Hi_Velocity_AHU_Sol_GSA-EQ7PSEH-17-0015.pdf

PDF 1 MB Posted

Attached to
High Velocity Air Handler Units Design Build, Houston, TX Federal contract opportunity
Solicitation number
GSA-EQ7PSEH-17-0015
Issued by
General Services Administration Public Buildings Service

About this file

High Velocity Air Handler Unit Solicitation

View the file

Other files for this federal contract opportunity

Other files attached to High Velocity Air Handler Units Design Build, Houston, TX, newest first.
File Type Posted
Amendment_07_Hi_Velocity_AHU.pdf PDF
Amendment_06_Hi_Velocity_AHU.pdf PDF
Amendment_05_Hi_Velocity_AHU.pdf PDF
Amendment_04_Hi_Velocity_AHU.pdf PDF
Amendment_03_Hi_Velocity_AHU.pdf PDF
TX0211_2008_ACM_Reinspection_Report.pdf PDF
Amendment_02_Hi_Velocity_AHU.pdf PDF
Amendment_01_Hi_Velocity_AHU.pdf PDF
Minutes_for_Site_Visit_for_High_Velocity_AHU_project_@_Bob_Casey.pdf PDF
Sign-In_Sheet_for_Site_Visit__High_Velocity_AHU_project.pdf PDF
C301_GC_Reps_&_Certs.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U.S. General Services Administration, Public Buildings Service, Acquisition Management Services Division, Non-Prospectus Projects Branch (7PQC) Greater Southwest Region 07

SOLICITATION DOCUMENTS

SOLICITATION NO.: GSA-EQ7PSEH-17-0015

PROJECT: Design Build Project for High Velocity Air Handler Units Bob Casey Federal Building Houston, Texas

ISSUE DATE: May 23, 2017

Site Visit: Wednesday, June 14, 2017 @ 10:30 AM CST

PROPOSAL DUE: July 17, 2017 Original offer and two (2) copies to perform the work required are due at the place specified in Section I.H by 4:00 PM Central Standard Time

U.S. General Services Administration These documents are the property of the United States government. Copying, dissemination, or distribution of these Drawings, Plans, or specifications to unauthorized persons is prohibited.

Distribution to those with other than a need to know is strictly prohibited.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

GSAEQ7PSEH170015

2. TYPE OF SOLICITATION

SEALED BID (IFB)

✓ NEGOTIATED (RFP)

3. DATE ISSUED

05/23/2017

PAGE

OF PAGES

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

EQ7PSEH-17-0015

6. PROJECT NO.

Hi Velocity Air Handler Units, Houston, TX

7. ISSUED BY CODE 7PQC 8. ADDRESS OFFER TO

GSA PBS 7PQC

ACQUISITION MANAGEMENT DIV - NON PROSPECTUS

819 TAYLOR ST 12B

FORT WORTH TX 76102

GSA PBS 7PQC

ACQUISITION MANAGEMENT DIV - NON PROSPECTUS

819 TAYLOR ST 12B

FORT WORTH TX 76102

9. FOR INFORMATION

CALL:

a. NAME

Senthia Bruns

b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

817-978-0835 senthia.bruns@gsa.gov

SOLICITATION

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

SEE ATTACHED

11. The contractor shall begin performance within 10 calendar days and complete it within 240 calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable.

(See ).

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES", indicate within how many calendar days after award in Item 12b.)

12b. CALENDAR DAYS

✓ YES NO 15

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and 1 copies to perform the work required are due at the place specified in Item 8 by 4:00 CST (hour) local time 07/17/2017 (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

b. An offer guarantee is, is not required.

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers providing less than 120 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

NSN 7540-01-155-3212 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA - FAR (48 CFR) 53.236-1(d) mailto:senthia.bruns@gsa.gov

AMOUNTS

OFFER (Must be fully completed by offeror)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14.)

CODE FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

21. ITEMS ACCEPTED:

AWARD (To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)

31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA

BY

31c. DATE

STANDARD FORM 1442 (REV. 4-85) BACK

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) ( ) 41 U.S.C. 253(c) ( )

26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BY

SOLICITATION, OFFER, AND AWARD, CONTINUED

High Velocity Air Handler Units Replacement with Design Bob Casey Federal Courthouse

515 Rusk Avenue Houston, TX 77002

ITEM NO. 1

Remove and replace the high velocity air handler units at the Bob Casey Federal Building in Houston, TX.

Part of this project is to provide proper sizing. The work of the project is defined by the contract documents and includes the following; The General Contractor shall provide final and complete architectural and mechanical design drawings and specifications incorporated into complete construction drawings. The architectural design drawings shall be modified to provide design and specification of requirements for modification to existing mechanical system, electrical, walls and ceilings removal and replacement of existing High Velocity Units, painting of finishes. Design shall include all demolition, electrical, mechanical and plumbing requirements.

The contractor will provide all necessary labor, material, supervision and equipment necessary to complete the Statement of Work, dated April 25, 2017. PLEASE PROVIDE A PRICE BREAKDOWN ON

ATTACHED PROPOSAL SHEET.

The delivery date is 240 days after the Full Notice to Proceed.

