USCG specification CMS-1287_ Floating Pier Replacement.doc
DOC document 264 KB Posted
- Attached to
- FLOATING PIER REPLACEMENT AT PIER 3 Federal contract opportunity
- Solicitation number
- HSCG42-11-Q-PFC004
About this file
USCG specification CMS-1287_ Floating Pier Replacement
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| USCG drawing T-6132-CD.pdf | ||
| RFQ solic PFC004 pages 3-FINISH.doc | DOC document | |
| SF1442_RFQ solic pages 1-2.doc | DOC document | |
| USCG drawing T-6133-CD.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TRAINING CENTER
CAPE MAY, NJ
FACILITIES ENGINEERING
DIVISION
CMS-1287
SAMS No.: 2792247
OCTOBER, 2010
SPECIFICATION FOR
FLOATING PIER REPLACEMENT
PIER 3, RPFN P03
TRACEN CAPE MAY
CAPE MAY, NEW JERSEY
TABLE OF CONTENTS
1DRAWING INDEX
1REFERENCE DOCUMENTS
2DIVISION 01 – GENERAL REQUIREMENTS
2SECTION 01 10 00 SUMMARY
4SECTION 01 30 00 ADMINISTRATIVE REQUIREMENTS
7SECTION 01 32 16 CONSTRUCTION PROGRESS SCHEDULE
10SECTION 01 33 00 SUBMITTAL PROCEDURES
20SECTION 01 40 00 QUALITY REQUIREMENTS
26SECTION 01 50 00 TEMPORARY FACILITIES AND CONTROLS
30SECTION 01 60 00 PRODUCT REQUIREMENTS
33SECTION 01 70 00 EXECUTION AND CLOSEOUT REQUIREMENTS
35SECTION 01 70 10 GENERAL CLEANING
37SECTION 01 74 19 CONSTRUCTION WASTE MANAGEMENT & DISPOSAL
40SECTION 01 90 99 FIRE PREVENTION AND LIFE SAFETY PROTECTION
44DIVISION 02 – EXISTING CONDITIONS
44SECTION 02 41 16 STRUCTURE DEMOLITION
47DIVISION 31 - EARTHWORK
47SECTION 31 62 10 STEEL PILES
51DIVISION 35 – WATERWAY AND MARINE CONSTRUCTION
51SECTION 35 51 13 CONCRETE FLOATING PIER FOR SMALL CRAFT
DRAWING INDEX
| T-6132-CD |
| SITE PLAN |
| SHT 1 of 2 |
| T-6133-CD |
| PROFILE, SECTION, DETAILS |
| SHT 2 of 2 |
DRAWINGS: Drawings and the accompanying specifications are the property of the Government and comprise legal documentation that pertains exclusively to this project. Drawings can only be obtained electronically by downloading the files identified with the solicitation at https://www.fbo.gov . Hard copies will not be provided.
REFERENCE DOCUMENTS
NJDEP Federal Consistency Determination, dated 8/13/10, NJDEP File No. 0502-05-0008.1 (CDT 100003).
U.S. Army Corps of Engineers permit, dated 8/27/10, file number CENAP-OP-R-2010-0509-46 (LOP).
DIVISION 01 – GENERAL REQUIREMENTS
SECTION 01 10 00
SUMMARY
PART 1 GENERAL
1.1 CONTRACT DESCRIPTION
A. Work of the Project includes all materials, labor, equipment, services, and all operations necessary for the replacement of an existing floating pier located at Pier 3 at the United States Coast Guard Training Center (TRACEN) Cape May, New Jersey. Major work items include but are not limited to:
1. Provide and install new 8’ wide by 50’ long concrete floating pier;
2. Provide and install two 14” dia. By 40’ long steel piles.
3. Removal and disposal of the existing floating pier;
4. Mobilization, demobilization and clean up;
5. Supervision, materials, equipment, transportation, labor and all other incidentals necessary to complete the work.
1.2 CONTRACTOR'S USE OF SITE
A. Access to Site: Work on this contract shall be performed while the unit is in full operational status. Work shall be conducted around all government functions. No work can begin until a construction progress schedule, is approved by the Coast Guard.
B. Time Restrictions for Performing Work: The Contractor will be permitted to perform construction work through the hours of 8:00 am and 4:30 PM Mondays through Fridays, excluding Saturdays, Sundays and Federal Holidays. Work performed other than in these periods of time will only be allowed after approval of the Contracting Officer’s Technical Representative (COTR) following a 48 hour (72 hours for Sundays and Mondays) advance request.
C. Access to Base: Prior to commencement of the contract, the Contractor and all sub-contractors are required to register with the USCG TRACEN Cape May Security Office. Background screenings will be performed by TRACEN Security for all employees of the Contractor and sub-contractors working on the Base. The Contractor shall contact USCG TRACEN Cape May Security Office at (609) 898-6915 for detailed requirements.
D. Training Center Regulations: The Contractor, his employees, and subcontractors shall become familiar with and obey all Training Center regulations. All personnel employed on the project shall keep within the limits of the work and avenues of ingress and egress, and shall not enter any other areas outside of the site of the work unless required to do so in the performance of their duties. The Contractor's equipment shall be conspicuously marked for identification.
1.3 GOVERNMENT OCCUPANCY
A. The Government will occupy the site during the entire period of construction.
B. Cooperate with Government to minimize conflict, and to facilitate Government's operations.
C. Schedule the Work to accommodate Government occupancy.
1.4 SUB-CONTRACTOR RESPONSIBILITIES
A. Sub-contractors shall comply with the conditions of the contract. All general conditions and contract requirements shall be provided to all sub-contractors by the Contractor.
1.5 SPECIFICATION CONVENTIONS
A. These specifications are written in imperative mood and streamlined form. This imperative language is directed to the Contractor, unless specifically noted otherwise. The words “shall be” are included by inference where a colon (:) is used within sentences or phrases.
