Requirements_1.docx

DOCX document 17 KB Posted

Attached to
Apache (AH-64) maintenance racks Federal contract opportunity
Solicitation number
HOODW1JYAE0004
Issued by
Department of the Army

View the file

Other files for this federal contract opportunity

Other files attached to Apache (AH-64) maintenance racks, newest first.
File Type Posted
Requirement_1.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

S2P2 REQUIREMENTS SETS

1. Apache (AH-64) maintenance racks

a. 7 each: AH-64 cowling racks for Preventative Maintenance Schedule inspections Each rack shall have the capacity to safely store the following panels:

Panel
Size in inches
APU Top Enclosure
34(L) x 14(H) x 17(W)
200 Panel (2x)
44(L) x 34(H) x 3(W)
5L126
32(L) x 22(H) x 1(W)
5R130
40(L) x 15(H) x 1(W)
L510 Upper
24(L) x 23(H) x 10(W)
L510 Lower
28(L) x 16(H) x 14(W)
5L173
32(L) x 25(H) x 15(W)
5R172
35(L) x 24(H) x 16(W)
B200
54(L) x 9(H) x 41(W)
L-540
22(L) x 37(H) x 16 1/2(W)

b. 1 each: AH-64 cowling rack for Phase Maintenance inspection.

Each rack shall have the capacity to safely store the following panels:

Panel
Size in inches
Foot guard X4
16 1/4Long X 9High X 1/8 Wide
APU front enclosure
11 1/4 Long X 15 1/4 High X 1 Wide
APU top enclosure
33 Long X 17 1/4 High X 18 1/2 Wide
APU side enclosure
33 Long X 12 High X 16 Wide
APU aft enclosure
18 3/4 Long 26 1/2 High X 3 Wide
B-120
24 Long X 3 High X 15 Wide
B-90
24 Long X 3 High X 15Wide
Pilot left armor seat panel
21 1/8 Long X 9 High X 14 1/2 Wide
CPG left armor seat panel
21 1/8 Long X 9 High 14 1/2 Wide
Pilot right armor seat panel
21 1/8 Long X 12 High 14 1/2 Wide
CPG right armor seat panel
21 1/8 Long X 12 High 14 1/2 Wide
Pilots seat swing panel
21 1/2 Long X 3 High 8 1/2 Wide
CPG seat swing panel
21 1/2 Long X 3 High 8 1/2 Wide
T-205 L
55 1/2 Long X 12 1/2 High X 16 1/2 Wide
T-205 R
55 1/2 Long X 12 1/2 High X 16 1/2 Wide
T- 225A
19 1/8 Long X 9 1/2 High 18 1/8 Wide
T-250 L
41 1/2 Long X 3 High 21 1/8 Wide
T-250 R
41 1/2 Long X 3 High 21 1/8 Wide
T-290L
48 Long X 16 High X 17 Wide (due to BFT)
T-290R
48 Long X 4 High 20 Wide
T- 325
32 Long X 12 High X 42 Wide
T-545
31 Long X 12 High X 9 Wide
LN-6
25 Long X 10 High X 16 Wide
5L-120
18 Long X 12 High X 4 Wide
5L-126
32 Long X 22 1/2 High X 2 Wide
5L-152
14 Long X 10 1/8 High X 2 Wide
5L-160
42 Long X 13 High X 2 Wide
L-200
44 Long X 34 High X 3 Wide
L-230
27 Long X 8 High X 2 Wide
L-325
28 1/2 Long X 24 High X 24 Wide
5L-173
32 Long X 24 High X 15 Wide
L-510 T
24 Long X 24 High X 10 Wide
L-510 B
28 Long X 16 High X 14 Wide
L-530
18 Long X 41 High X 10 Wide
L-545
22 round X 6 Wide
L-546
X 36 Long X 19 High 9 Wide
5R-130
39 1/2 Long X 14 3/4 High X Wide
5R-135
39 1/4 Long X 8 High X 7 Wide
R-578
16 Long 7 High X 1/2 Wide
R-230
27 Long X 8 High X 2 Wide
B-65R
11 Long X 10 3/4 High X 1/2 Wide
B-85R
9 3/4 Long X 10 3/4 High X 1/2 Wide
5b-87L
57 1/2 Long X 10 1/2 High X 1 Wide
5B-87R
57 1/2 Long X 10 High X 1 Wide
B-200
53 3/4 Long X 8 3/4 High 46 Wide
RW-9
8 3/4 Long X 9 High X 1/2 Wide
5R-172
35 Long X 22 High X 14 Wide
R-200
44 Long X 34 High X 3 Wide
RN-6
25 Long X 10 High X 16 Wide
CL-1
16 3/4 Long X 17 1/4 High X 1 Wide
CL-3
10 1/4 Long X 15 1/2 High X 1/2 Wide
CL-5
18 1/4 Long X 10 1/4 High X 2 Wide
CL-7
18 Long X 22 High X 1/2 Wide
CR-2
14 Long X 17 High X 9 3/4 Wide
CR-4
22 Long X 18 3/4 High X 2 1/2 Wide
CR-6
16 Long X 18 High X 1 Wide
PL-1
13 1/2 Long X 17 1/2 High X 1/2 Wide
PL-3
8 Long X 14 1/2 High X 1/2 Wide
PL-5
17 Long X 18 1/2 High X 3 1/2 Wide
PR-2
10 Long X 27 3/4 High X 9 1/2 Wide
PR-4
6 1/2 Long X 9 1/2 High X 1/2 Wide
PLT ECS inlet panel
7 Long X 10 High X 3 1/2 Wide
Secondary Exhaust Nozzle X 6 slots
27 Long X 22 High X 10 Wide
Primary engine exhaust nozzle X2 slots
20 Long X 22 High X 20 Wide
Eng. exhaust fairing X 2 slots
27 Long X 30 High X 34 Wide
Upper aft NGB enclosure X 2 slots
14 Long X 25 High X 10 Wide
Lower aft NGB enclosure X 2 slots
14 Long X 25 High X 10 Wide
IPS blower exhaust duct X 2 slots
13 Long X 26 High X 10 Wide
APU exhaust
16 Long X 33 High X 16 Wide
Engine inlet fairings
27 Long 30 High XX 6 Wide
RW-7
9 Long X 8 High X 1/2 Wide
RW-8
8 Long X 8 High X 1/2 Wide
RW-14 (2ea)
7 Long X 7 High X 1/2 Wide
RW-15 (2ea)
5 Long X 5 High X 1/2 Wide
RW stinger closeout
10 Long X 6 High X 1/2 Wide
L Wing trailing edge
74 1/4 Long X 12 1/4 High X 5 Wide
LW-7
9 Long X 8 High X 1/2 Wide
LW-8
8 Long X 8 High X 1/2 Wide
LW-14 (2ea)
7 Long X 7 High X 1/2 Wide
LW-15 (2ea)
5 Long X 5 High X 1/2 Wide
LW stinger closeout
10 Long X 6 High X 1/2 Wide
L Wing trailing edge
74 1/4 Long X 12 1/4 High X 5 Wide
L-540
22 long x 37 High x 16 1/2 wide

