Pre-Quote_Conference-Abate.Encapsulate_Asbestos._Question.Answers.pdf
PDF 36 KB Posted
- Attached to
- Abate/Encapsulate Interiors in Hangar #2 Federal contract opportunity
- Solicitation number
- HSCG37-15-Q-PQQ103
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FAR.CLAUSES.SERVICE.CONTRACTS.doc | DOC document | |
| SOW.Abate.Encapsulate.docx | DOCX document | |
| SCA.WD.Abate.Encapsulate.doc | DOC document | |
| SF1449_Sector_San_Diego.Abate.Encapsulate.PQQ103.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
What are work schedule interactions with USCG personnel and vendor employee’s?
Upon award, this will be discussed in detail with the Contracting Officer’s Representative (COR).
As per the Statement of Work (SOW), Page 2, 1.02.C, the vendor is responsible for proposing a, “Phasing & Lay Down Plan of how they intend to perform the work within the scheduled construction period”.
Is there hallways/ alternate ways to egress in the spaces impacted?
Yes
Is Air Monitoring being provided by USCG?
No, it is the vendor’s responsibility.
Are there Dry Wall Specifications?
Yes, dry wall and pain to match existing.
Can all three areas be worked on at one time?
Yes, if the entire space does not have to be vacated or impact operations.
Has the drywall been tested for asbestos?
No
Has the “Popcorn Ceiling” been tested for Asbestos?
Yes
If abatement/encapsulation is conducted without disturbing the dry wall, does the dry wall need to be replaced?
No
Does the vendor need to remove the HVAC unit in the Supply Closet location?
No, USCG personnel will take care of this.
What is the finish for the ceiling spaces?
Knock Down finish is sufficient