PART 2 PRODUCTS - Not Used
PART 3 EXECUTION - Not Used
END OF SECTION
DIVISION 01 – GENERAL REQUIREMENTS
SECTION 01 30 00
ADMINISTRATIVE REQUIREMENTS
PART 4 GENERAL
4.1 PRE-BID SITE VISIT
A. Bidders are responsible for visiting the site to field verify existing conditions and determine actual dimensions and the nature of the work required. Failure to visit the site does not relinquish the bidder from determining the extent and scope of the work required and estimating the difficulty and cost to complete the project. Requests for equitable adjustments, in either time or money, arising from failing to field verify site conditions may be denied. Provisions regarding the site visit requirements are outlined in FAR Clause 52.236-3 “Site Investigation and Conditions Affecting the Work”
B. During the Solicitation Phase of this Project, two Pre-Bid site visits will be scheduled by the Owner. The first pre-bid site visit will held two weeks after the release of the Solicitation. The second Pre-Bid site visit will be held three weeks after the release of the Solicitation. It is the responsibility of the contractor to contact the Project Engineer, Robert J. Caruso, PE, Civil Engineer, Facilities Engineering, Design Section, at (609) 898-6402 to obtain the specific dates, as no other site visits will be scheduled.
4.2 SITE CONDITION VERIFICATION
A. The Contractor shall verify the conditions of the existing site, equipment and facilities potentially affected by the work under this contract and photograph and/or videotape the conditions in order to document their pre-construction condition. Copies of the photos and videos shall be submitted to the Contracting Officer prior to starting work.
4.3 COORDINATION AND PROJECT CONDITIONS
A. Coordinate scheduling, submittals, and Work of various sections of this specification to ensure efficient and orderly sequence of installation of interdependent construction elements.
B. Coordinate completion and clean-up of Work.
4.4 PRECONSTRUCTION MEETING
A. The Contract Specialist (KSP) will schedule meeting after Notice of Award.
B. Attendance Required: KSP, Contracting Officer’s Technical Representative (COTR) and Contractor.
C. The agenda will be provided by the KSP after the contract is awarded.
4.5 PROGRESS AND TECHNICAL REVIEW MEETINGS: Either party may request a meeting to review the progress of the project and/or review or clarify the technical requirements of the specifications. Meetings generally take place at the project site.
4.6 SAFETY AND HEALTH STANDARDS: The contractor shall comply with all the requirements in the Occupational Safety and Health Act (OSHA) 29 CFR 1910 and the U.S. Army Corps of Engineers (USACE) Safety and Health Requirements Manual No. 385-1-1.
4.7 EQUIPMENT: The contractor shall supply all equipment necessary to perform all work.
4.8 RECEIPT OF MATERIALS: Shipments of equipment, materials, and supplies shall be addressed to the Contractor - not the Coast Guard. The contractor shall provide all equipment, materials and labor for off-loading. The Coast Guard will not accept shipments for the Contractor.
4.9 SPECIAL WORKING CONDITIONS: Contractor's personnel shall wear outer garments consisting of at least a tee shirt, long trousers, (down to the ankles), and shoes at all times while at the job site. They shall not communicate with recruits or the instructors.
4.10 CUTTING AND PATCHING
A. General: Execute cutting and patching to complement adjacent work, in order to fit or integrate products together using methods to avoid damage and to provide appropriate surfaces to receive patching and finishing. Restore work with new products in accordance with requirements of the contract documents.
1. Structural elements: do not cut and patch structural elements in a manner that could change their load-carrying capacity or load-deflection ratio.
2. Operational elements: do not cut and patch operating elements and related components in a manner that results in reducing their capacity to perform as intended.
3. Visual requirements: do not cut and patch construction in a manner that results in visual evidence of cutting and patching.
4. Before proceeding, meet at project site with COTR and parties involved in cutting and patching, including mechanical and electrical trades. Review areas of potential interference and conflict. Coordinate procedures and resolve potential conflicts before proceeding.
B. Materials: Use materials identical to existing materials. For exposed surfaces, use materials that visually match existing adjacent surfaces to the fullest extent possible. If identical materials are unavailable or cannot be used, use materials that, when installed, will match the visual and functional performance of existing materials. Verify material substitutions with the COTR prior to application and installation.
C. Examination: Examine existing conditions prior to commencing work including elements subject to damage or movement during cutting and patching. Beginning of cutting and patching means acceptance of existing conditions.
D. Preparation: Provide temporary support of work to be cut.
E. Performance: Employ skilled workers to perform cutting and patching. In general, use hand or small power tools designed for sawing and grinding, not hammering and chopping. Cut holes and slots as small as possible, neatly to size required, and with minimum disturbance of adjacent surfaces. Temporarily cover openings when not in use.
F. Patch construction by filling, repairing, refinishing, closing up, and similar operations following performance of other work. Patch with durable seams that are as invisible as possible. Provide materials and comply with installation requirements specified in other sections of these specifications.
4.11 SELECTIVE DEMOLITION
A. General: Quality assurance: any soiling, staining, breakage or other damage caused by the contractor shall be the sole responsibility of the contractor to clean, repair or replace to original condition all such items at no additional cost to the USCG. Maintain existing utilities indicated to remain in service and protect them against damage during selective demolition operations.
B. Perform demolition in such manner as to eliminate hazards to persons and property; to minimize interference with use of adjacent areas, utilities and structures or interruption of use of such utilities; and to provide free passage to and from such adjacent areas of structures.
1. Adjoining areas: avoid interference with use of adjoining areas or interruption of free passage to adjoining areas.
4.12 USCG CONTRACT PERSONNEL DEFINITIONS
A. Contracting Officer: Assigned by the US Coast Guard to execute the contract and enforce all contract requirements. Hereon referred to as the “KO”.