c. 1 each AH-64 door rack for Phase Maintenance inspection.

Each rack shall have the capacity to safely store AH-64 Pilot and Co-Pilot doors.

Anticipated dimension for the rack is 4’ long x 1’ wide x 9’ high.

d. 3 each AH-64 hellfire missile rack.

Each rack shall have the capacity to safely store 6 hellfire training missiles.

Missiles should be easily accessible and prevented from falling by a locking mechanism Anticipated dimension for the rack is 6’ long x 6’ wide x 5’ high.

e. All Apache (AH-64) maintenance racks shall comply with the following:

· All racks shall comply with OSHA (CFR 1910) regulations. The equipment needs to be manufactured out of aluminum in order to make it easy moveable inside the hangar. To ensure long life time, make it recognizable as 302nd Squadron equipment and easy visible the racks shall be powder coated in “Carmel Orange”. On at least two sides all equipment shall be marked “302 SQN” in black paint.

· All racks shall have fork lift pockets in order to be transportable by a fork lift.

· All racks shall have a protective layer (i.e. industrial carpeting) to protect the parts to be stored.

· All racks must have an identification plate which shows at least Manufacturer, part number and manufacturing date.

· All racks shall have directional and locking casters.

· To ensure future support and commonality all racks shall be provided by the same vendor. The vendor should keep a customer file for future support such as repairs, replacement and any additional requirements.

· Vendor needs to install all provided equipment and provide handling instructions at 302nd Squadron facilities, Fort Hood, TX within 5 days of equipment arrival at 302nd SQDN.

· Vendor is responsible for handling and crating of equipment.

· All racks shall be ready for pick-up by government arranged transportation at vendor facility no later than 90 days after order confirmation.