HC1028-16-T-0132_RFQ.pdf
PDF 1 MB Posted
- Attached to
- Offsite Media Storage Federal contract opportunity
- Solicitation number
- HC1028-16-T-0132
- Issued by
- Defense Information Systems Agency
About this file
Request For Quote (RFQ)
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| HC102816T0132_Request_for_Information_(RFI).pdf | ||
| HC1028-16-T-0132_RFQ_UPDATED.pdf | ||
| DHQCSD17MPC0001_RFI.pdf | ||
| HC1028-16-T-0132_ATTACHMENT_A.xlsx | XLSX spreadsheet | |
| HC1028-16-T-0132_QASP.pdf | ||
| HC1028-16-T-0132_Evaluation_Table_LPTA.pdf | ||
| HC1028-16-T-0132_Frequency_Addendum.pdf | ||
| HC1028-16-T-0132_DD_254.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
HC1028-16-T-0132 21-Jun-2016
b. TELEPHONE NUMBER
618-229-9651
8. OFFER DUE DATE/LOCAL TIME
12:00 PM 21 Jul 2016
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA X ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
HC10289. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
MARTY D. BOST
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.X
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
DISA/DITCO-SCOTT-PL83
2300 EAST DRIVE
SCOTT AFB IL 62225-5406
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE 16. ADMINISTERED BY
SEE SCHEDULE
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
FAX:
TEL: SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$27,500,000
NAICS:
493110
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF87
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
HC1028-16-T-0132
Section SF 1449 - CONTINUATION SHEET
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Lot Contractor Delivery and Pickup
FFP
Non-Personal Services - Contractor Delivery and Pickup Transportation Charges in accordance with the Statement of Work dated 06 April 2016. Cost will be developed for transportation between the DISA CSD Site and the Contractor's
Storage Facility.
For a complete breakout of the anticipated locations, please see Attachment A.
The period of performance is 01 October 2016 - 30 September 2017.
FOB: Destination
NET AMT
0002 1 Lot Container Handling Fees
FFP
Container Handling Fees - Closed Containers in accordance with the Statement of
Work dated 06 April 2016. Priced the same for all DISA locations.
0003 1 Lot Media Handling Fees
FFP
Media Handling Fees - Individual Slotted Media in accordance with the Statement of Work dated 06 April 2016. Priced the same for all DISA locations.
0004 1 Lot Contractor-Provided Transport Containers
FFP
Contractor-Provided Transport Containers in accordance with the Statement of
Work dated 06 April 2016. Different sizes of transport containers, used to transport
Media that is slotted for storage at the Contractor's Facility. Priced according to size. Priced the same for all DISA locations.
0005 1 Lot Contractor Storage, Slotting, Vaulting
FFP
Contractor Storage, Slotting, Vaulting in accordance with the Statement of Work dated 06 April 2016. Storage of Individual Slotted Media at Contractor's Facility.
Priced the same for all DISA locations.
0006 1 Lot Container and Vault Storage
FFP
Container and Vault Storage in accordance with the Statement of Work dated 06
April 2016. Storage of Closed Containers at Contractor's Facility. Priced according to size. Priced the same for all DISA locations.
0007 1 Lot Contractor Invoicing
FFP
Contractor Invoicing in accordance with the Statement of Work dated 06 April
2016. Priced the same for all DISA locations.
0008 1 Lot Unscheduled & Emergency/Critical Service
FFP
Unscheduled Delivery- Media returned to Site or Designated Alternate Site within
4 hours of notification in accordance with the Statement of Work dated 06 April
2016. Priced the same for all DISA locations identifed by Site or Designated
Alternate Site.
Price Per Occurence: $___________
Emergency/Critical Service - Media returned to Site or Designated Alternate Site within 8 hours of notification in accordance with the Statement of Work dated 06
April 2016. Priced the same for all DISA locations identified by Site or Designated
Invoice only if used.
0009 1 Lot Recovery test - Move Media
FFP
Standard Emergency Recovery Test-Move Media Between DISA Site and
Contractor's Facility within 4 hours of notification in accordance with the
Statement of Work dated 06 April 2016.
Price Per Test: $__________
Standard Disaster Recovery Test-Move Media to Alternate DISA Site within 24 hours of notification in accordance with the Statement of Work dated 06 April
2016.
Mid-Tier Disaster Recovery Test-Move Media to Alternate DISA Site within 24
Capacity Disaster Recovery Test-Move Media to Alternate DISA Site within 24
Price Per Test: $_________
0010 1 Lot Additional Services
FFP
The Government will provide a SOW defining the requested additional work.
Additional services under this contract shall be negotiated by contract modification if and when those services are required. It is the Government’s intent to request a proposal each time, with the pricing to be no higher than the awarded amounts for these hours/materials.
For additional information, please see Attachment A.
1001 1 Lot OPTION Contractor Delivery and Pickup
FFP
Non-Personal Services - Contractor Delivery and Pickup Transportation Charges in accordance with the Statement of Work dated 06 April 2016. Cost will be
The period of performance is 01 October 2017 - 30 September 2018.
1002 1 Lot OPTION Container Handling Fees
FFP
1003 1 Lot OPTION Media Handling Fees
FFP
1004 1 Lot OPTION Contractor-Provided Transport Containers
FFP
Contractor-Provided Transport Containers in accordance with the Statement of
Work dated 06 April 2016. Different sizes of transport containers, used to transport
1005 1 Lot OPTION Contractor Storage, Slotting, Vaulting
FFP
Contractor Storage, Slotting, Vaulting in accordance with the Statement of Work
1006 1 Lot OPTION Container and Vault Storage
FFP
Container and Vault Storage in accordance with the Statement of Work dated 06
1007 1 Lot OPTION Contractor Invoicing
FFP
1008 1 Lot OPTION Unscheduled & Emergency/Critical Service
FFP
Unscheduled Delivery- Media returned to Site or Designated Alternate Site within
4 hours of notification in accordance with the Statement of Work dated 06 April
1009 1 Lot OPTION Recovery test - Move Media
FFP
Standard Emergency Recovery Test-Move Media Between DISA Site and
1010 1 Lot OPTION Additional Services
FFP
The Government will provide a SOW defining the requested additional work.
Additional services under this contract shall be negotiated by contract modification if and when those services are required. It is the Government’s intent to request a
2001 1 Lot OPTION Contractor Delivery and Pickup
FFP
Non-Personal Services - Contractor Delivery and Pickup Transportation Charges in accordance with the Statement of Work dated 06 April 2016. Cost will be
The period of performance is 01 October 2018 - 30 September 2019.
2002 1 Lot OPTION Container Handling Fees
FFP
2003 1 Lot OPTION Media Handling Fees
FFP
2004 1 Lot OPTION Contractor-Provided Transport Containers
FFP
Contractor-Provided Transport Containers in accordance with the Statement of
Work dated 06 April 2016. Different sizes of transport containers, used to transport
2005 1 Lot OPTION Contractor Storage, Slotting, Vaulting
FFP
Contractor Storage, Slotting, Vaulting in accordance with the Statement of Work
2006 1 Lot OPTION Container and Vault Storage
FFP
Container and Vault Storage in accordance with the Statement of Work dated 06
2007 1 Lot OPTION Contractor Invoicing
FFP
2008 1 Lot OPTION Unscheduled & Emergency/Critical Service
FFP
Unscheduled Delivery- Media returned to Site or Designated Alternate Site within
4 hours of notification in accordance with the Statement of Work dated 06 April
2009 1 Lot OPTION Recovery test - Move Media
FFP
Standard Emergency Recovery Test-Move Media Between DISA Site and
2010 1 Lot OPTION Additional Services
FFP
The Government will provide a SOW defining the requested additional work.
Additional services under this contract shall be negotiated by contract modification if and when those services are required. It is the Government’s intent to request a
3001 1 Lot OPTION Contractor Delivery and Pickup
FFP
Non-Personal Services - Contractor Delivery and Pickup Transportation Charges in accordance with the Statement of Work dated 06 April 2016. Cost will be
The period of performance is 01 October 2019 - 30 September 2020.
3002 1 Lot OPTION Container Handling Fees
FFP
3003 1 Lot OPTION Media Handling Fees
FFP
3004 1 Lot OPTION Contractor-Provided Transport Containers
FFP
Contractor-Provided Transport Containers in accordance with the Statement of
Work dated 06 April 2016. Different sizes of transport containers, used to transport
3005 1 Lot OPTION Contractor Storage, Slotting, Vaulting
FFP
Contractor Storage, Slotting, Vaulting in accordance with the Statement of Work
3006 1 Lot OPTION Container and Vault Storage
FFP
Container and Vault Storage in accordance with the Statement of Work dated 06
3007 1 Lot OPTION Contractor Invoicing
FFP
3008 1 Lot OPTION Unscheduled & Emergency/Critical Service
FFP
Unscheduled Delivery- Media returned to Site or Designated Alternate Site within
4 hours of notification in accordance with the Statement of Work dated 06 April
3009 1 Lot OPTION Recovery test - Move Media
FFP
Standard Emergency Recovery Test-Move Media Between DISA Site and
3010 1 Lot OPTION Additional Services
FFP
The Government will provide a SOW defining the requested additional work.
Additional services under this contract shall be negotiated by contract modification if and when those services are required. It is the Government’s intent to request a
4001 1 Lot OPTION Contractor Delivery and Pickup
FFP
Non-Personal Services - Contractor Delivery and Pickup Transportation Charges in accordance with the Statement of Work dated 06 April 2016. Cost will be
The period of performance is 01 October 2020 - 30 September 2021.
4002 1 Lot OPTION Container Handling Fees
FFP
4003 1 Lot OPTION Media Handling Fees
FFP
4004 1 Lot OPTION Contractor-Provided Transport Containers
FFP
Contractor-Provided Transport Containers in accordance with the Statement of
Work dated 06 April 2016. Different sizes of transport containers, used to transport
4005 1 Lot OPTION Contractor Storage, Slotting, Vaulting
FFP
Contractor Storage, Slotting, Vaulting in accordance with the Statement of Work
4006 1 Lot OPTION Container and Vault Storage
FFP
Container and Vault Storage in accordance with the Statement of Work dated 06
4007 1 Lot OPTION Contractor Invoicing
FFP
4008 1 Lot OPTION Unscheduled & Emergency/Critical Service
FFP
Unscheduled Delivery- Media returned to Site or Designated Alternate Site within
4 hours of notification in accordance with the Statement of Work dated 06 April
4009 1 Lot OPTION Recovery test - Move Media
FFP
Standard Emergency Recovery Test-Move Media Between DISA Site and
4010 1 Lot OPTION Additional Services
FFP
The Government will provide a SOW defining the requested additional work.
Additional services under this contract shall be negotiated by contract modification if and when those services are required. It is the Government’s intent to request a
REQUEST FOR QUOTE
This is a commercial purchase using FAR Part 12 and Part 13 procedures. The following information, as required per FAR 12.603(c) (2) applies:
(i) This is a combined synopsis/solicitation for commercial items prepared in accordance with FAR Part 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation, proposals are being requested and a written solicitation will not be issued.
(ii) The solicitation reference number is HC1028-16-T-0132; it is being issued as a Request for Quotation (RFQ).
(iii) The solicitation document and incorporated provisions and clauses are those in effect through the Federal
Acquisition Circular 2005-88 effective 15 Jun 16, and the Defense Federal Acquisition Regulation Supplement DPN
20160607 Edition effective 07 Jun 16.
(iv) This acquisition is 100% Small Business Set Aside under North American Industry Classification System
(NAICS) code 493110. For the purpose of this procurement the small business size standard is $27.5M.
The Government is seeking discounted pricing to obtain these nonpersonal services to provide Off-Site Storage of
Unclassified and Classified Computer-Generated Media as identified in the attached Statement of Work (SOW).
The Period of Performance (POP) for this effort is 01 October 2016 through 30 September 2017 with (4) one-year option periods.
Award will be made to the offeror who presents the Lowest Price Technically Acceptable (LPTA) to the
Government in accordance with the criteria in the RFQ. The proposal must comply in all material respects with the requirements of the law, regulation and conditions set forth in the solicitation. The proposal must meet all mandatory solicitation requirements. The offeror must be determined responsible according to the standards of FAR
Part 9, Subpart 1. The agency intends to award a firm-fixed price order/contract using the Lowest Price Technically acceptable methodology. The Quotes must represent best value from selection of the technically acceptable quote in accordance with the stated requirements and delivery, with lowest evaluated price. All proposals will be forwarded to the customer for evaluation; however, if the lowest priced quote is determined technically acceptable, no further technical review will be required.
The award will be a single award Firm Fixed Price (FFP) based on the technically acceptable offer. Pricing should be based on fully burdened labor rates to perform this work.
**Contractor must have active facility clearance, level – Secret, at time of proposal submission. **
TECHNICAL PROPOSAL
The technical proposal should include all information you want the Government to consider/evaluate, regarding capability of your company to perform the required tasks. The proposal should address information such as personnel skills and experience, descriptions of the qualifications; level of knowledge; number of years of experience for the labor categories proposed for the potential candidates; proposed resumes management/technical approach to accomplishing these tasks; demonstrate understanding of the tasks at hand; past performance of the company for similar type work and complexity; and any additional pertinent information.
When addressing past performance/experience in the proposal, the Government considers some experience/contracts more significant than others, e.g. due to their close similarity to the requirements and the more recent nature of the past performance.
The technical proposal (including technical, management, relevant experience, past performance, and adherence to security requirements if applicable) shall be limited to no more than twenty (20) single-sided pages.
SUBMISSION INSTRUCTIONS
As a minimum, your pricing information should include:
--Proposed pricing for basic performance required under the Statement of Work (SOW). Price proposal should be submitted in Microsoft Excel and itemized by labor categories, estimated labor hours, rate, number of employees for each labor category, what percentage of discount has been given, and total proposed cost for the requirement.
Additional services under this contract shall be negotiated by contract modification if and when those services are required. It is the Government’s intent to request a proposal each time, with the pricing to be no higher than the awarded amounts for these hours/materials.
This procurement will be conducted entirely electronically. All information submitted must be presented in software applications which are readable by Government systems (generally, Microsoft Office such as Word, Excel, etc.). All submissions must be made to this email address: marty.d.bost.civ@mail.mil.
The Government reserves the right to award without discussions. Therefore, the Offeror’s initial proposal shall contain the Offeror’s best terms based on past performance, technical/management approach, and cost.
The Government will entertain questions on this procurement until 10:00 am CST, Tuesday, July 5, 2016. No late questions will be accepted. No questions will be accepted via phone calls. Responses to all questions posed will be provided to all interested parties. Please send all questions via email to marty.d.bost.civ@mail.mil.
Proposals are due by 12:00 pm CST Wednesday, July 21, 2016. The Government reserves the right to award without discussions.
Please send all questions/quotes to Marty Bost at marty.d.bost.civ@mail.mil.
STATEMENT OF WORK
mailto:marty.d.bost.civ@mail.mil
As of 06 April 2016
Contract Number:
1. Contracting Officer Representative (COR)
a. Primary COR
Name:
Organization:
DODAAC:
Address:
Phone Number:
Fax Number:
E-Mail Address:
2. Contract Title. Off-Site Tape Media Storage
3. Background. Defense Information System Agency (DISA) provides a broad range of Information Technology support services to Department of Defense (DOD) components. This support consists primarily of mainframe, mid-tier and client server data processing. DISA currently staffs and operates multiple sites in the United States. The sites have varying computing power configurations, with larger sites supporting other larger sites and smaller sites.
The current site locations requiring off-site tape media storage are as follows: Columbus, OH, Mechanicsburg, PA, Montgomery, AL, Ogden, UT, Oklahoma City, OK, San Antonio, TX, and St. Louis, MO. Additional locations may be added at DISAs request during the contract.
4. Objectives. DISA must provide its customers, mainframe, mid-tier, client server and desktop recovery capabilities to ensure continuity of operations in the event that a DISA site is disabled or nonfunctional. DISA has a requirement for off-site storage management of Unclassified and Classified media and rotation and retrieval services to ensure availability of critical customer data to minimize the impact of a catastrophic service interruption. The tape media retention period is determined by the customer.
5. Scope. The Contractor shall furnish all labor, facilities and transportation to pick up and deliver tape media and documentation from and to a DISA site based on a predetermined schedule. The Contractor must be able to provide off-site storage management of unclassified and classified tape media and rotation, retrieval and recovery services to all DISA sites. The Contractor shall also provide, in the event of a disaster or a disaster recovery test, transportation of the stored tape media and associated documentation from a specified DISA Site and ensure emergency shipment of the tape media and documentation to an alternate designated DISA processing site within the time limits identified in the SOW.
6. Specific Tasks.
6.1 Task 1-Contractor’s Delivery and Pickup-Transportation: The Contractor’s personnel shall pick up and deliver shipments of outgoing and incoming classified and unclassified tape media from the DISA site (based on specific
DISA site schedule that will be provided upon contract award) 24x7x365 days as scheduled by the Government.
Regular deliveries and pickups will be scheduled between 0700 and 1700 local time. Bar code reader or similar technology will be utilized to ensure accurate tracking and scanning of all media transports.
6.1.1 The Contractor’s personnel shall notify the DISA site Point of Contact (POC) within 2 hours prior or 30 minutes following the scheduled pickup if the Contractor cannot meet the scheduled pick-up and delivery times due to weather conditions, road conditions, or mechanical failure of the contractor’s vehicle. The missed pick-up and/or delivery time will be rescheduled within 24 hours.
6.1.2 The Government will have authority to cancel or change the time of any regular scheduled pick-up or delivery by notifying the Contractor no later than 2 hours prior to the scheduled pick-up or delivery time on the day of the requested change to the schedule.
6.1.3 The Contractor shall proceed directly to the storage facility immediately following the tape media pickup from a DISA facility. The Contractor shall also proceed directly to all DISA facilities immediately following loading of the media to be returned to the DISA facility. Other route stops are not permitted. Classified media must be accompanied at all times by a cleared (Secret) Contractor until turnover of media to a cleared, authorized employee at the DISA site or Contractor’s facility. The Contractor shall comply with DOD 5220.22-M (NISPOM) anytime the Contractor’s personnel are handling, packaging and transporting media, which is Classified at the Confidential or
Secret level.
6.1.4 The Contract employees, upon arrival at the Contractor’s facility, shall store the slotted media and the storage cases. Segregated storage racks will be provided for each customer. All tapes will be filed and containers moved to the appropriate secured area by the close of business that same day. The Contractor shall provide shelf storage space for classified media cases. The storage space shall meet the minimum requirements for storage of Classified national security information at the Secret level, as specified in DOD 5220.22-M, National Industrial Security
Program Operating Manual (NISPOM).
6.1.5 Open Container Storage/Slotted Media: Contractor will rotate individual tapes by their retention date. The
Contractor picks up the locked container from the DISA site, unlocks the container at the vaulting facility, and the media is slotted inside the customer's designated vault space. Contractor has interaction with the media. Each tape within the transport container can have its own retention date. Contractor can provide exact labeling information on the media stored at their facility.
6.1.6 Closed Container Storage: Contractor will rotate the container by its retention date. Contractor will pick up the locked container from the DISA site and store it unopened at its vaulting facility. Contractor will not interact with the tapes inside the closed container. The container and its entire contents have a single retention date. The details of the containers’ contents are the Government’s responsibility.
6.1.7 Contractor-Provided Transport Containers: Contractor will use containers designed to minimize the risk of potential data loss. Containers and carts must remain locked at all times during transit. Containers must be water, shatter and fire-resistant, foam lined and specific for each type of tape. Containers must have a unique customer identification label that does not identify the customer name or the contents.
6.1.8 The Contractor shall provide access to the storage facility for the purpose of a media audit within 24 hours of request by DISA. All DISA-owned tape media stored in the segregated storage areas of the facility shall be accessible to approved DISA personnel for audit.
6.1.9 The Contractor’s personnel may be asked, on an unscheduled basis, to bring a specific tape/container back to the DISA site, within 8 hours of recall notification for operational recovery. If a disaster occurs at the DISA site, the
Contractor shall be required to ensure emergency/critical delivery of the back-up media to the designated recovery sites marked on the storage cases within 4 hours of a declaration of any disaster or emergency.
6.2 Task 2-Contractor’s Vehicle Requirements: The Contractor shall provide a vehicle with a verified license, insurance and separate cargo area with automatic latches/locks. The Contractor’s vehicle used to transport media covered by this contract must be used only for the transportation of computer media and be retrofitted for protecting magnetic media. The Contractor’s vehicle should be unmarked and have an audible security alarm system that is active at all times. The cargo area will remain locked at all times except during loading/unloading. The storage area of the Contractor’s vehicle must be temperature controlled and maintained at the same temperature and humidity requirements as listed in paragraph 8.1.3. All vehicles used to transport government tape media will be equipped with Global Positioning Tracking (GPS) systems and be able to provided vehicles with real time tracking within thirty minutes.
6.3 Task 3-Contractor’s Reporting and Communication Requirements:
6.3.1 The Contractor must immediately notify the government of any situations regarding missing tape media and/or containers at the contractor’s offsite facility or during transportation. Immediate notification will be accomplished by contacting the government POC at each site provided on attachment A (under revision), or the contract COR listed in paragraph 1.a of this SOW. Contractor can also contact the DISA Helpdesk (844) 347-2457 and request the
DISA site storage team be notified of the incident.
6.3.2 The Contractor shall provide a monthly report to the DISA site storage POC within ten working days after the end of the month. The monthly report will record actual pick-up times, times in route (to/from), number of cartons transported, number of tapes hand-filed, any procedural deviations and/or security problems encountered during the reporting period. The Contractor shall notify the DISA site POC if any problems arise while performing the duties outlined in this SOW.
6.4 Task 4-Contractor’s Recovery and Testing Requirements: Recovery testing requirements shall be met in accordance with general guidelines for testing requirements; specific changes to these guidelines may be requested by DISA. The DISA site POCs will be responsible for requesting, scheduling and evaluating the results with the
Contractor.
6.4.1 Emergency Test: On an emergency basis, the Contractor may be asked to bring back tapes to the DISA site.
The shipment could consist of all mainframe media and mid-tier media. If an emergency test occurs, the Contractor shall return the media within 4 hours of notification.
6.4.2 Standard Disaster Recovery Test: The Contractor shall ship media to the alternate processing site. The shipment shall consist of mainframe media and/or mid-tier media shipped to and returned from the alternate processing site. The media shall be delivered to the alternate processing site within 24 hours of notification to the
Contractor by DISA.
6.4.3 Mid-Tier Disaster Recovery Test: The Contractor shall ship mid-tier media to and return them from the alternate processing site. The media shall arrive at the alternate processing site within 24 hours of notification to the
Contractor by DISA.
6.4.4 Capacity Disaster Recovery Test: The Contractor shall ship all mainframe media and mid-tier media to and return them from the alternate processing site. The media shall be delivered to the alternate site within 24 hours of notification to the Contractor by DISA.
6.5 Task 5-Contractor’s Personnel Requirements: Contractor employee must be able to receive and follow English verbal and/or written instructions.
6.5.1 Contractor personnel shall be insured/bonded for a minimum of $25,000 for liability, negligence and loss and/or damage of media/data, in accordance with all governing Federal and/or State laws. Bond verification shall be provided to the DISA Contracting Officer within 3 workdays of personnel hiring action. All costs associated with the bonding shall be the responsibility of the Contractor. Guidance concerning these areas and material is contained in the most recent versions of DOD 5200.1-R, Information Security Program, DOD 5200.2-R, Personnel Security
Program, and DOD 5200.8-R Physical Security Program. The Contractor shall provide documentation (i.e.
Certificate of Insurance) to the DISA Contracting Officer.
6.5.2 The Contractor shall provide each DISA site POC and the COR with telephone number for emergency response 24x7x365 to be able to respond to designated site emergencies within 15 minutes of being contacted. In the event a voice message is left, the contractor will respond to the call within 15 minutes.
6.6 Task 6-Contractor’s Invoice Requirements: The Contractor shall provide a monthly invoice for certification and payment no later than 10 working days after the end of the month. The invoice shall include the month end date;
period being billed for; site name and amount being charged; number of trips, number of media (identified by type) picked-up and delivered, and number of media (identified by type) stored; any site required emergency trips and/or site test requirements; dollar amount being charged; unique customer generated invoice number; and total for all sites. Some DISA sites may have multiple accounts.
6.7 Task 7-Contractor’s Miscellaneous Requirements:
6.7.1 Contractor will provide web-based tracking software and training as required, to each DISA site to allow the
Government real-time online access to media retention information and to be able to process personnel access changes, changes in media retention and disaster recovery updates.
6.7.2 The Contractor must have a backup storage facility of their own in compliance with the above listed requirements and the Contractor shall have a Disaster Recovery Plan for their facility. A copy of this plan will be provided to the Government along with any relevant updates during the life of the contract.
6.8 Task 8-Contractor’s Transition Plan: Transition service includes the planning, support necessary to move stored tapes, transportation and supporting documentation. The local DISA storage teams will administratively facilitate the transfer, but the contractor is responsible for the actual relocation of stored tapes. The contractor will provide a written transition plan with their proposal. Contract transition will be completed within 60 days of award.
6.8.1 The Contractor shall be responsible for preparing a transition plan that demonstrates a non-disruptive strategy of how the workload shall be obtained from the current Contractor. If the workload is transitioned to another contract provider, it may first be recalled back to the originating DISA facility or directly transferred to the new contract facility. The workload transition will be coordinated between the current contractor, the new contractor and the Government to maintain the chain of custody.
6.8.2 If the contracted service is transitioned to another facility or contract provider – or the current contract is terminated, the current contract provider shall provide all support necessary to move all the stored tapes back to a
DISA facility or the new contract facility. The Contractor shall be responsible for the safety and security of all
Government equipment and materials until officially transferred, in writing with a full inventory listing, to the
Government or to the follow-on Contractor. The implementation of the transition strategy will begin immediately upon award of the contract.
6.9 Task 9- Cyber Threat Security Plan
a) Handling of Non-Public Information
In performance of this contract, the contractor may have access to Department of Defense (DoD) information. The contractor agrees (a) to use and protect such information from unauthorized disclosure IAW DoD Instruction
8582.01: Security of Unclassified DoD Information on Non-DoD Information Systems; (b) to use and disclose such information only for the purpose of performing this contract and to not use or disclose such information for any personal or commercial purpose; (c) to comply with other current Federal and DoD information protection and reporting requirements for specified categories of information (e.g., medical, proprietary, critical program information (CPI), personally identifiable information, export controlled); (d) to obtain permission of the
Government Requiring Activity before disclosing/discussing such information with a third party; (e) to return and
/or electronically purge, upon Government request, any DoD information no longer required for contractor performance; and (f) to advise the Contracting Officer and/or Contracting Officer’s Representative of any unauthorized release of such information.
b) Cyber Threat Security Plan
In conjunction with the Defense Federal Acquisition Regulation Supplement (DFARS) Subpart 204.73, Safeguarding Unclassified Controlled Technical Information, DFARS Clause 252.204-7012, Safeguarding unclassified controlled technical information, and DoD, DISA, NIST, and other Federal mandated regulations, instructions, procedures, and laws, the contractor shall develop, submit, and implement upon approval a Cyber
Threat Security Plan (plan).
The contractor shall submit the plan 30 days after contract award to the Contracting Officer and COR for acceptance. The Contracting Officer and COR have 10 working days to provide an acceptance or feedback to the contractor. If no written acceptance is received within the 10 working days, then the contractor can consider the plan accepted. If the contractor receives feedback within the 10 working days, then the contractor has 10 working days to provide the Contracting Officer and COR an updated plan based on comments provided by the Government.
This plan shall be consistent with and further detail the approach contained in the contractor’s proposal that resulted in the award of this contract and in compliance with the requirements stated in the clause mentioned under this task.
This plan shall describe the processes and procedures that will be followed to ensure appropriate security of IT resources that are developed, processed, or used under this contract. This plan shall contain the following:
(a) Vulnerability Management: evaluate network components, security procedures, and processes for potential exploitation from attack.
(b) Cyber Threat Intelligence: provide policy enforcement and end-point protection against unwarranted attacks on the network.
(c) Analytics Monitoring: provide scalable analytics solution capable of combining potential risk indicators and developing leads.
(d) Mitigation and Response: provide the process on how the threat will be mitigated and responded to upon discovery.
(e) Lessons Learned and Action Plan: provide lessons learned and an action plan that will help all interested parties avoid repeated and similar attacks.
(f) Subcontractors: explain how your subcontractors will be required to implement this requirement within their processes in support of this task.
Annually, anniversary date of acceptance of the plan, the contractor shall submit verification to the Contracting Officer and COR that the plan remains valid.
c) Contractor Furnished Equipment
There will be no Contractor Furnished Equipment (CFE) employed for remote access to a Government network
7. Performance Standards.
7.1 The Government will periodically evaluate the Contractor’s performance in accordance with the Quality
Assurance Surveillance Plan (QASP). The purpose of the QASP is to ensure reliable, uninterrupted services are provided in accordance with the SOW. The plan ensures an acceptable performance level with a minimum of unnecessary complaints. The Government’s QASP elements include (1) periodic inspection/random monitoring of the Contractor’s performance and facilities, (2) progress meetings with the Contractor and (3) customer feedback.
7.2 This contract and its associated delivery/task orders are subject to the Federal SCRM policies and regulation including the Defense Federal Acquisition Supplement (DFARS) 252.239-7017 Notice of Supply Chain Risk, DFARS 252.239-7018 Supply Chain Risk, DoD Instruction 5200.44 Protection of Mission Critical Functions to
Achieve Trusted Systems and Networks, Section 806 of the FY2011 NDAA Requirements for Information Relating to Supply Chain Risk, and internal DISA SCRM Processes and Procedures.
The contractor shall submit a SCRM plan as part of its technical proposal that describes how the contractor will reduce and mitigate Supply Chain Risk using the security controls outlined below (further described in CNSSI
1253, Appendix D and NIST SP 800-53), as applicable to your contract.
Control
Number
HW SW Srvc
SA-12 Supply Chain Protection x x x
SA-12(1) Supply Chain Protection / Acquisition Strategies / Tools / Methods x x x*
SA-12(2) Supply Chain Protection / Supplier Reviews x x x*
SA-12(5) Supply Chain Protection / Limitation of Harm x x x*
SA-12 (7) Supply Chain Protection Assessments Prior to Selection / Acceptance/ Update x x x*
SA-12 (8) Supply Chain Protection / Use of All-Source Intelligence x x x*
SA-12 (9) Supply Chain Protection / Operations Security x x x
SA-12 (10) Supply Chain Protection / Validate as Genuine and Not Altered x x x*
SA-12 (11) Supply Chain Protection / Penetration Testing / Analysis of Elements, Processes, and Actors x x x
SA-12 (12) Supply Chain Protection / Inter-Organizational System Components x x x
SA-12 (13) Supply Chain Protection / Critical Information System Components x x x*
SA-12 (14) Supply Chain Protection / Identity and Traceability x x x*
SA-12 (15) Supply Chain Protection / Process to Address Weaknesses or Deficiencies x x x
IR-4 (10) Incident Handling / Supply Chain Coordination x x x*
IR-6 (3) Supply Chain Protection / Incident Reporting / Coordination With Supply
Chain x x x*
SA-11 Developer Security Testing and Evaluation x x x*
SA-14 Criticality Analysis x x x*
SA-15 Development Process, Standards, and Tools x x x*
SI-7 Software, Firmware, and Information Integrity x x x*
CM-4 Security Impact x x x*
PM-16 Threat Awareness Program x x x
*Not required if there will be no procurement of hardware, firmware, or software systems.
8. Place of Performance. All work shall be performed either at the DISA Sites, Alternate Designated Sites, the
Contractor’s approved storage facilities and in route between authorized primary and alternate transport routes, between the 2 sites. Primary sites are those identified as having a current requirement for the contracted service and are listed in paragraph 3. Primary sites will be transitioned upon award of the contract. As workload dictates, additional sites and accounts can be added to the contract upon request by the Government and acceptance by the
Contractor.
8.1 Contractor’s Facilities. To ensure the viability and compliance of the Contractor’s storage facilities, the
Government may perform inspections and tests in a manner that will not delay the work to be performed by the
Contractor under this contract or any related contract. The Contractor shall provide access to DISA Site personnel for compliance verification. The access will be coordinated with the facility prior to the visit. Deficiencies will be provided in written form to the Contractor for resolution. The Contracting Officer may require the Contractor to correct or repair facilities or work that is defective or does not conform to contract requirements. Unacceptable performance will be recorded and the Contractor shall be required to correct the unacceptable condition within a 48-hour time period. This includes making rapid repairs to ensure safe work conditions and facility security. Written verification shall be provided by the Contractor to the Contracting Officer when remedial action has been completed. If the Contractor does not correct the unacceptable condition within 48 hours, the COR will notify the
Contracting Officer who will take appropriate administrative action for unacceptable performance.
8.1.1 Location: The Contractor’s facility must be removed from high-risk areas including flood plains, earthquake fault zones, and know landslide or mudslide geographical hazards. The off-site facility must be a sufficient distance from the primary (DISA ) site to significantly reduce the likelihood of a single catastrophic event or terrorist attack affecting both sites. The prevailing standard within the Disaster Recovery industry is a minimum of 25 miles between sites. The 25-mile standard is endorsed by DISA as minimally acceptable, but it is recommended that each site review the potential for a regional disaster (i.e., hurricane, flood, earthquake, etc.) to determine if the 25-mile minimum is a sufficient distance from the primary processing site to safeguard critical backup resources. Waivers to the minimum distance requirements will be considered on a case-by-case basis when advantageous to the
Government.
8.1.2 Contractor’s Storage Space Requirements: The Contractor will provide dedicated storage space to store closed containers and open container/slotted storage for tapes. Contractor may be required to accommodate long-term storage of specific media that needs to remain in the Contractor’s storage facility for an extended period. The
Contractor shall be responsible for identifying any media with an expired retention date, pulling that media out of the rotation, and returning it to the responsible DISA Site. The DISA Sites may provide the following types of media:
a) 3480/3490 cartridge tapes (mainframe storage)
b) 9840/9940/3590 cartridge tapes
c) 4mm and 8mm cartridges
d) Digital Linear Tape (DLT), Super Digital Linear Tape (SDLT), Linear Tape-Open (LTO) cartridge tapes
8.1.3 Environmental Controls: The Contractor shall maintain temperature and humidity levels to maintain and preserve the integrity of the media/data contained within the designated storage area of the Contractor’s facility.
Temperature must be maintained between 60 and 70 degrees Fahrenheit. Humidity must be maintained between 35 and 45 percent. Temperature and humidity levels must be continually monitored to detect variances from these standards. The Contractor’s facility must be capable of being restored to stated environmental levels within 8 hours of any alternate site storage facility environmental failure.
8.1.4 Fire Suppression and General Maintenance: The Contractor’s facility shall be equipped with professionally guarded or off-site, central station monitoring systems for (1) fire alarm and suppression system; (2) environmental system with controls located in the storage floor space area, including an air filtration system; (3) back-up power source to guarantee emergency lighting during a power failure.
8.1.5 Security Provisions: The Contractor’s facility shall be equipped with a professionally guarded or off-site, central station security monitoring system including independent security in the designated storage area.
Contractor’s facility must be guarded by an Intrusion Detection System (IDS) and electronic access controls. The
Contractor’s facilities shall be accessible at least once per month for an unannounced security audit of vaults and storage areas by DISA Site Security Division Personnel. DOD 5220.22-M (NISPOM) addresses provisions for security inspection without advance notice. The Contractor, at the Contractor’s expense, shall correct any noted deficiencies and provided written verification to the Contracting Officer. Complete records of all security inspections performed by the Contractor shall be maintained and made available to the Government upon request during contract performance and for as long as the contract requires.
9. Period of Performance. The period of performance is 01 October 2016 - 30 September 2017, plus four (4) one-year option periods. As requested by the COR, the Contractor shall continue performance during emergency or mission essential conditions.
10. Deliverable/Delivery Schedule.
SOW
Task#
Deliverable
Title
Format Due Date Distribution/
Copies
Frequency and Remarks
Task 1 Pick up and deliver outgoing and
DISA Sites will provide their schedule
Frequency is set by each
DISA Site incoming media and containers
Task 1 Unscheduled
Recall of
Media
As requested by the DISA Site for
Disaster Recovery
DISA Site POCs Infrequent, within 8 hrs of notification
Task 1 Emergency
Recall of
Media
As requested by the DISA Site for
Disaster Recovery
DISA Site POCs Infrequent, within 4 hrs of notification
Task 3 Daily
Discrepancy
Report
Contractor-
Determined Format
Daily DISA Site POCs Daily–as discrepancies are noted
Task 3 Monthly
Report
Contractor-
Determined Format
Monthly DISA Site POCs By 10th work day of following month
Task 4 Recovery
Testing
As requested by the DISA Site for
Recovery Testing
DISA Site POCs Infrequent, As requested by DISA
Task 5 Certificate of
Insurance
Commercial Format 30 days following award
KO Initial and when updated
Task 5 POC Listing Contractor-
Determined Format
10 days following award
DISA Site POCs and COR
Initial and when updated
Task 6 Monthly
Invoice
Contractor-
Determined Format incorporating requirements of 6.13
Monthly COR By 10th work day of following month
Task 7 Provide software and training
10 days following award
DISA Site POCs Coordinate with Site
Security
Managers and IA program
Manager
Task 7 Disaster
Recovery
Plan
30 days after contract award
Copy to KO and
COR
Initial and when updated
Task 8 Transition
Plan
60 days after
Copy to KO and
COR
Initial and when updated
Task 9 Cyber Threat
Security Plan
Contractor-
Determined Format incorporating requirements of 6.9
30 days after
Copy to KO and
COR
Initial and
Annual
Para
7.2
Supply Chain
Risk
Management
Plan Update
Within 5 business days whenever there is a change that affects one or more security
Copy to Program
Manager and COR
Initial and when updated controls as described in the
Committee on
National Security
Systems
Instructions
(CNSSI) 1253
Appendix D
(companion publication to
National Institute of Standards. At a minimum, the following events substantiate the need for an update:
changes in company ownership, changes in senior company leadership, supplier changes, subcontractor changes, and ICT supply chain compromises.
11. Security Requirements: The work supporting this contract will be up to and including the Secret Level.
Security Requirements: This section shall be considered a supplement to block 13 of the Government provided DD
254, Contract Classification Specification.
References:
a. DOD 5200.2-R, DOD Personnel Security Program.
b. DISAI 240-110-36, Personnel Security.
c. DOD 5220.22-M, National Industrial Security Program Operating Manual.
d. DOD 5220.22-R, Industrial Security Regulation.
e. DISA Computing Services Directorate (CSD) Security Handbook.
f. DODM 5200.01, Information Security Program, 24 February 2012
11.1 Facility Security Clearance. The work to be performed under this contract is up to the Secret level. Therefore, the company must have a final Secret Facility Clearance (FCL) from the Defense Security Service (DSS) Facility
Clearance Branch (FCB).
11.2 Security Clearance and Information Technology (IT) Level. All personnel performing on this contract will be U.S. citizens. There are two levels of personnel security requirements under this contract covering two types of positions:
11.2.1 Secret Security Clearance. The following Courier/Driver position requires a minimum of interim Secret security clearance when contract performance starts. Immediately upon hire, the incumbents will require unescorted building/area access with no IT access to DISA systems. The work to be performed under the classified portion of this contract requires access to government facilities and/or access to containerized classified government tape media.
- Courier/Driver, Classified Unclassified Access and a Position of Trust. The following Courier/Driver position requires a minimum of a favorably completed Position of Trust when performance starts. Immediately upon hire, the incumbents will require escorted building/area access with no IT access to DISA systems. The work to be performed under the unclassified portion of this contract requires access to government facilities and/or have access to containerized unclassified government tape media.
- Courier/Driver, Unclassified
11.3 Investigation Requirements.
11.3.1 All personnel requiring Secret under this contract must undergo a favorably adjudicated National Agency Check, Local Agency Check and Credit Check (NACLC) as a minimum investigation. The NACLC will be maintained current within 10-years and requests for Secret Periodic Reviews (SPRs) will be initiated prior to the 10-year anniversary date of the previous NACLC or SPR.
11.4 Adjudication for IT access. There is no IT access to DISA systems for this contract effort.
11.5 Interim IT access.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .