Attachment_4_QASP.pdf

PDF 196 KB Posted

Attached to
Yokota Bus Driver Services Federal contract opportunity
Solicitation number
HE1254-19-Q-2004
Issued by
Department of Defense Education Activity

About this file

Attachment 4 QASP

View the file

Other files for this federal contract opportunity

Other files attached to Yokota Bus Driver Services, newest first.
File Type Posted
QA_2_HE1254-19-Q-2004_Yokota.pdf PDF
Attachment_1_PWS.pdf PDF
HE1254-19-Q-2004-P0003.pdf PDF
HE1254-19-Q-2004-P0001.pdf PDF
HE1254-19-Q-2004.pdf PDF
Attachment_1_PWS.pdf PDF
HE1254-19-Q-2004-P0002.pdf PDF
Attachment_2_Pricing_Sheet.xlsx XLSX spreadsheet
Attachment_5_Past_Performance_Questionnaire.pdf PDF
Attachment_6_Letter_of_Commitment.pdf PDF
Q&A_1_HE1254-19-Q-2004_Yokota.xlsx XLSX spreadsheet
Attachment_7_FAR_42.15_–_CPARS_Form.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOR INFORMATIONAL PURPOSES ONLY

PAC EAST QASP

ATTACHMENT 4

QUALITY ASSURANCE SURVEILLANCE PLAN

FOR

DoDEA PAC East DISTRICT

SCHOOL TRANSPORTATION SERVICES

QASP and Performance Requirements Summary (PRS)

I. INTRODUCTION

1. This Quality Assurance Surveillance Plan (QASP) provides guidance and procedures to Government personnel responsible for surveillance of the contractor’s performance for work performed under Contracts for the DoDEA Pacific East District. Its Governments primary focus is to ensure:

• The contractor’s compliance and/or failure to comply with the terms and conditions of the contract are systematically identified, accurately documented and reported in a timely manner, and the contractor demonstrates compliance with its own Quality Control Plan.

• That a basis is provided to support contract administration decisions regarding acceptance of services, payment for services, and evoking contractual remedies for failure by the contractor to perform as required.

• That the Government's interests in its business dealings with the contractor are protected and served.

2. Through responsible surveillance of contractor performance, utilizing the methods and procedures prescribed herein, the QASP serves as an effective mechanism to ensure acceptance of the level of quality of services required by contractual requirements. It is consistent with this contract’s Performance Work Statement (PWS), which identifies requirements the Government will focus on during its inspection of services.

• The plan is developed on the premise that the Contractor, not the Government, is responsible for implementing effective management and quality control measures to ensure compliance with performance requirements.

• Nonconformance with contract requirements is termed a “Deficiency.” The term “Deficiency” refers to performance of a service requirement that does not meet the associated contractual requirement defined in the contract’s PWS.

• Inspection and acceptance of contractor services will be accomplished pursuant to the provisions of FAR

Clause FAR 52.212-4 Contract Terms and Conditions – Commercial Items in the contract.

• For services that do not conform to contract requirements, the Government may require the Contractor to re-perform to ensure conformity and acceptance at no increase in contract amount. In the event substandard services cannot be corrected through re-performance the Government will require the contractor to:

-- Take necessary action to ensure that future performance conforms to contract requirements.

-- Reduce the contract price in accordance with the associated deduction allowed for in the Standard Deductions.

• In the event substandard performance occurs, should the contractor fail to take the necessary action to ensure future conformance with contract requirements, or fail to promptly re-perform services to an acceptable level, the Government may:

-- Have the services performed by other means and charge to the contractor any cost incurred.

-- Terminate the contract for cause.

3. Suggestions for changes, additions and improvements to this QASP are encouraged and will be subject to final approval by the Contracting Officer (KO). Written or telephonic coordination for changes, supplementation or improvements may be initiated by the (COR) with concurrent information retained by the District Transportation Supervisor and the Student Transportation Offices.

4. It is important to emphasize that quality control and the contractor’s implementation of its Quality

Control Plan (QCP) is the sole responsibility of the contractor, not the Government. The Government surveys and inspects the contractor’s performance for purposes of “assuring” the level of quality of services agreed to in the contract are received. Hence, the Government is responsible for quality assurance.

5. The Government has the right under this contract to perform quality assurance at any time or place as long as it does not interfere with the progress of the work. This means the Government may conduct inspections at any point in performance including:

• Inspection of materials prior to incorporation into the work, or, inspection of the contractor's preparations;

• Inspection during the work (following or riding buses performing routes, etc..) process itself, especially where quality characteristics may not be obvious from simple visual inspection of the output.

• Inspection of the completed item or service.

6. There are essentially five elements to quality assurance:

• The output, service, or requirement the contractor is obligated to perform by the PWS.

• The requirements established by the PWS, whether relating to quality, timeliness, and/or other measures.

• The quality assurance method, including the frequency of its application.

