HE125419R2003 Amend 0001 Hanscom Solicitation Conformed.pdf
PDF 869 KB Posted
- Attached to
- DoDEA Student Transportation Services – Hanscom Air Force Base, Massachusetts Federal contract opportunity
- Solicitation number
- HE1254-20-R-2003-0001
- Issued by
- Department of Defense Education Activity
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 2 Pricing Sheet Amend 0001.xlsx | XLSX spreadsheet | |
| HE125419R2003 Amend 0001 Hanscom Solicitation.pdf | ||
| Attachment 1 PWS Hanscom Amend 0001.pdf | ||
| HE125419R2003 Amd 0001 QA.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
HE125420R2003 30-Apr-2020
b. TELEPHONE NUMBER 8. OFFER DUE DATE/LOCAL TIME
04:00 PM 01 Jun 2020
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
HE12549. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
MILESKA RODRIGUEZ
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
DOD EDUCATION ACTIVITY
ATTN: PROCUREMENT DIVISION
4800 MARK CENTER DRIVE
SUITE 05F09-02
ALEXANDRIA VA 22350-1400
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE HEVAS6 16. ADMINISTERED BY
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
DODEA AMERICAS REGIONAL OFFICE
ATTN: SUPERINTENDENT/CHIEF OF STAFF
700 WEST PARK DRIVE
PEACHTREE CITY GA 30269-1498
TEL: 678-364-8055 FAX:
FAX:
TEL: SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$16,500,000
NAICS:
485410
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF52
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
HE125420R2003
Section SF 1449 - CONTINUATION SHEET
ITEM NO SUPPLIES/SERVICES MAX
QUANTITY
UNIT UNIT PRICE MAX AMOUNT
0001 1,440 Run Scheduled Bus Transportation Services
FFP
Contractor shall provide scheduled student bus transportation services in accordance with the Performance Work Statement (PWS).
FOB: Destination
V222
MAX
NET AMT
UNIT UNIT PRICE MAX AMOUNT
0002 480 Run Activity Bus Transportation Services
FFP
Contractor shall provide activity bus transportation services in accordance with the Performance Work Statement (PWS).
UNIT UNIT PRICE MAX AMOUNT
0003 1,440 Run Safety Aides
FFP
Contractor shall provide Safety Aides required IAW the PWS.
R430
UNIT UNIT PRICE MAX AMOUNT
0004 1 Task Contractor Manpower Reporting
FFP
MANDATORY ANNUAL REPORT NOT SEPARATELY PRICED.
UNIT UNIT PRICE MAX AMOUNT
1001 1,440 Run OPTION Scheduled Bus Transportation Services
FFP
Contractor shall provide scheduled student bus transportation services in accordance with the Performance Work Statement (PWS).
UNIT UNIT PRICE MAX AMOUNT
1002 480 Run OPTION Activity Bus Transportation Services
FFP
Contractor shall provide activity bus transportation services in accordance with the Performance Work Statement (PWS).
UNIT UNIT PRICE MAX AMOUNT
1003 1,440 Run OPTION Safety Aides
FFP
Contractor shall provide Safety Aides required IAW the PWS.
UNIT UNIT PRICE MAX AMOUNT
1004 1 Task OPTION Contractor Manpower Reporting
FFP
MANDATORY ANNUAL REPORT NOT SEPARATELY PRICED.
UNIT UNIT PRICE MAX AMOUNT
2001 1,440 Run OPTION Scheduled Bus Transportation Services
FFP
Contractor shall provide scheduled student bus transportation services in accordance with the Performance Work Statement (PWS).
UNIT UNIT PRICE MAX AMOUNT
2002 480 Run OPTION Activity Bus Transportation Services
FFP
Contractor shall provide activity bus transportation services in accordance with the Performance Work Statement (PWS).
UNIT UNIT PRICE MAX AMOUNT
2003 1,440 Run OPTION Safety Aides
FFP
Contractor shall provide Safety Aides required IAW the PWS.
UNIT UNIT PRICE MAX AMOUNT
2004 1 Task OPTION Contractor Manpower Reporting
FFP
MANDATORY ANNUAL REPORT NOT SEPARATELY PRICED.
UNIT UNIT PRICE MAX AMOUNT
3001 1,440 Run OPTION Scheduled Bus Transportation Services
FFP
Contractor shall provide scheduled student bus transportation services in accordance with the Performance Work Statement (PWS).
UNIT UNIT PRICE MAX AMOUNT
3002 480 Run OPTION Activity Bus Transportation Services
FFP
Contractor shall provide activity bus transportation services in accordance with the Performance Work Statement (PWS).
UNIT UNIT PRICE MAX AMOUNT
3003 1,440 Run OPTION Safety Aides
FFP
Contractor shall provide Safety Aides required IAW the PWS.
UNIT UNIT PRICE MAX AMOUNT
3004 1 Task OPTION Contractor Manpower Reporting
FFP
MANDATORY ANNUAL REPORT NOT SEPARATELY PRICED.
UNIT UNIT PRICE MAX AMOUNT
4001 1,440 Run OPTION Scheduled Bus Transportation Services
FFP
Contractor shall provide scheduled student bus transportation services in accordance with the Performance Work Statement (PWS).
UNIT UNIT PRICE MAX AMOUNT
4002 480 Run OPTION Activity Bus Transportation Services
FFP
Contractor shall provide activity bus transportation services in accordance with the Performance Work Statement (PWS).
