PAMILCO._GOVERNMENT_PROPERTY_REPORT.doc
DOC document 80 KB Posted
- Attached to
- CGC PAMLICO Federal contract opportunity
- Solicitation number
- HSCG85-17-Q-P45007
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A0004_Amendment_to_PAMLICO.pdf | ||
| A0004_Amendment_to_PAMLICO_3NOV16.pdf | ||
| A0003_Amendment_to_PAMLICO.3.pdf | ||
| PAMLICO_Request_for_Clarification_A0003_(3).docx | DOCX document | |
| Pamlico..160-WLIC_3301_5_1_-_B_Ceiling_Plan_Main_and_Upper_Decks.pdf | ||
| A0002_Amendment_to_PAMLICO.pdf | ||
| PAMLICO_BLANK_CORRECT_100716.xls | XLS spreadsheet | |
| A0001_Amendment_to_PAMLICO.pdf | ||
| PAMLICO_Request_for_Clarification.docx | DOCX document | |
| PAMLICO._Past_Perf_Questionnaire.docx | DOCX document | |
| PAMLICO_BLANK.SUPPLIES_SCHEDULE.100616.xls | XLS spreadsheet | |
| PAMLICO.Ombudsman_Notice.doc | DOC document | |
| PAMLICO_SPEC.6OCT2016.pdf | ||
| PAMLICO_SOLICITATION.OCT62016.DYE.docx | DOCX document |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GOVERNMENT PROPERTY REPORT
The Contractor shall complete each column throughout the contract performance period with the assistance of the Government Property Administrator, as needed.
| contract number: |
| vessel: USCGC PAMLICO (WLIC-800) |
Contractor point of contact:
telephone number:
Contractor’s address:
The chart below is for use during the performance of the above listed contract. The Contractor shall complete each column of the chart with the assistance of the Government Property Administrator, as needed.
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| 6 |
Type of property received (include name, description , nsn and serial #) value of property
| date received |
| date installed/ |
consumed Use this block to record :
1. current location of property in the possession of the Contractor for use during the availability or otherwise being temporarily held until being returned to/reinstalled on cutter.
2. disposition instructionsfor unused, serviceable, salvage or scrap property. state which apply.
date disposition carried out
| description |
| nsn\serial\p/n |
* Definitions (all property defined below will require disposition instructions):
Serviceable - defined as property that was pre-existing in a location that was, during the course of performance, replaced and which will be turned in by the Coast Guard for future use.
Salvage – defined as property that has no serviceable value, but that has some value in excess of its scrap value.
Scrap – defined as property having no value except for it basic material content.
The undersigned hereby certify that all property provided under referenced contract has been accounted for. That is property has either been consumed in the performance of the contract or disposition instructions, as listed above, have been provided.
PROPERTY ADMINISTRATOR DATE
(Sign at time disposition instructions are given)
CONTRACTOR SIGNATURE DATE
(sign after execution of disposition instructions)
NOTE: The Contractor must carry out all disposition instructions as instructed above. This report must accompany the Contractor’s final invoice. (07/02)