• The documentation and reporting of results, including checklists, work sheets, summary forms, and contract discrepancy reports (CDRs).

• Follow-up to ensure any required corrective action has been taken by the contractor.

II. DEFINITIONS

Alternate Contracting Officer's Representative (ACOR) - This individual will be designated by the CO.

The ACOR is responsible for surveilling and inspecting contractor performance and providing written recommendation for acceptance of services. This individual shall have overall responsibility for the coordination of contractor performance in accordance with the performance work statement and any resulting task order that may be issued by the CO. Duties also include technical assistance to the CO and surveillance and compliance duties as further enumerated in this plan.

Contract - An agreement between the government and contractor enforceable by law.

Contract Administration - All interrelated activities with the purpose of ensuring contract terms and conditions are met by both the contractor and the government.

Contracting Officer (CO) - An official in a contracting office authorized by written appointment to enter into, administer, and terminate contracts and place delivery orders under contracts.

Contracting Officer's Representative (COR) - This individual will be designated by the CO. The COR is responsible for surveilling and inspecting contractor performance and providing written recommendation for acceptance of services. This individual shall have overall responsibility for the coordination of contractor performance in accordance with the performance work statement and any resulting task order that may be issued by the CO. Duties also include technical assistance to the CO and surveillance and compliance duties as further enumerated in this plan.

Inspection - Examination of services by Government personnel utilizing applicable inspection methodologies to determine conformance to contract requirements, terms, and conditions.

Quality Assurance (QA) - Actions taken by Government personnel, including inspection, to determine if the products/services delivered by the contractor meet the contract requirements. Quality assurance involves a broader range of activities than just inspection.

Quality Control (QC) - Actions taken by a contractor to ensure that the product or service delivered under the contract meets the contract requirements.

Performance Work Statement (PWS) is a Statement of Work (SOW) for Performance-Based Acquisitions that clearly describes the performance objectives and standards that are expected of the contractor. When a contract is awarded, the PWS is legally binding upon the contractor and the U.S. Government.

Surveillance - Quality assurance and other actions taken by Government personnel to determine contractor conformance and nonconformance with contract performance requirements. Surveillance is a broader term than inspection or QA because it encompasses the examination of the business as well as the technical aspects of the contract. However, the term "quality assurance surveillance" refers to those surveillance actions directly related to quality assurance.

http://acqnotes.com/acqNote/statement-of-work http://acqnotes.com/acqNote/performance-based-acquisitions

III. QASP PROCEDURES

1. Quality Assurance Surveillance Schedule - The Quality Assurance Evaluator (QAE) or COR, as applicable, will develop internal surveillance schedules for Government use only based on PWS requirements and inspection methodology established herein.

2. Method of Inspection - The methods of inspection to be utilized, at Government discretion, to assure quality services are received under the contract are identified below. These methods are “Scheduled/Random Inspection” and “Record of Customer Complaints.” Note that the Government reserves the right to unilaterally change its methods of inspection, and if accomplished, will promptly provide a copy of the revised QASP to the contractor for informational purposes:

• Inspection - The COR/QAE will develop a surveillance schedule based on select requirements in the

PWS. Table 1 provided with this QASP highlights select requirements for potential inspection. The surveillance schedule will not be provided to the contractor in order to maintain the integrity of the process associated with quality assurance.

-- The COR/QAE is responsible for selecting and scheduling routes and vehicles for inspection. The COR/QAE will utilize the Vehicle Quality Assurance Checklist as a guide for vehicle inspections.

-- Determination of various routes and vehicles for scheduled inspection is subjective. However, to provide consistent surveillance, and as a basis for comparing trends from month to month, the COR/QAE will apply consistent criteria in selecting and scheduling routes and vehicles for scheduled inspection.

-- The COR/QAE should vary routes, runs and vehicles to be inspected, so the same services or vehicles are not inspected every time and inspections do not follow an obvious pattern. Document the method used in scheduling inspections and apply it consistently from surveillance period to surveillance period so trends may be identified.

-- The COR/QAE should schedule additional inspections for emphasis on known or suspected problem areas, plus to follow up on customer complaints. As needed, monthly surveillance schedules should be revised for additional inspections in problem areas. The COR/QAE must establish a clear pattern of increased inspections to focus on problem areas, giving the contractor greater incentive to improve performance because known problem areas are being closely observed.

• Record of Customer Complaint - At any time during the life of the contract, the COR/QAE may receive customer complaints about the quality of services. COR/QAE will verify the complaints and may perform Random Inspections to investigate the complaints. The complainant or COR/QAE should properly record all complaints. The COR/QAE shall:

-- Investigate complaints as they are received to ensure they are valid and document the complaint on the form provided at Enclosure 1; Record of Customer Complaint. Notify the contractor manager of any validated complaint and annotate the complaint form with the means, date, and time the contractor was notified. Retain validated complaint forms in the COR file.

-- Customer complaints are seldom used to reject a service or deduct money from contractor payments.

However, validated customer complaints can reinforce the accuracy of sample results. At the end of each month, count all validated complaints to determine if overall performance is acceptable or unacceptable.

Forward a copy of each form to the KO with the COR/QAE’s recommendation for further action, when necessary. When scheduled inspections also indicate unsatisfactory service, validated complaints may support seeking remedies other than or in addition to monetary deductions.

-- Customer complaints, like incidental COR/QAE observations, may be the bases for scheduling follow-up observations under scheduled inspections, focusing attention on known or suspected problem areas.

Revise or initiate scheduled inspection schedules as needed for emphasis on unsatisfactory areas of performance.

3. Documentation/Reports

a. Contractor Discrepancy Report:

A Contractor Discrepancy Report (CDR) is generally prepared by a COR to notify the contractor of a pending discrepancy of non-performance or failure to meet an objective. The purpose of a CDR is to allow the contractor to correct their discrepancy without interference from the Government. If the contractor fails to correct the discrepancy within the time given in the CDR, the CO has the option of elevating the issue. The COR will generate the CDR and forward directly to the assigned Contract Specialist (CS)/Contracting Officer (CO) within the DoDEA-E Procurement Division not later than the following business day. Upon receipt, the CS/CO will work jointly with the COR to ensure all information contained in the CDR is accurate, sufficient and credible. Once determined valid, sufficient and supportable the CS/CO will issue the CDR to the contractor the following business day. The Contractor will provide a written position in response to the CDR and return the document to the CS/CO within two (2) business days after receipt. The CO will render a final position of the CDR from the Contractor and issue the completed CDR to the Contractor. A copy will be provided to the COR with the original document being retained in the official contract file.

For every observed defect and validated customer complaint, the COR will initiate a CDR to document defects and track the steps taken to finalize the action. Fill in blocks 1-7 of the CDR as follows:

(1) Block 1: Enter the contract and current task order numbers.

(2) Block 2: Enter a CDR report number. Number CDR’s in sequence for each contract as defects occur. Maintain a log of CDR’s in report number sequence on a locally developed log which includes, as a minimum, the contract and task order numbers, the CDR report number, the date of defect, the dates sent to and received back from contractor, the date sent to DEPO, and the close-out date.

(3) Block 3: Enter the names of the contractor and contract manager.

(4) Block 4: Enter the COR’s name, title, and field office.

(5) Block 5: Enter Dates, prepared, and returned by contractor, action complete.

(6) Block 6: Describe the deficiency in detail; at a minimum, enter the date, time, bus route and run, CLIN, deficiency, and references in the contract specification.

(7) Block 7: The COR identified in Block 4 will sign representing the CO.

QASP Enclosure 1

RECORD OF CUSTOMER

COMPLAINT

Date of Complaint: Time of Complaint:

Source of Complaint: School/Facility:

Individual: Contract Reference:

Nature of Complaint:

Validation:

Date/Time Contractor Informed:

Action Taken by Contractor:

Date Received/Validated by:

Table 1 - Performance Requirement Summary

Failure by the contractor to perform critical performance elements in accordance with the PWS requirements are subject to the Schedule of Deductions in the table below.

Performance Requirement Summary (PRS) Chart

PWS

REFERENCE

STANDARDS QUALITY

LEVEL

SURVEILLANCE

METHOD

REMEDY/DISINCENTI

VE

Paragraph 3.3

Compliance with Contractor Personnel Standards/Requirements

100% Compliance

Planned Sampling/ Customer Complaint

A Contract Discrepancy Report (CDR) will be issued for a response which may lead to a Cure Notice.

Paragraphs 3.1

Security Standards/Requirements

Review Attendance Records

Same As Above

Paragraphs 3.2

Compliance with Safety Procedures/Standards

Paragraphs 2.1.6

Compliance with seatbelt or child safety restraint system standards

Paragraph 3.5.

Report accidents or incidents verbally to

COR

100% Inspection

Paragraph 3.5

Submit written accident report or incident report to the COR by close of business next day

No more than one

(1) occurrence per month

Paragraph 3.1.3.

Submit Daily School Bus Safety/Security Inspection Checklist and keep on file for 30 days.

Paragraph 2.5.4.4

School Buses are clean and provide smoke free environment

Paragraph 3.3.14.3

Maintain 18-30 degree Celsius passenger compartment temperature

No more than one

Paragraph 3.1.8

Transportation Standards and Procedures

Paragraph 3.1.8

Perform all scheduled runs and service all stops

Paragraph 3.1.9 Report to the COR of time delay of ten (10) minutes or longer in a run

Paragraph 3.1.9.2 not corrected within sixty

(60) minutes of notification to COR

No more than one

Paragraph 2.1.6.1.7 & 3.1.10

Report student misbehavior in writing

No more than one

QUALITY ASSURANCE SURVEILLANCE PLAN
FOR
DoDEA PAC East DISTRICT
SCHOOL TRANSPORTATION SERVICES

File details come from the government source that posted it.