UNIT UNIT PRICE MAX AMOUNT
4003 1,440 Run OPTION Safety Aides
FFP
Contractor shall provide Safety Aides required IAW the PWS.
UNIT UNIT PRICE MAX AMOUNT
4004 1 Task OPTION Contractor Manpower Reporting
FFP
MANDATORY ANNUAL REPORT NOT SEPARATELY PRICED.
DELIVERY - INSPECTION INFO
Delivery Information: Information in this section will be populated in the award document.
Inspection And Acceptance Terms: Information in this section will be populated in the award document as follows:
Inspect At and Accept At: Destination
Inspect By and Accept By: Government
CLIN DELIVERY/TASK ORDER MINIMUM/MAXIMUM QUANTITY AND CLIN ORDER
VALUE
The minimum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not be less than the minimum quantity and order value stated in the following table. The maximum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not exceed the maximum quantity and order value stated in the following table.
CLIN
MINIMUM
QUANTITY
MINIMUM
AMOUNT
MAXIMUM
QUANTITY
MAXIMUM
AMOUNT
0001 5.00
720.00
240.00
720.00
1.00
CLAUSES INCORPORATED BY REFERENCE
52.203-3 Gratuities APR 1984
52.203-6 Alt I Restrictions On Subcontractor Sales To The Government
(Sep 2006) -- Alternate I
OCT 1995
52.203-19 Prohibition on Requiring Certain Internal Confidentiality
Agreements or Statements
JAN 2017
52.204-7 System for Award Management OCT 2018
52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011
52.204-10 Reporting Executive Compensation and First-Tier
Subcontract Awards
OCT 2018
52.204-13 System for Award Management Maintenance OCT 2018
52.204-16 Commercial and Government Entity Code Reporting JUL 2016
52.204-18 Commercial and Government Entity Code Maintenance JUL 2016
52.204-21 Basic Safeguarding of Covered Contractor Information
Systems
JUN 2016
52.204-22 Alternative Line Item Proposal JAN 2017
52.204-23 Prohibition on Contracting for Hardware, Software, and
Services Developed or Provided by Kaspersky Lab and Other
Covered Entities.
JUL 2018
52.204-24 Representation Regarding Certain Telecommunications and
Video Surveillance Services or Equipment.
DEC 2019
52.209-6 Protecting the Government's Interest When Subcontracting
With Contractors Debarred, Suspended, or Proposed for
Debarment
OCT 2015
52.209-9 Updates of Publicly Available Information Regarding
Responsibility Matters
OCT 2018
52.209-10 Prohibition on Contracting With Inverted Domestic
Corporations
NOV 2015
52.212-1 Instructions to Offerors--Commercial Items OCT 2018
52.212-2 Evaluation - Commercial Items OCT 2014
52.212-3 Offeror Representations and Certifications--Commercial
Items
MAR 2020
52.212-3 Alt I Offeror Representations and Certifications--Commercial
Items (MAR 2020) Alternate I
OCT 2014
52.212-4 Contract Terms and Conditions--Commercial Items OCT 2018
52.217-5 Evaluation Of Options JUL 1990
52.219-6 Notice Of Total Small Business Set-Aside NOV 2011
52.219-14 Limitations On Subcontracting JAN 2017
52.222-3 Convict Labor JUN 2003
52.222-17 Nondisplacement of Qualified Workers MAY 2014
52.222-21 Prohibition Of Segregated Facilities APR 2015
52.222-26 Equal Opportunity SEP 2016
52.222-35 Equal Opportunity for Veterans OCT 2015
52.222-36 Equal Opportunity for Workers with Disabilities JUL 2014
52.222-37 Employment Reports on Veterans FEB 2016
52.222-40 Notification of Employee Rights Under the National Labor
Relations Act
DEC 2010
52.222-41 Service Contract Labor Standards AUG 2018
52.222-54 Employment Eligibility Verification OCT 2015
52.222-55 Minimum Wages Under Executive Order 13658 DEC 2015
52.222-62 Paid Sick Leave Under Executive Order 13706 JAN 2017
52.223-18 Encouraging Contractor Policies To Ban Text Messaging
While Driving
AUG 2011
52.224-3 Privacy Training JAN 2017
52.225-13 Restrictions on Certain Foreign Purchases JUN 2008
52.232-18 Availability Of Funds APR 1984
52.232-33 Payment by Electronic Funds Transfer--System for Award
Management
OCT 2018
52.232-40 Providing Accelerated Payments to Small Business
Subcontractors
DEC 2013
52.233-3 Protest After Award AUG 1996
52.233-4 Applicable Law for Breach of Contract Claim OCT 2004
52.237-1 Site Visit APR 1984
52.237-2 Protection Of Government Buildings, Equipment, And
Vegetation
APR 1984
52.242-15 Stop-Work Order AUG 1989
252.201-7000 Contracting Officer's Representative DEC 1991
252.203-7000 Requirements Relating to Compensation of Former DoD
Officials
SEP 2011
252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013
252.203-7003 Agency Office of the Inspector General AUG 2019
252.203-7005 Representation Relating to Compensation of Former DoD
Officials
NOV 2011
252.204-7004 Antiterrorism Awareness Training for Contractors. FEB 2019
252.204-7008 Compliance With Safeguarding Covered Defense Information
Controls
OCT 2016
252.204-7012 Safeguarding Covered Defense Information and Cyber
Incident Reporting
DEC 2019
252.204-7015 Notice of Authorized Disclosure of Information for Litigation
Support
MAY 2016
252.204-7016 Covered Defense Telecommunications Equipment or Services
-- Representation
DEC 2019
252.204-7017 Prohibition on the Acquisition of Covered Defense
Telecommunications Equipment or Services -- Representation
DEC 2019