B. Contract Specialist: Appointed by the Contracting Officer (KO) to administer the contract. Hereon referred to as the “KSP”.
C. Contracting Officer’s Technical Representative: Appointed by the Contracting Officer (KO) to monitor the performance of the contract to ensure compliance with the contract requirements. Hereon referred to as the “COTR”
D. Project Engineer: Assigned by the US Coast Guard to provide technical assistance to the Contracting Officer’s Technical Representative (COTR).
PART 5 PRODUCTS - Not Used
PART 6 EXECUTION- Not Used
END OF SECTION
DIVISION 01 – GENERAL REQUIREMENTS
SECTION 01 32 16
CONSTRUCTION PROGRESS SCHEDULE
PART 7 GENERAL
7.1 DESCRIPTION
A. The intention of this Section is to adequately plan and execute the Work of the Construction Contract so that it is completed within the number of calendar days allowed, and to assist the Contracting Officer (KO) in appraising the reasonableness of the proposed schedule and in evaluating progress of the Work. Prepare and maintain the schedules and reports described in this Section.
B. Definitions:
1. "Day," as used throughout the Contract unless otherwise stated, means "calendar day”.
7.2 QUALITY ASSURANCE
A. The construction schedule as submitted by the Contractor and approved by the Contracting Officer will be an integral part of the Contract and will establish interim completion dates for the various activities under Contract.
B. Should any activity not be completed within 15 days after the stated schedule date, the Contractor shall explain in writing how this portion of the project can be expedited so as to not affect the remaining portions of the Contract.
7.3 FORMAT
A. The Contractor is requested to use Microsoft Project to prepare construction schedules.
B. Listings: Reading from left to right, in ascending order for each activity. Identify each activity with applicable specification section number.
C. Diagram Sheet Size: 11 inches high x 17 inches wide.
D. Scale and Spacing: To allow for notations and revisions.
7.4 CONSTRUCTION SCHEDULES
A. Within 10 days after date established in Notice to Proceed, submit one paper copy and one electronic copy of proposed construction schedule prepared in accordance with this section.
B. Graphically show by bar-chart all activities necessary to complete the Work.
C. Include, but do not necessarily limit indicated activities to:
1. Project mobilization;
2. Submittal and approval of Shop Drawings and Samples;
3. Demolition;
4. Procurement of equipment and critical materials;
5. Fabrication of special material and equipment, and its installation and testing;
6. Final cleanup;
7. Final inspecting and testing.
D. Include time for all activities by the Contracting Officer that affect progress, required dates for completion, or both, for all and each part of the work.
7.5 SCHEDULE OF VALUES
A. This schedule shall be prepared as a detailed cost breakdown of the contract price and be submitted with the Construction Schedule. This schedule shall include but not be limited to costs of materials, equipment, and labor for all major work categories shown on the Construction Schedule. The Contractor shall adhere to the following guidelines when developing the Schedule of Values.
1. Format-The line items in the Schedule of Values shall be the same as that of the Construction Schedule.
2. Bonds-Bonding costs will only be paid in a lump sum if they are broken out separately and included with the schedule of values. The Contractor shall provide evidence that he has furnished full payment to the surety.
B. Materials-To request progress payments for materials delivered to the construction or fabrication site, the particular category of work associated with the materials must be broken down into separate material and labor costs.
7.6 PROGRESS SCHEDULES
A. Maintain schedules to record actual start and finish dates of completed activities.
B. Indicate progress of each activity to date of revision, with projected completion date of each activity. Update diagrams to graphically depict current status of Work.
C. Identify activities modified since previous submittal, major changes in Work, and other identifiable changes.
D. Indicate changes required to maintain Date of Completion.
E. Submit sorts required to support recommended changes.
F. Prepare narrative report to define problem areas, anticipated delays, and impact on schedule. Report corrective action taken or proposed and its effect including effects of changes on schedules of separate contractors.
PART 8 PRODUCTS - Not Used
PART 9 EXECUTION - Not Used
END OF SECTION
DIVISION 01 – GENERAL REQUIREMENTS
SECTION 01 33 00
SUBMITTAL PROCEDURES
PART 10 GENERAL
10.1 DESCRIPTION
A. The Contractor shall prepare all submittals required by this specification and/or submittals itemized on the “Submittal List” found at the end of this Section.
B. The Contractor shall prepare any additional submittals deemed necessary by the Contracting Officer’s Technical Representative (COTR).
C. The Contractor shall prepare a Submittal Schedule within 10 days after Notice to Proceed for Submittals.
10.2 SUBMITTAL PROCEDURES
A. Submit four (4) copies of all submittals to the Contracting Officer (KO) for review and approval prior to the start of construction unless noted otherwise.
B. Submit one (1) copy of all submittals to the COTR for review prior to the start of construction unless noted otherwise.
C. The Contractor shall allow 14 calendar days, excluding delivery time, for the submittal review process.
D. Transmit each submittal with the Material Approval Request Form.
E. Identify Project, Contract Number, Contractor, subcontractor and supplier; pertinent drawing and detail number, and specification section number, appropriate to submittal.
F. The contractor shall furnish the Contracting Officer (KO) a minimum of three (3) copies of information called out in the respective sections of this Contract. Any deviations from the specification shall be so noted on the submittal. Stamp each sheet with the Contractor's certification stamp. Data submitted in a bound volume or on one sheet printed on two sides may be stamped on the front of the first sheet only. The Contractor's certification stamp shall be as follows:
"It is hereby certified that the (equipment) (material) shown and marked in this submittal is that proposed to be incorporated into Contract Number ____________, is in compliance with the Contract drawings and specifications, can be installed in the allocated spaces, and is submitted for Government approval. Certified by _______________________ Date __________________"
G. The person signing the certification shall be the same person designated in writing by the contractor as having that authority. The signature shall be an original (signed in ink). Stamped signatures are not acceptable.
