H9224022Q2031_QnAs.pdf

PDF 97 KB Posted

Attached to
IT Infrastructure Enhancement Federal contract opportunity
Solicitation number
H92240-22-Q-2031
Issued by
United States Special Operations Command

About this file

This document contains questions and answers related to solicitation H92240-22-Q-2031 for IT infrastructure enhancement work at Naval Special Warfare Group Two facilities. The scope of work includes conducting a technical refresh and standardization of four intermediate distribution frame locations, providing solutions to address physical security, TEMPEST requirements, and operational readiness issues. The contractor will be responsible for relocating and removing fiber and network cables, including unterminated cables, as well as any equipment and racks. Limited after-hours work may be approved on a case-by-case basis. The government estimates the work should be completed within three to six months but the contractor will be responsible for proposing a timeline. Existing fiber can be reused if in good working condition and of sufficient length.

View the file

Other files for this federal contract opportunity

Other files attached to IT Infrastructure Enhancement, newest first.
File Type Posted
H9224022Q2031 Combined Synopsis_Solicitation_Amd2.docx DOCX document
H9224022Q2031 Combined Synopsis_Solicitation_Amd1.docx DOCX document
Attachment I - Performance Work Statement.pdf PDF
Attachment II - DD254.pdf PDF
H9224022Q2031 Combined Synopsis_Solicitation.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question under Solicitation H92240-22-Q-2031 Government Response 1 Will work be allowed after hours and/or on the weekend(s) to help mitigate interruptions? Yes, On limited basis 2 Will the contractor be responsible for relocating Network Fiber Cable? Yes 3 Is the current equipment that needs to be removed part of the Statement of Work? Yes 4 Are there GFE Racks for the separation of Networks? Yes 5 Is there a GFE wall rack for the separation of the BICES Network? No 6 Is this Statement of Work currently funded? Yes

Will the contractor be responsible for removing ‘rouge’ unterminated cables that may or may not be associated with the Four IT Rooms? Yes

8 Will the contractor have access to Node 19, if needed? Yes, with supervision 9 Will the pipes carrying wiring be removed by government if they interrupt installation of cabinet? The Government will take care of removal if need be.

Is there a preferred time to do the work (eg non-working hours)? Normal working hours not to interfere with work in progress. Limited After Hours work can be planed on a case by case basis.

Is there a preferred time line for completion? Contractor will be responsible for quoting completion time. The Government does not expect work to exceed 3-6 Months to include submission and approval of drawings.

Can existing fiber be used if properly functioning?

Yes, however some of the fiber will need to be re-ran because of change in length.

When moving cabinets there may not be a large enough service loop for it to be re-used.

H92240-22-Q-2031 Questions & Answers

Q&As

File details come from the government source that posted it. Updated .