Gov't responses to questions received by the deadline of 3/17/2017, 2:00pm EST.

View the file

Other files for this federal contract opportunity

Other files attached to Generator Replacement, newest first.
File Type Posted
WD_2015-5469_rv3.pdf PDF
Florence_Generator_SOW_(Final).docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HSCEMS-17-Q-00005

Questions and Answers

Questions and Answers

HSCEMS-17-Q-00005

Question

Question/Comment/Clarification

Response

1)
Confirm the following:

Power supply to generator.

Power supply to the panel for trailer is 480V 3 phase, with a transformer to split the feed into 208V 3 phase also.

Power supplied to the 800a transfer switch is 480 3 PH from the transfer switch 120/240 Power supplied to the panel is 240/480 3PH and step down transformer is stepped down to 120/240 to trailer.

2)
Confirmation that you want a 1200A transfer switch to replace the existing 800A transfer switch?
We are asking that the transfer switch be compatible with the GEN SET, whether it is an 800a or 1200a.
3)
What are the current loads at the Foxtrot bldg and Radiology Trailer?
Loads for today at 1200 were PH1-65a, PH2 58a, PH3 62a. Trailer- PH1, PH2 and PH3- read 0, no X-Raying today. From transformer to X-ray PH1 27a and PH2 25a
4)
Confirmation that this is a design-build project and the contract is responsible for all engineering and design?

This is a design-build project.

5)
Will there be a 1wk extension of the bid due date?
The Gov’t does not intend to extend the response due date.
6)
Will there be an extension of the performance period (~180 days) if this is a design-build project?

The Government does not intend to extend the period of performance.