An organized pre-bid site visit will be conducted on Wednesday, June 14, 2017 at 10:30 AM CST, at the Bob Casey Federal Building, Basement Break Room, B105, located at 515 Rusk Avenue, Houston, TX 77002. Contact GSA Project Manager Duc Le (phone 832-397-8497, cell 281-772-6072), no later than Tuesday, June 13, 2017, 4:00 PM (CST) to confirm attendance. In accordance with FAR Part 28.102-1, Performance and Payment Bonds will be required for award.

If you have any contractual or procedural questions, please contact Senthia Bruns, Contracting Officer, at 817-978-0835 or email senthia.bruns@gsa.gov.

Your proposal is due on Tuesday, July 17, 2017, by 4:00 PM Central Standard Time. If you are submitting a proposal for this project, please complete and return the following via email: SF1442 and any/all signed amendments to:

Email to: senthia.bruns@gsa.gov .

This solicitation and any resultant award is subject to the following, as included herein:

- SF1442 “Solicitation, Offer, Award”

- Statement of Work, dated April 25, 2017

- Solicitation and Agreement GSA-EQ7PSEH-17-0015

- Construction Wage Requirement Decision Number TX170303 dated 4/21/2017

Proposal Form for the Replacement of the High Velocity Air Handler Duct System

Bob Casey Federal Courthouse, Houston, TX Company Name: ________________ Date:_____________

Unit Price Total Price

General Condition $ $ Demo and dispose of existing HV-AHU (6 Units) (recycle) $ $ New Wall Fans AHU (6 Units)- Material $ $ New Wall Fans AHU (6 Units)- Labors $ $ Controls $ $ Air Balance $ $ Piping $ $ Electrical $ $ Asbestos Abatement $ $ Onsite Project Management $ $ Overhead $ $ Profit $ $ Bond $ $

Lump Sum Total $ $

Proposed AHU Manufacturer: _________________

U.S. General Services Administration

Public Buildings Service

Greater Southwest Region

1 SOW v4 04/15/2015

April 25, 2017

Scope of Work

1. Project Title: High Velocity Air Handler Units Replacement with Design

2. Project Location: Bob Casey Federal Courthouse 515 Rusk Avenue Houston, Texas 77002

Building Location Hours: After Hours or Week Ends

3. Purpose: Replace the 50+ year old units which are worn out and inefficient with new high efficiency fan wall units designed for the building size. It is conjectured that the existing units were designed for a building that was to be twice the height but was cut back due to budgetary reasons. There have been no studies or calculations done to confirm this. Part of the design build of this project is to provide proper sizing.

4. Points of Contact:

GSA Contracting Officer Senthia Bruns GSA/Public Buildings Service Non-Prospectus Projects Branch (7PQC) 819 Taylor Street, 12B Fort Worth, Texas 76102-6124 817-978-0835 (office) 817-807-3017 (cell) Senthia.bruns@gsa.gov

Leenette Wilke GSA Building Manager Eastern Service Center 1919 Smith Street, Ste. 1600 Houston, Texas 77002-8049 361-888-3330 (office) 281-228-5613 (fax) 501-766-5469 (cell) Leenette.wilke@gsa.gov

GSA Supervisory Project Manager Small Projects Delivery Branch 2 (7PSP) Region 7, GSA Public Building Services Duc M. Le, PE 1919 Smith Street, Ste. 1600 mailto:Senthia.bruns@gsa.gov mailto:Leenette.wilke@gsa.gov

Greater Southwest Region

2 SOW v4 04/15/2015

Houston, TX 77002-8049 832-397-8497 (office) 713-397-8466 (fax) 281-772-6072 (cell) duc.le@gsa.gov

5. Notice to Proceed:

5.1. Before any of the work within the scope of the contract is started, the Contractor shall confer with the COR (Contracting Officer Representative) and agree on a sequence of procedure; means of access to premises and building; delivery of material and use of approaches; use of corridors, stairways, elevators, and similar means of communications; and the location partitions, eating spaces for spaces for Contractor’s employees and the like.

6. Period of Performance: 240 Days

7. Description of Work: Contractor shall provide all materials, labor, tools, equipment and supervision to accomplish tasks as outlined in contractor documents.

Design and Replace HVU 1, HVU 2, HVU 3, HVU 4, HVU 5, and HVU 6

1. Design: Contractor shall provide all materials, labor, tools, equipment and supervision to accomplish tasks as outlined in contractor documents.

General Architectural Design Requirements: The General Contractor shall provide final and complete architectural and mechanical design drawings and specifications incorporated into complete construction drawings. The architectural design drawings shall be modified to provide design and specification of requirements for modification to existing mechanical system, electrical, walls and ceilings removal and replacement of existing High Velocity Units, painting of finishes. Design shall include all demolition, electrical, mechanical and plumbing requirements. The A/E Contractor shall provide meeting documentation in the form of agenda, minutes, and action items for all meetings in support of this project attended by the a/e firm.

Architectural design, specification, and drawing modification shall be completed by the A/E Contractor. CM&I services will be awarded separately.

2. REFERENCES

AFBMA 9 - Load Ratings and Fatigue Life for Ball Bearings.

• AMCA 99 - Standards Handbook.

• AMCA 210 - Laboratory Methods of Testing Fans for Rating Purposes.

• AMCA 300 - Test Code for Sound Rating Air Moving Devices.

• AMCA 500 - Test Methods for Louver, Dampers, and Shutters.

mailto:duc.le@gsa.gov

Greater Southwest Region

3 SOW v4 04/15/2015

• AHRI 410 - Forced-Circulation Air-Cooling and Air-Heating Coils.

