Section_B_SOS.xls
XLS spreadsheet 32 KB Posted
- Attached to
- CGC OSAGE IRESS DRY DOCK Federal contract opportunity
- Solicitation number
- HSCG85-16-Q-P45A06
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Past_Performance_Questionnaire_OSAGE.doc | DOC document | |
| Specification_OSAGE_(WLR_65B)_DD_FQ4_BMM_16R0.pdf | ||
| A0001_Amendment_to_a_Sol.pdf | ||
| Solicitation_Amended_OSAGE_FY16DD.docx | DOCX document | |
| Past_Performance_Questionnaire_OSAGE.doc | DOC document | |
| Section_B_SOS.xls | XLS spreadsheet | |
| Solicitation_OSAGE_FY16_DD.pdf | ||
| Specification_OSAGE_(WLR_65B)_DD_FQ4_BMM_16R0.pdf | ||
| Request_for_Clarification_doc.docx | DOCX document | |
| OSAGE_(WLR_65B)_DD_FQ4_BMM_16ER0_BLANK.xls | XLS spreadsheet | |
| OSAGE_(WLR_65B)_DD_FQ4_BMM_16R0_Specification.pdf | ||
| Pre_Solicitation.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| PRICING SCHEDULE FOR: | |||||
| USCGC OSAGE (WLR-65B) DRYDOCK AVAILABILITY FY2016 | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Hull Plating (U/W Body), Inspect - Tender | JOB | 1 | $0.00 | |
| D-002 | Hull Plating (U/W Body), Inspect - Barge | JOB | 1 | $0.00 | |
| D-003 | Hull Plating (U/W Body), Ultrasonic Testing - Tender | JOB | 1 | $0.00 | |
| D-004 | Hull Plating (U/W Body), Ultrasonic Testing - Barge | JOB | 1 | $0.00 | |
| D-005 | Tanks (MP Fuel Stowage and Overflow), Clean and Inspect - Tender | JOB | 1 | $0.00 | |
| D-006 | Voids (Non-Accessible), Leak Test - Tender | JOB | 1 | $0.00 | |
| D-007 | Voids (Non-Accessible), Leak Test - Barge | JOB | 1 | $0.00 | |
| O-008 | Voids (Non-Accessible), Internal Surfaces, Preserve - Tender | EACH | 5 | $0.00 | |
| O-009 | Voids (Non-Accessible), Internal Surfaces, Preserve - Barge | EACH | 5 | $0.00 | |
| D-010 | Keel Coolers, Clean, Inspect and Hydro - Barge | JOB | 1 | $0.00 | |
| D-011 | Hull Fittings (Weight Handling Rigging Hardware), Inspect and Test - Barge | JOB | 1 | $0.00 | |
| D-012 | Hull Fittings (Mooring and Towing), Inspect and Test - Tender | JOB | 1 | $0.00 | |
| D-013 | Hull Fittings (Mooring and Towing), Inspect and Test - Barge | JOB | 1 | $0.00 | |
| D-014 | Spuds, Overhaul - Tender | JOB | 1 | $0.00 | |
| D-015 | Spuds, Overhaul - Barge | JOB | 1 | $0.00 | |
| D-016 | Spud Wells, Preserve - Tender | JOB | 1 | $0.00 | |
| D-017 | Spud Wells, Preserve - Barge | JOB | 1 | $0.00 | |
| D-018 | Decks – Exterior (Buoy or Construction Deck), Preserve 100% | JOB | 1 | $0.00 | |
| O-019 | U/W Body, Preserve (100%) - Tender | JOB | 1 | $0.00 | |
| O-020 | U/W Body, Preserve (100%) - Barge | JOB | 1 | $0.00 | |
| O-021 | U/W Body, Preserve (Partial - Condition A) - Tender | JOB | 1 | $0.00 | |
| O-022 | U/W Body, Preserve (Partial - Condition A) - Barge | JOB | 1 | $0.00 | |
| O-023 | U/W Body, Preserve (Partial - Condition B) - Tender | JOB | 1 | $0.00 | |
| O-024 | U/W Body, Preserve (Partial - Condition B) - Barge | JOB | 1 | $0.00 | |
| D-025 | Drydock - Tender | JOB | 1 | $0.00 | |
| D-026 | Drydock - Barge | JOB | 1 | $0.00 | |
| D-027 | Temporary Services, Provide - Tender and Barge | JOB | 1 | $0.00 | |
| D-028 | Sea Trial Performance, Support, Provide | JOB | 1 | $0.00 | |
| D-029 | Main Diesel Engine and Propulsion Shafting, Upgrade | JOB | 1 | $0.00 | |
| D-030 | Steering System, Upgrade | JOB | 1 | $0.00 | |
| D-031 | Weathertight Doors (External), Renew | JOB | 1 | $0.00 | |
| D-032 | Boat Davit Winch, Shrink Wrap | JOB | 1 | $0.00 | |
| D-033 | Buoy and Cargo Handling Crane, Shrink Wrap | JOB | 1 | $0.00 | |
| O-034 | Bilges, Lead Based Paint, 100% Abatement, Perform - Tender | JOB | 1 | $0.00 | |
| O-035 | Hull Plating Freeboard, Preserve 100% - Barge | JOB | 1 | $0.00 | |
| O-036 | Hull Plating Freeboard, Preserve 100% - Tender | JOB | 1 | $0.00 | |
| D-037 | Decks – Exterior (Barge Aft Main Deck), Preserve 100% | JOB | 1 | $0.00 | |
| D-038 | Sewage Tank, Renew | JOB | 1 | $0.00 | |
| D-039 | Bulkhead Repair, Pilothouse | JOB | 1 | $0.00 | |
| D-040 | Repair, Hull - Barge | JOB | 1 | $0.00 | |
| O-00A | Composite Labor Rate | Hour | 400 | ||
| D-00B | GFP Report | NSP | EA | ||
| O-00Z | Laydays | Day | 5 | ||
| Total Price of Definite Items | |||||
| Total Price of Option Items | |||||
| Total Price of Definite and Optional Items |
&C(02/08/2016)
Rev-0 - Page &P of &N
File details come from the government source that posted it. Updated .