252.204-7018 Prohibition on the Acquisition of Covered Defense
Telecommunications Equipment or Services
DEC 2019
252.205-7000 Provision Of Information To Cooperative Agreement Holders DEC 1991
252.209-7004 Subcontracting With Firms That Are Owned or Controlled By
The Government of a Country that is a State Sponsor of
Terrorism
MAY 2019
252.215-7008 Only One Offer JUL 2019
252.225-7012 Preference For Certain Domestic Commodities DEC 2017
252.225-7031 Secondary Arab Boycott Of Israel JUN 2005
252.225-7042 Authorization to Perform APR 2003
252.225-7050 Disclosure of Ownership or Control by the Government of a
Country that is a State Sponsor of Terrorism
DEC 2018
252.232-7003 Electronic Submission of Payment Requests and Receiving
Reports
DEC 2018
252.232-7010 Levies on Contract Payments DEC 2006
252.237-7010 Prohibition on Interrogation of Detainees by Contractor
Personnel
JUN 2013
252.243-7002 Requests for Equitable Adjustment DEC 2012
252.244-7000 Subcontracts for Commercial Items JUN 2013
252.247-7023 Transportation of Supplies by Sea FEB 2019
CLAUSES INCORPORATED BY FULL TEXT
52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018)
(a) Definitions. As used in this provision--
Administrative proceeding means a non-judicial process that is adjudicatory in nature in order to make a determination of fault or liability (e.g., Securities and Exchange Commission Administrative Proceedings, Civilian
Board of Contract Appeals Proceedings, and Armed Services Board of Contract Appeals Proceedings). This includes administrative proceedings at the Federal and State level but only in connection with performance of a
Federal contract or grant. It does not include agency actions such as contract audits, site visits, corrective plans, or inspection of deliverables.
Federal contracts and grants with total value greater than $10,000,000 means--
(1) The total value of all current, active contracts and grants, including all priced options; and
(2) The total value of all current, active orders including all priced options under indefinite-delivery, indefinite-quantity, 8(a), or requirements contracts (including task and delivery and multiple-award Schedules).
Principal means an officer, director, owner, partner, or a person having primary management or supervisory responsibilities within a business entity (e.g., general manager; plant manager; head of a division or business segment; and similar positions).
(b) The offeror ( ) has ( ) does not have current active Federal contracts and grants with total value greater than
$10,000,000.
(c) If the offeror checked “has” in paragraph (b) of this provision, the offeror represents, by submission of this offer, that the information it has entered in the Federal Awardee Performance and Integrity Information System (FAPIIS) is current, accurate, and complete as of the date of submission of this offer with regard to the following information:
(1) Whether the offeror, and/or any of its principals, has or has not, within the last five years, in connection with the award to or performance by the offeror of a Federal contract or grant, been the subject of a proceeding, at the
Federal or State level that resulted in any of the following dispositions:
(i) In a criminal proceeding, a conviction.
(ii) In a civil proceeding, a finding of fault and liability that results in the payment of a monetary fine, penalty, reimbursement, restitution, or damages of $5,000 or more.
(iii) In an administrative proceeding, a finding of fault and liability that results in--
(A) The payment of a monetary fine or penalty of $5,000 or more; or
(B) The payment of a reimbursement, restitution, or damages in excess of $100,000.
(iv) In a criminal, civil, or administrative proceeding, a disposition of the matter by consent or compromise with an acknowledgment of fault by the Contractor if the proceeding could have led to any of the outcomes specified in paragraphs (c)(1)(i), (c)(1)(ii), or (c)(1)(iii) of this provision.
(2) If the offeror has been involved in the last five years in any of the occurrences listed in (c)(1) of this provision, whether the offeror has provided the requested information with regard to each occurrence.
(d) The offeror shall post the information in paragraphs (c)(1)(i) through (c)(1)(iv) of this provision in FAPIIS as required through maintaining an active registration in the System for Award Management, which can be accessed via https://www.sam.gov (see 52.204-7).
https://www.sam.gov/
(End of provision)
ATTACHMENTS
ATTACHMENTS
ATTACHMENT NO. TITLE
1 Performance Work Statement (PWS)
2 Pricing Sheet
3 Past Performance Questionnaire (PPQ)
4 QASP
5 Technical Capability
6 Reps and Certs
(End Attachments)
CLAUSES INCORPORATED BY FULL TEXT
52.212-1 INSTRUCTIONS TO OFFERORS--COMMERCIAL ITEMS ADDENDUM TO FAR 52.212-1
Addendum to Paragraph (b). Paragraph (b) is changed to read as follows:
(b) Communication.
The Contracting Officer and Contract Specialist are the sole points of contact for this acquisition.
Communications with other officials may compromise the integrity of this acquisition and result in cancellation of the requirement.
Intent to Submit Offer.