• AHRI 430 - Central-Station Air-Handling Units.

• AHRI 435 - Application of Central-Station Air-Handling Units.

• ASTMB117 - Standard Practice for Operating Salt Spray Apparatus.

• NEMA MG1 - Motors and Generators.

• NFPA 70 - National Electrical Code.

• SMACNA - HVAC Duct Construction Standards - Metal and Flexible.

• UL 723 - Test for Surface Burning Characteristics of Building Materials.

• UL 900 - Test Performance of Air Filter Units.

• UL 1995 - Standard for Heating and Cooling Equipment.

• UL 94 - Test for Flammability of Plastic Materials for Parts in Devices and

Appliances.

• IBC 2000, 2003 - International Building Code.

• NFPA 90A - Standard for the Installation of Air Conditioning and Ventilating

Systems.

• NFPA 5000 - Building Construction and Safety Code.

• ASHRAE 90.1 Energy Code.

• AHRI Standard 1060 - Rating Air-to-Air Heat Exchangers for Energy Recovery

Ventilation Equipment.

• GSA 2003 Facilities Standard - 5.9 HVAC Systems and Components.

SUBMITTALS

• Shop Drawings: Indicate assembly, unit dimensions, weight loading, required clearances, construction details, field connection details, and electrical characteristics and connection requirements. Computer generated fan curves for each air handling unit shall be submitted with specific design operating point noted.

A computer generated psychometric chart shall be submitted for each cooling coil with design points and final operating point clearly noted. Sound data for discharge, radiated and return positions shall be submitted by octave band for each unit.

Calculations for required base rail heights to satisfy condensate trapping requirements of cooling coil shall be included.

• Product Data:

Provide literature that indicates dimensions, weights, capacities, ratings, and fan performance, finishes of materials, electrical characteristics, and connection requirements.

Provide data of filter media, filter performance data, filter assembly, and filter frames.

Provide manufacturer's installation instructions.

Greater Southwest Region

4 SOW v4 04/15/2015

QUALIFICATIONS

• Manufacturer: Company specializing in manufacturing Air Handler products specified in this section must show a minimum five years documented experience and complete catalog data on total product.

• SAFETY AGENCY LISTED & CERTIFICATION

• Air Handling units shall be cETLus safety listed to conform with UL Standard 1995 and CAN/CSA Standard C22.2 No. 236. Units shall be accepted for use in New York City by the Department of Building, MEA 342-99-E.

• Air handler furnished with double width, double inlet (DWDI) fans and/or plenum fans where applicable, shall be certified in accordance with the central station air handling unit’s certification program, which is based on AHRI Standard 430.

(NOTE: Above does not apply to fan array)

• Air handling unit water heating & cooling coils shall be certified in accordance with the forced circulation air cooling and air heating coils certification program, which is based on AHRI Standard 410.

DELIVERY, STORAGE, AND HANDLING

• Deliver, store, protect and handle products to site.

• Accept products on site on factory-furnished shipping skids. Inspect for damage.

• Store in clean dry place and protect from construction traffic. Handle carefully to avoid damage to components, enclosures, and finish.

PRODUCTS

• ACCEPTABLE MANUFACTURERS

The following manufacturers are approved for use. No substitutions will be permitted.

Alliance Air Products Buffalo Daikin Applied Engineered Air Governair Haakon Temtrol

GENERAL DESCRIPTION

• Configuration: Fabricate as detailed on drawings.

• Performance: Conform to AHRI 430. See schedules on prints. (NOTE: above does not apply to fan array)

Greater Southwest Region

5 SOW v4 04/15/2015

• Acoustics: Sound power levels (dB) for the unit shall not exceed the specified levels shown on the unit schedule. The manufacturer shall provide the necessary sound treatment to meet these levels if required.

UNIT CONSTRUCTION

• Fabricate unit with heavy gauge channel posts and panels secured with mechanical fasteners. All panels, access doors, and ship sections shall be sealed with permanently applied bulb-type gasket. Shipped loose gasketing is not allowed.

• Panels and access doors shall be constructed as a 2-inch nominal thick; thermal broke double wall assembly, injected with foam insulation with an R-value of not less than R-13.

The inner liner shall be constructed of G90 galvanized steel (Minimum 20 Gauge).

The outer panel shall be constructed of G90 galvanized steel (Minimum 18 Gauge).

The floor plate shall be constructed as specified for the inner liner.

Unit will be furnished with solid inner liners.

• Panel deflection shall not exceed L/240 ratio at 125% of design static pressure, maximum 5 inches of positive or 6 inches of negative static pressure. Deflection shall be measured at the panel midpoint.

• Module to module field assembly shall be accomplished with an overlapping, full perimeter internal splice joint that is sealed with bulb type gasketing on both mating modules to minimize on-site labor and meet indoor air quality standards.

• Access doors shall be flush mounted to cabinetry, with minimum of two six inch long stainless steel piano-type hinges, latch and full size handle assembly. Access doors shall swing outward for unit sections under negative pressure. Access doors on positive pressure sections, shall have a secondary latch to relieve pressure and prevent injury upon access.

• A minimum 6-inch formed G60 galvanized steel base rail shall be provided by the unit manufacturer for structural rigidity and condensate trapping... The base rail shall be constructed 10-gauge nominal.

