HC102817R0015_RFP.docx
DOCX document 146 KB Posted
- Attached to
- DISA Processor Capacity Services (XSPCS) Federal contract opportunity
- Solicitation number
- HC102817R0015
- Issued by
- Defense Information Systems Agency
About this file
Request for Procurement (RFP) HC102817R0015
View the file
Other files for this federal contract opportunity
Show all 50
DISA Processor Capacity Services (XSPCS) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HC1028-17-R-0015
Section B - Supplies or Services and Prices
IDC CONTRAINTS
CONTRACT MINIMUM/MAXIMUM QUANTITY AND CONTRACT VALUE
The minimum quantity and contract value for all orders issued against this contract shall not be less than the minimum quantity and contract value stated in the following table. The maximum quantity and contract value for all orders issued against this contract shall not exceed the maximum quantity and contract value stated in the following table.
X-86
MINIMUM
QUANTITY
MINIMUM
AMOUNT
MAXIMUM
QUANTITY
MAXIMUM
AMOUNT
$770,000.00
$323,921,060.00
SPARC
MINIMUM
QUANTITY
MINIMUM
AMOUNT
MAXIMUM
QUANTITY
MAXIMUM
$630,000.00
$329,586,627.00
CLIN DELIVERY/TASK ORDER MINIMUM/MAXIMUM QUANTITY AND CLIN ORDER VALUE
The minimum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not be less than the minimum quantity and order value stated in the following table. The maximum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not exceed the maximum quantity and order value stated in the following table.
CLIN
MINIMUM
QUANTITY
MINIMUM
AMOUNT
MAXIMUM
QUANTITY
MAXIMUM
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 5 |
| Years |
XSPCS BASE PERIOD
FFP
X86 AND SPARC PROCESSOR CAPACITY SERVICES (XSPCS)
5 YEAR BASE ORDERING PERIOD
FOB: Destination
MAX
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1 |
| Years |
| OPTION |
| XSPCS OPTION YEAR 1 |
FFP
X86 AND SPARC PROCESSOR CAPACITY SERVICES (XSPCS)
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1 |
| Years |
| OPTION |
| XSPCS OPTION YEAR 2 |
FFP
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1 |
| Years |
| OPTION |
| XSPCS OPTION YEAR 3 |
FFP
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1 |
| Years |
| OPTION |
| XSPCS OPTION YEAR 4 |
FFP
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1 |
| Years |
| OPTION |
| XSPCS OPTION YEAR 5 |
FFP
MAX
Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
| CLIN |
| INSPECT AT |
| INSPECT BY |
| ACCEPT AT |
| ACCEPT BY |
| 0001 |
| N/A |
| N/A |
| N/A |
| Government |
| 1001 |
| N/A |
| N/A |
| N/A |
| Government |
| 2001 |
| N/A |
| N/A |
| N/A |
| Government |
| 3001 |
| N/A |
| N/A |
| N/A |
| Government |
| 4001 |
| N/A |
| N/A |
| N/A |
| Government |
| 5001 |
| N/A |
| N/A |
| N/A |
| Government |
CLAUSES INCORPORATED BY REFERENCE
| 52.246-4 |
| Inspection Of Services--Fixed Price |
| AUG 1996 |
| 52.246-16 |
| Responsibility For Supplies |
| APR 1984 |
Section F - Deliveries or Performance
DELIVERY INFORMATION
| CLIN |
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
| 0001 |
| N/A |
| N/A |
| N/A |
| N/A |
| 1001 |
| N/A |
| N/A |
| N/A |
| N/A |
| 2001 |
| N/A |
| N/A |
| N/A |
| N/A |
| 3001 |
| N/A |
| N/A |
| N/A |
| N/A |
| 4001 |
| N/A |
| N/A |
| N/A |
| N/A |
| 5001 |
| N/A |
| N/A |
| N/A |
| N/A |
| 52.242-15 |
| Stop-Work Order |
| AUG 1989 |
| 52.242-17 |
| Government Delay Of Work |
| APR 1984 |
| 52.247-34 |
| F.O.B. Destination |
| NOV 1991 |
Section G - Contract Administration Data
| 252.204-7002 |
| Payment For Subline Items Not Separately Priced |
| DEC 1991 |
| 252.204-7006 |
| Billing Instructions |
| OCT 2005 |
| 252.245-7002 |
| Reporting Loss of Government Property |
| APR 2012 |
| 252.245-7003 |
| Contractor Property Management System Administration |
| APR 2012 |
CLAUSES INCORPORATED BY FULL TEXT
52.204-9000 POINTS OF CONTACT (AUG 2005)
Contracting Officer Name: Jacqueline D. Johnson Organization/Office Symbol: DITCO PL8322 Phone No.: 618-229-9351 E-Mail Address: jacqueline.d.johnson20.civ@mail.mil
Contract Specialist Name: Michelle R. Crain Organization/Office Symbol: PL8322 Phone No.: 618-229-9566 E-Mail Address: michelle.r.crain2.civ@mail.mil
COR/Mission Partner Point of Contact (Note: To be filled in upon contract award) Name:
Organization/Office Symbol:
Phone No.:
E-Mail Address:
Contractor Point of Contact Contractor Legal Business Name:
DUNS:
CAGE CODE:
Contractor POC:
E-Mail Address:
Phone Number:
Fax Number:
(End of clause)
52.204-9001 CONTRACT/ORDER CLOSEOUT—FIXED-PRICE, TIME-AND-MATERIALS, OR LABOR-HOURS (JAN 2007)
Timely contract closeout is a priority under this contract/order. The Contractor shall submit a final invoice within ninety (90) calendar days after the expiration of this contract/order, unless the Contractor requests and is granted an extension by the Contracting Officer, in writing. In addition, and concurrent with the submission of the final invoice, the Contractor shall notify the Contracting Officer of the amount of excess funds that can be deobligated from this contract/order so the closeout process can begin as soon as possible upon expiration of this contract/order. A bilateral contract/order closeout modification will be forwarded to the Contractor by the Contracting Officer and must be signed by the Contractor and returned to the Contracting Officer within thirty (30) calendar days of issuance of the modification. A Contractor’s failure to respond and/or sign the bilateral closeout modification within thirty (30) calendar days of receipt will constitute approval of the terms of the modification and the modification will subsequently be processed unilaterally by the Contracting Officer to deobligate excess funds and close this contract/order.
If this contract/order contains option periods, the Contractor is required to submit an invoice within ninety (90) calendar days after expiration of the base period of performance and the expiration of each exercised option period of performance to allow for deobligation of excess funds that were obligated in those respective periods of performance.
52.237-9001 ENTERPRISE-WIDE CONTRACTOR MANPOWER REPORTING APPLICATION (eCMRA) REPORTING (JAN 2015)
The contractor shall ensure ALL contractor labor hours including subcontractor, at all levels/tiers, labor hours required for the performance of services provided under this contract are reported via a secure data collection site.
The contractor and all subcontractors, at all levels/tiers, providing direct labor under this contract shall report complete and accurate data for the labor executed during the period of performance during each Government fiscal year (FY), which runs from October 1 to September 30. The Contractor shall input the data into the appropriate eCMRA reporting tool, which can be accessed via a secure web site at http://www.ecmra.mil/. There are four separate eCMRA tools: Army, Air Force, Navy and All Other Defense Components. The appropriate eCMRA reporting tool to use is determined by the requiring activity being supported (e.g., if DISA awards a contract for an Air Force requiring activity, the contractor shall load the required reporting data in the “Department of Air Force CMRA” tool). While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. The contractor shall completely fill in all required data fields. The contractor shall enter initial data into the appropriate eCMRA tool to establish the basic contract record no later than 15 working days after receipt of contract award or contract modification incorporating this clause. The contractor shall notify the COR when the basic contract record has been established in the appropriate eCMRA tool.
eCMRA User Manuals and Frequently Asked Questions (FAQs) are available at http://www.ecmra.mil/
Contractors may direct technical questions to the eCMRA help desk at usaf.pentagon.saf-aq.mbx.cmra-help-desk-dod@mail.mil
252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (MAY 2013)
(a) Definitions. As used in this clause--
Department of Defense Activity Address Code (DoDAAC) is a six position code that uniquely identifies a unit, activity, or organization.
Document type means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
Local processing office (LPO) is the office responsible for payment certification when payment certification is done external to the entitlement system.
(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall--
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.acquisition.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this Web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.
(e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:
(1) Document type. The Contractor shall use the following document type(s).
(Contracting Officer: Insert applicable document type(s). Note: If a “Combo” document type is identified but not supportable by the Contractor's business systems, an “Invoice” (stand-alone) and “Receiving Report” (stand-alone) document type may be used instead.)
(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in WAWF, as specified by the contracting officer.
(Contracting Officer: Insert inspection and acceptance locations or “Not applicable”.)
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
| Field Name in WAWF |
| Data to be entered in WAWF |
| Pay Official DoDAAC |
| HQ0131 |
| Issue By DoDAAC |
| HC1028 |
| Admin DoDAAC |
| HC1028 |
| Inspect By DoDAAC |
| (Will be provided on award document) |
| Service Approver (DoDAAC) |
| (Will be provided on award document) |
| Service Acceptor (DoDAAC) |
| (Will be provided on award document) |
| Accept at Other DoDAAC |
| N/A |
| Ship To Code |
| N/A |
| Ship From Code |
| N/A |
| Mark For Code |
| N/A |
| LPO DoDAAC |
| N/A |
| DCAA Auditor DoDAAC |
| N/A |
| Other DoDAAC(s) |
| N/A |
(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g. timesheets) in support of each payment request.
(5) WAWF email notifications. The Contractor shall enter the e-mail address identified below in the “Send Additional Email Notifications” field of WAWF once a document is submitted in the system:
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.
Payment Processing Questions: Contact the following DFAS office as specified in the contract/order:
Columbus Center: 1-800-756-4571 HQ0131 – Option 2 – Then Option 2
Additional DISA WAWF guidance and information for both contractor and government personnel is available at: http://www.ditco.disa.mil/hq/WAWF
(2) For technical WAWF help, contact the WAWF helpdesk at 866-618-5988.
Section H - Special Contract Requirements
ENVIRONMENTAL CONDITIONS
H.1 Environmental Conditions
This special section is intended to be used for all contracts at the Federal Center, 4300 Goodfellow, St. Louis, MO (DECC St. Louis).
Summary of Goodfellow Federal Complex Environmental Conditions
This effort may require work at DECC St. Louis at the Goodfellow Federal Complex. Many of the facilities and grounds on the Goodfellow Federal Complex, St. Louis, Missouri have been reported to have environmental concerns with varying concentrations of hazardous chemicals/materials. Contractors are required to include the costs of working around and in these known conditions at the Goodfellow complex in the proposal.
The following is a list of reported environmental contaminants that have the potential to affect worker safety and health. This list has been extracted from the 2013 Tetra Tech Occupational Exposure Evaluation Report.
ASBESTOS
Amosite – trace amounts up to 6% Chrysotile – trace amounts up to 10% Crocidolite – trace amounts Total Asbestos – trace amounts up to 15%
TOXIC METALS
Antimony Arsenic Barium Beryllium Cadmium Chromium Copper Lead Mercury Selenium Silver
Polychlorinated Biphenyls (PCBs) Decachlorobiphenyls Dichlorobiphenyls Heptachlorobiphenyls Hexachlorobiphenyls Monochlorobiphenyls Nonachlorobiphenyls Octachlorobiphenyls Pentachlorobiphenyls Tetrachlorobiphenyls Trichlorobiphenyls Total PCBs
Total Petroleum Hydrocarbons (TPHs) Diesel Range Organics Gasoline Range Organics Oil Range Organics
Volatile Organic Compounds (VOCs) Acetone Carbon disulfide Dichloroethylene, 1,2-cis- Methyl Ethyl Ketone Trichloroethene Xylenes, m Xylenes, p Total Xylenes
Semi-Volatile Organic Compounds (SVOCs) Acenaphthene Acenaphthylene Acetophenone Anthracene Benzaldehyde Benz(a)Anthracene Benzo(a)Pyrene Benzo(b)Flouranthene Benzo(g,h,i)Perylene Benzo(k)Fluoranthene Bis(2-Ethyl Hexyl) Phthalate Biphenyl, 1,1´- Butyl Benzyl Phthalate Caprolactam Carbazole Carbon disulfide Chlorophenyl Phenyl Ether, 4- Chrysene Dibenzo(a,h)Anthracene Dibenzofuran Dichlorophenol, 2,4- Diethyl Phthalate Dimethylphenol, 2,4- Di-n-Butyl Phthalate Di-n-Octylphthalate Fluoranthene Fluorene Hexachlorocyclohexane, beta Indeno(1,2,3-cd)Pyrene Methylnaphthalene, 2- Methylphenol, 2-, 3-, 4- (Cresols) Naphthalene Nitroaniline, 3- Nitrophenol, 4- Nitrosodiphenylamine, n- Pentachlorophenols Phenanthrene Phenol Pyrene
POISON
Cyanide
EXPLOSIVE COMPOUNDS AND PHOSPHORUS
2,4-Dinitrotoluene 2,6-Dinitrotoluene 2-Amino-4, 6-Dinitrotoluene 4-Nitrotoluene Nitrobenzene Phosphorus
Approximately 82 total contaminants that have the potential to affect worker safety and health were reported by Tetra Tech on site (Cyanide was reported by SCS Engineers 2008 Combined Preliminary Assessment/Site Inspection Report (starting on page 4-19) and is provided as part of this list of contaminants). The added totals of each variation of the asbestos contaminants, the xylene contaminants, and the polychlorinated biphenyls contaminates may make them a potential safety and health hazard as well. A list of contaminants and their locations can be found in Appendix B, Tables 1 through 14 of the 2013 Tetra Tech Occupational Exposure Evaluation Report. The 2013 Tetra Tech report does not constitute a complete list of potential contaminants. Twenty-one additional reports assessing various aspects of the environmental contamination on the Goodfellow Federal Complex are available upon request. Safety Fact Sheets are provided for each contaminant. All these reports were compiled to assess the contamination from an environmental perspective. Environmental action thresholds do not necessarily correlate into OSHA permissible exposure limits (PELs) because they were the result of testing/sampling in a static environment. OSHA requirements involve sampling/testing using an 8-hour time weighted average/30-minute excursion limit while each job specific activity is in progress.
Contractors whose employees are engaged in work that could potentially put them into contact with, or disturb any and/or all of the environmental contaminants present in such a manner as to make them airborne, shall perform the appropriate hazard assessment and testing to protect their employees according to OSHA 29 CFR 1910 and 1926 regulations. The hazard assessment shall include industrial hygiene sampling/testing as necessary. Contractors shall take the appropriate protective measures to ensure their actions do not place other federal complex personnel at risk (i.e. post warning signs, install engineering controls, create barriers, erect containment, control access to work areas, etc.). Contractors will also ensure their employees decontaminate as required prior to leaving work areas and/or the job site so they do not cross contaminate non-contaminated areas/spaces.
Multiple building interiors (first and second floors) are reported to contain varying amounts of lead based-paint and/or particulate lead and mercury that could affect worker safety and health. These areas include, but are not limited to, the space above the ceiling tiles and some mechanical rooms. Asbestos containing materials are also present in some of these spaces and are currently being managed in place. Work in areas that has the potential to disturb asbestos containing materials requires an asbestos work permit to be issued from the GSA Building Manager prior to the start of work. This permit should be worked directly with GSA with the knowledge of the COR Efforts that may affect asbestos containing materials require a pre-assessment to be accomplished and coordination through the GSA Region 6 Asbestos Program Manager prior to the start of work. The asbestos pre-assessment for construction projects is typically performed by GSA.
Multiple building interiors (basement/basement crawl spaces/utility tunnels) are reported to contain a variety of environmental contaminants that could affect worker safety and health. Contamination includes friable asbestos in the soil, different toxic metals on building surfaces and in the soil, different explosive compounds and phosphorus in the sump water and soil, and different organic compounds in the sump water and soil. Asbestos containing materials are also present in some of these spaces and are currently being managed in place. Work in areas that has the potential to disturb asbestos containing materials requires an asbestos work permit to be issued from the GSA Building Manager prior to the start of work. This permit should be worked directly with GSA with the knowledge of the COR Efforts that may affect asbestos containing materials require a pre-assessment to be accomplished and coordination through the GSA Region 6 Asbestos Program Manager with the knowledge of the COR prior to the start of work. The asbestos pre-assessment for construction projects is typically performed by GSA.
Multiple building interiors (building electrical spaces and interior/exterior ground soil and groundwater) are reported to contain a variety of polychlorinated biphenyl (PCB) contamination. Building interior contamination includes PCBs in the concrete where PCB oil filled transformers used to be. The crawlspace soil of Building 108B is also reported to have PCB contamination. Exterior building ground soil and groundwater is also contaminated with PCB contamination that could affect worker safety and health. Maintenance and construction projects that could disturb PCB laden concrete, interior/exterior ground soil or groundwater must be coordinated through the GSA Region 6 Environmental Program Manager prior to the start of work.
Multiple federal complex exterior areas are reported to be contaminated with a variety of environmental contaminants in the ground soil and groundwater that could affect worker safety and health. Maintenance and construction projects that could disturb federal complex grounds/ground water must be coordinated through the GSA Region 6 Environmental Program Manager with the knowledge of the COR prior to the start of work.
The 2013 Tetra Tech Occupational Exposure Evaluation Report and the SCS Engineers 2008 Combined Preliminary Assessment/Site Inspection Report with Addendum 1(Interim Lead Wipe Sampling and Assessment Report) can be reviewed. GSA Region 6 Public Building Services has made these reports and the twenty-one additional reports available in a reading library located at the Goodfellow Federal Office Complex, GSA St. Louis West Field Office, 4300 Goodfellow Boulevard, St. Louis Missouri.
Reports incorporated by reference – 2008 SCS Engineers Combined Preliminary Assessment/Site Inspection Report with Addendum 1(Interim Lead Wipe Sampling and Assessment Report, 2013 Tetra Tech Occupational Exposure Evaluation Report, and 2016 OCCU-TECH Asbestos Air, Lead Air, and Lead Dust Investigation report. These reports can be reviewed at the reading room located at the Federal Center in Building 107.
If new information or updates become available concerning the environmental conditions at the Goodfellow complex they will be made available via the GSA website at:
www.gsa.gov/goodfellow.
If your organization would like to receive updates from GSA’s Environmental Team, please add your email address to the GSA distribution list by visiting the following website and registering:
https://docs.google.com/forms/d/1Y4UMAMcYYu2Co_TM7ERpuuNq3mWJGlSkA9b5GXcOsE/viewform?c=0&w=1
SUBMITTALS
Prior to beginning any work (after contract award and prior to Notice to Proceed), the contractor shall prepare and submit to the GSA Region 6 Environmental Program Manager with knowledge of the COR for review, a site specific work/safety plan describing the protective measures they will use. Contractors shall provide any sampling/testing results as part of the safety plan. The site specific work/safety plan shall include but not be limited to the following (cover the who, what, when, where, why, and how):
1. Introduction
1. Location and Description
1. Hazard Assessment
| Assessment |
| Personal Protective Equipment Required |
1. Responsibilities
1. Operating Procedures Must include disposal procedures for contaminated materials/PPE
1. Emergency Procedures
| Emergency Contacts |
| Emergency Procedures |
Accident/Incident Reporting
MINIMUM INSURANCE
The minimum insurance required and shall be included in the contract Schedule or elsewhere in the contract:
FAR 28.307-2 -- Liability.
(a) Workers' compensation and employer's liability. Contractors are required to comply with applicable Federal and State workers' compensation and occupational disease statutes. If occupational diseases are not compensable under those statutes, they shall be covered under the employer's liability section of the insurance policy, except when contract operations are so commingled with a contractor's commercial operations that it would not be practical to require this coverage. Employer's liability coverage of at least $100,000 shall be required, except in States with exclusive or monopolistic funds that do not permit workers' compensation to be written by private carriers. (See 28.305(c) for treatment of contracts subject to the Defense Base Act.)
(b) General liability.
(1) The contracting officer shall require bodily injury liability insurance coverage written on the comprehensive form of policy of at least $500,000 per occurrence.
(2) Property damage liability insurance shall be required only in special circumstances as determined by the agency.
(c) Automobile liability. The contracting officer shall require automobile liability insurance written on the comprehensive form of policy. The policy shall provide for bodily injury and property damage liability covering the operation of all automobiles used in connection with performing the contract. Policies covering automobiles operated in the United States shall provide coverage of at least $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage. The amount of liability coverage on other policies shall be commensurate with any legal requirements of the locality and sufficient to meet normal and customary claims.
The contractor shall certify to the Contracting Officer in writing that the required insurance has been obtained in accordance with FAR 52.228-5, Insurance-Work on a Government Installation, contained in Section I.
252.232-7007 LIMITATION OF GOVERNMENT'S OBLIGATION (APR 2014)
(a) Contract line item(s) is/are incrementally funded. For this/these item(s), the sum of $---- (clause to be included and filled in on individual task orders) of the total price is presently available for payment and allotted to this contract. An allotment schedule is set forth in paragraph (j) of this clause.
(b) For items(s) identified in paragraph (a) of this clause, the Contractor agrees to perform up to the point at which the total amount payable by the Government, including reimbursement in the event of termination of those item(s) for the Government's convenience, approximates the total amount currently allotted to the contract. The Contractor is not authorized to continue work on those item(s) beyond that point. The Government will not be obligated in any event to reimburse the Contractor in excess of the amount allotted to the contract for those item(s) regardless of anything to the contrary in the clause entitled "TERMINATION FOR THE CONVENIENCE OF THE GOVERNMENT." As used in this clause, the total amount payable by the Government in the event of termination of applicable contract line item(s) for convenience includes costs, profit and estimated termination settlement costs for those item(s).
(c) Notwithstanding the dates specified in the allotment schedule in paragraph (j) of this clause, the Contractor will notify the Contracting Officer in writing at least ninety days prior to the date when, in the Contractor's best judgment, the work will reach the point at which the total amount payable by the Government, including any cost for termination for convenience, will approximate 85 percent of the total amount then allotted to the contract for performance of the applicable item(s). The notification will state (1) the estimated date when that point will be reached and (2) an estimate of additional funding, if any, needed to continue performance of applicable line items up to the next scheduled date for allotment of funds identified in paragraph (j) of this clause, or to a mutually agreed upon substitute date. The notification will also advise the Contracting Officer of the estimated amount of additional funds that will be required for the timely performance of the item(s) funded pursuant to this clause, for subsequent period as may be specified in the allotment schedule in paragraph (j) of this clause, or otherwise agreed to by the parties. If after such notification additional funds are not allotted by the date identified in the Contractor's notification, or by an agreed substitute date, the Contracting Officer will terminate any item(s) for which additional funds have not been allotted, pursuant to the clause of this contract entitled "TERMINATION FOR THE CONVENIENCE OF THE GOVERNMENT".
(d) When additional funds are allotted for continued performance of the contract line item(s) identified in paragraph (a) of this clause, the parties will agree as to the period of contract performance which will be covered by the funds. The provisions of paragraph (b) through (d) of this clause will apply in like manner to the additional allotted funds and agreed substitute date, and the contract will be modified accordingly.
(e) If, solely by reason of failure of the Government to allot additional funds, by the dates indicated below, in amounts sufficient for timely performance of the contract line item(s) identified in paragraph (a) of this clause, the Contractor incurs additional costs or is delayed in the performance of the work under this contract and if additional funds are allotted, an equitable adjustment will be made in the price or prices (including appropriate target, billing, and ceiling prices where applicable) of the item(s), or in the time of delivery, or both. Failure to agree to any such equitable adjustment hereunder will be a dispute concerning a question of fact within the meaning of the clause entitled "disputes."
(f) The Government may at any time prior to termination allot additional funds for the performance of the contract line item(s) identified in paragraph (a) of this clause.
(g) The termination provisions of this clause do not limit the rights of the Government under the clause entitled "DEFAULT." The provisions of this clause are limited to work and allotment of funds for the contract line item(s) set forth in paragraph (a) of this clause. This clause no longer applies once the contract if fully funded except with regard to the rights or obligations of the parties concerning equitable adjustments negotiated under paragraphs (d) or (e) of this clause.
(h) Nothing in this clause affects the right of the Government to this contract pursuant to the clause of this contract entitled "TERMINATION FOR CONVENIENCE OF THE GOVERNMENT."
(i) Nothing in this clause shall be construed as authorization of voluntary services whose acceptance is otherwise prohibited under 31 U.S.C. 1342.
(j) The parties contemplate that the Government will allot funds to this contract in accordance with the following schedule:
On execution of contract $--
(month) (day), (year) $----
(month) (day), (year) $----
(month) (day), (year) $---- (clause to be included and filled in on individual task orders) (End of clause)
Section I - Contract Clauses
| 52.202-1 |
| Definitions |
| NOV 2013 |
| 52.203-3 |
| Gratuities |
| APR 1984 |
| 52.203-5 |
| Covenant Against Contingent Fees |
| MAY 2014 |
| 52.203-7 |
| Anti-Kickback Procedures |
| MAY 2014 |
| 52.203-8 |
| Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity |
| MAY 2014 |
| 52.203-10 |
| Price Or Fee Adjustment For Illegal Or Improper Activity |
| MAY 2014 |
| 52.203-12 |
| Limitation On Payments To Influence Certain Federal Transactions |
| OCT 2010 |
| 52.203-16 |
| Preventing Personal Conflicts of Interest |
| DEC 2011 |
| 52.203-17 |
| Contractor Employee Whistleblower Rights and Requirement To Inform Employees of Whistleblower Rights |
| APR 2014 |
| 52.204-2 |
| Security Requirements |
| AUG 1996 |
| 52.204-4 |
| Printed or Copied Double-Sided on Postconsumer Fiber Content Paper |
| MAY 2011 |
| 52.204-9 |
| Personal Identity Verification of Contractor Personnel |
| JAN 2011 |
| 52.204-13 |
| System for Award Management Maintenance |
| OCT 2016 |
| 52.207-3 |
| Right of First Refusal of Employment |
| MAY 2006 |
| 52.209-7 |
| Information Regarding Responsibility Matters |
| JUL 2013 |
| 52.209-10 |
| Prohibition on Contracting With Inverted Domestic Corporations |
| NOV 2015 |
| 52.212-4 |
| Contract Terms and Conditions--Commercial Items |
| JAN 2017 |
| 52.215-2 |
| Audit and Records--Negotiation |
| OCT 2010 |
| 52.215-8 |
| Order of Precedence--Uniform Contract Format |
| OCT 1997 |
| 52.219-16 |
| Liquidated Damages-Subcontracting Plan |
| JAN 1999 |
| 52.222-17 |
| Nondisplacement of Qualified Workers |
| MAY 2014 |
| 52.222-29 |
| Notification Of Visa Denial |
| APR 2015 |
| 52.222-40 |
| Notification of Employee Rights Under the National Labor Relations Act |
| DEC 2010 |
| 52.222-50 |
| Combating Trafficking in Persons |
| MAR 2015 |
| 52.222-54 |
| Employment Eligibility Verification |
| OCT 2015 |
| 52.223-5 |
| Pollution Prevention and Right-to-Know Information |
| MAY 2011 |
| 52.223-6 |
| Drug-Free Workplace |
| MAY 2001 |
| 52.223-10 |
| Waste Reduction Program |
| MAY 2011 |
| 52.223-15 |
| Energy Efficiency in Energy-Consuming Products |
| DEC 2007 |
| 52.223-18 |
| Encouraging Contractor Policies To Ban Text Messaging While Driving |
| AUG 2011 |
| 52.223-19 |
| Compliance with Environmental Management Systems |
| MAY 2011 |
| 52.227-1 |
| Authorization and Consent |
| DEC 2007 |
| 52.227-11 |
| Patent Rights--Ownership By The Contractor |
| MAY 2014 |
| 52.227-14 |
| Rights in Data--General |
| MAY 2014 |
| 52.228-5 |
| Insurance - Work On A Government Installation |
| JAN 1997 |
| 52.229-3 |
| Federal, State And Local Taxes |
| FEB 2013 |
| 52.229-6 |
| Taxes--Foreign Fixed-Price Contracts |
| FEB 2013 |
| 52.232-1 |
| Payments |
| APR 1984 |
| 52.232-8 |
| Discounts For Prompt Payment |
| FEB 2002 |
| 52.232-17 |
| Interest |
| MAY 2014 |
| 52.232-18 |
| Availability Of Funds |
| APR 1984 |
| 52.232-23 |
| Assignment Of Claims |
| MAY 2014 |
| 52.232-25 |
| Prompt Payment |
| JAN 2017 |
| 52.232-30 |
| Installment Payments for Commercial Items |
| JAN 2017 |
| 52.232-39 |
| Unenforceability of Unauthorized Obligations |
| JUN 2013 |
| 52.232-40 |
| Providing Accelerated Payments to Small Business Subcontractors |
| DEC 2013 |
| 52.233-1 |
| Disputes |
| MAY 2014 |
| 52.233-1 Alt I |
| Disputes (May 2014) - Alternate I |
| DEC 1991 |
| 52.233-3 |
| Protest After Award |
| AUG 1996 |
| 52.233-4 |
| Applicable Law for Breach of Contract Claim |
| OCT 2004 |
| 52.237-2 |
| Protection Of Government Buildings, Equipment, And Vegetation |
| APR 1984 |
| 52.237-3 |
| Continuity Of Services |
| JAN 1991 |
| 52.242-13 |
| Bankruptcy |
| JUL 1995 |
| 52.242-15 |
| Stop-Work Order |
| AUG 1989 |
| 52.242-17 |
| Government Delay Of Work |
| APR 1984 |
| 52.243-1 |
| Changes--Fixed Price |
| AUG 1987 |
| 52.243-1 Alt II |
| Changes--Fixed-Price (Aug 1987) - Alternate II |
| APR 1984 |
| 52.244-6 |
| Subcontracts for Commercial Items |
| JAN 2017 |
| 52.245-1 |
| Government Property |
| JAN 2017 |
| 52.245-9 |
| Use And Charges |
| APR 2012 |
| 52.246-25 |
| Limitation Of Liability--Services |
| FEB 1997 |
| 52.248-1 |
| Value Engineering |
| OCT 2010 |
| 52.249-2 |
| Termination For Convenience Of The Government (Fixed-Price) |
| APR 2012 |
| 52.249-8 |
| Default (Fixed-Price Supply & Service) |
| APR 1984 |
| 52.251-1 |
| Government Supply Sources |
| APR 2012 |
| 52.252-6 |
| Authorized Deviations In Clauses |
| APR 1984 |
| 52.253-1 |
| Computer Generated Forms |
| JAN 1991 |
| 252.201-7000 |
| Contracting Officer's Representative |
| DEC 1991 |
| 252.203-7000 |
| Requirements Relating to Compensation of Former DoD Officials |
| SEP 2011 |
| 252.203-7001 |
| Prohibition On Persons Convicted of Fraud or Other Defense-Contract-Related Felonies |
| DEC 2008 |
| 252.203-7002 |
| Requirement to Inform Employees of Whistleblower Rights |
| SEP 2013 |
| 252.203-7003 |
| Agency Office of the Inspector General |
| DEC 2012 |
| 252.203-7005 |
| Representation Relating to Compensation of Former DoD Officials |
| NOV 2011 |
| 252.204-7000 |
| Disclosure Of Information |
| OCT 2016 |
| 252.204-7003 |
| Control Of Government Personnel Work Product |
| APR 1992 |
| 252.204-7004 Alt A |
| System for Award Management Alternate A |
| FEB 2014 |
| 252.204-7005 |
| Oral Attestation of Security Responsibilities |
| NOV 2001 |
| 252.204-7008 |
| Compliance With Safeguarding Covered Defense Information Controls |
| OCT 2016 |
| 252.204-7009 |
| Limitations on the Use or Disclosure of Third-Party Contractor Reported Cyber Incident Information |
| OCT 2016 |
| 252.204-7012 |
| Safeguarding Covered Defense Information and Cyber Incident Reporting |
| OCT 2016 |
| 252.204-7015 |
| Notice of Authorized Disclosure of Information for Litigation Support |
| MAY 2016 |
| 252.205-7000 |
| Provision Of Information To Cooperative Agreement Holders |
| DEC 1991 |
| 252.209-7004 |
| Subcontracting With Firms That Are Owned or Controlled By The Government of a Country that is a State Sponsor of Terrorism |
| OCT 2015 |
| 252.209-7006 |
| Limitations on Contractors Acting as Lead System Integrators |
| JAN 2008 |
| 252.209-7007 |
| Prohibited Financial Interests for Lead System Integrators |
| JUL 2009 |
| 252.211-7003 |
| Item Unique Identification and Valuation |
| MAR 2016 |
| 252.211-7007 |
| Reporting of Government-Furnished Property |
| AUG 2012 |
| 252.211-7008 |
| Use of Government-Assigned Serial Numbers |
| SEP 2010 |
| 252.215-7008 |
| Only One Offer |
| OCT 2013 |
| 252.219-7003 |
| Small Business Subcontracting Plan (DOD Contracts)--Basic |
| MAR 2016 |
| 252.222-7002 |
| Compliance With Local Labor Laws (Overseas) |
| JUN 1997 |
| 252.223-7004 |
| Drug Free Work Force |
| SEP 1988 |
| 252.223-7006 |
| Prohibition On Storage, Treatment, and Disposal of Toxic or Hazardous Materials |
| SEP 2014 |
| 252.225-7021 |
| Trade Agreements--Basic |
| DEC 2016 |
| 252.225-7043 |
| Antiterrorism/Force Protection Policy for Defense Contractors Outside the United States |
| JUN 2015 |
| 252.225-7048 |
| Export-Controlled Items |
| JUN 2013 |
| 252.226-7001 |
| Utilization of Indian Organizations and Indian-Owned Economic Enterprises, and Native Hawaiian Small Business Concerns |
| SEP 2004 |
| 252.227-7013 |
| Rights in Technical Data--Noncommercial Items |
| FEB 2014 |
| 252.227-7014 |
| Rights in Noncommercial Computer Software and Noncommercial Computer Software Documentation |
| FEB 2014 |
| 252.227-7015 |
| Technical Data--Commercial Items |
| FEB 2014 |
| 252.227-7016 |
| Rights in Bid or Proposal Information |
| JAN 2011 |
| 252.227-7017 |
| Identification and Assertion of Use, Release, or Disclosure Restrictions |
| JAN 2011 |
| 252.227-7019 |
| Validation of Asserted Restrictions--Computer Software |
| SEP 2016 |
| 252.227-7028 |
| Technical Data or Computer Software Previously Delivered to the Government |
| JUN 1995 |
| 252.227-7030 |
| Technical Data--Withholding Of Payment |
| MAR 2000 |
| 252.227-7037 |
| Validation of Restrictive Markings on Technical Data |
| SEP 2016 |
| 252.229-7002 |
| Customs Exemptions (Germany) |
| JUN 1997 |
| 252.232-7003 |
| Electronic Submission of Payment Requests and Receiving Reports |
| JUN 2012 |
| 252.232-7008 |
| Assignment of Claims (Overseas) |
| JUN 1997 |
| 252.232-7010 |
| Levies on Contract Payments |
| DEC 2006 |
| 252.233-7001 |
| Choice of Law (Overseas) |
| JUN 1997 |
| 252.237-7023 |
| Continuation of Essential Contractor Services |
| OCT 2010 |
| 252.239-7001 |
| Information Assurance Contractor Training and Certification |
| JAN 2008 |
| 252.239-7010 |
| Cloud Computing Services |
| OCT 2016 |
| 252.239-7017 |
| Notice of Supply Chain Risk |
| NOV 2013 |
| 252.239-7018 |
| Supply Chain Risk |
| OCT 2015 |
| 252.243-7001 |
| Pricing Of Contract Modifications |
| DEC 1991 |
| 252.243-7002 |
| Requests for Equitable Adjustment |
| DEC 2012 |
| 252.244-7000 |
| Subcontracts for Commercial Items |
| JUN 2013 |
| 252.245-7001 |
| Tagging, Labeling, and Marking of Government-Furnished Property |
| APR 2012 |
| 252.245-7002 |
| Reporting Loss of Government Property |
| APR 2012 |
| 252.245-7003 |
| Contractor Property Management System Administration |
| APR 2012 |
| 252.245-7004 |
| Reporting, Reutilization, and Disposal |
| SEP 2016 |
| 252.246-7000 |
| Material Inspection And Receiving Report |
| MAR 2008 |
| 252.246-7001 |
| Warranty Of Data |
| MAR 2014 |
| 252.246-7001 Alt II |
| Warranty Of Data (Mar 2014) - Alternate II |
| MAR 2014 |
| 252.246-7005 |
| Notice of Warranty Tracking of Serialized Items |
| MAR 2016 |
| 252.246-7006 |
| Warranty Tracking of Serialized Items |
| MAR 2016 |
| 252.246-7007 |
| Contractor Counterfeit Electronic Part Detection and Avoidance System |
| AUG 2016 |
| 252.247-7023 |
| Transportation of Supplies by Sea |
| APR 2014 |
| 252.251-7000 |
| Ordering From Government Supply Sources |
| AUG 2012 |
52.209-9000 ORGANIZATIONAL AND CONSULTANT CONFLICTS OF INTEREST (OCCI) (DEC 2014)
(a) An offeror shall identify in its proposal, quote, bid or any resulting contract, any potential or actual Organizational and Consultant Conflicts of Interest (OCCI) as described in FAR Subpart 9.5. This includes actual or potential conflicts of interests of proposed subcontractors. If an offeror identifies in its proposal, quote, bid or any resulting contract, a potential or actual conflict of interests the offeror shall submit an Organizational and Consultant Conflicts of Interest Mitigation Plan to the contracting officer. The Organizational and Consultant Conflicts of Interest Mitigation Plan shall describe how the offeror addresses potential or actual conflicts of interest and identify how they will avoid, neutralize, or mitigate present or future conflicts of interest.
(b) Offerors must consider whether their involvement and participation raises any OCCI issues, especially in the following areas when:
(1) Providing systems engineering and technical direction.
(2) Preparing specifications or work statements and/or objectives.
(3) Providing evaluation services.
(4) Obtaining access to proprietary information.
(c) If a prime contractor or subcontractor breaches any of the OCCI restrictions, or does not disclose or misrepresents any relevant facts concerning its conflict of interest, the government may take appropriate action, including terminating the contract, in additional to any remedies that may be otherwise permitted by the contract or operation of law.
52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS--COMMERCIAL ITEMS (JAN 2017)
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
(2) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015).
(3) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).
(4) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Public Laws 108-77 and 108-78 (19 U.S.C. 3805 note)).
(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items: (Contracting Officer check as appropriate.)
X (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Sept 2006), with Alternate I (Oct 1995) (41 U.S.C. 4704 and 10 U.S.C. 2402).
X (2) 52.203-13, Contractor Code of Business Ethics and Conduct (Oct 2015) (41 U.S.C. 3509).
____ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (June 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)
X (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (Oct 2016) (Pub. L. 109-282) (31 U.S.C. 6101 note).
___ (5) [Reserved]
___ (6) 52.204-14, Service Contract Reporting Requirements (Oct 2016) (Pub. L. 111-117, section 743 of Div. C).
___ (7) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (Oct 2016) (Pub. L. 111-117, section 743 of Div. C).
X (8) 52.209-6, Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (Oct 2015) (31 U.S.C. 6101 note).
X (9) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (July 2013) (41 U.S.C. 2313).
____ (10) [Reserved]
____ (11)(i) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (NOV 2011) (15 U.S.C. 657a).
____ (ii) Alternate I (NOV 2011) of 52.219-3.
____ (12) (i) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (OCT 2014) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).
____ (ii) Alternate I (JAN 2011) of 52.219-4.
____ (13) [Reserved]
____ (14)(i) 52.219-6, Notice of Total Small Business Set-Aside (NOV 2011) (15 U.S.C. 644).
____ (ii) Alternate I (NOV 2011).
____ (iii) Alternate II (NOV 2011).
____ (15)(i) 52.219-7, Notice of Partial Small Business Set-Aside (June 2003) (15 U.S.C. 644).
____ (ii) Alternate I (Oct 1995) of 52.219-7.
____ (iii) Alternate II (Mar 2004) of 52.219-7.
X (16) 52.219-8, Utilization of Small Business Concerns (Nov 2016) (15 U.S.C. 637(d)(2) and (3)).
X (17)(i) 52.219-9, Small Business Subcontracting Plan (Jan 2017) (15 U.S.C. 637(d)(4)).
____ (ii) Alternate I (Nov 2016) of 52.219-9.
____ (iii) Alternate II (Nov 2016) of 52.219-9.
____ (iv) Alternate III (Nov 2016) of 52.219-9.
____ (v) Alternate IV (Nov 2016) of 52.219-9.
____ (18) 52.219-13, Notice of Set-Aside of Orders (NOV 2011) (15 U.S.C. 644(r)).
____ (19) 52.219-14, Limitations on Subcontracting (JAN 2017) (15 U.S.C. 637(a)(14)).
____ (20) 52.219-16, Liquidated Damages—Subcon-tracting Plan (Jan 1999) (15 U.S.C. 637(d)(4)(F)(i)).
____ (21) 52.219-27, Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (NOV 2011) (15 U.S.C. 657f).
X (22) 52.219-28, Post Award Small Business Program Rerepresentation (July 2013) (15 U.S.C. 632(a)(2)).
____ (23) 52.219-29, Notice of Set-Aside for, or Sole Source Award to, Economically Disadvantaged Women-Owned Small Business Concerns (Dec 2015) (15 U.S.C. 637(m)).
____(24) 52.219-30, Notice of Set-Aside for, or Sole Source Award to, Women-Owned Small Business Concerns Eligible Under the Women-Owned Small Business Program (Dec 2015) (15 U.S.C. 637(m)).
X (25) 52.222-3, Convict Labor (June 2003) (E.O. 11755).
X (26) 52.222-19, Child Labor--Cooperation with Authorities and Remedies (Oct 2016) (E.O. 13126).
X (27) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).
X (28) 52.222-26, Equal Opportunity (Sept 2016) (E.O. 11246).
X (29) 52.222-35, Equal Opportunity for Veterans (Oct 2015) (38 U.S.C. 4212).
X (30) 52.222-36, Equal Opportunity for Workers with Disabilities (July 2014) (29 U.S.C. 793).
X (31) 52.222-37, Employment Reports on Veterans (FEB 2016) (38 U.S.C. 4212).
____ (32) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O. 13496).
____ (33)(i) 52.222-50, Combating Trafficking in Persons (March 2, 2015) (22 U.S.C. chapter 78 and E.O. 13627).
____ (ii) Alternate I (March 2, 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).
____ (34) 52.222-54, Employment Eligibility Verification (Oct 2015). (E. O. 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial items as prescribed in 22.1803.)
____ (35) 52.222-59, Compliance with Labor Laws (Executive Order 13673) (OCT 2016). (Applies at $50 million for solicitations and resultant contracts issued from October 25, 2016 through April 24, 2017; applies at $500,000 for solicitations and resultant contracts issued after April 24, 2017).
Note to paragraph (b)(35): By a court order issued on October 24, 2016, 52.222-59 is enjoined indefinitely as of the date of the order. The enjoined paragraph will become effective immediately if the court terminates the injunction. At that time, DoD, GSA, and NASA will publish a document in the Federal Register advising the public of the termination of the injunction.
____ (36) 52.222-60, Paycheck Transparency (Executive Order 13673) (OCT 2016).
____ (37)(i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA–Designated Items (May 2008) (42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
____ (ii) Alternate I (May 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
____ (38) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (June, 2016) (E.O. 13693).
____ (39) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (June, 2016) (E.O. 13693).
____ (40) (i) 52.223-13, Acquisition of EPEAT® Registered Imaging Equipment (Jun 2014) (E.O.s 13423 and 13514).
____ (ii) Alternate I (OCT 2015) of 52.223-13.
____ (41)(i) 52.223-14, Acquisition of EPEAT® Registered Televisions (Jun 2014) (E.O.s 13423 and 13514).
____ (ii) Alternate I (Jun 2014) of 52.223-14.
____ (42) 52.223-15, Energy Efficiency in Energy-Consuming Products (Dec 2007) (42 U.S.C. 8259b).
____ (43)(i) 52.223-16, Acquisition of EPEAT[supreg]-Registered Personal Computer Products (OCT 2015) (E.O.s 13423 and 13514).
____ (ii) Alternate I (Jun 2014) of 52.223-16.
____ (44) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving (Aug 2011) (E.O. 13513).
____ (45) 52.223-20, Aerosols (June, 2016) (E.O. 13693).
____ (46) 52.223-21, Foams (June, 2016) (E.O. 13693).
____ (47)(i) 52.224-3, Privacy Training (JAN 2017) (5 U.S.C. 552a).
____ (ii) Alternate I (JAN 2017) of 52.224-3.
X (48) 52.225-1, Buy American--Supplies (May 2014) (41 U.S.C. chapter 83).
____(49) (i) 52.225-3, Buy American--Free Trade Agreements--Israeli Trade Act (May 2014) (41 U.S.C. chapter 83, 19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, Pub. L.
103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, and 112-43.
____ (ii) Alternate I (May 2014) of 52.225-3.
____ (iii) Alternate II (May 2014) of 52.225-3.
____ (iv) Alternate III (May 2014) of 52.225-3.
____ (50) 52.225-5, Trade Agreements (Oct 2016) (19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).
X (51) 52.225-13, Restrictions on Certain Foreign Purchases (June 2008) (E.O.’s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).
____ (52) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Oct 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).
____ (53) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (Nov 2007) (42 U.S.C. 5150
____ (54) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (Nov 2007) (42 U.S.C. 5150).
____ (55) 52.232-29, Terms for Financing of Purchases of Commercial Items (Feb 2002) (41 U.S.C. 4505, 10 U.S.C. 2307(f)).
____ (56) 52.232-30, Installment Payments for Commercial Items (Jan 2017) (41 U.S.C. 4505, 10 U.S.C. 2307(f)).
X (57) 52.232-33, Payment by Electronic Funds Transfer—System for Award Management (July 2013) (31 U.S.C. 3332).
____ (58) 52.232-34, Payment by Electronic Funds Transfer—Other than System for Award Management (July 2013) (31 U.S.C. 3332).
____ (59) 52.232-36, Payment by Third Party (MAY 2014) (31 U.S.C. 3332).
X (60) 52.239-1, Privacy or Security Safeguards (Aug 1996) (5 U.S.C. 552a).
____ (61) 52.242-5, Payments to Small Business Subcontractors (JAN 2017)(15 U.S.C. 637(d)(12)).
____ (62)(i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Feb 2006) (46 U.S.C. Appx. 1241(b) and 10 U.S.C. 2631).
____ (ii) Alternate I (Apr 2003) of 52.247-64.
(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items: (Contracting Officer check as appropriate.)
_____(1) 52.222-17, Nondisplacement of Qualified Workers (May 2014) (E.O. 13495).
_____ (2) 52.222-41, Service Contract Labor Standards (MAY 2014) (41 U.S.C. chapter 67).
_____ (3) 52.222-42, Statement of Equivalent Rates for Federal Hires (MAY 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67).
_____ (4) 52.222-43, Fair Labor Standards Act and Service Contract Labor Standards--Price Adjustment (Multiple Year and Option Contracts) (MAY 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67).
_____ (5) 52.222-44, Fair Labor Standards Act and Service Contract Labor Standards--Price Adjustment (MAY 2014) (29 U.S.C 206 and 41 U.S.C. chapter 67).
_____ (6) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment--Requirements (MAY 2014) (41 U.S.C. chapter 67).
_____ (7) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services--Requirements (MAY 2014) (41 U.S.C. chapter 67).
_____(8) 52.222-55, Minimum Wages Under Executive Order 13658 (DEC 2015) (E.O. 13658).
_____ (9) 52.222-62, Paid Sick Leave Under Executive Order 13706 (JAN 2017) (E.O. 13706).
_____ (10) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (MAY 2014) (42 U.S.C. 1792).
_____ (11) 52.237-11, Accepting and Dispensing of $1 Coin (Sept 2008) (31 U.S.C. 5112(p)(1)).
(d) Comptroller General Examination of Record. The Contractor shall comply with the provisions of this paragraph (d) if this contract was awarded using other than sealed bid, is in excess of…