For planning purposes only, please send an e-mail to Ms. Laura Holder at Laura.Holder@dodea.edu, Ms. Mileska
Rodriguez at Mileska.Rodriguez@dodea.edu, and Ms. Colleen C. Pritchard at Colleen.Pritchard@dodea.edu to give notification if your company intends to submit a proposal in response to this solicitation. The subject of the e-mail shall be “Intent to Submit a Proposal for HE1254-20-R-2003.” Please provide the company’s name and point of contact to include name, title, address, e-mail, phone number, company’s DUNS, and NATO Cage Code. Failure to submit a notice of intent does not prohibit an Offeror from submitting a proposal.
Submission of Questions.
Offerors shall submit questions concerning this solicitation, electronically, NO LATER THAN 12:00 p.m. (1200 hours) Eastern Daylight Time (EDT), 14 May 2020. Questions submitted after this date may not be considered for a response.
Submission of Offers.
Offerors must ensure that the signed and dated attached proposal and all attachments are virus free, legible, and arrives in Ms. Holder’s, Ms. Rodriguez’s, and Ms. Pritchard's e-mail inboxes by the solicitation closing time. E-mails over 10 MB will be rejected by DoDEA’s network. If the electronic copy cannot be opened, the Contract mailto:Laura.Holder@dodea.edu mailto:Mileska.Rodriguez@dodea.edu mailto:Colleen.Pritchard@dodea.edu
Specialist or Contracting Officer will notify the Offeror and a replacement electronic copy shall be provided by the
Offeror within one (1) working day after notification.
Documents shall be submitted in separate .pdf or Microsoft Office (e.g. Word, Excel, etc.) format by e-mail on or before the closing date and time stated in Block 8 of the solicitation to Ms. Laura Holder at
Laura.Holder@dodea.edu, Ms. Mileska Rodriguez at Mileska.Rodriguez@dodea.edu, and Ms. Colleen C. Pritchard at Colleen.Pritchard@dodea.edu.
At a minimum, offers must offerors shall submit a package consisting of an Administrative Cover Letter, Signed SF
1449, Signed SF 30 (as applicable) and four (4) separate volumes as follows:
1. Administrative Cover Letter
The Administrative Cover Letter shall state the following:
a. The solicitation number
b. Unique Entity Identifier (DUNS Number)
c. Complete Business Mailing Address.
d. N/CAGE Code
e. NAICS Code
f. Contact Name
g. Contact Phone and e-mail address
2. Signed SF 1449
Offerors shall complete blocks 12, 17a, and 30a-c of the SF 1449 Solicitation/Contract/Order for
Commercial Items. Offerors shall insert their company’s CAGE code in the box titled “CODE” in block 17.
By submission of its offer, the Offeror accedes to all solicitation requirements, including terms and conditions, representations and certifications, and technical requirements, in addition to those identified as
Document
Title
Page Limitations Apply to Each Proposal Submitted Pages shall be numbered numerically
Administrative
Cover Letter
Administrative
Cover Letter 1 page
Signed SF 1449 SF 1449 1 page (includes only the first page of the SF 1449)
Signed SF 30 SF 30 1 page (for each SF 30, as applicable)
Volume I
Factor 1 -
Technical Proposal
Use Attachment 5
No additional material will be considered outside of Attachment 5, Times New Roman, not less than 12-point font
Volume II
Factor 2 - Past
Performance 5 pages
Times New Roman, not less than 12-point font
Volume III Factor 3 - Price Use Attachment 2
(submit according to Volume III instructions in this clause)
Volume IV
Representations and Certifications
Use Attachment 6
(No additional material will be considered outside of Attachment 6, with the exception of the following:
Contractor filled-in Enclosures 1 through 5, If Applicable, The Subcontractor/Teaming Agreement (maximum 5 pages), and
The Offeror Responsibility Determination in accordance with FAR
9.104-1 (maximum 2 pages)
New Time Roman, not less than 12-point font mailto:Laura.Holder@dodea.edu mailto:Mileska.Rodriguez@dodea.edu mailto:Colleen.Pritchard@dodea.edu evaluation factors or sub-factors. Offeror’s terms and conditions will not be accepted. The SF 1449 shall be signed and dated by an Official authorized to bind the Organization, and be included in the quotation submission.
3. Signed SF 30
Offerors shall complete blocks 8 and 15a-c of each SF 30 Amendment of Solicitation/Modification of
Contract, issued for this solicitation. Each SF 30 shall be signed and dated by an Official authorized to bind the Organization, and be included in the quotation submission.
4. Volume I – Factor 1: Technical Capability
The Offeror shall complete Attachment 5 in order to address Factor 1: Technical Capability.
This factor evaluates the Offeror’s proposed buses and the ability to accomplish the technical requirements outlined in the PWS as they relate to the below criteria. The Technical Proposal shall provide sufficient information in order for the Government to assess the Offeror’s capability to successfully perform the requirement in accordance with the performance objectives, tasks, and standards as expressed in the PWS. A rating of “Unacceptable” for any subfactor will result in the proposal being deemed Technically Unacceptable and not being considered for contract award.
The Offeror shall address the following subfactors as follows:
Subfactor 1 – Vehicles Specification: This subfactor is a mandatory Fill-In for all Technical Proposals
(Volume I).
In order to meet the requirements of subfactor 1, the Offeror must complete all the mandatory fill-in fields of the table provided in Attachment 5 (Technical Capability) to provide technical specifications which clearly demonstrate that its offered vehicles meet the requirements of the PWS paragraph 3.3 Do not exceed the PDF fillable sections of any of the mandatory or non-mandatory fields. All Technical Capability responses must conform to the formatted fields provided at Attachment 5. Only complete rows that apply (i.e., are used). E.g., if an Offeror requires only three (3) rows are sufficient to list all the makes/models/years of vehicles in fleet that are proposed for this effort, then only three rows must be completed.
