About this file

Contains Quality Assurance Surveillance Plan (QASP) for Snow Removal for Massena Border Patrol Station.

View the file

Other files for this federal contract opportunity

Other files attached to Snow Removal, newest first.
File Type Posted
Massena New York.pdf PDF
Solicitation and Bid Worksheet.pdf PDF
PWS_Snow_Removal.doc DOC document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SNOW REMOVAL ACTIVITIES – MASSENA STATION

Attachment B

QUALITY ASSURANCE SURVEILLANCE PLAN

FOR

SNOW/ICE REMOVAL SERVICES

Massena Border Patrol Station Swanton Sector

QUALITY ASSURANCE SURVEILLANCE PLAN

FOR

SNOW/ICE REMOVAL SERVICES

INTRODUCTION

This Quality Assurance Surveillance Plan (QASP) has been developed to evaluate contractor actions while implementing this SOW. The QASP provides a systematic method to evaluate the services the contractor is required to furnish.

This QASP is based on the premise the government desires to maintain a quality standard in operating, maintaining, and repairing facilities and that a service contract to provide the service is the best means of achieving that objective.

The contractor, and not the government, is responsible for management and quality control actions to meet the terms of the contract. The role of the government is quality assurance to ensure contract standards are achieved.

In this contract the quality control program is the driver for product quality. The contractor is required to develop a comprehensive program of inspections and monitoring actions. The first major step to ensuring a “self-correcting” contract is to ensure that the quality control program approved at the beginning of the contract provides the measures needed to lead the contractor to success.

Once the quality control program is approved, careful application of the process and standards presented in the remainder of this document will ensure a robust quality assurance program.

QUALITY ASSURANCE SURVEILLANCE PLAN

FOR

SNOW/ICE REMOVAL SERVICES

1. This checklist shall be filled out by the Contractor and submitted to the COTR or his representative by the third [traditional] workday following the end of each performance month.

2. Contractor shall sign and date the completed form.

3. COTR/Representative shall countersign and date, if in agreement with report. If there are discrepancies, COTR/Representative shall so note the Objective and discrepancies noted on this form.

4. COTR shall retain original. Contractor, COTR Representative, and Contract Specialist shall receive copies of the form.

See the last page for a more detailed list of actions under this quality assurance plan.

MONTH/YEAR: ________________________________

Performance Objective
Standard
SOW Para
Frequency of Actions
Performance Threshold/

Number of Valid Complaints Actual Performance

(√ if threshold met. Attach explanation if not) Penalty imposed After/

% Penalty Imposed

Approved Snow/Ice Materials Used In accordance with State and Local standards

3.1a, 3.1b
As needed
No more than 3 customer complaints per service month.

4th Complaint

2%

Minimization of Equipment breakdowns
Motorized Equipment shall be maintained so as to prevent breakdowns during critical snow event clearing.

Non-motorized equipment should be maintained or replaced so that no instances of lost clearing actions occur.

3.2
Standard equipment prevention maintenance procedures
No more than 2 equipment breakdown per piece of equipment per service month.

3rd Complaint/ 3%

Removal of snow banks or drifts to allow full left-to-right views of Trippany Rd.
Banks and drifts shall be removed so that a normal small car has adequate views.
3.1c(1)

3.1c(2)

As needed
No more than 3customer complaint per service month.

4th Complaint/

3%

Removal of snow and ice from catch basins as directed or needed
Within reason, catch basin capacity shall be able to accommodate normal snow event accumulation
3.1d
As needed
No more than 1 customer complaint per service month

2nd Complaint/

2%

Snow accumulations maintained at 2-4 inches at all times
Within reason, snow accumulation shall be cleared of excess levels within 1 hour of callout.
3.1e
As needed
No more than 3 customer complaints per month

4th Complaint/

2%

Entrances, walkways, and garage doors cleared and/or sanded by 0630 on normal workdays
For safety considerations, this is priority; preventive measures to salt or sand may be appropriate. Sand/salt barrels, if available, shall be filled and accessible.
3.1e, 3.1f
As needed
No more than 2 customer complaint per month

3rd Complaint/

5%

Fuel tanks, water suppression building, generator shed, fuel oil tank, and dumpsters adequately shoveled
Within reason, snow must be removed and areas sanded to allow safe access to these areas. Sand/salt barrels, if available, shall be filled and accessible.
3.1f
As needed
No more than 2 customer complaints per month

3rd Complaint/

2%

The Contractor shall hand-shovel sidewalks, entrances, around the bulk gasoline tank. All the entrance and exit gates including fencing shall be maintained free of snow and ice buildup.
Within reason, snow must be removed and areas sanded to allow safe access to these areas.
3.1g
As needed
No more than 2 complaints per month

3rd Complaint/

2%

Contractor shall keep lanes clear to allow for access to the station marina.

For safety considerations, this is a priority and preventive measures may be appropriate. Sand/salt barrels, if available, shall be filled and accessible.
3.1h
As needed
No more than 3 complaints per month

4th Complaint/

2%

Contractor shall clear areas around card swipe access points to allow for full access by either vehicle or pedestrian, as intended.
For safety considerations, this is a priority and preventive measures may be appropriate.
3.1i
As needed
No more than 2 complaints per month

3rd Complaint/

2%

Vehicle entrance/exit areas clear of snow/ice accumulation
For safety considerations, this is priority; preventive measures may be needed to salt/sand areas.
3.1j
As needed
No more than 3 complaints per month

4th Complaint

3%

Main building roof snow accumulation does not exceed 18 inches.
Within reason, remove snow and ice as soon as possible upon expected 18” accumulation
3.1k
As needed
No more than 3 complaints per month

4th Complaint

3%

Walkways, sidewalks, and equipment kept clear of snow fall from roof.
For safety considerations, this is priority; preventive measures may be needed. Sand/salt barrels, if available, shall be filled and accessible for use.
3.1l
As needed
No more than 2 complaints per month.

3rd Complaint

2%

Accumulated sand removal
Motorized sweeper used to pick up salt and sand accumulations.
3.1L

No complaints

5% penalty if not accomplished within 2 weeks of request

SUBMITTED:

Date: _________________

Contractor

CONCURRED:

Date: _________________

COTR/COTR Representative

OR: See Below for Discrepancies (Forward a copy to Contract Specialist)

SURVEILLANCE: The CBP COTR shall appoint a quality assurance (QA) person to receive complaints from compound personnel and pass them to the contractor for correction.

STANDARDS: General standards of performance are published in the PWS. More specific standards are noted in the QASP Table above. Violation of these standards and customer complaints shall not exceed the thresholds cited above for each performance objective. The QA shall notify the Contract Specialist for appropriate action in accordance with FAR 52.212.4, Contract Terms and Conditions-Commercial Items (May 1997) or the appropriate Inspection of Services clause, if any of the above performance objectives exceed the customer complaint thresholds. In most cases, this requirement is satisfied by submission of the monthly report. Continued non-compliance may require more a more formal memorandum stating the severity of the violations along with records of discussion with the Contractor.

PROCEDURES: Any CBP employee that observes unacceptable services, either incomplete or not performed, for any of the above performance objectives should immediately contact the QA and the QA will complete appropriate documentation to record the complaint. The QA will consider the customer complaint valid upon receipt from the customer. The QA should inform the customer of the approximate time the unacceptable performance will be corrected and shall advise the customer to contact the QA if not corrected. The QA will consider customer complaints as resolved unless notified otherwise by the customer. The QA shall verbally notify the Contractor to pick up a copy of the complaint. The Contractor will be given two hours after verbal notification to correct the unacceptable performance. If the Contractor disagrees with the complaint after investigation of the site and challenges the validity of the complaint, the Contractor will notify the QA who will conduct an investigation to determine the validity of the complaint. If the QA determines the complaint as invalid, he will document the written complaint of the findings and notify the customer. The QA will retain the annotated copy of the written complaint for his/her files. If after investigation the QA determines the complaint as valid, the QA will inform the Contractor and the Contractor will be given an additional hour to correct the customer complaint. A customer complaint will not be recorded if proper and timely correction of the unacceptable condition(s) is accomplished – unless the complaints become routine. The Contractor shall return the written customer complaint document, properly completed with actions taken, to the QA, who will file the complaint for monitoring future recurring performance. Recurring customer complaints are not permitted for any of the above service items. If repeat customer complaints are received for the same deficiency – and they exceed the threshold for number of complaints - during the service period, the QA should contact the Contract Specialist for appropriate action. The Contract Specialist and Contracting Officer are the only persons permitted to authorize deductions from a Contractor’s invoice.

Corrective Actions: If unsatisfactory performance occurs in the same category for two consecutive months, the Contractor will be required to submit a plan for corrective action to the Contracting Officer. The COTR, COTR Representative, and Contract Specialist shall also receive a copy of the plan. The COTR and COTR Representative will monitor that (those) activities closely in that month to insure that the Contractor follows through with the plan for corrective action, and they will note compliance with or deviation from that plan in the month that the plan for corrective action is initiated.

Consequences for Continued Poor Performance: If the Contractor fails to achieve satisfactory performance in at least two of the performance objective areas, the Contracting Officer has the prerogative, upon the recommendation of the COTR, to issue a Cure Notice to the Contractor. If the poor performance continues, the Contracting Officer may terminate the contract for cause and re-solicit the snow plowing activity. The former Contractor shall be barred from participation in any re-solicitation action.