FY19_BAA_QA_Phase_II.XLSX
XLSX spreadsheet 13 KB Posted
- Attached to
- Chemical/Biological Technologies FY2019 Program Build Federal contract opportunity
- Solicitation number
- HDTRA1-19-S-0001
- Issued by
- Defense Threat Reduction Agency
About this file
This document contains a question and answer sheet pertaining to a Broad Agency Announcement solicitation from the Defense Threat Reduction Agency. The solicitation seeks proposals for the Chemical and Biological Technologies Fiscal Year 2019 Program Build within areas including detection of chemical and biological threats, information systems, individual and collective protection, hazard mitigation, threat agent science, medical pretreatments, diagnostics, therapeutics, and threat surveillance. Proposal periods of performance may be proposed up to five years total and are not limited to one year, with go/no-go metrics not required for each task. Reference pages are not included in the 25-page technical proposal limit. Questions should be directed to the provided email address.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FY19_BAA_Q&A.xlsx | XLSX spreadsheet | |
| ATTACHMENT_5_-_Reps_and_Certs.pdf | ||
| ATTACHMENT_4_-_Cost_Spreadsheet.xlsx | XLSX spreadsheet | |
| ATTACHMENT_3_-_SF1408.pdf | ||
| ATTACHMENT_6_-_Supplemental_Volume_Coversheet.pdf | ||
| ATTACHMENT_2_-_SOW_Template.pdf | ||
| HDTRA1-19-S-0001_Final.pdf | ||
| ATTACHMENT_1_TRL_Definitions.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Question | Answer |
| Q1: Topic CBI-01 - With regards to the requirement " Software must be able to comply with DoD standards for authorization to operate" does this mean we need to obtain a full stand-alone ATO for the application? Or if our software is developed within an system like ATAK that has some existing infrastructure within the DoD would this fulfill the needs for compliance? | A1. Software that is developed with an existing DoD infrastructure, such as TAK, is compliant with this requirement. |
| Q2: Specifically, our question pertains to References. Are Reference pages included in the 25 page limit of the Technical Proposal? | A2. No. |
| Q3: Is each period of performance limited to one year or could one period be two years? | A3. No such limitation exists. Offerors may propose periods of performance as they see fit, provided the total period of performance, inclusive of all Options, does not exceed 5-years (see FAR 17.204(e)). |
| Are go/no-go metrics required for each task and not just at the end of each period? | A4. Go/no-go metrics are not a requirement for each task. |
File details come from the government source that posted it. Updated .