NOTE: The table appearing on pages 1-2 of Attachment 5 contains ten total rows to list Types of Vehicles. If an
Offeror is proposing more than ten types of vehicles to meet this requirement, then additional tables can be provided, however, this is the ONLY exception to the field constraints of Attachment 5 (i.e., no other additional pages may accompany a proposal, e.g., to permit more space to describe the company’s technical approach or capability to address any of the other Technical sub-factors).
Subfactor 2 – Daily Commute (DC) Student Transportation Services (STS): This subfactor is a mandatory
Fill-In for all Technical Proposals (Volume I).
In order to meet the requirements of subfactor 2, the Offeror must complete all the mandatory fill-in fields of the table provided in Attachment 5 (Technical Capability) to provide the offeror’s technical approach and capability in accordance with the PWS requirements for each task below.
Objective One/Task One: Contract Management – STS Program Management and Operations (PWS Para. 2.1.1)
Objective Two/Task One: STS - Student Transportation (PWS Para. 2.2.1)
Objective Two/Task Two: STS – Safety Procedures (PWS Para. 2.2.2)
Objective Three/Task One: Scheduled Co-Curricular (PWS Paragraph 2.3.1)
Subfactor 3 - Special Education Needs (SPEN) Transportation Services: This subfactor is a mandatory Fill-
In for all Technical Proposals (Volume I).
In order to meet the requirements of subfactor 3, the Offeror must complete all the mandatory fill-in fields of the table provided in Attachment 5 (Technical Capability) to provide the offeror’s technical approach and capability in accordance with the PWS requirements for each task below.
Objective Four/Task One: Special Needs Transportation Services (PWS Paragraph 2.4.1)
Objective Four/Task Two: Safety Aide (PWS Paragraph 2.4.2)
Objective Four/Task Three: Special Needs Transportation Driver (PWS Paragraph 2.4.3)
Subfactor 4 - Risk Plans: This subfactor is a mandatory Fill-In that all Technical Proposals (Volume I) must include.
In order to meet the requirements of subfactor 4, the Offeror must complete all the mandatory fill-in fields of the table provided in Attachment 5 (Technical Capability) to identify short-term and long-term risks for executing the requirements and describe their plan(s) for mitigating the risks identified.
5. Volume II – Factor 2: Past Performance.
The past performance evaluation is an assessment of the Offeror’s probability of meeting the minimum past performance solicitation requirements based on the Offeror’s demonstrated recent and relevant record of how well the Offeror performed on previous contracts. The Government will review the information collected, to include, but not limited to the Past Performance Questionnaires (Attachment 3) to determine the quality of the Offeror’s overall record of recent and relevant past performance.
Offeror shall submit past performance information on at least two (2), but not more than five (5), recent contracts for the prime and subcontractors (performing as the Prime on that effort) to determine the recency and relevancy of the Offeror’s performance. To be recent, the effort must be on-going or must have been completed within the last three (3) years by the closing date/time of this solicitation. To be relevant, the
Offeror must demonstrate that performance involved similar scope and magnitude of effort and complexities this solicitation requires.
Past Performance information submitted that is not recent (more than 3 years) and/or not relevant will not be evaluated.
i. Subcontractor/Teaming Information. If an Offeror proposes a teaming arrangement for services, the Offeror (proposed prime Offeror) shall provide past performance information on any subcontractor or teaming arrangement offered.
At a minimum, when a prime Offeror teams with a subcontractor, past performance information relevant to that subcontractor shall be provided on at least one (1) effort. The information required shall be the same as above. Offerors shall include in their proposal the written consent of their proposed subcontractor(s) to allow the Government to discuss the subcontractor’s past performance assessment with the Offeror.
ii. Questionnaires. Offerors must send Past Performance Questionnaires (PPQ), Attachment 3, to their Customers’ points of contact (POCs) and instruct the POCs to complete the questionnaire in
English. Offerors shall make their best effort to send out a sufficient number of past performance questionnaires to reasonably expect submission to the contracting officer at least one questionnaire on each cited contract/work effort. The questionnaire recipient should e-mail completed questionnaires directly to the contract specialist listed on the questionnaire. Past Performance
Questionnaires are requested to be received in the issuing office by the closing date/time of the solicitation.
iii. The Government reserves the right to obtain information relative to present and past performance on its own, in addition to information provided by the Offeror and from contract and subcontract
POCs. If you are aware that one or more of your contracts in the Past Performance Information
Retrieval System (PPIRS) specifically relates to the requirements in this acquisition, please provide this contract/work effort as one of the past performance submissions with your proposal.
6. Volume III – Factor 3: Price.
This factor will not be assigned a rating for this factor. However, the offeror’s proposal will be evaluated for completeness, price fairness and reasonableness, and balancing of prices based upon the offeror’s priced proposal using the Pricing Sheet (Attachment 2) as follows:
a. Completeness. Attachment 2 must be complete for each Sub-contract Line Item (SLIN) within each
Contract Line Item (CLIN) the offeror proposes. Offerors should only fill-in (complete) the shaded cells in column ‘F’ of the Pricing Sheet, and be sure to complete all shaded cells for each SLIN with the CLIN(s) being proposed.
b. Price Fairness & Reasonableness. Shall be evaluated using the techniques and procedures stated in FAR
15.404-1.
