Attachment 4 Volume I Cost Breakout for CBA Fort Bragg South

263 KB Posted

Attached to
Services Federal contract opportunity
Solicitation number
HDEC08-10-R-0019
Issued by
Defense Commissary Agency

About this file

Attachment 4 Volume 1 Cost Breakout for CBA Fort Bragg South

Text of this file

Cost Breakout

Attachment 4
HDEC08-10-R-0019
VOLUME I
COST BREAKOUT
Offerors are required to submit their cost breakout in accordance with provision
52.215-4509, "Proposal Submission," paragraph (b)(4), located in Section L of the
solicitation.
The tabs below contain worksheets for Shelf Stocking, Custodial, Receiving/Storage Holding
Area, Yearly Totals, and 5 Year totals as well as Printing Instructions for these worksheets.
The worksheets for Shelf Stocking, Custodial, and Receiving/Storage/Holding Area
contain "sample" occupational titles and the applicable minimum wage rates; however,
it is ultimately the contractors responsibility to ensure that all information submitted is
correct in accordance with the applicable Wage Determination and/or Collective
Bargaining Agreement.

Printing Instructions

Attachment 4
BASIC INSTRUCTIONSHDEC08-10-R-0019
This icon and/or disk contains the required forms and formats for submitting proposals in response to the
solicitation. Some of the forms have protected formats and cells, however the necessary inputs are "unprotected"
and may be changed as needed to adequately reflect your proposal. Formulas are included where appropriate
to automatically generate various computations. The offer is ultimately responsible for the accuracy of all calculations.
If there are calculation differences between the hard copy and the computer files, the hard copy shall take precedence.
PRINTING PARAMETERS
In order to print these spreadsheets you must use print ranges and titles as they are described in your
software manual. The ranges have been defined and named. The range names are listed below.
Range NamesSizeTitlesOrientationTopics
SS_PAGE1Fit Columns to PageB:A1..B:A8PortraitShelf Stocking Direct Labor, Health & Welfare Sheet
SS_PAGE2Fit Columns to PageB:A1..B:A8PortraitShelf Stocking Holidays & Vacations Sheet
SS_PAGE3Fit Columns to PageB:A1..B:A8PortraitShelf Stocking Fringe Calculations Sheet
SS_PAGE4Fit Columns to PageB:I1..B:I19PortraitShelf Stocking Supplies & Equipment Sheet
SS_PAGE5Fit Columns to PageNonePortraitShelf Stocking Summary Sheet
CS_PAGE1Fit Columns to PageC:A1..C:A8PortraitCustodial Direct Labor, Health & Welfare Sheet
CS_PAGE2Fit Columns to PageC:A1..C:A8PortraitCustodial Holidays & Vacations Sheet
CS_PAGE3Fit Columns to PageC:A1..C:A8PortraitCustodial Fringe Calculations Sheet
CS_PAGE4Fit Columns to PageC:I1..C:I19PortraitCustodial Supplies & Equipment Sheet
CS_PAGE5Fit Columns to PageNonePortraitCustodial Summary Sheet
WH_PAGE1Fit Columns to PageD:A1..D:A8PortraitRSH Direct Labor, Health & Welfare Sheet
WH_PAGE2Fit Columns to PageD:A1..D:A8PortraitRSH Holidays & Vacations Sheet
WH_PAGE3Fit Columns to PageD:A1..D:A8PortraitRSH Fringe Calculations Sheet
WH_PAGE4Fit Columns to PageD:I1..D:I19PortraitRSH Supplies & Equipment Sheet
WH_PAGE5Fit Columns to PageNonePortraitRSH Summary Sheet
RS_PAGE1Fit Columns to PageE:A1..E:A8PortraitResidual Grocery Direct Labor, Health & Welfare Sheet
RS_PAGE2Fit Columns to PageE:A1..E:A8PortraitResidual Grocery Holidays & Vacations Sheet
RS_PAGE3Fit Columns to PageE:A1..E:A8PortraitResidual Grocery Fringe Calculations Sheet
RS_PAGE4Fit Columns to PageE:I1..E:I19PortraitResidual Grocery Supplies & Equipment Sheet
RS_PAGE5Fit Columns to PageNonePortraitResidual Grocery Summary Sheet
GRANDSFit Columns to PageNonePortraitTotals of Shelf Stocking , Custodial,RSH and Residual Grocery
GRAND_TOTALSFit Columns to PageNoneLandscape5 year totals of Shelf Stocking , Custodial, RSH and Residual Grocery
You may also use the macro "Print1" to print a group of pages. Make the sheet you wish to print active. Run the macro and it will print
the group of spreadsheets for you. This macro currently works only in Excel. The macro can also be activated by pressing the Print
button on each sheet.

