HC102818Q0008_QASP.DOCX
DOCX document 22 KB Posted
- Attached to
- Preventative Maintenance for CCTV System Federal contract opportunity
- Solicitation number
- HC102818Q0008
- Issued by
- Defense Information Systems Agency
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| HC102818Q0008.docx | DOCX document | |
| HC102818Q0008_Pricing_Worksheet_for_RFQ.XLSX | XLSX spreadsheet | |
| HC102818Q0008_PWS.DOC | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
1. Contract or Task Order Title: Closed-circuit Television (CCTV) System Preventative Maintenance.
2. Work Requirements:
· Task 1 – Perform four (4) quarterly preventative maintenance checks
· Task 2 – Emergency Services
3. Primary Method of Surveillance: Customer feedback will be utilized for Tasks 1 and 2.
4. Scope of Performance:
The contractor shall visit SUBMEPP once every quarter to conduct CCTV preventative maintenance to ensure they are operating within the identified manufacturer’s specifications, and to include immediate response to emergency service calls to ensure the CCTV system stay running in-between the scheduled maintenance.
5. Performance Standards:
| Performance Standard |
| Acceptable Quality Level (AQL) |
| Method of Surveillance |
| The contractor is required to provide all deliverables IAW Paragraph 6 of the PWS. |
| 98% AQL, with less than 2% of any document requiring revision. |
| 100% review of all documents and service prior to acceptance. |
6. Mandatory or regulatory compliance items:
The contractor will monitor compliance as required by FAR 52.222-50, Combating Trafficking in Persons, and report any issues to the contracting officer.
7. Acceptable Quality Level (AQL):
The AQL for this project is 98% for the above Performance Standard.
8. Evaluation Method:
The Mission Partner Point of Contact will review the written service summary report each time a preventative maintenance is conducted or following each emergency repair call. Customer feedback may be obtained from customer satisfaction surveys or from random customer complaints.
9. Incentives (Positive and/or Negative):
Both positive and negative performance will be documented in past performance reports/database, (Contractor Performance Assessment Reporting System (CPARS), as appropriate and will be taken into consideration for follow-on work.
Enclosure 6, Page 1 of 2 Pages 17Jul2013/Version 2
QASP
Page 1 of 1 Pages
File details come from the government source that posted it.