PWS_Ranges_RFI.docx

DOCX document 411 KB Posted

Attached to
Ranges Telecommunications Federal contract opportunity
Solicitation number
H92240-17-T-0002
Issued by
United States Special Operations Command

About this file

Performance Work Statement (PWS) resubmittal due to previous technical issues in upload.

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Statement (PWS) Draft Naval Special Warfare Center Naval Special Warfare Ranges Telecommunications

1. BACKGROUND

1.1 This requirement is for high-speed, dedicated internet services with T1 and T3 circuits for Naval Special Warfare (NSW) Ranges to include La Posta, Camp Morena, Camp Billy Machen-Niland, San Clemente Island NSW Network (supports MAROPS, BUD/S, SBT12), and Naval Amphibious Base Coronado.

1.2 Annual recurring service is required to maintain this connectivity. This includes uninterrupted (24x7) network monitoring, enhanced network security features, and maintenance of the communications link between the locations identified in paragraph 3.1 and the internet network.

2. OBJECTIVES

2.1 The wide area network will be available without service interruption for use by NSW personnel to complete mission requirements. The network shall be provided via switched and dedicated connection, providing network connectivity back to NSWC HQ at Naval Amphibious Base, Coronado.

2.2 Locations identified in paragraph 3.1 require port speeds of at least 3 Mbps or higher to maintain daily operational requirements.

2.3 The Contractor shall provide full equipment and service components for the basic network backbone, including

2.3.1 Channel Service Unit/Data Service Unit – The vendor shall provide the digital interface device (Pargain Modems) to connect to the client’s router.

2.3.2 Diagnostic Modem – The Contractor shall utilize and mange a diagnostic modem to isolate, correct, and provide feedback on connectivity to NSW.

2.3.3 Network Access Facility – The Contractor shall provide a point of presence (POP) or access “loop” accept originating digital traffic and deliver terminating long distance traffic. The network facility arrangement will be via dedicated access consisting of private line service between the NSW locations and the nearest POP.

2.3.4 The Contractor shall allow for high-bandwidth aggregation via a T3 circuit at Naval Amphibious Base Coronado. The anticipated process by which the high bandwidth concentration are processed via multiple geographical areas as identified in paragraph 3.1 and Exhibit 1

2.3.5 Contractor shall ensure, in accordance with paragraph 9, all necessary security protocals, data safeguards, and safety procedures including automatic fire suppression and protection, router environmental tolerances, and power guidelines.

2.3.6 Contractor shall establish appropriate administrative, technical, and physical safeguards to protect any and all nonpublic Government data to ensure the confidentiality, integrity, and availability of Government data. Clearance not required for vendor access. Vendor personnel will require NSW escorts to all on base areas.

2.3.7 The Contractor shall provide continuity of service from existing service with zero break in service. Under no circumstance can there be a break in service to listed locations.

3. SCOPE

3.1 Contractor shall provide Network Services in the quantities, specifications, and locations as identified in the table below and Exhibit 1:

Name
Service
Bandwidth
Port
NAB, CA
MISBASIC
T3(10MB)
IPS PORT, T3, MRC
La Posta, CA
MISBASIC
T1X2
IPS PORT, FT3 (2XDS1), MRC
Morena, CA
MISBASIC
T1X2
IPS PORT, FT3(2XDS1), MRC
CBM Niland, CA
MISBASIC
T1X2
IPS PORT, FT3 (2XDS1), MRC
San Clemente Island, CA
MISBASIC
T1X4
IPS PORT, (4XDS1), MRC

Exhibit 1

4. CONTRACTOR MANPOWER REPORTING

4.1 The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the Naval Special Warfare Center via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address: http://www.ecmra.mil/. Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year, beginning with 2013. Contractors may direct questions to the help desk at help desk at: http://www.ecmra.mil .

5. GOVERNMENT RESOURCES

6.1 The CISCO virtual private network (VPN) solution is in place at each Range and at the headquarters to tunnel information directly back into the NSW network enclave. The VPN enables us to remotely trouble-shoot systems and secures our data while riding commercial land lines.

6. PLACE OF PERFORMANCE

6.1 Telecommunication services will be provided at the following areas: Naval Amphibious Base Coronado, CA, La Posta, CA, Morena, CA, Niland, CA, and San Clemente Island, CA.

6.2 In the event that vendor access to the base is required, the contractor shall coordinate with the COR prior to each visitation. The contractor shall ensure, at the minimum, that the following information is provided on all visit certifications to ensure accuracy:

6.2.1 The point of contact and phone number of the person visited to establish need-to-know. (NOTE: Point of contact cannot be a Security Manager or SSO).

6.2.2 Duration of visit

6.2.3 Purpose of visit

6.2.4 Provide one form of ID which will be exchanged for an Visitor’s Badge.

6.2.5 Vendor Technician will be escorted at all time while on base permises.

7. PERIOD OF PERFORMANCE

8.1 Base Period will be 12 months from date of award.

8.2 Contract shall include four twelve-month option periods.

8. REFERENCES

(a) DoDI 4640.14p DoD Unified Capabilities (UC)

(b) DoD Directive 8000.1, "Management of DoD Information Resources and Information Technology," February 27, 2002 through (ah), see enclosure 1

(c) DoDI 8500.2Information Assurance (IA) Implementation, 6 February 2003
(d) DoDI 8100.04Department of Defense (DoD) Unified Capabilities (UC), 9 December 2010

(e) National Security Telecommunications and Information Systems, Security Instruction (NSTISSI) No. 4009, "National Information, Systems Security Glossary," September 2000 1

(f) CJCSI 6211.02D Defense Information Systems Network (DISN): Responsibilities, 24 January 2012 image1.png

File details come from the government source that posted it. Updated .