Shelf Stocking

Attachment 4Attachment 4Attachment 4Attachment 4
SOLICITATION NUMBER:HDEC08-10-R-0019SOLICITATION NUMBER:HDEC08-10-R-0019SOLICITATION NUMBER:HDEC08-10-R-0019SOLICITATION NUMBER:HDEC08-10-R-0019
COMMISSARY:Fort Bragg SouthCOMMISSARY:Fort Bragg SouthCOMMISSARY:Fort Bragg SouthCOMMISSARY:Fort Bragg South
CONTRACTOR NAME:CONTRACTOR NAME:CONTRACTOR NAME:CONTRACTOR NAME:
Shelf Stocking Operations Work SheetShelf Stocking Operations Work SheetShelf Stocking Operations Work SheetShelf Stocking Operations Work Sheet
Direct LaborContractor Proposed PensionContractor ProposedDOLLAR TOTALS
(The labor categories below are SAMPLES)Shelf Stocking Supplies & Equipment================
CBA
COST ELEMENTHours XRates =Labor Cost(Article 44 - $1.85/hour per Bargaining Union Employee)(The elements listed below are SAMPLES and are not considered
=====a requirement of the solicitation.)
Store Worker I (Stocker)0$13.83$0.00COST ELEMENTDOLLARS
Project Manager00.00$0.00==
00.00$0.00HoursRateExtendedQty.Unit/ExtendedDIRECT LABOR$0.00
00.00$0.00Labor CategoriesPriceElementsYearlyPricePriceDIRECT LABOR HEALTH & WELFARE$0.00
00.00$0.00==============
00.00$0.00Store Worker I (Stocker)0$ 1.85$0.00Blades, Carton Cutter00.00$0.00SUB-TOTAL$0.00
----0$ 1.85$0.00Cutter, Carton00.00$0.00
TOTALS0$0.000$ 1.85$0.00Dispenser, Tape00.00$0.00HOLIDAYS/SICK/VACATIONS$0.00
====0$ 1.85$0.00Safety Shoes00.00$0.00HOL & VAC. HEALTH & WELFARE$0.00
Indirect Labor Hours (Non-Working)00$ 1.85$0.00Tape Masking00.00$0.00==
=0$ 1.85$0.00Back Brace00.00$0.00SUB-TOTAL$0.00
Direct Labor Hours (Productive/Working)0Cart, Bushel00.00$0.00
=Stocking Apron00.00$0.00FRINGES$0.00
Pallet Jacks00.00$0.00
======Feather Duster00.00$0.00PENSION$0.00
TOTALS0$0.0000.00$0.00
Direct Labor Health and Welfare======00.00$0.00EQUIPMENT & SUPPLIES$0.00
00.00$0.00-
H&WH&W00.00$0.00SUB-TOTAL$0.00
COST ELEMENTHoursRatesCost00.00$0.00=
=====00.00$0.00G&A0.00%$0.00
Store Worker I (Stocker)0$3.35$0.0000.00$0.00
Project Manager0$0.00$0.00======PROFIT0.00%$0.00
0$3.35$0.00TOTALS00.00$0.00
0$3.35$0.00=======
0$3.35$0.00GRAND TOTAL$0.00
0$3.35$0.00====
----ANNUAL CASES1,100,520
TOTALS0$0.00===
====CASE PRICE$0.00000
===
Holidays, Sick and Vacations
Holidays, Sick,
Sick/Vacations
COST ELEMENTHolidaysVacationsDollars
=====
Store Worker I (Stocker)100$0.00( (Holidays + Vacations) * 8)
Project Manager100$0.00times Work Hours
00$0.00divided by ( 2080 hours -
00$0.00( (Holidays + Vacations) * 8) )
00$0.00times the hourly rate
00$0.00in each category
----
TOTALS20$0.00
====
Holidays and Vacations Health & Welfare
Holidays/Sick/H&WH&W
COST ELEMENTVacationsRatesCost
=====
Store Worker I (Stocker)0$3.35$0.00
Project Manager0$0.00$0.00
0$3.35$0.00
0$3.35$0.00
0$3.35$0.00
0$3.35$0.00
----
TOTALS0$0.00
====
FRINGE CALCULATIONS
COST ELEMENTDOLLARS
======
DIRECT LABOR COST$0
DIRECT HEALTH & WELFARE COSTS$0
HOLIDAYS/SICK/VACATION$0
PENSION$0
HOLIDAYS AND VACATIONS HEALTH & WELFARE$0
------
SUBTOTAL$0
======
FICAX7.65%=$0
FUTAX0.00%=$0
SUTAX0.00%=$0
Workman's CompensationX0.00%=$0
Employer's LiabilityX0.00%=$0
Comprehensive General LiabilityX0.00%=$0
OtherX0.00%=$0
OtherX0.00%=$0
------
TOTAL FRINGES$0
======

Click Here to Print

RSH

Attachment 4Attachment 4Attachment 4Attachment 4
SOLICITATION NUMBER:HDEC08-10-R-0019SOLICITATION NUMBER:HDEC08-10-R-0019SOLICITATION NUMBER:HDEC08-10-R-0019SOLICITATION NUMBER:HDEC08-10-R-0019
COMMISSARY:Fort Bragg SouthCOMMISSARY:Fort Bragg SouthCOMMISSARY:Fort Bragg SouthCOMMISSARY:Fort Bragg South
CONTRACTOR NAME:CONTRACTOR NAME:CONTRACTOR NAME:CONTRACTOR NAME:
R/S/H Operations Work SheetR/S/H Operations Work SheetR/S/H Operations Work SheetR/S/H Operations Work Sheet
Direct LaborContractor Proposed PensionContractor ProposedDOLLAR TOTALS
(The labor categories below are SAMPLES)R/S/H Supplies & Equipment================
CBA
COST ELEMENTHours XRates =Labor Cost(Article 44 - $1.85/hour per Bargaining Union Employee)(The elements listed below are SAMPLES and are not considered
=====a requirement of the solicitation.)
Forklift Operator0$14.69$0.00COST ELEMENTDOLLARS
Project Manager0$0.00$0.00==
0$0.00$0.00HoursRateExtendedQty.Unit/ExtendedDIRECT LABOR$0.00
0$0.00$0.00Labor CategoriesPriceElementsYearlyPricePriceDIRECT LABOR HEALTH & WELFARE$0.00
0$0.00$0.00==============
0$0.00$0.00Forklift Operator0$ 1.85$0.00Blades, Carton Cutter00.00$0.00SUB-TOTAL$0.00
----0$ 1.85$0.00Cutter, Carton00.00$0.00
TOTALS0$0.000$ 1.85$0.00Dispenser, Tape00.00$0.00HOLIDAYS/SICK/VACATIONS$0.00
====0$ 1.85$0.00Safety Shoes00.00$0.00HOL & VAC. HEALTH & WELFARE$0.00
Indirect Labor Hours (Non-Working)0$ 1.85$0.00Tape Masking00.00$0.00==
=0$ 1.85$0.00Back Brace00.00$0.00SUB-TOTAL$0.00
Direct Labor Hours (Productive/Working)0Cart, Bushel00.00$0.00
=Cart, Stocking00.00$0.00FRINGES$0.00
Pallet Jacks00.00$0.00
======00.00$0.00PENSION$0.00
TOTALS0$0.0000.00$0.00
Direct Labor Health and Welfare======00.00$0.00EQUIPMENT & SUPPLIES$0.00
00.00$0.00-
H&WH&W00.00$0.00SUB-TOTAL$0.00
COST ELEMENTHoursRatesCost00.00$0.00=
=====00.00$0.00G&A0.00%$0.00
Forklift Operator0$3.35$0.0000.00$0.00
Project Manager0$0.00$0.00======PROFIT0.00%$0.00
0$3.35$0.00TOTALS00.00$0.00
0$3.35$0.00=======
0$3.35$0.00GRAND TOTAL$0.00
0$3.35$0.00====
----===
TOTALS0$0.00
====MO PRICE$0.00
===
Holidays, Sick and Vacations
Holidays, Sick,
Sick/Vacations
COST ELEMENTHolidaysVacationsDollars
=====
Forklift Operator100$0.00( (Holidays + Vacations) * 8)
Project Manager100$0.00times Work Hours
00$0.00divided by ( 2080 hours -
00$0.00( (Holidays + Vacations) * 8) )
00$0.00times the hourly rate
00$0.00in each category
----
TOTALS20$0.00
====
Holidays and Vacations Health & Welfare
Holidays/Sick/H&WH&W
COST ELEMENTVacationsRatesCost
=====
Forklift Operator0$3.35$0.00
Project Manager0$0.00$0.00
0$3.35$0.00
0$3.35$0.00
0$3.35$0.00
0$3.35$0.00
----
TOTALS0$0.00
====
FRINGE CALCULATIONS
COST ELEMENTDOLLARS
======
DIRECT LABOR COST$0
DIRECT HEALTH & WELFARE COSTS$0
HOLIDAYS/SICK/VACATION$0
PENSION$0
HOLIDAYS AND VACATIONS HEALTH & WELFARE$0
------
SUBTOTAL$0
======
FICAX7.65%=$0
FUTAX0.00%=$0
SUTAX0.00%=$0
Workman's CompensationX0.00%=$0
Employer's LiabilityX0.00%=$0
Comprehensive General LiabilityX0.00%=$0
OtherX0.00%=$0
OtherX0.00%=$0
------
TOTAL FRINGES$0
======