H. Schedule submittals to expedite Project, and deliver to the COTR at TRACEN Cape May Facilities Engineering. Coordinate submission of related items.
I. Identify variations from Contract Documents and product or system limitations that may be detrimental to successful performance of completed Work.
J. Allow space on submittals for Contractor and Contracting Officer’s Technical Representative review stamps.
K. When revised for resubmission, identify changes made since previous submission.
L. Distribute copies of reviewed submittals as appropriate. Instruct parties to promptly report inability to comply with requirements.
M. Submittals not requested will not be recognized or processed.
10.3 PRE-CONSTRUCTION SUBMITTALS
A. Submit Pre-Construction submittals within 10 calendar days after receipt of the Notice to Proceed for Submittals.
B. Submit a Construction Schedule, Schedule of Values and Pre-Construction Photographs or Videos. Submit Progress Schedules and in accordance to Section 01 32 16.
C. Submit a Safety Plan that is tailored to the project and is based on the requirements identified in the OSHA Manual 29 CFR 1910 and the USACE Safety and Health Requirements #385-1-1. The General Contractor shall be responsible for the safety of all personnel at the project site for the duration of the Contract.
D. Submit an initial submittal schedule in accordance with Part 1.4.A. of this section.
10.4 SUBMITTALS FOR SITE WORK
A. Submit an initial submittal schedule within 10 calendar days after receipt of the Notice to Proceed for Submittals for all major products proposed for use and work to be performed in this contract. The submittal schedule shall include the project name, contract number, contractor name and date. The submittal schedule shall also include columns for specification section, description, data submitted, date submitted, date returned, status of approval and notes. After review of the submittal schedule by the COTR, resubmit the revised schedule within 10 calendar days.
B. The Contractor shall begin submitting for approval submittals items within 10 calendar days after the Notice to Proceed for Submittals. Submittals shall include all information required by this specification and/or itemized on the “Submittal List” found at the end of this section.
C. The Contractor shall promptly resubmit all unapproved submittals.
D. No work shall be installed until approval of the submittal has been made. Proceeding with work utilizing submittal items requiring COTR's approval or acceptance, prior to receiving said approval or acceptance, shall be at the Contractor's risk and may jeopardize contract performance.
E. The KO and the COTR reserves the right to request additional submittals as the work on this contract progresses.
F. Defective Work: Acceptance of submittals does not restrict the Government's right to reject materials at a later date where inspection reveals latent defects in all or individual items, departures from requirements of the contract, use of damaged articles or materials and improper installation; nor does this approval prejudice the Government's rights of rejecting any work found defective during the final inspection and acceptance.
10.5 PRODUCT DATA
A. Product Data: Submit pursuant to Part 1.2 of this section for review for conformance with contract.
B. Mark each copy to identify applicable products, models, options, and other data. Supplement manufacturers' standard data to provide information specific to this Project.
C. Indicate product utility and electrical characteristics, utility connection requirements, and location of utility outlets for service for functional equipment and appliances.
10.6 SHOP DRAWINGS
A. Shop Drawings: Submit pursuant to Part 1.2 of this section for review for conformance with contract.
B. Shop drawing submittals shall be drawings, diagrams, schedules and other data specially prepared for the work of this contract by the contractor or any subcontractor, manufacturer, supplier or distributor to illustrate a portion of work to be installed under this contract.
C. Indicate special utility and electrical characteristics, utility connection requirements, and location of utility outlets for service for functional equipment and appliances.
D. When required by individual specification sections, provide shop drawings signed and sealed by professional engineer responsible for designing components shown on shop drawings.
1. Include signed and sealed calculations to support design.
2. Submit drawings and calculations in form suitable for submission to and approval by authorities having jurisdiction.
3. Make revisions and provide additional information when required by authorities having jurisdiction.
10.7 DESIGN DATA
A. Submit pursuant to Part 1.2 of this section for review for conformance with contract.
B. Submit for information for limited purpose of assessing conformance with information given and design concept expressed in Contract Documents.
10.8 CERTIFICATIONS
A. Manufacturer's certification furnished by the Contractor on items of materials and equipment incorporated into the work will be accepted only when this method will assure full compliance with the provisions of the contract, as determined by the Contracting Officer. Pre-printed certificates will not be acceptable. All certifications shall be in the original. The original of all manufacturers’ certifications shall name the appropriate item of equipment or material, specification, standard, or other document specified as controlling the quality of that item and shall have attached thereto certified copies of test data upon which the certifications are based. All certificates shall be signed by the manufacturer's official authorized to sign certificates of conformance or compliance.
B. When specified in individual specification sections, submit certification to Contracting Officer’s Technical Representative, in quantities specified for Product Data.
C. Indicate material or product conforms to or exceeds specified requirements. Submit supporting reference data, affidavits, and certifications as appropriate.
10.9 MANUFACTURER'S INSTRUCTIONS
A. When specified in individual specification sections, submit printed instructions for delivery, storage, assembly, installation, start-up, adjusting, and finishing, to Contracting Officer’s Technical Representative in quantities specified for Product Data.
B. Indicate special procedures, perimeter conditions requiring special attention, and special environmental criteria required for application or installation.
10.10 MANUFACTURER’S AND INSTALLERS QUALIFICATIONS
A. When requested by the Contracting Officer (KO), submit qualifications of the manufacturers or installers as required. Qualifications shall include a list of projects of similar nature and a list of five references, minimum, with all contact information. Additional references may be required upon request.
10.11 OPERATIONS AND MAINTENANCE MANUALS
A. Submit Operations and Maintenance Manuals in accordance with Section 01 70 00.
10.12 CLOSEOUT SUBMITTALS
A. Submit Closeout Submittals in accordance with Section 01 70 00.
PART 11 PRODUCTS - Not Used
PART 12 EXECUTION - Not Used
END OF SECTION
This page intentionally left blank.
