HB SON LED Lights.pdf

PDF 141 KB Posted

Attached to
HB LED Light Fixtures Federal contract opportunity
Solicitation number
NM-AN2140-23-01418
Issued by
Department of Commerce National Oceanic and Atmospheric Administration

About this file

This document outlines requirements for a federal procurement of LED lighting fixtures for the NOAA Ship Henry B. Bigelow. The procurement requires Phoenix Lighting brand LED marine fixtures in three models, with quantities of 10 each for the 2-foot and 4-foot models, and 20 of the 4-foot model with emergency battery backup. Delivery is required no later than 8 weeks after order receipt to the ship's address in Newport, RI. Invoices should be sent to the ship's executive officer. The contracting officer is solely authorized to make any changes to the contract requirements. The related federal contract opportunity is solicitation number NM-AN2140-23-01418 for the procurement of LED light fixtures from the Department of Commerce National Oceanic and Atmospheric Administration.

View the file

Other files for this federal contract opportunity

Other files attached to HB LED Light Fixtures, newest first.
File Type Posted
JOFOC_HB LED Lights.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Need: LED Lights

1. Purpose and Scope

Henry Bigelow requires the procurement of LED lighting fixtures to replace fluorescent lights currently in use throughout the passageways, staterooms and working areas throughout the ship. LED lights are energy efficient and reliable alternatives to fluorescent lighting originally installed aboard the vessel. The LED lighting fixtures MUST be Phoenix Lighting brand to ensure compatibility with existing systems, improve interchangeability, and reduce the number of spares required. Furthermore the listed lights are compliant with the following standards: UL 1598 Suitable for Wet Locations, UL 1598C LED Retrofit Conversion (retrofit kits only), CSA C22.2 No. 250.0-08, UL 1598A Marine Outside Type (Saltwater), UL 924 Emergency Lighting Equipment, ABS, IP65, CE.

Additionally, U.S. Coast Guard Safety Alert 13-18 (attached) notified mariners that certain LED light fixtures cause interference with VHF radio and AIS Reception leading to nontrivial safety concerns. The Safety Alert does not provide a standard for LED lighting that would guarantee noninterference, but describes a trial and error methodology for testing lighting systems and their interference potential. Henry Bigelow has not had any radio interference upon the installation of Phoenix lights. It is currently unclear which brands/makes/models of lights cause interference, so purchase of any other brand of lights would introduce a risk that the lights would interfere with radio communications, rendering them unusable aboard.

Due to this vendors must be authorized reseller for Phoenix products and lead time must be less than 8 weeks.

2. Requirements

Henry Bigelow requires the following lights:

Part Number

Manufacturer Model Description Quantity

010400.101 PHOENIX

LIGHTING RLED-4

LED MARINE FIXTURE

(READILED SERIES), 4 FOOT,

120V-277VAC, 2 X 19 WATT SMD

ARRAYS, VAPOR TIGHT

010200.100 PHOENIX

LIGHTING RLED-2

LED MARINE FIXTURE

(READILED SERIES), 2 FOOT,

120V-277VAC, 2 X 9.5 WATT SMD

ARRAYS, VAPOR TIGHT

010400.112 PHOENIX

LIGHTING

RLED-

4-EMB2

LED MARINE FIXTURE

(READILED SERIES), 4 FOOT,

120V-277VAC, 2 X 19 WATT SMD

ARRAYS, VAPOR TIGHT with

EMERGENCY BATTERY BACKUP

3. Delivery Schedule

Request delivery of all components no later than 8 weeks after receipt of order.

4. Delivery Address

NOAA Ship Henry B. Bigelow c/o Chief Engineer 47 Chandler Street NOAA Ship Henry Bigelow Newport, RI 02871

5. Payment

Send all invoices to the following: XO.Henry.Bigelow@noaa.gov

NOAA Ship Henry B. Bigelow 47 Chandler Street, Pier 2 Newport, RI 02841

6. Contracting Officer

The Contracting Officer is the sole person authorized to make or approve any changes in any of the requirements of this contract and notwithstanding any provisions contained elsewhere in this contract, the said authority remains solely with the Contracting Officer.

In the event the Contractor makes any changes at the direction of any person other than the Contracting Officer, the change will be considered to have been made without authority and no adjustment will be made in the contract terms and conditions, including price.

mailto:XO.Henry.Bigelow@noaa.gov

File details come from the government source that posted it. Updated .