Click Here to Print

Custodial

Attachment 4Attachment 4Attachment 4Attachment 4
SOLICITATION NUMBER:HDEC08-10-R-0019SOLICITATION NUMBER:HDEC08-10-R-0019SOLICITATION NUMBER:HDEC08-10-R-0019SOLICITATION NUMBER:HDEC08-10-R-0019
COMMISSARY:Fort Bragg SouthCOMMISSARY:Fort Bragg SouthCOMMISSARY:Fort Bragg SouthCOMMISSARY:Fort Bragg South
CONTRACTOR NAME:CONTRACTOR NAME:CONTRACTOR NAME:CONTRACTOR NAME:
Custodial Operations Work SheetCustodial Operations Work SheetCustodial Operations Work SheetCustodial Operations Work Sheet
Direct LaborContractor Proposed PensionContractor ProposedDOLLAR TOTALS
(The labor categories below are SAMPLES)Custodial Supplies & Equipment================
CBA
COST ELEMENTHours XRates =Labor Cost(Article 44 - $1.85/hour per Bargaining Union Employee)(The elements listed below are SAMPLES and are not to be considered
=====a requirement of the solicitation.)
Janitor (Excluding RSHA, Meat Custodial & Outside Areas)0$13.63$0.00COST ELEMENTDOLLARS
Janitor, Meat Custodial Operations0$13.63$0.00==
Janitor, RSHA Custodial Operations (Includes Outside Areas)0$13.63$0.00HoursRateExtendedQty.Unit/ExtendedDIRECT LABOR$0.00
Project Manager0$0.00$0.00Labor CategoriesPriceElementsYearlyPricePriceDIRECT LABOR HEALTH & WELFARE$0.00
0$0.00$0.00==============
0$0.00$0.00Janitor (Excluding RSHA, Meat Custodial & Outside Areas)0$ 1.85$0.00Bowl, Cleaner00.00$0.00SUB-TOTAL$0.00
----Janitor, Meat Custodial Operations0$ 1.85$0.00Seat Covers (250 per case)00.00$0.00
TOTALS0$0.00Janitor, RSHA Custodial Operations (Includes Outside Areas)0$ 1.85$0.00Cleaner, Carpet00.000.00HOLIDAYS/SICK/VACATIONS$0.00
====0$ 1.85$0.00Sweeping Compound00.000.00HOL & VAC. HEALTH & WELFARE$0.00
Indirect Labor Hours (Non-Working)0$ 1.85$0.00Cleaner, Glass00.000.00==
=0$ 1.85$0.00Cleaner, Neutral00.000.00SUB-TOTAL$0.00
Direct Labor Hours (Productive/Working)0Disinfectant00.000.00
=Dust Cloths (50 lb bails)00.000.00FRINGES$0.00
Dust Mop Heads00.000.00
Floor Finish00.000.00PENSION$0.00
Mop Bucket00.000.00
Direct Labor Health and Welfare======Floor Stripper (5 gal)00.000.00EQUIPMENT & SUPPLIES$0.00
TOTALS0$0.00Dust Mop Handle and Frame00.000.00-
H&WH&W======Gloves Latex00.000.00SUB-TOTAL$0.00
COST ELEMENTHoursRates =CostSqueegee00.000.00=
=====Window Brush00.000.00G&A0.00%$0.00
Janitor (Excluding RSHA, Meat Custodial & Outside Areas)0$3.35$0.00Black Pads (19 in)00.000.00
Janitor, Meat Custodial Operations0$3.35$0.00Mop Head, Wet00.000.00PROFIT0.00%$0.00
Janitor, RSHA Custodial Operations (Includes Outside Areas)0$3.35$0.00Floor Scraper-Unger00.000.00
Project Manager0$0.00$0.00Pads, Buffing (27 in)00.000.00==
0$0.00$0.00Pads, Red Scrub (19 in)00.000.00GRAND TOTAL$0.00
0$0.00$0.00Pads, Doodle Bug00.000.00====
----Polish, Furniture00.000.00MONTHLY PRICE$0.00
TOTALS0$0.00Polish, Metal00.000.00===
====Propane00.000.00
Oil00.000.00
Holidays and VacationsScrapers-Hand00.000.00
Holidays, Sick,Razor Blades00.000.00
Sick/VacationsRazor Blades-4 in. Unger00.000.00
COST ELEMENTHolidaysVacationsDollarsWall Cleaner00.000.00
=====Soap, Hand, Liquid (gal)00.000.00
Janitor (Excluding RSHA, Meat Custodial & Outside Areas)100$0.00( (Holidays + Vacations) * 8)Sponges00.000.00
Janitor, Meat Custodial Operations100$0.00times Work HoursGreen Hand Pads00.000.00
Janitor, RSHA Custodial Operations (Includes Outside Areas)100$0.00divided by ( 2080 hours -Spray Bottle Trigger00.000.00
Project Manager100$0.00( (Holidays + Vacations) * 8) )Spray Buff00.000.00
00$0.00times the hourly rateToilet Tissue, 96rl (case)00.000.00
00$0.00in each categoryRoll Towles (case)00.000.00
----Trash Liners, Lg00.000.00
TOTALS40$0.00Trash Liners, Sm00.000.00
====Vaccuum Belts00.000.00
Dust pans00.000.00
Holidays and Vacations Health & WelfareCounter Brooms00.000.00
Broom- Outside- 36 inch00.000.00
Holidays/Sick/H&WH&WBurnisher, 21" Propane00.000.00
COST ELEMENTVacationsRatesCostMaid Caddy00.000.00
=====Carpet Extractor00.000.00
Janitor (Excluding RSHA, Meat Custodial & Outside Areas)0$3.35$0Gas Blower00.000.00
Janitor, Meat Custodial Operations0$3.35$0Auto Scurbber-48 inch00.000.00
Janitor, RSHA Custodial Operations (Includes Outside Areas)0$3.35$0Wet Dry Vac00.000.00
Project Manager0$0.00$0Trash can with wheels (35 Gal)00.000.00
0$0.00$0Vacuum, Wet/Dry00.000.00
0$0.00$0Washer, Pressure00.000.00
----00.000.00
TOTALS0$000.000.00
====00.000.00
00.000.00
FRINGE CALCULATIONS======
TOTALS00.00$0
COST ELEMENTDOLLARS======
======
DIRECT LABOR COST$0.00
DIRECT HEALTH & WELFARE COST$0.00
HOLIDAYS/SICK/VACATION$0.00
PENSION$0.00
HOLIDAYS AND VACATIONS HEALTH & WELFARE$0.00
------
SUBTOTAL$0.00
======
FICAX7.65%=$0.00
FUTAX0.00%=$0.00
SUTAX0.00%=$0.00
Workman's CompensationX0.00%=$0.00
Employer's LiabilityX0.00%=$0.00
Comprehensive General LiabilityX0.00%=$0.00
OtherX0.00%=$0.00
OtherX0.00%=$0.00
------
TOTAL FRINGES$0.00
======

Click Here to Print

Year Totals

Attachment 4
SOLICITATION NUMBER:HDEC08-10-R-0019
COMMISSARY:Fort Bragg South
CONTRACTOR NAME:
BASE YEAR GRAND TOTALS
DOLLAR TOTALS
================
COST ELEMENTDOLLARS
==
DIRECT LABOR$0.00
DIRECT HEALTH & WELFARE$0.00
==
TOTAL$0.00
HOLIDAYS/SICK/VACATIONS$0.00
HOL & VAC. HEALTH & WELFARE$0.00
==
TOTAL$0.00
FRINGES CALCULATIONS$0.00
PENSION$0.00
SUPPLIES & EQUIPMENT$0.00
SUB-TOTAL$0.00
G&A$0.00
PROFIT$0.00
==
GRAND TOTAL$0.00
==

Click Here to Print xAdministrator:

5 Yr. Totals

SOLICITATION NUMBER:HDEC08-10-R-0019
COMMISSARY:Fort Bragg SouthSelect File, then Print from Excel
CONTRACTOR NAME:
GRAND TOTALS
BASE YEAROPTION 1OPTION 2OPTION 3OPTION 4GRAND
COST ELEMENTDOLLARSDOLLARSDOLLARSDOLLARSDOLLARSTOTALS
=======
DIRECT LABOR0.000.000.000.000.000.00
DIRECT LABOR HEALTH & WELFARE0.000.000.000.000.000.00
=======
TOTAL0.000.000.000.000.000.00
HOLIDAYS AND VACATIONS0.000.000.000.000.000.00
HOLIDAYS AND VACATIONS HEALTH & WELFARE0.000.000.000.000.000.00
=======
TOTAL0.000.000.000.000.000.00
FRINGE CALCULATIONS0.000.000.000.000.000.00
PENSION0.000.000.000.000.000.00
SUPPLIES & EQUIPMENT0.000.000.000.000.000.00
SUB-TOTAL0.000.000.000.000.000.00
G&A0.000.000.000.000.000.00
PROFIT0.000.000.000.000.000.00
=======
GRAND TOTAL0.000.000.000.000.000.00
=======
SOLICITATION NUMBER:HDEC08-10-R-0019
COMMISSARY:Fort Bragg South
CONTRACTOR NAME:
ESCALATION FACTORS
OPTION 1OPTION 2OPTION 3OPTION 4
COST ELEMENTDOLLARSDOLLARSDOLLARSDOLLARS
======
DIRECT LABOR0.00%0.00%0.00%0.00%
DIRECT LABOR HEALTH & WELFARE0.00%0.00%0.00%0.00%
======
TOTAL
HOLIDAYS AND VACATIONS0.00%0.00%0.00%0.00%
HOLIDAYS AND VACATIONS. HEALTH & WELFARE0.00%0.00%0.00%0.00%
======
TOTAL
FRINGE CALCULATIONS0.00%0.00%0.00%0.00%
PENSION0.00%0.00%0.00%0.00%
SUPPLIES & EQUIPMENT0.00%0.00%0.00%0.00%
SUB-TOTAL
G&A0.00%0.00%0.00%0.00%
PROFIT0.00%0.00%0.00%0.00%
======
GRAND TOTAL
======

Shelf Stocker Loaded Wage Rate

Attachment 4Attachment 4Attachment 4Attachment 4
SOLICITATION NUMBER:HDEC08-10-R-0019SOLICITATION NUMBER:HDEC08-10-R-0019SOLICITATION NUMBER:HDEC08-10-R-0019SOLICITATION NUMBER:HDEC08-10-R-0019
COMMISSARY:Fort Bragg SouthCOMMISSARY:Fort Bragg SouthCOMMISSARY:Fort Bragg SouthCOMMISSARY:Fort Bragg South
CONTRACTOR NAME:CONTRACTOR NAME:CONTRACTOR NAME:CONTRACTOR NAME:
Shelf Stocker Loaded Wage Rate Work SheetShelf Stocker Loaded Wage Rate Work SheetShelf Stocker Loaded Wage Rate Work SheetShelf Stocker Loaded Wage Rate Work Sheet
Direct LaborContractor Proposed PensionContractor ProposedDOLLAR TOTALS
(The labor categories below are SAMPLES)Supplies & Equipment================
CBA
COST ELEMENTHours XRates =Labor Cost(Article 44 - $1.85/hour per Bargaining Union Employee)(The elements listed below are SAMPLES and are not considered
=====a requirement of the solicitation.)
Store Worker I (Stocker)1$13.83$13.83COST ELEMENTDOLLARS
==
HoursRateExtendedQty.Unit/ExtendedDIRECT LABOR$13.83
NOTE: A QUANTITY OF 1 HAS BEEN ENTERED TOLabor CategoriesPriceElementsYearlyPricePriceDIRECT LABOR HEALTH & WELFARE$3.35
CALCULATE THE LOADED HOURLY RATE. PROCEED==============
TO ENTER FRINGE, G&A, AND PROFIT PERCENTAGESStore Worker I (Stocker)1$ 1.85$1.85Supplies and Equipment Costs00.00$0.00SUB-TOTAL$17.18
----are not included in the loaded00.00$0.00
TOTALS1$13.83rate for Store Worker I00.00$0.00HOLIDAYS/SICK/VACATIONS$0.55
====00.00$0.00HOL & VAC. HEALTH & WELFARE$0.13
Indirect Labor Hours (Non-Working)000.00$0.00==
=00.00$0.00SUB-TOTAL$0.69
Direct Labor Hours (Productive/Working)100.00$0.00
=00.00$0.00FRINGES$1.51
00.00$0.00
======00.00$0.00PENSION$1.85
TOTALS1$1.8500.00$0.00
Direct Labor Health and Welfare======00.00$0.00EQUIPMENT & SUPPLIES$0.00
00.00$0.00-
H&WH&W00.00$0.00SUB-TOTAL$21.23
COST ELEMENTHoursRatesCost00.00$0.00=
=====00.00$0.00G&A0.00%$0.00
Store Worker I (Stocker)1$3.35$3.3500.00$0.00
======PROFIT0.00%$0.00
TOTALS00.00$0.00
=======
GRAND TOTAL$21.23
====
----
TOTALS1$3.35
====
Holidays, Sick and Vacations
Holidays, Sick,
Sick/Vacations
COST ELEMENTHolidaysVacationsDollars
=====
Store Worker I (Stocker)100$0.55( (Holidays + Vacations) * 8)
times Work Hours
divided by ( 2080 hours -
( (Holidays + Vacations) * 8) )
times the hourly rate
in each category
----
TOTALS10$0.55
====
Holidays and Vacations Health & Welfare
Holidays/Sick/H&WH&W
COST ELEMENTVacationsRatesCost
=====
Store Worker I (Stocker)0$3.35$0.13
----
TOTALS0$0.13
====
FRINGE CALCULATIONS
COST ELEMENTDOLLARS
======
DIRECT LABOR COST$14
DIRECT HEALTH & WELFARE COSTS$3
HOLIDAYS/SICK/VACATION$1
PENSION$2
HOLIDAYS AND VACATIONS HEALTH & WELFARE$0
------
SUBTOTAL$20
======
FICAX7.65%=$2
FUTAX0.00%=$0
SUTAX0.00%=$0
Workman's CompensationX0.00%=$0
Employer's LiabilityX0.00%=$0
Comprehensive General LiabilityX0.00%=$0
OtherX0.00%=$0
OtherX0.00%=$0
------
TOTAL FRINGES$2
======