To account for the option period(s) possible under FAR 52.217-8 (maximum six months) Option to Extend Services, the Government has provided a table within Attachment 2, labeled “FAR 52.217-8 Option to Extend Services.” The contractor will provide a Unit Price for each CLIN Description. If the Government has to exercise the option under
FAR 52.217-8, then the Government will use the rate given for the last year performance was completed.
7. Volume IV: Representations and Certifications
The Offeror shall complete Attachment 6 (to include Contractor filled-in Enclosures 1 through 5, any applicable Subcontractor/Teaming Agreement, and the Offeror Responsibility Determination) in order to address Factor IV: Representations and Certifications.
Addendum to Paragraph (c). Paragraph (c) is changed to read as follows:
(c) Period for acceptance of offers. The offeror agrees to hold the prices in its offer firm for 120 calendar days from the date specified for receipt of offers, unless another time period is specified in an addendum to the solicitation.
Addendum to Paragraphs (d) & (e). Paragraphs (d) & (e) are deleted in its entirety.
Addendum to Paragraph (g) Contract award. Paragraph (g) is changed to read as follows:
The Government intends to award without discussions. Therefore, the offeror’s initial proposal should contain the offeror’s best approach/terms for technical, past performance, and price. However, despite this intent, the
Government reserves the right to conduct discussions if the Government determines they are necessary. If the
Government determines that discussions are necessary, a competitive range will be established. In the event issues pertaining to this award cannot be resolved to the Government's satisfaction, the Government reserves the right to withdraw and cancel the solicitation. In such event, offerors will be notified in writing.
Addendum to Paragraph (h). Paragraph (h) is deleted in its entirety.
Addendum to Paragraph (i). Paragraph (i) is deleted in its entirety.
52.212-1 (End of Addendum to FAR 52.212-1)
52.212-2 ADDENDUM – EVALUATION – COMMERCIAL ITEMS (OCT 2014)
(a) Addendum to Paragraph (a). Paragraph (a) is changed to read as follows:
The Government will award a single Firm-Fixed Price (FFP) Indefinite Delivery/Indefinite Quantity (IDIQ) contract to the Offeror, for a 5-year period, to the responsible Offeror whose proposal represents the best value. The resultant
IDIQ contract will only be awarded to an Offeror who is deemed responsible in accordance with FAR Part 9 and whose proposal conforms to the solicitation, and will be most advantageous to the Government, price and other factors considered. This acquisition will be conducted in accordance with FAR Parts 12 and 15.
By submission of its proposal, the Offeror agrees to all solicitation requirements, including terms and conditions, representations and certifications, and technical requirements. Failure to meet a requirement may result in a proposal being determined unacceptable for award. Offerors must clearly identify any exception to the solicitation terms and conditions and provide complete accompanying rationale.
To make the best value award decision, the Government will evaluate three (3) factors, Technical Capability, Past
Performance, and Price. The Technical Capability factor is more important than the Past Performance factor. The non-price factors when combined are more important than price. All the Technical Capability subfactors are of equal importance.
The Government shall evaluate according in accordance with FAR Part 15.101-1 (Trade-off Process), the provisions of this solicitation, and according to the instructions at 52.212-1 and addendum to 52.212-1.
Evaluation Factors:
a. Factor 1: Technical Capability. Offerors’ technical proposals will be evaluated to determine the Offeror’s technical approach in accordance with the subfactors below. The Technical Capability subfactors are of equal importance.
i. Sub-factor 1 – Vehicles Specification. The government will evaluate the offeror’s technical specifications which clearly demonstrate that its offered vehicles meet the requirements of the PWS paragraph 3.3.
ii. Sub-factor 2: Daily Commute (DC) Student Transportation Services (STS). The government will evaluate the offeror’s technical approach and capability in accordance with the PWS requirements for each task below :
Objective One/Task One: Contract Management – STS Program Management and Operations (PWS Para. 2.1.1)
Objective Two/Task One: STS - Student Transportation (PWS Para. 2.2.1)
Objective Two/Task Two: STS – Safety Procedures (PWS Para. 2.2.2)
Objective Three/Task One: Scheduled Co-Curricular (PWS Paragraph 2.3.1)
iii. Sub-factor 3: Special Education Needs (SPEN) Transportation Services. The government will evaluate the offeror’s technical approach and capability below.
Objective Four/Task One: Special Needs Transportation Services (PWS Paragraph 2.4.1)
Objective Four/Task Two: Safety Aide (PWS Paragraph 2.4.2)
Objective Four/Task Three: Special Needs Transportation Driver (PWS Paragraph 2.4.3)
iv. Sub-factor 4: Risk Plans. The government will evaluate the offeror’s identified short-term and long-term risks for executing the requirements, as well as their plan(s) for mitigating the risks identified.
Technical Capability Rating Evaluation Process:
The technical rating includes consideration of strengths, weaknesses, and deficiencies in determining technical ratings. The Technical Capability Factor will be rated in accordance with the following Adjective Rating Method:
Combined Technical/Risk Capability Rating Method
Adjectival Rating Description
Outstanding Proposal indicates an exceptional approach and understanding of the requirements and contains multiple strengths, and risk of unsuccessful performance is low.
Good Proposal indicates a thorough approach and understanding of the requirements and contains at least one strength, and risk of unsuccessful performance is low to moderate.
Acceptable Proposal meets requirements and indicates an adequate approach and understanding of the requirements, and risk of unsuccessful performance is no worse than moderate.
Marginal Proposal has not demonstrated an adequate approach and understanding of the requirements, and/or risk of unsuccessful performance is high.
Unacceptable Proposal does not meet requirements of the solicitation, and thus, contains one or more deficiencies, and/or risk of unsuccessful performance is unacceptable.
Proposal is unawardable.
b. Factor 2: Past Performance. In assessing the offeror’s probability of meeting the solicitation requirements, evaluation of past performance will result in Past Performance Recency, Relevancy, and Overall Ratings as follows:
Recency Assessment. An assessment of the past performance information will be made to determine if it is recent according:
Past Performance Recency Ratings
Recent The effort must be ongoing or must have been completed within the last three (3) years by the closing date and time of this solicitation.
Not Recent The effort has been completed for more than three (3) years by the closing date and time of this solicitation.
Relevancy Assessment. The Government will determine how relevant the effort accomplished by the Offeror is to the effort to be acquired through the solicitation. The Government is not bound by the Offeror’s assessment of relevancy. To be relevant, the Offeror must demonstrate that performance involved similar scope, magnitude of effort, and complexities this solicitation requires.
Relevancy will be rated in accordance with the following Rating method:
Past Performance Relevancy
Very Relevant Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.
Relevant Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.
Somewhat Relevant Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.
Not Relevant Present/past performance effort involved little or none of the similar work of effort and complexities this solicitation requires.
Past Performance Overall Rating. The past performance evaluation is an assessment of the Offeror’s probability of meeting the minimum past performance solicitation requirements. The Government will review the information collected, to include, but not limited to the Past Performance Questionnaire, Attachment 3, to determine the quality of the Offeror’s overall record of recent and relevant past performance.
Past Performance Acceptable/Unacceptable Rating method:
Past Performance Confidence Assessment
Acceptable Based on the offeror’s performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort, or the offeror’s performance record is unknown.
Unacceptable Based on the offeror’s performance record, the Government does not have a reasonable expectation that the offeror will be able to successfully perform the required effort.
Neutral An offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the offeror may not be evaluated favorably or unfavorably on past performance. In the context of acceptability/unacceptability, a neutral rating shall be considered
“acceptable.”
In addition to past performance information submitted by the Offeror and Questionnaires completed for the Offeror, past performance information may be obtained from Past Performance Information
Retrieval System (PPIRS), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), or other databases; the Defense Contract
Management Agency; and interviews with Program Managers, Contracting Officers, or other sources known to the government.
In evaluating past performance, the Government reserves the right to give greater consideration to information on those individual contracts deemed most relevant to the effort described in this RFP. The
Government also reserves the right to give greater consideration to an individual Offeror’s past performance information rather than the combined past performance information of an Offeror and its associates using teaming arrangements.
Offerors without a record of relevant past performance or for whom information on past performance is not available or is so sparse that a past performance rating cannot be reasonably assigned will not be evaluated favorably nor unfavorably on past performance and as a result, will receive a “Neutral” rating for the Past Performance factor.
If the Government chooses to conduct negotiations, Offerors will be provided an opportunity to address any adverse past performance information not previously addressed. Adverse past performance is defined as past performance information which supports a less than satisfactory rating on any evaluation aspect or any unfavorable comments received from sources without a formal rating system.
The Government may reject a proposal if it is found that the Offeror deleted, misrepresented, or withheld any information that might have a negative impact on its past performance record.
c. Factor 3: Price. This factor will not be assigned a rating. However, the offeror’s proposal will be evaluated for completeness, fair and reasonable pricing, and balancing of prices based upon the offeror’s priced proposal using the
Pricing Sheet at Attachment 2 as follows:
a. Completeness. Attachment 2 must be complete for each Sub-contract Line Item (SLIN) within each Contract Line
Item (CLIN) the offeror proposes.
b. Fair & Reasonable Pricing. Shall be evaluated using the techniques and procedures stated in FAR 15.404-1.
(b) Addendum to Paragraph (b). Paragraph (b) is changed to read as follows:
To account for the option period(s) possible under FAR 52.217-8 (maximum six months) Option to Extend Services, the Government has provided a table within Attachment 2, labeled “FAR 52.217-8 Option to Extend Services.” The contractor will provide a Unit Price for each CLIN Description. If the Government has to exercise the option under
FAR 52.217-8, then the Government will use the rate given for the last year performance was completed.
(End of FAR 52.212-2 Addendum)
52.212-4 ADDENDUM – CONTRACTS TERMS AND CONDITIONS - - COMMERCIAL ITEMS (DEC 2006)
Text in paragraph (c) is deleted and replaced with the following:
Changes in terms and conditions of this contract may be made only by written agreement of the parties with the exception of certain changes such as administrative changes including changes in paying office, appropriation data, etc. authorized by the Federal Acquisition Regulation and its supplements that may be made unilaterally by the
Contracting Officer (for a complete list of changes that may be made unilaterally, see FAR 43.103(b)).
CONSENT TO DE-OBLIGATION OF EXCESS FUNDS AFTER FINAL PAYMENT
(a) This paragraph is an addendum to FAR 52.212-4.
(b) The Contractor agrees that, after final payment has been made, the Government may unilaterally, and without obtaining further approval from the Contractor, adjust the final quantities of goods and/or services delivered and accepted under this contract and adjust the final price of this contract to conform to the total amount paid as of the date final payment was made.
(c) In accordance with FAR 4.804-3, the paying office shall close the contract file upon issuance of the final payment voucher. No contract modification will be issued to de-obligate the excess funds.
(d) If this contract is a type of indefinite-delivery contract (e.g., indefinite-delivery indefinite-quantity, requirements), this paragraph shall apply to each order issued under the contract on a case-by-case basis.
(e) This paragraph shall be deemed to be written agreement of the parties as contemplated by the changes paragraph of the Contract Terms And Conditions – Commercial Items clause of this contract (FAR 52.212-4(c)).
DAMAGES TO BUSES
(a) This paragraph is an addendum to FAR 52.212-4.
(b) The contractor is responsible for the cost of repairs for any and all damages caused by DoDEA students. The
Government is not liable for any damages caused by DoDEA students. The Government will not reimburse the contractor for costs resulting from any such actions.
(End of Addendum to FAR 52.212-4)
52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR
EXECUTIVE ORDERS—COMMERCIAL ITEMS (DEVIATION 2018-O0021) (JAN 2020)
(a) Comptroller General Examination of Record. The Contractor shall comply with the provisions of this paragraph
(a) if this contract was awarded using other than sealed bid, is in excess of the simplified acquisition threshold, and does not contain the clause at 52.215-2, Audit and Records—Negotiation.
(1) The Comptroller General of the United States, or an authorized representative of the Comptroller General, shall have access to and right to examine any of the Contractor’s directly pertinent records involving transactions related to this contract.
(2) The Contractor shall make available at its offices at all reasonable times the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR Subpart 4.7, Contractor Records Retention, of the other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement. Records relating to appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved.
(3) As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and regardless of form. This does not require the Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law.
(b)(1) Notwithstanding the requirements of any other clauses of this contract, the Contractor is not required to flow down any FAR clause, other than those in this paragraph (b) (1) in a subcontract for commercial items. Unless otherwise indicated below, the extent of the flow down shall be as required by the clause—
(i) 52.203-13, Contractor Code of Business Ethics and Conduct (Oct 2015) (41 U.S.C. 3509).
(ii) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017)
(section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L.
113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
(iii) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by
Kaspersky Lab and Other Covered Entities (Jul 2018) (Section 1634 of Pub. L. 115-91).
(iv) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or
Equipment. (Aug 2019) (Section 889(a)(1)(A) of Pub. L. 115-232).
(v) 52.219-8, Utilization of Small Business Concerns (Oct 2018) (15 U.S.C. 637(d)(2) and (3)), in all subcontracts that offer further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds $700,000 ($1.5 million for construction of any public facility), the subcontractor must include 52.219-8 in lower tier subcontracts that offer subcontracting opportunities.
(vi) 52.222-17, Nondisplacement of Qualified Workers (MAY 2014) (E.O. 13495). Flow down required in accordance with paragraph (l) of FAR clause 52.222-17.
(vii) 52.222-21, Prohibition of Segregated Facilities (APR 2015).
(viii) 52.222-26, Equal Opportunity (Sept 2016) (E.O. 11246).
(ix) 52.222-35, Equal Opportunity for Veterans (Oct 2015) (38 U.S.C. 4212).
(x) 52.222-36, Equal Opportunity for Workers with Disabilities (July 2014) (29 U.S.C. 793).
(xi) 52.222-37, Employment Reports on Veterans (FEB 2016) (38 U.S.C. 4212).
(xii) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O. 13496).
Flow down required in accordance with paragraph (f) of FAR clause 52.222-40.
(xiii) 52.222-41, Service Contract Labor Standards (Aug 2018) (41 U.S.C. chapter 67).
(xiv)(A) 52.222-50, Combating Trafficking in Persons (Mar 2015) (22 U.S.C. chapter 78 and E.O. 13627).
(B) Alternate I (Mar 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).
(xv) 52.222-51, Exemption from Application of the Service Contract Act to Contracts for Maintenance, Calibration, or Repair of Certain Equipment-Requirements (May 2014) (41 U.S.C. chapter 67).
(xvi) 52.222-53, Exemption from Application of the Service Contract Act to Contracts for Certain Services-
Requirements (May 2014) (41 U.S.C. chapter 67).
(xvii) 52.222-54, Employment Eligibility Verification (Oct 2015) (E.O. 12989).
(xviii) 52.222-55, Minimum Wages Under Executive Order 13658 (Dec 2015).
(xix) 52.222-62 Paid Sick Leave Under Executive Order 13706 (Jan 2017) (E.O. 13706).
(xx)(A) 52.224-3, Privacy Training (JAN 2017) (5 U.S.C. 552a).
(B) Alternate I (JAN 2017) of 52.224-3.
(xxi) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Oct 2016) (Section
862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).
(xxii) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (May 2014) (42 U.S.C. 1792). Flow down required in accordance with paragraph (e) of FAR clause 52.226-6.
(xxiii) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Feb 2006) (46 U.S.C. Appx.
1241(b) and 10 U.S.C. 2631). Flow down required in accordance with paragraph (d) of FAR clause 52.247-64.
(2) While not required, the contractor may include in its subcontracts for commercial items a minimal number of additional clauses necessary to satisfy its contractual obligations.
(End of clause)
52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a Firm-Fixed Price (FFP) Indefinite Delivery Indefinite Quantity (IDIQ) contract resulting from this solicitation.
52.216-19 ORDER LIMITATIONS (OCT 1995)
(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than 5 days, the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .