Wedge Spec Rev
443 KB Posted
- Attached to
- DD WEDGE FYO9 Federal contract opportunity
- Solicitation number
- HSCG80-09-Q-3FA405
About this file
Specification Rev 1, WEDGE DD FY09
Text of this file
USCGC WEDGE (WLR-75307)
75 FOOT RIVER BUOY TENDER
SPECIFICATION FOR DRYDOCK REPAIRS
Developed By:
Dale Passarella
Commander (v) Maintenance and Logistics Command, Atlantic 300 E. Main Street, Suite (600) Norfolk, VA 23510-9102
(January 15, 2009 / Rev-1)
USCGC WEDGE (WLR-75307) DRYDOCK AVAILABILITY 2009
TABLE OF CONTENTS
Work Item Title Page
List of Sketches iii
Revisions Record iv
List of Applicable References v
List of Government-furnished Property x
List of Critical Inspection Items xi
Specification Feedback xii
Principal Characteristics xiii
General Requirements 1
1 Remove, Inspect, and Reinstall Propeller Shafts 8
2 Straighten Shaft 12
3 Renew Water-Lubricated Shaft Bearings 14
4 Renew Propeller Shaft Sleeve(s) 17
5 Renew Shaft Strut Barrel 20
6 Remove, Inspect, and Reinstall Propellers 22
7 Perform Minor Repairs and Reconditioning of Propeller 26
8 Clean, Inspect, and Test Grid Coolers 30
9 Renew Steel Longitudinals and Hull Plating in Barge Main Hold 35
10 Overhaul and Renew Sea Valves 38
11 Inspect and Test Air Receivers and Relief Valves 41
12 Remove, Inspect, and Reinstall Rudder Assemblies 44
Page i (Rev-1)
13 Renew Rudder Lower Bearing Trunk 48
14 Preserve Spud and Spud Well Surfaces 50
15 Preserve Tender Freeboard – 100% 54
16 Preserve Barge Freeboard – 100% 57
17 Shrink Wrap Crane 60
18 Protect Small Boat Davit and Winch 62
19 Inspect Various Deck Fittings 64
20 Preserve Barge Buoy Deck 66
21 Renew Depth Indicating Transducers 69
22 Preserve Underwater Body (Barge) – 100% 72
23 Preserve Underwater Body (Tender) - 100% 74
24 Preserve Stern Tubes 76
25 Preserve and Disinfect Potable Water Tank (Barge) – 100% 78
26 Preserve and Disinfect Potable Water Tank (Tender) – 100% 81
27 Renew Barge Potable Water Transfer Piping 84
28 Routine Drydocking 87
29 Provide Temporary Logistics 91
Page ii (Rev-1)
List of Sketches
Work Item Sketch Number Page
This section is not applicable to this package.
Page iii (Rev-1)
Revisions Record
This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package.
Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.
DATE REV# WORK ITEM# CHANGES MADE
14 Jan 2009 1
List of Critical Inspection Items
Added Work Item 14.
9 Modified paragraph 3.1.
12 Modified paragraph 3.1.3.
27 Modified paragraph 3.1.
NOTE: All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.
Page iv (Rev-1)
List of Applicable References
The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at time of specification writing and during contract execution. Electronic copies of the latest Editions of MLCA Standard Specifications are available on the Internet and may be accessed at the following Internet Uniform Resource Locator (URL) address:
http://www.uscg.mil/mlclant/vdiv/standard_specifications.asp.
Guidance for obtaining copies of all other documents referenced herein is provided in the solicitation.
Order of precedence. In the event of conflicts between text of this specification and the applicable references specified herein, order of precedence shall be in accordance with MLCA Standard Specification 0000_STD, paragraph 3.2 (Order of precedence), unless otherwise specified by the Contracting Officer (KO). The Contractor shall immediately notify the KO in writing of any perceived conflicts contained herein. Nothing in these documents, however, supersedes applicable laws and regulations, unless a specific exemption has been obtained.
FEDERAL AND MILITARY SPECIFICATIONS AND STANDARDS
MIL-PRF-16173, 2006, Corrosive Preventive Compound, Solvent Cutback, Cold Application
MIL-PRF-18458, May 2003, Grease, Wire Rope-Exposed Gear
MIL-PRF-83483, Feb 1998, Thread Compound, Antiseize, Molybdenum Disulfide Petrolatum
MIL-STD-167-1, Nov 2005, Mechanical Vibrations of Shipboard Equipment (Type I - Environmental and Type II - Internally Excited)
MIL-STD-2191, Nov 1992, Repair Welding, Weld Cladding, Straightening, and Cold Rolling of Main Propulsion Shafting
OTHER GOVERNMENT DOCUMENTS, DRAWINGS, AND PUBLICATIONS
DOCUMENTS
Page v (Rev-1) http://www.uscg.mil/mlclant/vdiv/standard_specifications.asp
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 0000_STD, 2006 Edition, General Requirements
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 0740_STD, 2004 Edition, Welding and Allied Processes
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 1001_STD, 2004 Edition, Temporary Hull Accesses
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 8634_STD, 2004 Edition, Drydocking
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 8635_STD, 2004 Edition, Provide Temporary Logistics
DRAWINGS
Coast Guard Drawing 75 WAGL 4400-2, Rev C, 75 FT. Tow-Boat Propeller, (75 WLIC A-B-D)
Coast Guard Drawing 75D WAGL 0103-4, Rev C, General Arrangement
– Main Deck & Hold
Coast Guard Drawing 75D WAGL 0700-1, Rev A, Docking Plan
Coast Guard Drawing 75D WAGL 2200-1, Rev A, Rudder Stock and Fittings (75306-75307)
Coast Guard Drawing 75D WAGL 2200-2, Rev A, Steering Gear ARRG’T (75306-75307)
Coast Guard Drawing 75D WAGL 2901-2, Rev -, Tank Capacities – Fresh Water, Fuel Oil, & Trim Tanks
Coast Guard Drawing 75D WAGL 4103-10, Rev -, Cooling Water Flow Diagram (75309-75310)
Coast Guard Drawing 75D WAGL 4103-11, Rev -, Cooling Water Piping Plan (75309-75310)
Coast Guard Drawing 75D WAGL 4103-2, Rev B, Cooling Water Piping Plan
Coast Guard Drawing 75D WAGL 4103-3, Rev C, Cooling Water Piping Plan
Page vi (Rev-1)
Coast Guard Drawing 75D WAGL 4103-4, Rev A, Cooling Water Piping Details (75306-75307)
Coast Guard Drawing 75D WAGL 4103-8, Rev -, Cooling Water Flow Diagram (75306-75307)
Coast Guard Drawing 75D WAGL 4301-1, Rev 1, Shafting and Bearings
Coast Guard Drawing 75D WAGL 4901-1, Rev B, Compressed Air Flow Diagram
Coast Guard Drawing 90 CGB 2002-1, Rev -, 90-FT. BARGE A-Frame Derrick – GEN’L ARRGEMT. - Spud & Spud Well
Coast Guard Drawing 90 CGB 4103-001, Rev 2, Barge Skin Cooling System
Coast Guard Drawing 90B CGB 0103-2, Rev -, General Plans
Coast Guard Drawing 90B CGB 0103-3, Rev 5, Outboard Profile
Coast Guard Drawing 90B CGB 2901-2, Rev -, Tank Capacity Table for 90’x 24’x 6’6” Special Barge
Coast Guard Drawing 90B CGB 3603-001, Rev -, Potable Water System for 90’x 24’x 6’-6” Special Barge
Coast Guard Drawing 90B CGB-500-1, Rev -, Lines & Framing Plan 90’-0” x 24’-0” x 6’-6” Spec Barge
Coast Guard Drawing 90B-CGB-1103-6, Rev -, Transv. Sections & Frames for 90’ x 26’ x 6’-6” Special Barge
Coast Guard Drawing 90B-CGB-2002-13, Rev -, USCGB 90’ X 26 X 6’- 6” New Crane Installation
Coast Guard Drawing FL 6713-201, Rev B, CRP-V850 Transducer (B-
14) Adapter Assembly
Coast Guard Fleet Drawing FL 2602-10, Rev D, Spud Arrangements and Details
NAVSEA Drawing 803-2145807, Rev C, Propulsion Shafting And Components
PUBLICATIONS
Page vii (Rev-1)
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Jun 2006, Coatings and Color Manual
Raytheon V850 Color Echosounder, 2nd Edition, Mar 1993, Operation Manual
Fernstrum Gridcooler Installation and Maintenance Manual, 2006, Form 165
INDUSTRY STANDARDS
American Bureau of Shipping (ABS) 2, Rule Requirements for Survey After Construction, 2007, Part 7, Appendix Section 10, Guide for Bronze and Stainless Steel Propeller Castings
American National Standards Institute/NSF International (ANSI/NSF) 61, 2005, Drinking Water System Components - Health Effects
American Society for Testing and Materials (ASTM), D1709, 10 August 2001, Standard Test Methods for Impact Resistance of Plastic Film by the Free-Falling Dart Method
American Society for Testing and Materials (ASTM), D1922 Rev A, 10 November 2000, Standard Test Method for Propagation Tear Resistance of Plastic Film and Thin Sheeting by the Pendulum Method
American Society for Testing and Materials (ASTM) D882, 2002, Standard Test Method for Tensile Properties of Thin Plastic Sheeting
American Society of Mechanical Engineers (ASME), PTC 25, 2001, Pressure Relief Devices
American Water Works Association (AWWA) C652, 2002, Disinfection of Water-Storage Facilities
American Society of Mechanical Engineers (ASME) B16.34, 2004, Valves-Flanged, Threaded, and Welding End
Manufacturers' Standardization Society of the Valve and Fittings Industry (MSS) SP-80, 2003 Edition, Bronze Gate, Globe, Angle and Check Valves
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-72, 1999 Edition, Ball Valves with Flanged or Butt-Welding Ends for General Service
Page viii (Rev-1)
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-61, 2003 Edition, Pressure Testing Of Steel Valves
Commercial Item Description (CID) A-A-52624, Sep 2001, Antifreeze, Multi Engine Type, Ethylene Glycol (For Caterpillar applications, use CAT Extended Life Pre-Mix coolant.)
International Standard For Organization (ISO) 484/2, 1981, Shipbuilding - Ship Screw Propeller - Manufacturing Tolerances - Part 2: Propellers of Diameter Between 0.80 and 2.50 m, Inclusive
International Standard For Organization (ISO) 484/2, 1981, Shipbuilding - Ship Screw Propeller - Manufacturing tolerances - Part 2: Propellers of Diameter Between 0.80 and 2.50m, Inclusive
ASTM International (ASTM) D1330, 2004, Standard Specification for Rubber Sheet Gaskets
ASTM International (ASTM) D3951, Reapproved 2004, Standard Practice for Commercial Packaging
ASTM International (ASTM) E797, 2005, Standard Practice for Measuring Thickness by Manual Ultrasonic Pulse-Echo Contact Method
ASTM International (ASTM) F992, 2006, Standard Specification for Valve Label Plates
Page ix (Rev-1)
List of Government-furnished Property
The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.
WORK
ITEM
MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED
COST
($/UNIT)
1 Y **Shaft, Propeller NSN: 2010-01-377-2282 1 ea. 11,015.00
6 Y **Propeller Left Hand
NSN: 2010-01-377-2284 1 ea 6250.00
6 Y **Propeller Right Hand
NSN: 2010-01-377-2308 1 ea. 6250.00
12 Y **Rudder NSN: 2040-01-044-2516 1 ea. 2,500.00
Y **Rudder stock NSN: N/A 2 ea. 1,500.00
21 N ***Sonar Transducer
NSN: 5845-01-470-2500 3 ea. $172.38
*Government-loaned property, which shall be returned to the vessel upon completion of the availability.
**New or refurbished equipment that the Government may provide for installation in place of existing equipment.
***Government-furnished property, which is to be supplied by either the vessel, Electronic Systems Support Unit (ESU) or local Electronic Support Detachment (ESD).
Page x (Rev-1)
List of Critical Inspection Items
The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see Std Spec 0000_STD, paragraph 3.6.2 (Inspection report particulars)):
Work Item Title
1 Remove, Inspect, and Reinstall Propeller Shafts
8 Clean, Inspect, and Test Grid Coolers
12 Remove, Inspect, and Reinstall Rudder Assemblies
14 Preserve Spud and Spud Well Surfaces
24 Preserve Stern Tubes
Page xi (Rev-1)
Specification Feedback
The intent of this section is to inform all users that a spec feedback mechanism is in place, and is located on the MLCA Naval Engineering Division’s website. Spec feedback is a very important part of our overall continuous improvement process, and is crucial to specification development. It will allow spec writers to capture all specification-related lessons learned, and avoid mistakes or ambiguities in follow-on availabilities.
All feedback will be reviewed, evaluated, and responded to in a timely manner.
If you have access to the CGWeb (Intranet), please use the following link, which will connect you to the MLCA(v) Naval Engineering website, for submitting your feedbacks:
http://webapps.mlca.uscg.mil/vdiv/specifications/feedback/defaul t.cfm
If you do not have access to the CGWeb (Intranet), you may still submit your feedbacks, using the following web link:
http://www.uscg.mil/mlclant/vdiv/specfeedback.asp
Page xii (Rev-1) http://webapps.mlca.uscg.mil/vdiv/specifications/feedback/default.cfm http://webapps.mlca.uscg.mil/vdiv/specifications/feedback/default.cfm http://www.uscg.mil/mlclant/vdiv/specfeedback.asp
PC_75D_WLR_Wedge_90'Barge (09 Jan 2004)
75D WLR
Principal Characteristics
75' WLR (D Class) "Wedge" Small Buoy River Tender
Length Overall 75' 0"
Depth (main deck at side to baseline) 7' 7-3/4"
Maximum Beam 22' 0"
Height of Highest Projection (above DWL) 32' 3"
Frame Spacing 1' 0"
Full Load Draft 5' 0"
Full Load Displacement 145 long tons
Shore Tie Voltage Requirements 440V/100A
PROPELLERS / SHAFT
Number of Propellers 2
Number of Blades per Propeller 5
Diameter of Propeller 44"
Pitch 50" fixed
Revolutions per Minute (RPM) 480
Shaft Diameter 4.5”
CG BARGE
Length Overall (LOA) 90' 0"
Depth (main deck at side to baseline) 6' 6"
Maximum Beam 24' 0"
Frame Spacing 1' 6"
Full Load Draft 3' 3"
Full Load Displacement N/A
Shore Tie Voltage Requirements 440V/100A
Page xiii (Rev-1)
00000_PWB_FLT (08 Apr 2008)
General Requirements
1. SCOPE
1.1 Intent. This item describes the general requirements to be followed by the Contractor while conducting this availability.
2. APPLICABLE DOCUMENTS
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 0000_STD, 2006 Edition, General Requirements
Coast Guard Maintenance and Logistics Command Atlantic (MLCA) Standard Specification 0740_STD, 2004 Edition, Welding and Allied Processes
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Jun 2006, Coatings and Color Manual
3. REQUIREMENTS
3.1 General. The Contractor shall conform to all requirements specified in Std Spec 0000_STD and in this item, as applicable, during the performance of this availability.
NOTICE!
The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and also to all other work subsequently authorized by changes, modifications, or extensions to the contract.
3.2 Contractor-provided fire watch personnel. The Contractor
shall provide fire watch personnel and equipment.
3.3 Welding and brazing requirements. The Contractor shall
perform all welding and allied processes, and nondestructive inspection (NDI), in accordance with Std Spec 0740_STD.
3.4 Term substitution - COTR for COR. The Contractor shall be aware that the term "COR" (Contracting Officer's Representative) has been discontinued in favor of "COTR" (Contracting Officer's
Page 1 (Rev-1)
Technical Representative); consequently, whenever "COR" is encountered in this specification package, including referenced standard specifications and other referenced documents, it shall refer to "COTR", explicitly.
3.5 Small boat storage particulars. When two aluminum skiff
small boats are removed as interference to Contractor-work, the Contractor shall provide a suitable pierside storage cradle, for safely storing said boat.
3.5.1 Aluminum skiff boat cradle design. Ensure that the two
(2) cradles meet the following criteria:
• Be capable of safely supporting a boat weighing approximately 2500 pounds.
• Support the boat at the following locations:
• Along the full length of the flat portion of the keel.
• Forward and aft, in the locations similar to those provided by the shipboard davit cradle.
Have the portions of the cradle directly contacting the hull or keel of the boat made from a homogeneous soft wood, such as Yellow Pine or Douglas Fir.
3.5.2 Boat protective cover. Provide a watertight cover with
raised wooden spreaders, to protect the small boat from nature, during the storage period.
3.5.3 Boat accessibility. Ensure the storage is located in the vicinity of the vessel, and is unrestricted, to allow for ship's force to complete maintenance, if required.
3.5.4 Access to COMDTINST M10360.3. The COMDTINST M10360.3 may be accessed at the following URL address:
http://www.uscg.mil/directives/cim.asp
3.5.5 QA inspection forms. QA inspection forms (QA-1 thru QA- 5), required in Std Spec 0000_STD to be completed and submitted during preservation of "critical-coated surfaces", are provided at the end of this item.
4. NOTES
No additional requirements.
Page 2 (Rev-1) http://www.uscg.mil/directives/cim.asp
QA-1: QUALITY ASSURANCE INSPECTION FORM - PRESERVATION CHECKLIST
CHECKPOINT 1 - COATING SYSTEM COMPLIANCE
Ensure all coatings are in compliance with COMDTINST M10360.3, Appendix C.
CHECKPOINT 2 - PAINT STORAGE
Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating manufacturer(s).
CHECKPOINT 3 - AMBIENT CONDITIONS
Ensure surface and surrounding temperatures are each between 50 and 90°F for water-based coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).
Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).
Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating manufacturer(s).
CHECKPOINT 4 - PRE-SURFACE PREPARATION
Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down
(maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.
CHECKPOINT 5 - SURFACE PREPARATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-12, SP-11, SP-10?).
Verify surface anchor profile (1.5-3.5 mils for abrasive-blasted steel surfaces; 1.0 mil (minimum) for power-tool cleaned surfaces; 1.0-1.5 mils for abrasive-blasted aluminum surfaces); and 1.5 -2.5 for surfaces to be coated w/single coat of inorganic zinc).
Measure soluble salt conductivity (5 measurements per 1000 sqft) - maximum threshold: 70 microsiemens/cm for non-submerged surfaces and 30 microsiemens/cm for submerged surfaces.
CHECKPOINT 6 - PRIMER COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Verify proper mixing and stand-in (induction) times.
Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.
Ensure surfaces are completely dry, unless otherwise allowed by the Coating Manufacturer(s).
Verify wet film thickness at random, to prevent under or over application.
Brush out all runs, sags, drips, and puddles.
Perform visual inspection for holidays and other defects.
CHECKPOINT 7 - STRIPE COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer's instructions.
After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).
CHECKPOINT 8 - TOP COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer's instructions.
Verify proper mixing and stand-in (induction) times, as applicable.
Verify wet film thickness at random, to prevent under or over application.
Brush out all runs, sags, drips, and puddles.
CHECKPOINT 9 - FINAL INSPECTION
Verify final system dry film thickness.
Verify system cure for service resumption - U/W Body surfaces: 5-8 hours @ 77 degrees F; Potable water tanks: 7 days @
77 degrees F.
Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure (minimum 7 days @ 77 degrees F.), to exhaust all solvent to the atmosphere and to prevent solvent entrapment.
CHECKPOINT 10 - RECORD KEEPING
Complete, sign, and submit all provided QA Inspection Forms.
Signature of Inspector:______________________________________________________Date:____________
Page 3 (Rev-1)
QA-2. QUALITY ASSURANCE INSPECTION FORM
ENVIRONMENTAL READINGS
(Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat)
DATE TIME
ENTER ACTIVITY
(Surface preparation, primer coat, barrier coat, top coat, etc?)
LOCATION DEW
POINT
SURFACE
TEMP.
% REL.
HUMIDITY
SIGNATURE
OF
INSPECTOR
.Signature of Inspector:__________________________________________________Date:____________
Page 4 (Rev-1)
QA-3 QUALITY ASSURANCE INSPECTION FORM
SURFACE PROFILE LOG
Vessel Name And Hull Number:____USCGC WEDGE (WLR 75307)____________________
Work Item Title:_______________________________________________________________
Location Of Work (Including Frame Numbers):_____________________________________
Area (Square Feet):_____________
Surface Preparation Method:_____________________________________________________
Abrasive Manufacturer And Size:_________________________________________________
Degreasing Method Used:________________________________________________________
Number Of Hours Surfaces (Steel Only) Left Unpainted:______________________________
Sweep blasting performed to remove flash rusting (steel)? Yes/No:_____________________
Place Surface Profile Replica Tapes In The Spaces Provided Below, To Serve As Permanent QA record.
Maintain separate log for each area/location. When an Area Is Divided Into Separate Sections, Maintain A Separate Log for Each Section.
AVERAGE MILS
(IAW ASTM D4417,
METHOD C)
Place Surface Profile Replica Tape Here
Reading:__________ mils
• Place Surface Profile Replica Tape Here
Date and Time:__________________________________________________
Location of Surface Profile Measurements:___________________________________________________________
Signature of Inspector:____________________________________________________________________________
Page 5 (Rev-1)
QA-4. QUALITY ASSURANCE INSPECTION FORM
SURFACE SOLUBLE SALT CONDUCTIVITY LOG
Vessel Name and Hull Number:____ USCGC WEDGE (WLR 75307)___________________
Work Item Title:_______________________________________________________________
Location of Work (including frame numbers):_______________________________________
Area (square feet):____________
DATE TEST LOCATIONS CONDUCTIVITY
(microsiemens/cm)
Date and Time:_________________________________________
Signature of Inspector:___________________________________
Page 6 (Rev-1)
QA-5. QUALITY ASSURANCE DATA FORM
DRY FILM THICKNESS (DFT) MEASUREMENTS IAW SSPC PA-2
(Use one sheet for each sequence)
Vessel Name and Hull Number:____ USCGC WEDGE (WLR 75307)__________________
Work Item Title:______________________________________________________________
Coating Manufacturer:_________________________________________________________
Product Name:________________________________________________________________
Batch Number:________________________________________________________________
Induction Time:_______________________________________________________________
Coating System Sequence (Indicate whether: primer, touch-up primer, barrier coat, 3rd coat?):__________________
DFT
MEASUREMENT
NUMBER
LOCATION OF READINGS MEASURED DFT
Application Method (Airless, Conventional Spray, Rolled):____________________
Average DFT: __________________________________________________________
Date and Time: _________________________________________________________
Signature of Inspector: ___________________________________
Page 7 (Rev-1)
24310L_FLT (12 Apr 2007) 75307 D WLR (26 Oct 2007)
WORK ITEM 1: Remove, Inspect, and Reinstall Propeller Shafts
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to remove, inspect, and reinstall a designated propeller shafts.
1.2 Government-furnished property.
MTI ITEM
DESCRIPTION NSN/PN QTY
ESTIMATED
COST
($/UNIT)
Y **Shaft, Propeller NSN: 2010-01-377-2282 1 ea. 11,015.00
2. APPLICABLE DOCUMENTS
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 0740_STD, 2004 Edition, Welding and Allied Processes
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual
Coast Guard Drawing 75D WAGL 4301-1, Rev 1, Shafting and Bearings
3. REQUIREMENTS
3.1 General.
3.1.1 Critical Inspection Report. The Contractor shall submit a critical inspection report (CIR) for the inspections listed in the following paragraph(s):
• 3.2.2 (Inspections).
3.1.2 Related work items. The Contractor shall accomplish this work item in conjunction with the following, which are separate work items in this specification package:
Page 8 (Rev-1)
• “Remove, Inspect, and Reinstall Propellers".
• “Renew Water-Lubricated Shaft Bearings”.
• “Renew Propeller Shaft Sleeve(s)”.
• “Renew Shaft Strut Barrel”.
3.1.3 Interferences. The Contractor shall be aware that
interferences in way of work include, but are not limited to the following:
• Rope guard
• Fairwater
• Rudders.
3.2 Work to be accomplished. Using Coast Guard Drawing 75D WAGL 4301-1 as guidance, as applicable, the Contractor shall accomplish the following for a designated propeller shafts:
3.2.1 Removals.
• Mark existing shaft position, and match-mark shaft coupling bolts to their respective holes, to facilitate reinstallation procedures.
• Remove the shaft and attached components to a suitable repair facility. Ensure shaft is properly protected and supported at all bearing journals, at all times, until reinstallation.
3.2.2 Inspections. Clean the shaft free of all marine growth, and accomplish the following inspections (Submit CIR):
3.2.2.1 Visually inspect the following components, as applicable, for excessive wear and other mechanical defects such as nicks, cracks, and corrosion, as applicable:
• Shaft surfaces.
• Bearing surfaces.
• All shaft and propeller associated fasteners.
• Couplings.
• Stern tube/shaft sealing systems.
• Packing ring and glands.
NOTICE!
Page 9 (Rev-1)
Before taking shaft runout readings, spin the shaft on a lathe for approximately two hours at the vessel's maximum rated RPM to eliminate any sagging that may have occurred during handling and storage.
3.2.2.2 Accomplish the following measurements:
• Measure keys and keyways.
• Measure all bearing sleeve or journal diameters.
• Measure runouts for shaft taper, shaft straightness, and coupling end diameters.
• With the key in-place, fit the shaft coupling to the shaft in shop and check the contact percentage by bluing.
If the contact is less than 80%, the Contractor shall grind and hand stone the coupling hub to achieve a minimum of 80 percent contact, and verify by bluing again. Make a small inscription on the shaft to mark the coupling hub location and use it as a reference in final assembly. Measure and record the coupling face and bore runouts.
3.2.2.3 Perform nondestructive inspection of all bearing sleeves, shaft tapers, coupling bolts, keyways, and welded repair surfaces, in accordance with Std Spec 0740_STD, Appendix C.
3.2.3 Stern tube inspection. The Contractor shall perform a
visual inspection of the stern tube interior surfaces, and submit a CFR.
3.2.4 Reinstallation. Reinstall the propeller shaft to its original configuration and accomplish the following, using Coast Guard Drawing 75D WAGL 4301-1, as applicable.
3.2.4.1 Machine, grind, or hand-stone couplings, if necessary, to achieve an 80 percent contact. True couplings to shaft by cutting coupling faces and land area.
3.2.4.2 Renew all stainless steel self-locking nuts for packing glands.
3.2.4.3 Renew all packing materials.
Page 10 (Rev-1)
3.3 Post-repair operational testing. In the presence of the
Coast Guard Inspector, the Contractor shall thoroughly test and prove the shafting system to be in satisfactory operating condition. Conduct a sea trial to test the propeller shaft in all modes of operation for a minimum of 4 hours. Inspect and correct any excessive leakage, abnormal noise and excessive vibration.
3.4 Government’s option for equipment renewal. The Contractor shall be aware that the Government reserves the right to furnish a new rudder or rudder stock (or both) for installation in place of the existing component, at no additional cost to the Government. If the Government exercises this right, the Contractor shall turn over the designated component to the Coast Guard Property Administrator as an MTI item.
4. NOTES
This section is not applicable to this work item.
Page 11 (Rev-1)
24350L_FLT (06 Mar 2006) 75307 D "Wedge"_WLR (23 Jan 2004)
WORK ITEM 2: Straighten Shaft
1. SCOPE
1.1 Intent. This work item describes the requirements
for the Contractor to straighten a designated shaft.
1.2 Government-furnished property.
None.
2. APPLICABLE DOCUMENTS
MIL-STD-2191, Nov 1992, Repair Welding, Weld Cladding, Straightening, and Cold Rolling of Main Propulsion Shafting
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 0740_STD, 2004 Edition, Welding and Allied Processes
Coast Guard Drawing 75D WAGL 4301-1, Rev 1, Shafting and Bearings
3. REQUIREMENTS
3.1 Shaft straightening requirements. Based on
inspection results obtained from a related shaft work item in this specification package, or provided by the Coast Guard Inspector, the Contractor shall straighten the designated shaft, using Coast Guard Drawing 75D WAGL 4301- 1, and MIL-STD-2191 as guidance and as specified herein.
3.1.1 Pre-straightening inspection. Prior to initiating
straightening processes, determine the location, magnitude and type of bend in the shaft, with the entire shaft supported on centers in a lathe, as follows:
• Before taking shaft runout readings, spin the shaft on the lathe for approximately two hours to eliminate any sagging that may have occurred during handling and storage.
Page 12 (Rev-1)
• Conduct a dial indicator survey of shaft runout at stations spaced every two feet of shaft length to determine the magnitude and location of the bend.
• At each station, mark the position of maximum runout on the periphery of the shaft.
NOTICE!
Be aware that the marks on the shaft periphery will be in a straight line if the shaft contains a simple bend, and will spiral part way around the shaft, if the shaft is both bent and twisted.
• Plot the maximum runout to an exaggerated scale, in order to locate the center of the bend, and to determine the extent of straightening required.
• Submit a CFR including locations and magnitudes of the bend.
3.1.2 Straightening procedures. Straighten the shaft to
equal or less than 0.005" total indicator runout, using the localized heating (hot spotting method for carbon steel shafts, in accordance with MIL-STD-2191, Section
11.2.2.2 and sub-paragraphs).
3.1.3 Post-straightening inspections. After completion
of straightening procedures, accomplish inspections, and submit a CFR:
• Conduct non-destructive inspection of all straightened areas in accordance with Std Spec 0740_STD, Appendix C.
• Recheck the shaft surfaces, as specified in paragraph
3.1.1 (Pre-straightening inspection).
3.2 Government’s option for equipment renewal. The Contractor shall be aware that the Government reserves the right to furnish a new rudder or rudder stock (or both) for installation in place of the existing component, at no additional cost to the Government. If the Government exercises this right, the Contractor shall turn over the designated component to the Coast Guard Property Administrator as an MTI item.
4. NOTES
Page 13 (Rev-1)
24400L_FLT (01 Aug 2007) 75307_DMP (30 Jul 2008)
WORK ITEM 3: Renew Water-Lubricated Shaft Bearings
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to renew the water-lubricated bearings for the port and starboard shafts.
1.2 Government-furnished property.
None.
2. APPLICABLE DOCUMENTS
Coast Guard Drawing 75D WAGL 4301-1, Rev 1, Shafting and Bearings
3. REQUIREMENTS
3.1. Related work items. The Contractor shall accomplish this work item in conjunction with the following, which are separate work items in this specification package:
• “Remove, Inspect, and Reinstall Propeller Shafts”.
• “Remove, Inspect, and Reinstall Propellers”.
• “Preserve Stern Tubes”.
3.2 Related work item. The Contractor shall perform this work in conjunction with "", which is a separate work item in this specification package.
3.3 Bearing renewal. The Contractor shall accomplish the
following, using Coast Guard Drawing 75D WAGL 4301-1 as guidance:
3.3.1 Removal. Remove the existing water-lubricated bearings;
dispose of the removed bearings after visually inspection for any abnormal wear patterns which may indicate misalignment.
Submit CFR.
Page 14 (Rev-1)
3.3.2 Inspections.
3.3.2.1 Visual. Visually inspect the following:
• Chocking material, if installed in the bearing housings.
• Bearings.
• Bearing housing bores.
• Shaft journal in way of bearings.
3.3.2.2 Measurements. Measure the inner diameter of each
bearing housing at the forward, middle and aft positions.
3.3.2.3 Documentation. Submit a CFR after the inspection and
measurements.
3.3.3 New bearing installation. The Contractor shall furnish
water-lubricated bearings, and accomplish the following, using Coast Guard Drawing 75D WAGL 4301-1 as guidance:
3.3.3.1 In the presence of the Coast Guard Inspector, the
Contractor shall check the alignment of the stern tube, forward seal flange, and bearing carriers relative to the shaft centerline including any offsets by running a taut line, using the optical scopes method, or using laser alignment.
3.3.3.2 Machine the new bearings to fit the bearing housing in accordance with the manufacturer's installation recommendations.
Drill and tap new bolt holes on the new bearings to match the bearing housings for proper fit.
3.3.3.3 Install the new water-lubricated bearings in accordance with the bearing manufacturer's recommendations, using new monel or type 316 stainless steel fasteners.
3.4 Final measurement. After bearing installation, the
Contractor shall:
3.4.1 Measure final bearing clearances at 90-degree intervals around the shaft atforward and aft ends of the bearing: a total of 8 measurements per bearing.
3.4.2 Submit a CFR after taking the measurements.
3.4.3 Minimum operating bearing clearance shall be as follows:
DIAMETER OF
JOURNAL
(INCHES)
MINIMUM OPERATING CLEARANCE
OF NEW WATER-LUBRICATED
BEARINGS (INCHES)
Page 15 (Rev-1)
3 0.022 4 0.025 5 0.027 6 0.030 7 0.032 8 0.035 9 0.037 10 0.040 11 0.042 12 0.045 13 0.047 14 0.050
3.5 Inspection and operational test. The Contractor shall
accomplish the following:
3.5.1 Visual inspection. Visually inspect the new bearings and record bearing clearances, after shaft reinstallation.
3.5.2 Operational test. Conduct an operational test of the
shaft during sea trials, to ensure there is no evidence of binding, abnormal vibration, and noise during sea trials.
3.5.3 Inspection and test documentation. Submit a CFR upon
completion of inspection and test.
4. NOTES
Page 16 (Rev-1)
24420L_FLT (15 Dec 2006) 75D WLR (30 Jan 2004)
WORK ITEM 4: Renew Propeller Shaft Sleeve(s)
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to renew the sleeve(s) on the port and starboard propeller shafts.
1.2 Government-furnished property.
None.
2. APPLICABLE DOCUMENTS
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 0740_STD, 2004 Edition, Welding and Allied Processes
Coast Guard Drawing 75D WAGL 4301-1, Rev 1, Shafting and Bearings
NAVSEA Drawing 803-2145807, Rev C, Propulsion Shafting And Components
3. REQUIREMENTS
3.1 Related work items. The Contractor shall accomplish this
work item in conjunction with the following, which are separate work items in this specification package:
• “Remove, Inspect, and Reinstall Propeller Shafts”.
• “Preserve Stern Tubes”.
3.2 Sleeve renewal requirements. Using Coast Guard Drawing 75D WAGL 4301-1 as guidance, the Contractor shall accomplish the following, for the port and starboard propeller shafts:
3.2.1 Removal. Remove and dispose of the sleeve(s).
3.2.2 Inspections. Clean all shaft journal surfaces, and
Page 17 (Rev-1) accomplish the following:
3.2.2.1 Perform a visual inspection of the shaft journal
surfaces for corrosion, deterioration, and other signs of failures.
3.2.2.2 Measure and record in the shaft journal outside
diameter and the shaft bearing inside diameter in the following positions:
• Forward.
• Middle.
• Aft.
3.2.2.3 Conduct nondestructive testing of all shaft surfaces in the way of sleeve fit areas, in accordance with Std Spec 0740_STD, Appendix C.
3.2.3 Inspection report. The Contractor shall submit a CFR for the completed inspection and measurements.
3.2.4 New sleeve installation requirements. After the Coast
Guard Inspector has reviewed all measurement findings, the Contractor shall furnish new hard steel nickel-chrome-boron shaft sleeves (see 4.1) and accomplish the following:
3.2.4.1 Bore new sleeve ID to the dimensions based on the
recorded shaft journal OD readings, to facilitate an interference fit, as specified below.
3.2.4.2 Install the new sleeves onto the shaft with a shrink-fit equal to 0.00075-inch per inch of shaft diameter, in accordance with NAVSEA HM&E-STD 803-2145807, Table 8-1 (Shaft Sleeve Shrink Fit).
3.2.4.3 After installation, machine new steps at the end of
each sleeve where the shaft covering is required.
3.2.5 Concentricity measurement. Check the outside diameter of each shaft sleeve to ensure it is concentric with the axis of rotation within 0.0005 inch (0.001 inch runout).
3.2.6 Polishing. Polish the sleeve surfaces to a 32 micro-inch RMS finish, upon completion of installation and all required machining.
3.3 Final documentation. The Contractor shall provide a
complete set of the new sleeve dimensional readings to the COTR
Page 18 (Rev-1) within 48 hours after completion of sleeve installation. At a minimum, the set of readings shall include the new sleeve length, diameters (inside and outside) at the bearing journals, concentricity, and polish.