Submittal List
| SECTION NO. |
| ARTICLE NO. |
| Description |
| PRE-CONST. SUBMITTALS |
| PRODUCT DATA |
| SHOP DRAWINGS |
| SAMPLES |
| DESIGN DATA |
| TEST REPORTS |
| CERTIFICATIONS |
| LABORATORY REPORTS |
| MANUF. INSTRUCT. |
| MANUF. FIELD REPORTS |
| MANUF. / INST. QUALIF. |
| OPER. / MAINT. MANUALS |
| CLOSEOUT SUBMITTALS |
| 01 32 16 |
| 1.4 |
| Construction Project Schedule |
| X |
| 1.5 |
| Schedule of Values |
| X |
| 1.6 |
| Progress Schedules |
| X |
| 01 33 00 |
| 1.3 |
| Safety Plan |
| X |
| 01 33 00 |
| 1.3 |
| Submittal Schedule |
| X |
| 1.3 |
| Pre-Construction Photographs/Video |
| X |
| 31 62 10 |
| 2.1 |
| Piles |
| X |
| X |
X
X
X
Pile Driving Equipment
X
| 35 51 13 |
| 2.1 |
| Floating Pier |
| X |
| X |
X
X
X
| 2.3 |
| Pile Rollers |
| X |
| X |
X
X
| 2.4 |
| Cleats |
| X |
| X |
X
X
| 2.4 |
| High Impact Bumpers |
| X |
| X |
X
X
| 2.1-2.4 |
| Hardware |
X
X
X
This page intentionally left blank.
DHS-USCG
TRAINING CENTER
CAPE MAY, NJ
MATERIAL APPROVAL REQUEST
| NOTE: |
| Instructions for completion of form on reverse side. All entries will be filled in by typewriter or pen. Ref: Para. 2 on reverse – submit to the Contracting Officer with attachments. |
Contract Number
| Submission Number |
| Submittal |
( ) New
( ) Re-submittal Date
Previous
Submission No.
| Project Number |
| Are More Forms Needed? |
( ) New
( ) Re-submittal
FOR GOVERNMENT USE ONLY
| Item No. |
| Specification |
Sect. & Para.
DESCRIPTION OF MATERIAL
(Include Type, Model No., Catalog No., Mfg., etc.)
Ap-
Prov.
| Disap. |
| As Noted |
| Init. |
Materials Marked
Properly
( ) YES ( ) NO
| Contractor |
| By: (Signature and Date) |
Request as indicated above was received in this office on ______________________________________.
Recommend approval or disapproval as indicated above and subject to any applicable comments on the reverse side.
Name and Grade
| Signature |
| Date |
Approved/disapproved as indicated above and subject to any applicable comments on the reverse side.
Name and Grade
| Signature |
| Date |
1. The term “material is defined as supplies, raw materials, equipment, parts components, and end items that are to be incorporated into the work required by the contract.
2. This form is to be used by contractors for submitting Shop Drawings, Equipment Data, Manufacturer’s Literature and Certificates, and Samples of Materials to the Government for approval in accordance with the provisions of the contract. Unless otherwise specified, it is to be prepared in five (5) copies, signed, and provided to the Contracting Officer with appropriate attachments. All documents submitted by contractors shall clearly indicate which Item(s) is/are to be approved.
3. Requests submitted shall be numbered consecutively, by contract, in the space entitled “Submission No.” This number, in addition to the Contract No., will be indicated in the appropriate block and the insertion of previous submission number and date in addition to a new submission include work for more than one (1) contract. Submittals requiring priority handling will be submitted on a separate form and so marked across the face of the form.
4. Nothing contained in this Material Approval Request when approved by the Contracting Officer shall restrict the Government’s rights to reject materials at a later date when inspection reveals latent defects, departures from requirements of the contract; use of damaged materials or prejudice to the Government’s rights of rejecting any work during the Final Inspection and Acceptance.
5. This form will not be used for submittals requiring contract changes within the meaning of the Changes clause.
Comments:
(For use by the Government – Item numbers to correspond with reverse side.)
| Item No. |
| Specification |
Sect. & Para.
Comments
DIVISION 01 – GENERAL REQUIREMENTS
SECTION 01 40 00
QUALITY REQUIREMENTS
PART 13 GENERAL
13.1 QUALITY CONTROL AND CONTROL OF INSTALLATION
A. Monitor quality control over suppliers, manufacturers, products, services, site conditions, and workmanship, to produce Work of specified quality.
B. All work shall be in strict compliance with the manufacturer’s instructions.
C. When manufacturers' instructions conflict with Contract Documents, request clarification from Contracting Officer’s Technical Representative (COTR) before proceeding.
D. Comply with specified standards as minimum quality for the Work except where more stringent tolerances, codes, or specified requirements indicate higher standards or more precise workmanship.
E. Perform Work by persons qualified to produce required and specified quality.
F. Upon request, the general contractor shall provide documented experience for all sub-contractors, manufacturers and applicators utilized as part of this contract.
G. Verify field measurements are as indicated on Shop Drawings or as instructed by manufacturer.
H. Secure products in place with positive anchorage devices designed and sized to withstand stresses, vibration, physical distortion, or disfigurement.
I. Use adequate numbers of skilled work personnel who are thoroughly trained and experienced in the necessary crafts and who are completely familiar with the specified requirements and the methods needed for proper performance of all work covered under this specification.
J. The general contractor shall coordinate the work of all trades to insure no conflicts occur that will prevent a complete operational installation.
K. All materials and methods of construction for building work shall comply with the International Building Code, latest edition. The contractor and his/her subcontractors shall be responsible to familiarize themselves with this document.
L. All materials and methods of construction for site work shall comply with the New Jersey Department of Transportation Standard Specifications for Road and Bridge Construction, 2001, with revisions, hereon referred to as the NJDOT Specifications. The contractor and his/her subcontractors shall be responsible to familiarize themselves with this document.
M. Comply with the latest edition of all applicable code requirements, including:
1. NFPA 101: Life Safety Code
2. Uniform Federal Accessibility Standards
3. ASCE 7-05: “Minimum Design Loads for Buildings and Other Structures”
4. National Electric Code (NEC)
5. ASHRAE Manual
6. Other applicable codes and industry standards
13.2 TOLERANCES
A. Monitor fabrication and installation tolerance control of products to produce acceptable Work. Do not permit tolerances to accumulate.
B. Comply with manufacturers' tolerances. When manufacturers' tolerances conflict with Contract Documents, request clarification from Contracting Officer’s Technical Representative before proceeding.
C. Adjust products to appropriate dimensions; position before securing products in place.
13.3 REFERENCES
A. For products or workmanship specified by association, trade, or other consensus standards, comply with requirements of standard, except when more rigid requirements are specified or are required by applicable codes.
B. Conform to reference standard, by date of issue, current on date of Contract Documents, except where specific date is established by code.
C. Obtain copies of standards where required by product specification sections.
D. When specified reference standards conflict with Contract Documents, request clarification from Contracting Officer’s Technical Representative before proceeding.
E. Contractual relationships, duties, and responsibilities of parties in Contract and those of Contracting Officer’s Technical Representative shall not be altered from Contract Documents by mention or inference otherwise in Reference documents.
F. The Contracting Officer has sole authority to approve or authorize any changes to the contract, particularly those that impact money or time.
13.4 LABELING
A. Attach label from agency approved by authority having jurisdiction for products, assemblies, and systems required to be labeled by applicable code.
B. Label Information: Include manufacturer's or fabricator's identification, approving agency identification, and the following information, as applicable, on each label.
1. Model number.
2. Serial number.
3. Performance characteristics.
PART 14 PRODUCTS - Not Used
PART 15 EXECUTION
A. QUALITY CONTROL REQUIREMENTS: Inspect all work under the contract and maintain records of the inspections. Approvals, except those required for field applications, shall be obtained before delivery of materials and equipment to the site. Surveillance of the inspection system will be performed by the Contracting Officer Technical Representative.
1. Field Inspections by the Contractor: The Contractor shall furnish all equipment, instruments, qualified personnel and facilities necessary to inspect all work required by the contract. All inspections performed results received each day shall be included in the Daily Report to the Inspector.
2. Field Inspections by the Government: Field inspections conducted by the Government will be made in accordance with FAR 52.246-12 entitled Inspection of Construction.
3. Repeated Inspections: Repeat inspections after corrections have been made to nonconforming materials and workmanship until inspections indicate the materials, equipment, and workmanship conform to the contract requirements. The re-inspections shall be performed at no additional cost to the Government.
15.2 EXAMINATION
A. Verify existing site conditions and substrate surfaces are acceptable for subsequent Work. Beginning new Work means acceptance of existing conditions.
B. Verify existing substrate is capable of structural support or attachment of new Work being applied or attached.
C. Examine and verify specific conditions described in individual specification sections.
D. Verify utility services are available, of correct characteristics, and in correct locations.
15.3 PREPARATION
A. Clean substrate surfaces prior to applying next material or substance.
B. Seal cracks or openings of substrate prior to applying next material or substance.
C. Apply manufacturer required or recommended substrate primer, sealer, or conditioner prior to applying new material or substance in contact or bond.
15.4 DAILY REPORTING
A. Submit the "Contractor's Daily Report" through the Contracting Officer's Authorized Representative by 10:00 AM on the first working day following the day the work was performed. The report shall be filled out and submitted by the Contractor's Job Superintendent. A sample format of an acceptable form is included at the end of this section. While the use of this sample format is not required, any other format must contain the same information as shown on the sample. DAILY REPORT FORMS WILL NOT BE SUPPLIED BY THE COAST GUARD; AN ELECTRONIC COPY OF THE FORM WILL BE PROVIDED UPON REQUEST.
END OF SECTION
USCG TRAINING CENTER FACILITIES ENGINEERING (609) 898-6945
CONTRACTOR'S DAILY REPORT TO INSPECTOR
CONTRACT NUMBER:
REPORT NUMBER:
DATE:
CONTRACTOR:
TITLE & LOCATION:
CONTRACT COMPLETION DATE:
NUMBER OF REMAINING WORK DAYS:
| WEATHER CONDITIONS: |
| AM |
TEMP.
PM
TEMP.
| PERCENT OF COMPLETION (in fiscal terms): |
| % |
WORK FORCE INFORMATION:
| TRADE |
| NUMBER |
| WORK-HOURS |
| EMPLOYER |
| WORK PERFORMED |
MATERIALS DELIVERED TO THE JOB SITE:
(Record quantity per load and number of loads if applicable)
| MAJOR EQUIPMENT ON THE JOB SITE |
| HOURS OPERATED |
LOCATION & DESCRIPTION OF DEFICIENCIES:
(Materials, Equipment, Safety, and/or Workmanship)
ACTION TAKEN OR TO BE TAKEN:
REMARKS:
Signature of authorized contractors on site superintendent printed name signature date
FOR CONTRACTING OFFICER'S AUTHORIZED REPRESENTATIVES USE ONLY
DIVISION 01 – GENERAL REQUIREMENTS
SECTION 01 50 00
TEMPORARY FACILITIES AND CONTROLS
PART 16 GENERAL
16.1 DESCRIPTION
A. This Section identifies and outlines the responsibilities of contractors performing work on the Training Center and in Coast Guard owned housing or for any tenant organization as pertaining to temporary facilities and controls.
16.2 TEMPORARY ELECTRICITY
A. Utility Outages and Shutdown: Needed power outages shall be arranged only with prior approval from Contracting Officer’s Technical Representative (COTR), with duration and affected areas held to a minimum.
B. Utilize The Government’s existing power service.
C. The Contractor may utilize electrical power from the nearest electrical receptacle, subject to availability. OSHA requirements will govern the use of such utility. All equipment used shall be supplied by the Contractor. US Coast Guard does not make any guarantee against any voltage variation or service interruption.
16.3 TEMPORARY FIRE PROTECTION
A. Install and maintain temporary fire-protection facilities to protect against predictable and controllable fire loss. Comply with NFPA 10 "Standard for Portable Fire Extinguishers" and NFPA 241 "Standard for Safeguarding Construction, Alterations and Demolition Operations."
1. Locate fire extinguishers where convenient and effective for their intended purpose, but not less than one extinguisher at each floor stairwell and one at each building construction opening for personnel egress.
2. Maintain unobstructed access to fire extinguishers, fire hydrants, temporary fire-protection facilities, stairways and other access routes for fighting fires.
3. Provide independent supervision of welding, flame cutting and other open flame work. Provide each fire supervisor with an appropriate fire extinguisher.
4. Provide training for all personnel on-site in the proper operation of each type of fire extinguisher provided. Provide all personnel with the proper notification procedure to summon the local fire department or emergency medical service.
5. There shall be NO SMOKING or unsupervised open flame permitted inside any structure, temporary or permanent; nor within 25 feet of combustible material or within 50 feet of flammable liquids or compressed gasses.
16.4 FIELD OFFICES AND SHEDS
A. OFFICE AND STORAGE SHED: The Contractor shall provide his own office and storage shed or trailer, if necessary. No equipment or material storage will be provided by the Coast Guard.
16.5 TEMPORARY WATER SERVICE
A. Water will be made available at the nearest hydrant or exterior hose bib. The contractor will be responsible for supplying all hose and adapters including a backflow preventer.
16.6 TEMPORARY SANITARY FACILITIES
A. Provide and maintain required facilities and enclosures. Existing facility use is not permitted. Provide facilities at time of project mobilization.
16.7 PROTECTION FROM WEATHER AND CONSTRUCTION OPERATIONS
A. Contractor's Staging and Stockpiling: The Contractor is responsible for the protection and use of materials for the project inside or outside the facility, including his dumpster and spot a pot used on site. Should the USCG notify the Contractor of a weather emergency such as an impending Hurricane, the Contractor will need to tie-down or move these temporary facilities to higher ground. Hurricane season is from June 1 - November 30.
16.8 VEHICULAR ACCESS AND PARKING
A. A lay down and parking area for Contractor’s vehicles, trailers and personnel will be designated by the Contracting Officer’s Technical Representative. Obey all U.S. Coast Guard Parking Signs and traffic rules.
B. Vehicles shall not travel or park on grass. If travel or parking on grass is necessary, grass shall be restored to original condition after completion of the project at no cost to the Government.
16.9 PROGRESS CLEANING AND WASTE REMOVAL
A. Maintain areas free of waste materials, debris, and rubbish. Maintain site in clean and orderly condition.
B. Collect and remove waste materials, debris, and rubbish from site periodically and dispose off-site.
16.10 TRAFFIC REGULATION
A. BARRICADES: Any stored debris, equipment and all areas dangerous to foot or vehicular traffic shall be barricaded by the Contractor. At night and during other times of poor visibility, barricades shall be illuminated. All barricading, including night illumination shall be maintained by the Contractor. All barricades shall be constructed in accordance with ANSI D6-1.
B. PEDESTRIAN TRAFFIC: The Contractor shall arrange his equipment and/or progression of work, so as not to interfere with the normal flow of pedestrian traffic. Where interference is unavoidable, the contractor shall provide a marked, safe, and clean route around the obstruction
16.11 BARRIERS
A. Provide barriers to prevent unauthorized entry to construction areas to protect existing facilities and adjacent properties from damage from construction operations and demolition.
B. Provide protection for plants designated to remain. Replace damaged plants.
C. Protect non-owned vehicular traffic, stored materials, site, and structures from damage.
16.12 POLLUTION CONTROL
A. Provide methods, means, and facilities to prevent contamination of soil, water, and atmosphere from discharge of noxious, toxic substances, and pollutants produced by construction operations.
B. Prevent hazardous materials & wastes from entering the ground, catch basins, drains, drainage areas & surface waters. Fuel and lubricate equipment in a manner that protects against spills and evaporation. Clean up all spills immediately. Surround temporary petroleum and liquid chemical storage tanks with a temporary berm of size and strength to contain the tank contents in the event of a leak or spill. Immediately notify the Contracting Officer (KO) and COTR of hazardous material spills. The Contractor shall be responsible for all costs associated with cleanup of material spills both hazardous and non-hazardous.
C. Comply with pollution and environmental control requirements of authorities having jurisdiction.
16.13 REMOVAL OF UTILITIES, FACILITIES, AND CONTROLS
A. Remove temporary utilities, equipment, facilities, materials, prior to final inspection.
B. Clean and repair damage caused by installation or use of temporary work.
C. Restore existing facilities used during construction to original condition. Restore permanent facilities used during construction to specified condition.
PART 17 PRODUCTS - Not Used
PART 18 EXECUTION - Not Used
END OF SECTION
DIVISION 01 – GENERAL REQUIREMENTS
SECTION 01 60 00
PRODUCT REQUIREMENTS
PART 19 GENERAL
19.1 SECTION INCLUDES
A. Products.
B. Product delivery requirements.
C. Product storage and handling requirements.
D. Product options.
E. Product substitution procedures.
F. Equipment electrical characteristics and components.
19.2 PRODUCTS
A. Furnish products of qualified manufacturers suitable for intended use. Furnish products of each type by single manufacturer unless specified otherwise.
B. Do not use materials and equipment removed from existing premises, except as specifically permitted by Contract Documents.
C. Furnish interchangeable components from same manufacturer for components being replaced.
19.3 PRODUCT DELIVERY REQUIREMENTS
A. RECEIPT OF MATERIALS: Shipments of equipment, materials, and supplies shall be addressed to the Contractor - not the Coast Guard. The contractor shall provide all equipment, materials and labor for off-loading. The Coast Guard will not accept shipments for the Contractor.
B. Transport and handle products in accordance with manufacturer's instructions.
C. Promptly inspect shipments to ensure products comply with requirements, quantities are correct, and products are undamaged.
D. Provide equipment and personnel to handle products by methods to prevent soiling, disfigurement, or damage.
19.4 PRODUCT STORAGE AND HANDLING REQUIREMENTS
A. Store and protect products in accordance with manufacturers' instructions.
B. Store with seals and labels intact and legible.
C. Store sensitive products in weather tight, climate controlled, enclosures in an environment favorable to product.
D. For exterior storage of fabricated products, place on sloped supports above ground.
E. Provide bonded off-site storage and protection when site does not permit on-site storage or protection.
F. Cover products subject to deterioration with impervious sheet covering. Provide ventilation to prevent condensation and degradation of products.
G. Store loose granular materials on solid flat surfaces in well-drained area. Prevent mixing with foreign matter.
H. Provide equipment and personnel to store products by methods to prevent soiling, disfigurement, or damage.
I. Arrange storage of products to permit access for inspection. Periodically inspect to verify products are undamaged and are maintained in acceptable condition.
19.5 PRODUCT OPTIONS
A. Products Specified by Reference Standards or by Description Only: Any product meeting those standards or description.
B. Products Specified by Naming One or More Manufacturers: Products of one of manufacturers named and meeting specifications, no options or substitutions allowed.
C. Products Specified by Naming One or More Manufacturers with Provision for Substitutions: Submit request for substitution for any manufacturer not named in accordance with the following article.
19.6 PRODUCT SUBSTITUTION PROCEDURES
A. The Contracting Officer (KO) will consider requests for Substitutions only within 15 calendar days after date established in Notice to Proceed.
B. Substitutions may be considered when a product becomes unavailable through no fault of Contractor.
C. Document each request with complete data substantiating compliance of proposed Substitution with Contract Documents.
D. A request constitutes a representation that the Contractor:
1. Has investigated proposed product and determined that it meets or exceeds quality level of specified product.
2. Will provide same warranty for Substitution as for specified product.
3. Will coordinate installation and make changes to other work which may be required for the Work to be complete with no additional cost to the Government.
4. Waives claims for additional costs or time extension which may subsequently become apparent.
5. Will reimburse the Government for review or redesign services associated with re-approval by authorities having jurisdiction.
E. If the substitution has a lesser value than the product originally specified, the Contractor shall provide a credit to the Government.
F. Substitutions will not be considered when they are indicated or implied on Shop Drawing or Product Data submittals, without separate written request, or when acceptance will require revision to Contract Documents.
G. Substitution Submittal Procedure:
1. Submit four (4) copies of Request for Substitution to the KO for consideration. Submit one (1) copy to the Contracting Officer’s Technical Representative (COTR). Limit each request to one proposed Substitution.
2. Submit Shop Drawings, Product Data, and certified test results attesting to proposed product equivalence. Burden of proof is on proposer.
3. The COTR will notify the KO/KSP in writing of recommendation to accept or reject request.
4. The KO will notify Contractor in writing of decision to accept or reject requests. The KO will notify the contractor in writing if modification to the contract is required.
PART 20 PRODUCTS – Not Used
PART 21 EXECUTION - Not Used
END OF SECTION
DIVISION 01 – GENERAL REQUIREMENTS
SECTION 01 70 00
EXECUTION AND CLOSEOUT REQUIREMENTS
PART 22 GENERAL
22.1 CLOSEOUT PROCEDURES
A. Submit written certification to the Contracting Officer (KO) that Contract Documents have been reviewed, Work has been inspected, and that Work is complete in accordance with Contract Documents and ready for Contracting Officer’s Technical Representative's review.
B. Provide submittals to KO required by the contract and authorities having jurisdiction.
C. Submit final Application for Payment identifying total adjusted Contract Sum, previous payments, and sum remaining due.
22.2 FINAL CLEANING
A. Execute final cleaning prior to final project assessment.
22.3 PROTECTING INSTALLED CONSTRUCTION
A. Protect installed Work and provide special protection where specified in individual specification sections.
B. Provide temporary and removable protection for installed products. Control activity in immediate work area to prevent damage.
22.4 PROJECT RECORD DOCUMENTS
A. Maintain on site one set of the following record documents; record actual revisions to the Work:
1. Drawings.
2. Specifications.
3. Addenda.
4. Change Orders and other modifications to the Contract.
5. Reviewed Shop Drawings, Product Data, and Samples.
6. Manufacturer's instruction for assembly, installation, and adjusting.
B. Ensure entries are complete and accurate, enabling future reference by The Government.
C. Store record documents separate from documents used for construction.
D. Record information concurrent with construction progress, not less than weekly.
E. Specifications: Legibly mark and record at each product section description of actual products installed, including the following:
1. Manufacturer's name and product model and number.
2. Product substitutions or alternates utilized.
3. Changes made by Addenda and modifications.
F. Record Drawings and Shop Drawings: Legibly mark each item to record actual construction including:
1. Measured depths of foundations in relation to finish floor datum.
2. Measured horizontal and vertical locations of underground utilities and appurtenances, referenced to…
This is the start of the file's text. The full file is on GovTribe.