Click Here to Print

Forklift Operator Loaded Wage

Attachment 4Attachment 4Attachment 4Attachment 4
SOLICITATION NUMBER:HDEC08-10-R-0019SOLICITATION NUMBER:HDEC08-10-R-0019SOLICITATION NUMBER:HDEC08-10-R-0019SOLICITATION NUMBER:HDEC08-10-R-0019
COMMISSARY:Fort Bragg SouthCOMMISSARY:Fort Bragg SouthCOMMISSARY:Fort Bragg SouthCOMMISSARY:Fort Bragg South
CONTRACTOR NAME:CONTRACTOR NAME:CONTRACTOR NAME:CONTRACTOR NAME:
Forklift Operator Loaded Wage Rate Work SheetForklift Operator Loaded Wage Rate Work SheetForklift Operator Loaded Wage Rate Work SheetForklift Operator Loaded Wage Rate Work Sheet
Direct LaborContractor Proposed PensionContractor ProposedDOLLAR TOTALS
(The labor categories below are SAMPLES)Supplies & Equipment================
CBA
COST ELEMENTHours XRates =Labor Cost(Article 44 - $1.85/hour per Bargaining Union Employee)(The elements listed below are SAMPLES and are not considered
=====a requirement of the solicitation.)
Forklift Operator1$14.69$14.69COST ELEMENTDOLLARS
==
HoursRateExtendedQty.Unit/ExtendedDIRECT LABOR$14.69
NOTE: A QUANTITY OF 1 HAS BEEN ENTERED TOLabor CategoriesPriceElementsYearlyPricePriceDIRECT LABOR HEALTH & WELFARE$3.35
CALCULATE THE LOADED HOURLY RATE. PROCEED==============
TO ENTER FRINGE, G&A, AND PROFIT PERCENTAGESForklift Operator1$ 1.85$1.85Supplies and Equipment Costs00.00$0.00SUB-TOTAL$18.04
----are not included in the loaded00.00$0.00
TOTALS1$14.69rate for Forklift Operator00.00$0.00HOLIDAYS/SICK/VACATIONS$0.59
====00.00$0.00HOL & VAC. HEALTH & WELFARE$0.13
Indirect Labor Hours (Non-Working)000.00$0.00==
=00.00$0.00SUB-TOTAL$0.72
Direct Labor Hours (Productive/Working)100.00$0.00
=00.00$0.00FRINGES$1.58
00.00$0.00
======00.00$0.00PENSION$1.85
TOTALS1$1.8500.00$0.00
Direct Labor Health and Welfare======00.00$0.00EQUIPMENT & SUPPLIES$0.00
00.00$0.00-
H&WH&W00.00$0.00SUB-TOTAL$22.19
COST ELEMENTHoursRatesCost00.00$0.00=
=====00.00$0.00G&A0.00%$0.00
Forklift Operator1$3.35$3.3500.00$0.00
======PROFIT0.00%$0.00
TOTALS00.00$0.00
=======
GRAND TOTAL$22.19
====
----
TOTALS1$3.35
====
Holidays, Sick and Vacations
Holidays, Sick,
Sick/Vacations
COST ELEMENTHolidaysVacationsDollars
=====
Forklift Operator100$0.59( (Holidays + Vacations) * 8)
times Work Hours
divided by ( 2080 hours -
( (Holidays + Vacations) * 8) )
times the hourly rate
in each category
----
TOTALS10$0.59
====
Holidays and Vacations Health & Welfare
Holidays/Sick/H&WH&W
COST ELEMENTVacationsRatesCost
=====
Forklift Operator0$3.35$0.13
----
TOTALS0$0.13
====
FRINGE CALCULATIONS
COST ELEMENTDOLLARS
======
DIRECT LABOR COST$15
DIRECT HEALTH & WELFARE COSTS$3
HOLIDAYS/SICK/VACATION$1
PENSION$2
HOLIDAYS AND VACATIONS HEALTH & WELFARE$0
------
SUBTOTAL$21
======
FICAX7.65%=$2
FUTAX0.00%=$0
SUTAX0.00%=$0
Workman's CompensationX0.00%=$0
Employer's LiabilityX0.00%=$0
Comprehensive General LiabilityX0.00%=$0
OtherX0.00%=$0
OtherX0.00%=$0
------
TOTAL FRINGES$2
======

Click Here to Print

Janitor Loaded Wage Rate

Attachment 4Attachment 4Attachment 4Attachment 4
SOLICITATION NUMBER:HDEC08-10-R-0019SOLICITATION NUMBER:HDEC08-10-R-0019SOLICITATION NUMBER:HDEC08-10-R-0019SOLICITATION NUMBER:HDEC08-10-R-0019
COMMISSARY:Fort Bragg SouthCOMMISSARY:Fort Bragg SouthCOMMISSARY:Fort Bragg SouthCOMMISSARY:Fort Bragg South
CONTRACTOR NAME:CONTRACTOR NAME:CONTRACTOR NAME:CONTRACTOR NAME:
Janitor Loaded Wage Rate Work SheetJanitor Loaded Wage Rate Work SheetJanitor Loaded Wage Rate Work SheetJanitor Loaded Wage Rate Work Sheet
Direct LaborContractor Proposed PensionContractor ProposedDOLLAR TOTALS
(The labor categories below are SAMPLES)Supplies & Equipment================
CBA
COST ELEMENTHours XRates =Labor Cost(Article 44 - $1.85/hour per Bargaining Union Employee)(The elements listed below are SAMPLES and are not considered
=====a requirement of the solicitation.)
Janitor1$13.63$13.63COST ELEMENTDOLLARS
==
HoursRateExtendedQty.Unit/ExtendedDIRECT LABOR$13.63
NOTE: A QUANTITY OF 1 HAS BEEN ENTERED TOLabor CategoriesPriceElementsYearlyPricePriceDIRECT LABOR HEALTH & WELFARE$3.35
CALCULATE THE LOADED HOURLY RATE. PROCEED==============
TO ENTER FRINGE, G&A, AND PROFIT PERCENTAGESJanitor1$ 1.85$1.85Supplies and Equipment Costs00.00$0.00SUB-TOTAL$16.98
----are not included in the loaded00.00$0.00
TOTALS1$13.63rate for Janitor00.00$0.00HOLIDAYS/SICK/VACATIONS$0.55
====00.00$0.00HOL & VAC. HEALTH & WELFARE$0.13
Indirect Labor Hours (Non-Working)000.00$0.00==
=00.00$0.00SUB-TOTAL$0.68
Direct Labor Hours (Productive/Working)100.00$0.00
=00.00$0.00FRINGES$1.49
00.00$0.00
======00.00$0.00PENSION$1.85
TOTALS1$1.8500.00$0.00
Direct Labor Health and Welfare======00.00$0.00EQUIPMENT & SUPPLIES$0.00
00.00$0.00-
H&WH&W00.00$0.00SUB-TOTAL$21.00
COST ELEMENTHoursRatesCost00.00$0.00=
=====00.00$0.00G&A0.00%$0.00
Janitor1$3.35$3.3500.00$0.00
======PROFIT0.00%$0.00
TOTALS00.00$0.00
=======
GRAND TOTAL$21.00
====
----
TOTALS1$3.35
====
Holidays, Sick and Vacations
Holidays, Sick,
Sick/Vacations
COST ELEMENTHolidaysVacationsDollars
=====
Janitor100$0.55( (Holidays + Vacations) * 8)
times Work Hours
divided by ( 2080 hours -
( (Holidays + Vacations) * 8) )
times the hourly rate
in each category
----
TOTALS10$0.55
====
Holidays and Vacations Health & Welfare
Holidays/Sick/H&WH&W
COST ELEMENTVacationsRatesCost
=====
Janitor0$3.35$0.13
----
TOTALS0$0.13
====
FRINGE CALCULATIONS
COST ELEMENTDOLLARS
======
DIRECT LABOR COST$14
DIRECT HEALTH & WELFARE COSTS$3
HOLIDAYS/SICK/VACATION$1
PENSION$2
HOLIDAYS AND VACATIONS HEALTH & WELFARE$0
------
SUBTOTAL$20
======
FICAX7.65%=$1
FUTAX0.00%=$0
SUTAX0.00%=$0
Workman's CompensationX0.00%=$0
Employer's LiabilityX0.00%=$0
Comprehensive General LiabilityX0.00%=$0
OtherX0.00%=$0
OtherX0.00%=$0
------
TOTAL FRINGES$1
======

Click Here to Print

Other files for this federal contract opportunity

Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .