NEIE Command and Response Trailers QA.docx
DOCX document 17 KB Posted
- Attached to
- DTRA Command and Response Trailers Federal contract opportunity
- Solicitation number
- HDTRA120R0026
- Issued by
- Defense Threat Reduction Agency
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| AMEMDMENT 1 - Combined Sypnosis and Solicitation - Trailers.docx | DOCX document | |
| Attaachment 1 - Specifications.docx | DOCX document | |
| Combined Sypnosis and Solicitation - Trailers.docx | DOCX document | |
| Attachment 2 - HDTRA120P0023.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFQ: HDTRA120R0026
Questions and Answers Q1. Specs show lower cabinets all the way across the front but also show the generator should be in the front. Do you want the generator in the cabinets with a door to the outside?
A1. The generator (1 per each trailer) should be housed inside an exterior accessed compartment which will extend into the inside of the trailers. The exterior-accessed compartment shall be mounted, lined & vented. This is to ensure it is sealed so no leakage into interior. From the inside, this compartment will be under the counter and enclosed as one part of the "L-shaped base." There should be no access to this compartment from inside.
Q2. Do you want the L shape base that is 36” wide drawer and 36”wide door with cabinets across the front and the left L would go over the generator. Are you picturing more cabinets under the work bench?
A2. Yes. However, we are not picturing more cabinets under the work bench.
Q3. With reference to the cabinets/storage for the Response Trailer, a 3” high bin face requested- is this referring to open shelving with 3” lip?
A3. Yes, it is referring to open shelving with a 3” lip.
Q4. Do you really require two 7wk gas generators? Or is it a misprint and only one generator as nothing else is plural in the wording.
A4. We only require 1 generator between 2kw and 7kw (Command Trailer Only).
Q5. Do you have specifications for insulation?
A5. No specifications.
Q6. No electrical specs for second trailer. Is that correct?
A6. No, only one generator. This needs to be a 2kw to 7kw gas generator.
File details come from the government source that posted it. Updated .