thruster and one (1) Seal Spacer. Since we are overhauling both the bow and stern thrusters, should there be a quantity of two (2) Seal Kits and two (2) Seal

Spacers furnished by the Government?

What parts are in a Seal Kit? What parts does the contractor need to purchase to overhaul the bow and stern thruster units?

Answer: Yes need to adjust GFE to (2) seal kits and (2) seal spacers. Will make changes

List of parts in Seal Kit attached.

D-083 Hull and Keel Repair PARA No. 3.3.2, 3.3.3 & 3.3.4

3.3.2: Please indicate how many feet of weld seam are to back gouged and re-welded.

3.3.3: Specifications suggest that indented plating is between transverse frames, please indicate exactly how many locations require straightening (17 locations between frame

33 and frame 50?).

Answer: Straightening and weld work will need to be determined during the inspection.

3.3.4: Do repairs span from frame 60 to 74 or frames 60 to 75?

Answer: Repairs between frames 60-75 but not to include

(FR75) Dimensions will have to be determined when work is being done

O-093 Crane Pedestal Repair

Can the Government provide photos of the damaged plate requiring replacement?

What is the thickness of the plating being replaced?

What are the specific dimensions of the 3 sq. ft. of plate being replaced?

Answer: Pictures attached in PDF format

Dimensions and thickness will be identified upon KTR inspection