4. NOTES
4.1 Nickel-chrome-boron shaft sleeve suppliers. Suppliers for the nickel-chrome-boron shaft sleeve include, but are not limited to the following:
National Maintenance and Repair Hartford, Illinois Phone: (618) 254-7451
Dover Corp/Dover Diversified/Waukesha Bearings Corporation Waukesha, Wisconsin Phone: (414) 547-3381
Page 19 (Rev-1)
24430L_WLIC_WLR (06 Apr 2006) 75D WLR (09 Aug 2004)
WORK ITEM 5: Renew Shaft Strut Barrel
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to renew the strut barrel for a designated shaft.
1.2 Government-furnished property.
None.
2. APPLICABLE DOCUMENTS
Coast Guard Drawing 75D WAGL 4301-1, Rev 1, Shafting and Bearings
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual
3. REQUIREMENTS
3.1 Related work item. The Contractor shall perform this work in conjunction with "Remove, Inspect, and Reinstall Propeller Shafts", which is a separate work item in this specification package.
3.2 Strut barrel renewal. The Contractor shall accomplish the following, using Coast Guard Drawing 75D WAGL 4301-1 as guidance:
3.2.1 Removal. Crop, remove, and dispose of the designated
shaft strut barrel.
3.2.2 New barrel fabrication, alignment and installation.
Fabricate a new shaft strut barrel, using the existing barrel as template. In conjunction with the shaft alignment specified in the "Remove, Inspect, and Reinstall Propeller Shafts" work item, position the new strut barrel to ensure proper alignment to the shaft centerline. Once correct alignment has been established, accomplish the following:
Page 20 (Rev-1)
3.2.2.1 Tack-weld the strut barrel to the vertical shaft strut and ensure that proper alignment is maintained between the strut, stern tube and cooper bearing.
3.2.2.2 After proper alignment has been verified, weld the
strut barrel in place.
3.2.2.3 Line bore the strut barrel to the shaft centerline, with any proper bearing off-set as required.
3.2.2.4 Conduct a final alignment check; ensure alignment is
within 0.005".
3.2.3 Documentation. Submit to the COTR a written report of
all recorded readings and measurements taken as part of this work item.
3.3 Preservation. The Contractor shall preserve all new and
disturbed surfaces, using the system specified "Underwater Water (U/W) Body and Boot-Top (U/W Body and Boot-Top, Steel Hulls, in Fresh Water)" in COMDTINST M10360.3, Appendix A (Cutters and Boats Exterior Coating Systems).
3.4 Shaft strut renewal. If a Change Request has been released and authorized by the Contracting Officer (KO), the Contractor shall fabricate and install a new shaft strut, as shown on Coast Guard Drawing 75D WAGL 4301-1. Prepare and paint the new strut, as specified in section 3.3 (Preservation) herein.
4. NOTES
Page 21 (Rev-1)
24500L_FLT (20 June 2007) 75D WLR_DMP (02 Sept 2008)
WORK ITEM 6: Remove, Inspect, and Reinstall Propellers
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to remove, inspect, and reinstall port and starboard propellers.
DESCRIPTION NSN/PN QTY
ESTIMATED
COST
($/UNIT)
Y **Propeller Right Hand NSN: 2010-01-377-2308 1 ea. 6250.00
Y **Propeller Left Hand NSN: 2010-01-377-2284 1 ea 6250.00
2. APPLICABLE DOCUMENTS
MIL-PRF-16173, 2006, Corrosive Preventive Compound, Solvent Cutback, Cold Application
Coast Guard Drawing 75 WAGL 4400-2, Rev C, 75 FT. Tow-Boat Propeller, (75 WLIC A-B-D)
International Standard For Organization (ISO) 484/2, 1981, Shipbuilding - Ship Screw Propeller - Manufacturing Tolerances - Part 2: Propellers of Diameter Between 0.80 and 2.50 m, Inclusive
3. REQUIREMENTS
3.1 Related work items. The Contractor shall accomplish this
work item in conjunction with the following, which are separate work items in this specification package:
• “Remove, Inspect, and Reinstall Propeller Shafts".
• “Remove, Inspect, and Reinstall Rudder Assemblies”.
Page 22 (Rev-1)
3.2 Protective and safety measures. The Contractor shall
accomplish the following:
• Before removing each propeller or propeller nut, fit a shore from the floor of the dock to one propeller blade near the root, to prevent shock transmission to reduction gear, as necessary.
• Protect propeller blade edges and blade roots with suitable covers, at all times until reinstallation, to prevent damage.
3.3 Work to be accomplished. The Contractor shall accomplish
the following for each propeller using Coast Guard Drawing 75 WAGL 4400-2 as a reference:
3.3.1 Removal. Remove the propeller to a suitable repair shop.
NOTICE!
If it becomes necessary to apply heat to facilitate propeller removal, ensure that the hub temperature never exceeds 500 degrees Fahrenheit; in addition, ensure that gland, packing ring, fill and vent plugs are removed, and the adjacent shafting and canvas under the blade edge guards are protected from flame impingement.
3.3.2 Inspection. Visually inspect the propeller for any
damage, cracks, and other defects. Examine and record the suction and pressure face thickness, blade tip profiles, leading and trailing edges, contours, track, width, diameter, taper, pitch, and keyway of the propeller in accordance with ISO 484/2, Class I. Submit a written CFR.
3.3.3 Polishing. Polish the propeller to a uniform 63 micro-
inch RMS finish.
3.3.4 Propeller hub fitting check. In the presence of the
Coast Guard Inspector and with the key in place, carefully check the fit of the propeller hub bore to the shaft taper by applying Prussian blue to the shaft taper.
3.3.4.1 Uniform fit. Obtain a uniform fit of 60 percent
contact over the taper, with a slightly heavier fit on the larger end. Do not heat the shaft taper to compensate for a poor fit.
3.3.4.2 Propeller fit. If the fit is less than 60 percent, hand grind/stone the propeller hub bore to achieve the required fit.
Page 23 (Rev-1)
WARNING!
Do not machine the shaft taper.
3.3.4.3 Location inscription. When 60 percent fit has been
obtained, make a small inscription on the shaft to mark the propeller location. Use this mark as a reference in final assembly.
3.4 Propeller Installation.
3.4.1 Cleaning. For the final assembly, the propeller bore and shaft taper surfaces shall be clean and free of bluing, lubricants, dirt, foreign particles, or any other substance, which would hinder moving the propeller along the taper.
Install the propeller with dry metal-to-metal contact to obtain the maximum frictional force for torque transmission. Renew the rubber O-rings and packing before reassembly, if applicable.
3.4.2 Assembly. With the propeller installed on the taper in
the same position as when fitted, install the propeller nut and drive up the propeller until it is advanced forward about 1/16" beyond the inscribed mark as specified in 3.2.4.3 (Location inscription). Lock the nut in place with an appropriate locking device.
NOTICE!
It is prohibited to use grease, oil, or other substances on the taper to help drive the propeller.
3.4.3 Void filling. When applicable, the Contractor shall fill all internal voids in the propeller hub and cap with rust preventive compound conforming to MIL-PRF-16173. Renew all brass plugs.
3.4.4 Adhere to the following warnings:
• Do not heat the propeller hub, to compensate for a poor fit on the shaft taper.
• Do not machine the shaft taper to achieve the required fit.
3.4.4.1 Lock propeller nut in place with new stainless steel
lock washer or monel cap screws.
Page 24 (Rev-1)
3.5 Propeller change-out. The Contractor shall be aware that
the Government reserves the right to furnish a propeller to be installed in-place of the one removed. When the Government exercises this right, the Contractor shall turn over the removed propeller to the Coast Guard PA as a MTI item. If a Change Request has been authorized and released by the KO, the Contractor shall inspect the Government-furnished propeller, and submit a CFR including any additional work that may be required to install the new propeller to the existing shaft.
3.5.1 Propeller details. 44" dia x 50" pitch 5-blade Nickel
Aluminum Bronze propellers.
Page 25 (Rev-1)
24520L_FLT (20 Jun 2007) 75E WLR (05 Jan 2005)
WORK ITEM 7: Perform Minor Repairs and Reconditioning of Propeller
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to perform minor repairs and reconditioning of a designated propeller.
1.2 Government-furnished property.
None.
2. APPLICABLE DOCUMENTS
MIL-STD-167-1, Nov 2005, Mechanical Vibrations of Shipboard Equipment (Type I - Environmental and Type II - Internally Excited)
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 0740_STD, 2004 Edition, Welding and Allied Processes
American Bureau of Shipping (ABS) 2, Rule Requirements for Survey After Construction, 2007, Part 7, Appendix Section 10, Guide for Bronze and Stainless Steel Propeller Castings
ASTM International (ASTM) D3951, Reapproved 2004, Standard Practice for Commercial Packaging
International Standard For Organization (ISO) 484/2, 1981, Shipbuilding - Ship Screw Propeller - Manufacturing tolerances - Part 2: Propellers of Diameter Between 0.80 and 2.50m, Inclusive
3. REQUIREMENTS
3.1 Related work item. The Contractor shall accomplish the
work specified herein in conjunction with "Remove, Inspect, and Reinstall Propellers", which is a separate work item in this specification package.
Page 26 (Rev-1)
3.2 Requirements for repairs and reconditioning. The
Contractor shall accomplish the following:
3.2.1 General requirements. Perform minor repair and
reconditioning tasks on the surfaces of the designated propeller, including threaded holes, in accordance with ABS-2, Part 7, Appendix Section 10, Subsection 1 (Bronze Propellers), for the conditions defined in 3.5.2 (Conditions for minor repair and reconditioning). In addition, perform straightening, welding, heat-treating, re-pitching, and stress-relieving, as necessary, to restore the propeller to a serviceable condition, as defined in section 3.5.6 (Serviceable condition). Ensure that removal and/or addition of material should be limited to the minimum necessary to accomplish the required repairs.
3.2.1.1 All propeller tolerances must conform to the Class I
standard specified in ISO 484/2.
3.2.2 Balancing. Perform single-plane balancing of both
reconditioned propeller and cap on rotational balancing equipment to ensure freedom from vibration in accordance with MIL-STD-167-1 for Type II (internally excited) vibration;
observe the following requirements:
3.2.2.1 Material removal. Remove material as evenly as
possible from over the entire blade surface (both suction and pressure faces) but not closer to the blade edges than 10 percent of the blade width, to prevent "thin spots" when balancing the propeller.
3.2.2.2 Addition of weight. Add weight to inside the propeller cap by welding, if necessary, to balance the cap, ensuring that the added material is clear of the propeller nut, the locking key, and the end of the propeller shaft.
3.2.2.3 Restrictions. Ensure that the maximum permissible
residual unbalance does not exceed the value determined by the following formulas for the speeds specified in table I below if no specific maximum permissible residual unbalance value provided by the Coast Guard Inspector.
TABLE I. Maximum permissible residual unbalance.
SPEED
(RPM) FORMULA
0 to 149 U = 0.177W 150 to 1,000 U = (400W)/(N x N) 1,000+ U = 4W/N
Page 27 (Rev-1)
Where U = Maximum allowable residual unbalance (ounce-inches) W = Weight of rotating part (pounds) N = Maximum operating speed (revolution/minute)
3.3 Post repair inspections. Upon completion of required
repairs and reconditioning, the Contractor shall accomplish the following inspections, and submit a CFR:
3.3.1 Measurements. Measure and record the propeller
dimensional tolerances, to ensure they match the requirement provided by the Coast Guard Inspector and ISO 484/2, Class I.
3.3.2 Nondestructive testing. The Contractor shall conduct
non-destructive inspection of all repaired areas, in accordance with Std Spec 0740_STD, Appendix C.
3.4 Post repair care and handling. Upon completion of all
repairs and inspections specified herein, the Contractor…
This is the start of the file's text. The full file is on GovTribe.
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Wedge Spec Rev | — | |
| Amendment 02 Wedge.pdf | ||
| Amendment 00002 RFIs.pdf | ||
| Supplies or Services and Price Costs | — | |
| Wedge Spec Rev | — | |
| Amendment 01 Wedge.pdf | ||
| Solicitation DD WEDGE.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .