Attachment I - Product Description_Rev1.pdf
PDF 22 KB Posted
- Attached to
- Ski Pulk Systems Federal contract opportunity
- Solicitation number
- H92240-21-Q-2022
- Issued by
- United States Special Operations Command
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Combined Synopsis - Ski Pulk Systems_2 June2021.docx | DOCX document | |
| Combined Synopsis - Ski Pulk Systems_4May2021.docx | DOCX document | |
| Questions and Answers_4May21.pdf | ||
| Combined Synopsis - Ski Pulk Systems.docx | DOCX document | |
| Attachment II - Pricing Spreadsheet.xlsx | XLSX spreadsheet | |
| Attachment I - Product Description.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRODUCT DESCRIPTION
Naval Special Warfare Group TWO (NSWG2)
Ski Pulk System
1. BACKGROUND
1.1. Naval Special Warfare Group TWO has a requirement for ski pulk systems capable of securely hauling equipment and supplies over snow into a remote area.
2. OBJECTIVE
2.1. To establish a source of supply for Search and Rescue and Individual Ski Pulks to be utilized by Naval Special
Warfare operators to haul combat equipment and supplies in a winter warfare environment.
3. DESCRIPTION OF REQUIREMENT
3.1. Product Name: Ski Pulk System
3.2. Description and Capabilities: Pulk systems capable of hauling combat equipment and supplies while skiing, snowshoeing, or hiking in snow-covered terrain.
3.3. Specifications/Salient Characteristics:
3.3.1. Ski Pulk body shall:
3.3.1.1. Be impact-resistant for artic environments
3.3.1.2. Be weather-resistant
3.3.1.3. Have foam padding on the interior for protection/isolation
3.3.1.4. Have heavy-duty lift handles
3.3.1.5. Have a stern ski pole push plate
3.3.1.6. Have load-securing strap systems both internal and external to the pulk cover
3.3.2. Runner system shall be:
3.3.2.1. Low-friction
3.3.2.2. Made of exchangeable parts for repair in field
3.3.2.3. Corrosion-resistant
3.3.2.4. Engineered to prevent water incursion to the body of the pulk.
3.3.3. Pulk cover shall be:
3.3.3.1. Water-resistant
3.3.3.2. Oil-resistant
3.3.3.3. Dirt-resistant
3.3.3.4. Tear-resistant for artic environments
3.3.3.5. White in color
3.3.3.6. Engineered to open and close with a zipper
3.3.3.7. Engineered to have zipped side pockets on outside of cover
3.3.4. Pulk pulling system shall include (at a minimum):
3.3.4.1. Quick-release harness
3.3.4.2. Dragging bar:
3.3.4.2.1. Shall be corrosion-resistant
3.3.4.2.2. Shall have quick-release system
3.3.4.3. Brake rope
3.3.4.4. Additional rope system for ascent/descent of steep/vertical surfaces
3.3.5. All pulk hardware (rivets, screws, etc) shall be:
3.3.5.1. Corrosion-resistant
3.3.5.2. Hardened
3.3.5.3. Engineered to provide safety measures preventing unintended loosening
3.3.6. Pulk shall come in the following dimensions:
3.3.6.1. Individual Pulk
3.3.6.1.1. Minimum acceptable dimensions: 116 cm (L) X 55cm (W)
3.3.6.1.2. Minimum acceptable volume: 180L
3.3.6.2. Search and Rescue Pulk:
3.3.6.2.1. Minimum acceptable dimensions: 170cm (L) X 55cm (W)
3.3.6.2.2. Minimum acceptable volume: 600L
3.4. Quantity: The ski pulk systems shall include -
DESCRIPTION U/I BASE QTY OPTION 1
Search and Rescue Pulk EA 5 5 Individual Pulk EA 10 10
4. DELIVERY INFORMATION
4.1. Required delivery date:
4.1.1. Base: 30 June 2021
4.1.2. Option 1: NLT 30 September 2022
4.2. Delivery POC Name: TBD
4.3. Delivery address:
Virginia Beach, VA 23459
4.4. Special instructions: N/A
5. SECURITY
5.1. N/A
6. QUALITY ASSURANCE
6.1. The Government reserves the right to perform inspections and surveillance to evaluate the Contractor’s compliance to the contract terms to include proper delivery of quantity and type of goods. The Government will make every effort to ensure that the surveillance methods used are conducted in an objective, fair, and consistent manner.
File details come from the government source that posted it. Updated .