blank tybee.xls
XLS spreadsheet 23 KB Posted
- Attached to
- Amendment A00001 USCGC AHI (87364) Federal contract opportunity
- Solicitation number
- HSCG80-12-Q-P45059
About this file
Blank Schedule of Supplies
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A00001.pdf | ||
| Revised Price Schedule Page 1 of 1.csv | CSV file | |
| USCGC AHI Revised Specification.doc | DOC document | |
| Replacement Pages 4 .doc | DOC document | |
| blank tybee.xls | XLS spreadsheet | |
| Amendment 04 Tybee.pdf | ||
| Spec Revision 2 TYBEE | — | |
| Amendment 03 Tybee.pdf | ||
| rev 1 TYBEE | — | |
| AHI_WPB_87_DD_JLS_12R0.pdf | ||
| AHI_WPB_87_DD_JLS_12R0 blank.pdf | ||
| Solicitation AHI.doc | DOC document |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| USCGC TYBEE (WPB-110B) DRYDOCK AVAILABILITY 2012 | |||||
| PRICING SCHEDULE FOR: | |||||
| USCGC TYBEE (WPB-110B) DRYDOCK AVAILABILITY 2012 | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | PERFORM ULTRASONIC THICKNESS MEASUREMENTS | JOB | 1 | ||
| O-001A | PERFORM ULTRASONIC THICKNESS MEASUREMENTS, ADDITONAL SHOTS | JOB | 1 | ||
| D-002 | Appendages (U/W), Leak Test | JOB | 1 | ||
| D-003 | Tanks (Potable Water), Clean and Inspect | JOB | 1 | ||
| D-004 | Rudder Assembly, Remove, Inspect and Reinstall | JOB | 1 | ||
| D-005 | Grey Water Holding Tanks , Clean and Inspect | JOB | 1 | ||
| D-006 | Sewage Holding Tanks , Clean and Inspect | JOB | 1 | ||
| D-007 | Aft Steering Compartment, Preserve and Insulate | JOB | 1 | ||
| D-008 | Battery Space Compartment | JOB | 1 | ||
| D-009 | Main Mast , Preserve, 100% | JOB | 1 | ||
| O-010 | U/W Body, Preserve “Partial – Condition A ” | JOB | 1 | ||
| O-011 | U/W Body, Preserve “Partial - Condition B” | JOB | 1 | ||
| O-012 | U/W Body, Preserve “Partial - Condition C ” | JOB | 1 | ||
| O-013 | U/W Body, Preserve “100%” | JOB | 1 | ||
| D-014 | Drydocking | JOB | 1 | ||
| D-015 | Temporary Services, Provide | JOB | 1 | ||
| D-016 | Data Service , Provide | JOB | 1 | ||
| D-017 | Sea Trial Performance, Provide Support | JOB | 1 | ||
| D-018 | Tanks (MP Fuel Service), Clean and Inspect | JOB | 1 | ||
| D-019 | Tanks (MP Fuel Stowage and Overflow), Clean and Inspect | JOB | 1 | ||
| D-020 | Fathometer Transducer, Renew | JOB | 1 | ||
| D-021 | Speed Doppler, Doppler Valve, Clean and Inspect | JOB | 1 | ||
| D-022 | Tanks (Potable Water), Preserve “ 100% ” | JOB | 1 | ||
| A-O | Composit Labor Rate | HR | 300 | ||
| B-O | GFP Report | NSP | EA | 1 | NSP |
| O-00Z | Laydays | DAY | 5 | ||
| Total Price of Definite Items | |||||
| Total Price of Option Items | |||||
| Total Price of Definite and Optional Items |
Sheet2
Sheet3
File details come from the government source that posted it. Updated .