• Factory leakage test available for units selected with high pressure, low leakage construction. The unit manufacturer shall provide a witnessed factory leak test on selected units. The cabinet shall be tested at the unit’s positive and negative maximum design operating static pressure, up to 8" of differential static pressure across the cabinet exterior walls for the entire unit. Cabinet leakage shall not exceed Class 6 leakage per ASHRAE Standard 111. All supply and return opening shall be sealed. Air pressure and flow shall be measured by a third party calibrated and certified apparatus. The testing shall be performed at the factory. Owner’s representative shall select on unit to be tested at the time of order. A written test

Greater Southwest Region

6 SOW v4 04/15/2015 report shall be prepared by the manufacturer and issued to the owner's representative.

• Factory panel deflection testing available for units selected with high pressure, low leakage construction. The unit manufacturer shall provide a factory deflection test on one unit at the unit’s positive and negative maximum design operating static pressure, up to 8" of differential static pressure across the cabinet exterior walls for the entire unit. A deflection limit of L/240 will be demonstrated at this time. “L” is defined as the height of a panel on the side of the unit. Measurement shall be at the mid-point of “L” along the largest panel on one side. Owner’s representative shall select on unit to be tested at the time of order. A written test report shall be prepared by the manufacturer and issued to the owner’s representative.

FAN ASSEMBLIES (Custom ECM Fan Array)

• The fan array will be arranged with high performance direct drive, single inlet, plenum fans with backwards inclined, high efficiency welded-aluminum or high performance composite impeller with galvanized or aluminum support frame.

Manual blank-off plates shall be provided to block fan airflow, one plate to be provided per array. [Optional] Backdraft dampers shall be provided to block fan airflow in lieu of blank-off plates.

• The fans are driven by long-life, low-temperature brushless DC electronically commutated motor (EC-Motor) with external rotor and integrated maintenance-free electronic circuitry and electronics. The motor is manufactured with maintenance-free, permanently lubricated ball bearings and shall be statically and dynamically balanced in accordance with ISO 1940 part

• The motor shall be closed, protection level IP 54, thermal class 155 with permissible operating temperature of -13°F to 140°F. Motor efficiency class shall comply with IE4. Fan characteristic curves indicate measurements on a chamber test in accordance with ISO5801. The three phase external rotor motor integrated into the fan hub meets the requirements for circulating electric machines set forth in DIN EN 60 034-1 (VDE 0530 Part 1).

• Fan system manufacturer must stock replacement parts in North America.

• The fan bulkhead wall shall be constructed of minimum 1” foam injected panel.

The panels walls shall be minimum 20 gauge galvanized metal and add structure to prevent vibration and “oil canning” of bulkhead wall. Bulkhead walls constructed of non-insulated sheet metal assemblies shall not be acceptable.

• The factory mounted and wired single point power panel shall include an external disconnect, and manual motor protection for each fan. The panel shall be UL or ETL listed.

Greater Southwest Region

7 SOW v4 04/15/2015

• The panel shall be provided with a BACnet compatible controller capable of monitoring the array’s airflow, total static pressure, power consumption, RPM, and individual fan alarm status and specific cause of alarm. Controller shall be configurable for fan speed control via BACnet interface (MSTP or IP), 0-10 VDC input, 4-20 mA input, constant airflow, or duct static pressure (static pressure sensor to be field provided an mounted).

COOLING AND HEATING COILS

• Water cooling coil shall be provided. Provide access to coil(s) for service and cleaning. Enclose coil headers and return bends fully within unit casing. Unit shall be provided with coil connections that extend a minimum of 5” beyond unit casing for ease of installation. Drain and vent connections shall be provided exterior to unit casing. Coil connections must be factory sealed with grommets on interior and exterior panel liners to minimize air leakage and condensation inside panel assembly. If not factory packaged, Contractor must supply all coil connection grommets and sleeves. Coils shall be removable through side and/or top panels of unit without the need to remove and disassemble the entire section from the unit.

Headers shall consist of seamless copper tubing to assure compatibility with primary surface. Headers to have intruded tube holes to provide maximum brazing surface for tube to header joint, strength, and inherent flexibility.

Header diameter should vary with fluid flow requirements.

Fins shall have a minimum thickness of 0.0075 inch aluminum plate construction. Fins shall have full drawn collars to provide a continuous surface cover over the entire tube for maximum heat transfer. Tubes shall be mechanically expanded into the fins to provide a continuous primary to secondary compression bond over the entire finned length for maximum heat transfer rates. Bare copper tubes shall not be visible between fins.

Coil tubes shall be OD seamless copper, 0.020 inch nominal tube wall thickness, expanded into fins, brazed at joints.

Coil connections shall be carbon steel, NPT threaded connection. Connection size to be determined by manufacturer based upon the most efficient coil circuiting. Vent and drain fittings shall be furnished on the connections, exterior to the air handler. Vent connections provided at the highest point to assure proper venting. Drain connections shall be provided at the lowest point to insure complete drainage and prevent freeze-up.

Coil casing shall be a formed channel frame of stainless steel.

Drain Pans to be stainless steel.

• Water heating coil shall be provided. Provide access to coil(s) for service and cleaning. Enclose coil headers and return bends fully within unit casing. Unit shall

Greater Southwest Region

8 SOW v4 04/15/2015 be provided with coil connections that extend a minimum of 5” beyond unit casing for ease of installation. Drain and vent connections shall be provided exterior to unit casing. Coil connections must be factory sealed with grommets on interior and exterior panel liners to minimize air leakage and condensation inside panel assembly. If not factory packaged, Contractor must supply all coil connection grommets and sleeves. Coils shall be removable through side and/or top panels of unit without the need to remove and disassemble the entire section from the unit.

Headers shall consist of seamless copper tubing to assure compatibility with primary surface. Headers to have intruded tube holes to provide maximum brazing surface for tube to header joint, strength, and inherent flexibility.

Header diameter should vary with fluid flow requirements.

Fins shall have a minimum thickness of 0.0075 inch aluminum plate construction. Fins shall have full drawn collars to provide a continuous surface cover over the entire tube for maximum heat transfer. Tubes shall be mechanically expanded into the fins to provide a continuous primary to secondary compression bond over the entire finned length for maximum heat transfer rates. Bare copper tubes shall not be visible between fins.

Coil tubes shall be OD seamless copper, 0.020 inch nominal tube wall thickness, expanded into fins, brazed at joints.

Coil connections shall be carbon steel, threaded connection. Connection size to be determined by manufacturer based upon the most efficient coil circuiting.

Vent and drain fittings shall be furnished on the connections, exterior to the air handler. Vent connections provided at the highest point to assure proper venting. Drain connections shall be provided at the lowest point to insure complete drainage and prevent freeze-up.

Coil shall be furnished as an uncased galvanized steel track to allow for thermal movement and slide into a pitched track for fluid drainage.

FILTERS

• Furnish flat panel filter section with 2-inch pleated MERV 8 filter. Provide side loading and removal of filters.

• Filter media shall be UL 900 listed, Class I or Class II.

• Filter Pressure transducers to be provided by BAS contractor.

ADDITIONAL SECTIONS

• Access section shall be provided for access between components.

• Multi-zone section shall be provided with a hot and a cold deck. Discharge shall be horizontal. No dampers shall be provided.

8. EXECUTION

Greater Southwest Region

9 SOW v4 04/15/2015

8.1. INSTALLATION

• Install in accordance with manufacturer’s Installation & Maintenance instructions.

8.2. ENVIRONMENTAL REQUIREMENTS

• Do not operate units for any purpose, temporary or permanent, until ductwork is clean, filters are in place, bearings lubricated, and fan has been test run under observation.

8.3. EXTRA MATERIALS

• Provide one additional set (2 total sets) of filters for each unit.

9. Liquidated Damages: $252.00 per day

10. Closeout Plan:

10.1. Customer Acceptance

10.2. Final Punch list complete

10.3. Financial Closeout

Greater Southwest Region

10 SOW v4 04/15/2015

Attachment 1:

Sustainability:

• Green Purchasing:

o The contractor shall refer to the “Green Procurement Compilation” for all products being installed in federal facilities. The Green Procurement Compilation can be found at https://sftool.gov/greenprocurement. The standards found in this compilation shall guide all product purchasing decisions as they relate to federal facilities.

o The use of the following standards (“Key Sustainable Product” or “KSP” standards) is mandatory for all contracts and task orders. See https://sftool.gov/green-products/1037/key-sustainable-products for more details.

Nylon Carpet: NSF 140 Gold certification and > 10% post-consumer recovered content.

Interior Latex Paint: < 50 grams per liter (g/L) VOCs post tint (i.e.

SCAQMD Rule 1113 standard).

Gypsum Board: Greenguard Gold Standard or 0 g/L VOCs.

Acoustical Ceiling Tiles: Meets California Section 01350 standard for low-VOC materials and total recycled content > 20% and recyclable in a closed loop process and USDA Certified BioPreferred and Environmental Product Declaration (EPD) available.

Concrete (ready-mix and site-mix): > 25% fly ash or > 15% ground granulated blast-furnace (GGBF) slag

A. For each KSP listed, the Contractor shall submit proof of compliance to the CO or his designee prior to the installation of the product or material. The CO’s designee shall verify compliance.

B. If the KSP materials listed above are 1) not reasonably available within a reasonable period of time; 2) fail to meet the performance standards set forth in the specification or fail to meet reasonable performance standards of GSA; or 3) are available only at an unreasonable price, only then can the Contractor use other types of products. In these cases the Contractor shall select products and materials, to the extent possible, which are the safest and most environmentally friendly. Exemptions must be submitted in writing and can only be approved by the CO.

GSA Solicitation No. GSA- EQ7PSEH-17-0015______________________________________________

Document: DB201A-SB / DEC 2016 (The Solicitation) Pages 1 of 30

Design Build Contract for High Velocity Air Handler Units at the Bob Casey Federal Building, Houston, Texas

The Solicitation

Notice to Offerors of Total Service-Disabled Veteran-Owned Small Business Set-Aside The General Services Administration (GSA) is setting aside the contract under the following clause found in the Agreement:

52.219-27, Notice of Total Service-Disabled Veteran-Owned Set-Aside

Table of Contents

I. General Information A. The Solicitation and the Contract B. List of Solicitation Documents C. Authorized Representatives D. Pre-Proposal Conference E. Estimated Price Range F. FAR 52.228-1 Bid Guarantee G. FAR 52.236-27 Site Visit - Construction H. Receipt of Offers

II. Proposals A. Proposal Contents B. Proposal Format C. Price Proposal D. Technical Proposal E. Other Information to be Submitted with Proposal F. Requirements for Joint Venture Offerors

III. General Provisions A. Availability of Funds B. Requests for Clarification or Interpretation C. Notice to Small Business Firms D. Information Concerning the Disclosure of Solicitation Results E. Affirmative Procurement Program F. Notice Concerning Preparation of Proposals G. Bond Requirements H. Contractor Performance Information I. Safeguarding Documents Designated as Sensitive But Unclassified J. Additional Security Requirements

IV. FAR/GSAR Solicitation Provisions

(The Solicitation) Pages 2 of 30

A. FAR 52.215-1 Instructions to Offerors—Competitive Acquisition B. FAR 52.216-1 Type of Contract C. FAR 52.222-5 Construction Wage Rate Requirements—Secondary Site of the Work D. FAR 52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal

Employment Opportunity for Construction E. FAR 52.233-2 Service of Protest F. Buy American G. Buy American Exceptions H. Special 8(a) Requirements I. FAR 52.252-1 Solicitation Provisions Incorporated by Reference J. GSAR 552.102 Incorporating Provisions and Clauses by Reference

V. Additional Solicitation Provisions and Instructions

A. FAR 52.211-1 Availability of Specifications Listed in the GSA Index of Federal Specifications, Standards and Commercial Item Descriptions, FPMR Part 101-29

B. FAR 52.211-3 Availability of Specifications Not Listed in the GSA Index of Federal Specifications, Standards and Commercial Item Descriptions

C. Additional Provisions D. Additional Clauses E. FAR 52.222-62 Paid Sick Leave

VI. Method of Award A. Evaluation of Offers B. Determination of Responsibility C. Price Reasonableness / Price Realism D. Unbalanced Prices E. Total Evaluated Price F. Non-Price Factors G. Evaluation of Joint Venture Offerors

I. General Information

I.A. The Solicitation and Contract

(1) This Solicitation is set-aside for Service-Disabled Veteran-Owned Small Businesses, in accordance with FAR 19. This Solicitation sets forth requirements for proposals for a Contract to construct the Project described in the Solicitation Documents. Proposals conforming to the Solicitation requirements will be evaluated in accordance with the Method of Award set forth herein. The Government will award the Contract to the selected Offeror, subject to the conditions set forth herein.

(2) Neither the Solicitation nor any part of an Offeror's proposal shall be part of the Contract except to the extent expressly incorporated therein by the Contracting Officer.

(3) The Offeror's proposal submitted in response to this Solicitation shall constitute a firm offer.

No contract shall be formed unless and until the Contracting Officer has countersigned the SF 1442 submitted by an Offeror, and delivered to the Contractor a copy of the SF 1442 with original signatures together with the Agreement reflecting the Offeror's proposed prices.

I.B. List of Solicitation Documents

(The Solicitation) Pages 3 of 30

The Solicitation Documents are comprised of:

(1) The Solicitation

(2) Offeror Representations and Certifications Form

(3) Standard Form (SF) 1442 – Solicitation Offer and Award

(4) The Agreement

(5) The Statement of Work, dated April 25, 2017

(6) Wage Determination TX170303, dated April 21, 2017

I.C. Authorized Representatives

The following individuals are designated as the authorized GSA representatives under this Solicitation:

(1) Contracting Officer

Name: Senthia Bruns General Services Administration/PBS

Address: 819 Taylor Street, Fort Worth, TX 76102 Telephone: 817-978-0835

Email: Senthia.bruns@gsa.gov

(2) GSA Project Manager; Alternate Point of Contact

Name: Duc Le Address: 1919 Smith Street, Houston, TX 77002

Telephone: 832-397-8497 Email: Duc.le@gsa.gov

I.D. Pre-Proposal Conference

N/A

I.E. Estimated Price Range or Budget Amount The estimated price range for the Project is between $1,000,000.00 and $5,000,000.

Award of any resulting procurement will be based on a trade-off type of best value government methodology.

I.F. FAR 52.228-1 Bid Guarantee (SEP 96)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier’s check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds—

(1) To unsuccessful bidders as soon as practicable after the opening of bids; and

(The Solicitation) Pages 4 of 30

(2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.

(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3,000,000, whichever is less.

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

I.G. FAR 52.236-27 Site Visit - Construction (FEB 95)

(1) The clauses at FAR 52.236-2, Differing Site Conditions, and FAR 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, Offerors are urged and expected to inspect the site where the work will be performed.

(2) A site visit regarding this Solicitation is scheduled as follows:

Date: June 14, 2017 Time: 10:30 AM

Location: Bob Casey Federal Building Break Room B105 (basement) Houston, TX

(3) Interested parties must notify the GSA Project Manager for further information about attendance and to confirm location, time, and date. Only those parties who have notified the GSA Project Manager and provided necessary information in advance of the meeting will be allowed to attend in person. To request a reasonable accommodation due to a disability, contact the GSA Project Manager.

For further information about the site visit or access requirements, please contact:

Name: Duc Le, GSA Project Manager Address: 1919 Smith Street, Houston, TX 77002

Telephone: 832-397-8497 Email: Duc.le@gsa.gov

(4) Questions regarding this Solicitation will be addressed at a site visit. All prospective Offerors shall submit in advance and in writing any questions they may have to Senthia Bruns, Contracting Officer via e-mail at Senthia.bruns@gsa.gov, NO LATER THAN June 29, 2017, 12:00 PM (CST). Answers to all questions received will be included in an amendment to the solicitation. The submission of written questions will not preclude anyone from posing questions during the site visit.

(5) Failure of a prospective Offeror to attend the site visit will be construed to mean that the Offeror fully understands all requirements of the solicitation. Prospective Offerors are advised http://www.acquisition.gov/far/current/html/52_233_240.html#wp1113365 http://www.acquisition.gov/far/current/html/52_233_240.html#wp1113375 mailto:Senthia.bruns@gsa.gov

(The Solicitation) Pages 5 of 30 that the site visit will be held solely for the purpose of explaining the concepts involved in the specifications, terms and conditions of this solicitation. Interested Offerors are strongly encouraged to attend the site visit.

(6) All prospective Offerors are advised that this solicitation will remain unchanged unless it is amended in writing. All amendments will be published on FedBizOpps.

I.H. Receipt of Offers

(1) In order to be considered for award, offers conforming to the requirements of the Solicitation must be received at the following office no later than 4:00 pm local time on the following date and at the following address:

Date: July 17, 2017 Address: General Services Administration/PBS

Attn: Senthia Bruns 819 Taylor Street, 12B Fort Worth, TX 76102

(2) Offers sent by commercial package delivery and hand delivery shall be deemed received as of the date and time of delivery to the office designated for receipt of offers.

(3) Offers sent by United States Mail shall be deemed timely if delivered to the address of the office designated for receipt of offers on or before the date established for receipt of offers.

II. Proposals

II.A. Proposal Contents

Proposals shall consist of the following documents, completed and executed in accordance with this Solicitation:

(1) Price Proposal

(2) Technical Proposal

(3) Representations and Certifications

(4) Bid Guarantee, using Standard Form 24

(5) GSA Form 527 – Contractor’s Qualification and Financial

II.B. Proposal Format

To aid in evaluation of proposals, each proposal shall be clearly and concisely prepared in writing: include all information required by the solicitation, with pages numbered and logically assembled. Each proposal shall identify name of Offeror, date of submission, and solicitation number.

Each proposal shall consist of one physical volume; titled, numbered, and containing a technical proposal, pricing proposal and the offeror representations and certifications. Each Proposal must also include a bid guarantee. Offer acceptance is 120 calendar days after the date offers are due.

Offerors are to submit an original proposal and two additional copies.

(The Solicitation) Pages 6 of 30

II.C. Price Proposal

(1) Contents

The Price Proposal shall consist of the SF 1442 and the Agreement, with prices and/or rates indicated for each price element shown on the pricing form included in Section II of the Agreement. Indicate the Base Contract Price, or if no such distinction is made, the Contract Price, in Block 17 of the SF 1442, which must be fully executed by the Offeror.

(2) Qualifications, Exclusions and Conditions

If the Offeror communicates in its proposal any qualifications, exclusions, or conditions to the proposed prices not provided for in the Contract Documents, the Contracting Officer may reject the proposal and exclude the Offeror from further discussions.

II.D. Technical Proposal The Technical Proposal shall include the information requested below for the non-price factors described in Section VI.

A score of unacceptable in the technical approach factor will result in the proposal being removed from further scoring and consideration for award. For this solicitation, all technical evaluation factors other than cost or price are significantly more important than cost or price.

Written or oral discussions will be conducted with the firms within the competitive range

The "best value concept" will be used for selecting the contractor. The goal of this method of evaluating technical factors and price is to select the proposal that offers the best value to the Government, not necessarily the lowest price.

1. Management Plan

This factor is comprised of the offeror's management capability and ability for planning, organizing and controlling the execution of construction and repair and alteration projects simultaneously, including scheduling work, coordination of subcontractors, trades and suppliers, minimization of delays and compliance with tenants’ needs. It includes: the coordination to assure compliance with contract requirements; a safety plan, technique for dealing with issues, problems, questions, emergencies and other areas of concern.

Submittal Requirement:

• The offeror shall submit a narrative describing their:

• Plan for organizing and controlling projects.

• Plan to manage sub-contractors (if any).

• Sustainability and Waste Management Plan.

• Quality Control Plan.

The offeror shall also submit a list of proposed sub-contractors (if any), and length of partnership.

This factor is comprised of the offeror's management capability and ability for planning, organizing and controlling the execution of construction and repair and alteration projects simultaneously, including scheduling work, coordination of subcontractors, trades and suppliers, minimization of delays and compliance with tenants’ needs. It includes: the coordination to assure compliance with contract requirements; technique for dealing with issues, problems, questions, emergencies and other areas of concern.

(The Solicitation) Pages 7 of 30

Standard for Evaluation:

The Offeror shall submit a narrative describing their:

Plan for organizing and controlling projects.

Plan to manage sub-contractors (if any).

Sustainability and Waste Management Plan.

Quality Control Plan.

The offeror shall also submit a list of proposed sub-contractors (if any), and length of partnership.

Use the following questionnaire for your responses. Information must be typed.

You may create a computer-generated questionnaire to complete, as long as it mirrors exactly the questionnaire shown below. You may attach additional pages for your responses, if necessary.

2. Experience and Past Performance of the Firm

A. List three (3) projects your firm has completed during the past five (5) years that are similar to this project. "Similar” is defined for this project as: Installation of (a) HVAC system with BAS controls (b) Installation HV AHU(s) on the interior of a building (c) HVAC and AHU(s) construction performed in a courthouse or similar building, where there is a high security requirement (d) AHU(s) construction performed in a courthouse or similar building environment where there is an extremely delicate political requirement.

a). Name/Address of Building Owner: _____________________________________________________

Building Owner's Representative's name, phone number and email address who can be contacted to verify the Offeror's experience and performance. (Do not include "General Contractors") ___

Air Handler Unit of HVAC system's manufacturer: ________ HVAC installed (include specific product names/types of system installed):____________________ How many AHU(s) in how many stories Building:

AHU(s) Size & Dimensions:

Original construction award amount:

Final construction cost at completion:

Actual construction period: to b). Name/Address of Building Owner: ___________________________________________________

Building Owner's Representative's name, phone number and email address who can be contacted to verify the Offeror's experience and performance. (Do not include "General Contractors") ___

Air Handler Unit of HVAC system's manufacturer: ________ HVAC installed (include specific product names/types of system installed):____________________ How many AHU(s) in how many stories Building:

AHU(s) Size & Dimensions:

Original construction award amount:

(The Solicitation) Pages 8 of 30 c). Name/Address of Building Owner:

Building Owner's Representative's name, phone number and email address who can be contacted to verify the Offeror's experience and performance. (Do not include "General Contractors") ___

Air Handler Unit of HVAC system's manufacturer: ________ HVAC installed (include specific product names/types of system installed):____________________ How many AHU(s) in how many stories Building:

AHU(s) Size & Dimensions:

Original construction award amount:

If additional pages are needed to list additional "similar projects", copies of this page shall be made and included in the Offeror's proposal.

The Government is not limited to contacting only those references provided by the Offeror above.

The Government may also consider the Offeror’s performance on contracts not submitted by the Offeror that the Government is aware of or becomes aware of as result of reference interviews or previous contracts with the Government.

Firm(s) without past performance will receive a neutral rating.

3. Experience and qualification of Key Personnel

Provide the following information regarding the experience and qualification of the Offeror's Key Personnel (Project Manager, On-Site Full Time Project Superintendent, etc.) proposed for this project.

The experience must be on “similar” projects completed within the past five (5) years. "Similar” is defined for this project as a) Installation of High Velocity (HV) Air Handler Units on the interior of a high rise building. HV-AHU(s) Replacement construction performed in a courthouse or similar building, where there is a high security requirement (d) HV AHU(s) construction performed in a courthouse or similar building environment where there is an extremely delicate political requirement.

Project Manager Qualifications:

Name:

Years employed by Offeror:

1). Describe formal training and experience of the person to be assigned as the Project Manager. Attach any current certifications or licensing:

(The Solicitation) Pages 9 of 30

2). List the responsibilities of this position, including on-site monetary signature authority level proposed for this project:

3). List "similar projects", as previously defined, the Project Manager has completed within the past 5 years.

a). Project Manager employed by:

Name/Address/Telephone Number of Building Owner:

HVAC AHU(s) installed (include specific product names/types of system installed, etc.)

Number of AHU(s) in how many stories Building:

AHU Sizes & Dimensions:

Original construction award amount:

Final construction cost at completion:

b). Project Manager employed by:

Name/Address of Building Owner:

HVAC system installed (include specific product names/types of system installed, etc.)

Original construction award amount:

Final construction cost at completion:

c). Project Manager employed by:

(The Solicitation) Pages 10 of 30

Name/Address of Building Owner:

HVAC system installed (include specific product names/types of system installed):

Original construction award amount:

Final construction cost at completion:

Actual construction period: to

No substitution for the proposed Project Manager shall be made without the prior approval by the Contracting Officer of his/her substitute.

If more than three (3) "similar projects" have been managed and completed by the proposed Project Manager within the past three (3) years, copies of this page shall be made and included in the Offeror's proposal.

Full Time On-site Construction Superintendent

Name:

Years employed by Offeror: years, _________months

1). Describe formal training and experience of the person to be assigned as the full time on-site Construction Superintendent. Attach any current certifications or licensing.

2). List the responsibilities of this position including on-site monetary signature authority level proposed for this project:

3). List "similar projects", as previously defined, that the full time on-site Construction Superintendent has performed on 3 "similar projects" completed within the past 5 years.

a). ). Construction Superintendent employed by: ___________________________________________

Name/Address of Courthouse: _______________________________________________

(The Solicitation) Pages 11 of 30

AHU system's manufacturer: Type of AHU(s) installed:

AHU(s) Size & Dimensions:

Original construction award amount:

Final construction cost at completion:

Original construction period: to b). Construction Superintendent employed by: _____________________________________

Name/Address of Courthouse: ___________________________________________

AHU system's manufacturer: Type HVAC system installed:

AHU(s) Sizes & Dimensions:

Final construction cost at completion:

c). Construction Superintendent employed by: __________________________________

Name/Address of Courthouse: _________________________________________

AHU system's manufacturer: Type HVAC system installed:

AHU(s) Sizes & Dimensions: ____

Final construction cost at completion:

No substitutions for the proposed Full Time On-site Construction Superintendent shall be made without the prior approval by the Contracting Officer or his/her substitute.

If more than three (3) "similar projects" have been supervised and completed by the proposed Full…