Attachment_I_-_Product_Description_-_HPI_Flooring_-_Rev1.docx
DOCX document 30 KB Posted
- Attached to
- HPI FLOORING (GYMNASIUM) Federal contract opportunity
- Solicitation number
- H92240-17-Q-2045
- Issued by
- United States Special Operations Command
About this file
UPDATED PRODUCT DESCRIPTION (PWS)
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| images_for_reference_to_grp10_flooring_contract.pdf | ||
| SRT_Two_Logo.jpg | JPG image | |
| Attachment_I_-_Product_Description_-_HPI_Flooring.docx | DOCX document | |
| Combined_Synopsis_Solicitation_Supplies.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Product Description Naval Special Warfare Command Human Performance Program (HPP) Facility Flooring System
1.0 OBJECTIVE:
The objective of this requirement is to replace the current floor within the NSWG-10 HPP facility with a flooring system that can withstand the repeated, high impact activities performed through various fitness programs.
It should be designed to reduce injuries, particularly when performing explosive movements. The flooring system will also withstand the environmental conditions of the facility to include high humidity. Naval Special Warfare Group TEN (NSWG-10) is located at Joint Expeditionary Base Little Creek Fort Story in Virginia Beach, VA.
2.0 BACKGROUND:
NSWG-10 requires specialized high performance facilities and equipment to test, train, and educate personnel in various physical fitness activities. This supports the SOCOM requirement to enhance and maintain operational performance and longevity of the Special Operations Force (SOF). This flooring system will replace the worn out and unsafe flooring currently installed in the NSWG-10 HPP facility.
3.0 DESCRIPTION OF REQUIREMENT:
PLAE Achieve 18mm Flooring System, Brand Name or Equal
3.1 General physical description to include capabilities:
3.1.1 Rolled flooring system designed for athletic training facilities with a smooth, near-seamless surface and a texturized non-slip finish. Should resist sagging and deformation by direct, blunt impact. Must be low maintenance, with a usage period of at least 10 years (Mfr warranty).
3.2 Specifications and characteristics:
· Material: EPDM rubber or similar
· Roll width: minimum 4’
· Roll length: minimum 25’
· Thickness: minimum 18mm
· Platforms: should install flush with surrounding flooring
· Shock absorption: 30% absorption
· Vertical deformation: minimum 2.00mm (ASTM F2157 Standard)
· Static load limit: minimum 400lbs/in2 (ASTM F970 Standard)
· Warranty: minimum 10 year warranty based on normal wear and usage
3.3 Quantities:
| Manufacturer Part Name |
| Description |
| U/I |
| QTY |
| UNIT PRICE |
| EXT PRICE |
| PLAE Achieve 18mm Flooring System, Brand Name or Equal |
| Rolled gym flooring mat; gray in color |
| EA |
| 3,000sf |
| $ |
| $ |
| Olympic platform with logo |
| 4’ x 6’ platform inlay with drop zone extension, dark blue in color with NSWG-10 command logo |
| EA |
| 7 |
| $ |
| $ |
| ‘OPERATIONAL READINESS’ logo |
| 40’ x 2 ¼’ motivational phrase inlayed in flooring |
| EA |
| 1 |
| $ |
| $ |
| Ladder inlays |
| Speed and agility ladder inlays, 16’ with six boxes in each ladder |
| EA |
| 4 |
| $ |
| $ |
| Installation materials |
| Tape, liquid adhesive, anchors for installing flooring system |
| EA |
| 1 |
| $ |
| $ |
4.0 DELIVERY INFORMATION
4.1 Required delivery date: Contractor shall provide a time-frame for completion.
4.2 Delivery address: 1600 Seabee Dr., Bldg 3889, Virginia Beach, VA 23459
4.3 The CONTRACTOR is responsible for the removal and disposal of the current flooring.
4.3.1 It has been approved by the Government for vendors to bring a disposal container, to be staged at the back of the building.
4.3.2 Initial access to the building will be from the Quarterdeck.
4.3.3 Vendors shall utilize the back doors of the building as required for entry and exit.
5.0 SECURITY: Due to the site being security restricted, the contractor will make every effort to build, assemble, and program equipment off-site before it is delivered to minimize the time needed at the USG facility. While at the facility the contractor will need to be escorted at all times.
5.1 Contractor shall establish appropriate administrative, technical, and physical safeguards to protect any and all nonpublic Government data to ensure the confidentiality, integrity, and availability of Government data.
5.2 Contractor must be able to obtain personnel and vehicle access to military installations. Contractor is responsible for coordinating all necessary access through the local Military Pass and Decal Office.
5.3 Working hours shall be from 0800-1600 Monday-Friday.
6.0 QUALITY ASSURANCE: The Government reserves the right to perform inspections and surveillance to evaluate the Contractor’s compliance to the contract terms to include proper delivery of quantity and type of goods. The Government will make every effort to ensure that the surveillance methods used are conducted in an objective, fair, and consistent manner.
7.0 ENCLOSURES:
1. SRT LOGO
2. EXAMPLES OF “OPERATIONAL COMMITMENT”
Ver: Oct 2014
Ver: May 2013
File details come from the government source that posted it. Updated .