Amendment_0002.pdf
PDF 391 KB Posted
- Attached to
- HVAC Replacements at Gateway and Los Indios LPOEs Federal contract opportunity
- Solicitation number
- GS-07-P-17-HT-C-0001
About this file
Amendment 0002
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_0001.pdf | ||
| GS-07-P-17-HT-C-0001.pdf | ||
| PBS_Past_Performance_Questionnaire.docx | DOCX document | |
| Attachment_A_-_Experience_on_Similar_Projects.pdf | ||
| Pre-Proposal_Attendee_Registration_Form.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
7PQD
Please see the attached.
7PQD
ACQUISITION MANAGEMENT DIVISION
ACQUISITION ENERGY & ACQUISITION SUPPORT
BRANCH
819 TAYLOR ST RM 12B01
FORT WORTH, TX 76102
ACQUISITION MANAGEMENT DIVISION
ACQUISITION ENERGY & ACQUISITION SUPPORT
BRANCH
819 TAYLOR ST RM 12B01
FORT WORTH, TX 76102
EQ7PMD-17-0008
GS-07-P-17-HT-C-0001
1 43
01/20/2017
12/30/2016
Amendment No. 2 – Solicitation No. GS-07-P-17-HT-C-0001 for HVAC Replacements at Gateway and Los Indios LPOEs
This amendment is issued to provide the Pre-Proposal Sign-In Sheet, a revised Scope of Work dated 01/19/2017, revised C101-SAT_GC_Agreement, and to respond to questions.
1. Must the HVAC equipment being provided be “Buy American Compliant”? Yes.
2. Other than the HVAC does the material being used be “Buy American Compliant”?
Yes.
3. The electrical disconnects all seem to be in fair condition can they be reused? No, please refer to SOW.
4. Some of the units did not have concrete pads are you requiring concrete pads for the condensers? Yes.
5. Please confirm controls are only disconnect and reconnect only, there will be no commissioning of controls or alterations to the existing sequence of operation? controls are Niagara based controls through the BAS.
6. Who is the control contractor and and what points of the HVAC system do you want to monitor? Also, there is no mention of DDC Controls - are DDC Controls required as part of this contract?
David Morris Performance Controls Group 281-900-9808 -All existing points that are being monitored: Cooling set point (occupied & unoccupied), heating set point (occupied & unoccupied), fan status, fan command, cool on/off, heat on/off, supply air temp., outside air damper position.
-Existing DDC controls can be reused. Integration could be needed depending on equipment being used.
7. At Los lndios the static pressure of a 4 ton AHU is not enough for the 12 ton ductwork please clarify. The ductwork is fine.
8. Is there any areas that are going to need temporary cooling? Per the SOW, temporary spot coolers shall be placed in areas where equipment downtime is longer than one day.
9. Do you want the commissioning report to be done by a third party? The SOW does not require that the commissioning report be done by a third party.
10. The statements of work say to update existing rooftop unit disconnects, please clarify.
Per the SOW, the contractor shall install new, appropriate size disconnects for new rooftop units.
11. The bid documents do not actually call for 15 SEER unit, but it says equal to or better than TRANE TTR5 which is a 15 SEER condenser. Our units are 13 SEER is that sufficient? The SOW has been updated to reflect the minimum SEER rating for each unit.
12. When is a bond or payment protection required? Please see Section III.R and Clause 52.228-13 in Document C101 (The Agreement) and Section III.G in Document C201 (The Solicitation). The below is from the FAR:
28.102 Performance and payment bonds and alternative payment protections for construction contracts.
28.102-1 General.
(a) 40 U.S.C. chapter 31, subchapter III, Bonds (formerly known as the Miller Act), requires performance and payment bonds for any construction contract exceeding $150,000, except that this requirement may be waived— http://uscode.house.gov/
(1) By the contracting officer for as much of the work as is to be performed in a foreign country upon finding that it is impracticable for the contractor to furnish such bond; or
(2) As otherwise authorized by the Bonds statute or other law.
(b)(1) Pursuant to 40 U.S.C. 3132, for construction contracts greater than $35,000, but not greater than $150,000, the contracting officer shall select two or more of the following payment protections, giving particular consideration to inclusion of an irrevocable letter of credit as one of the selected alternatives:
(i) A payment bond.
(ii) An irrevocable letter of credit (ILC).
(iii) A tripartite escrow agreement. The prime contractor establishes an escrow account in a federally insured financial institution and enters into a tripartite escrow agreement with the financial institution, as escrow agent, and all of the suppliers of labor and material. The escrow agreement shall establish the terms of payment under the contract and of resolution of disputes among the parties. The Government makes payments to the contractor’s escrow account, and the escrow agent distributes the payments in accordance with the agreement, or triggers the disputes resolution procedures if required.
(iv) Certificates of deposit. The contractor deposits certificates of deposit from a federally insured financial institution with the contracting officer, in an acceptable form, executable by the contracting officer.
(v) A deposit of the types of security listed in 28.204-1 and 28.204-2.
(2) The contractor shall submit to the Government one of the payment protections selected by the contracting officer.
(c) The contractor shall furnish all bonds or alternative payment protection, including any necessary reinsurance agreements, before receiving a notice to proceed with the work or being allowed to start work.
28.102-2 Amount required.
(a) Definition. As used in this subsection— “Original contract price” means the award price of the contract; or, for requirements contracts, the price payable for the estimated total quantity; or, for indefinite-quantity contracts, the price payable for the specified minimum quantity. Original contract price does not include the price of any options, except those options exercised at the time of contract award.
(b) Contracts exceeding $150,000—
(1) Performance bonds. Unless the contracting officer determines that a lesser amount is adequate for the protection of the Government, the penal amount of performance bonds must equal—
(i) 100 percent of the original contract price; and
(ii) If the contract price increases, an additional amount equal to 100 percent of the increase.
(2) Payment bonds.
(i) Unless the contracting officer makes a written determination supported by specific findings that a payment bond in this amount is impractical, the amount of the payment bond must equal— http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t37t40+1574+51++%2840%29%20%20AND%20%28%2840%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 https://www.acquisition.gov/sites/default/files/current/far/html/Subpart%2028_2.html#wp1073428 https://www.acquisition.gov/sites/default/files/current/far/html/Subpart%2028_2.html#wp1073432
(A) 100 percent of the original contract price; and
(B) If the contract price increases, an additional amount equal to 100 percent of the increase.
(ii) The amount of the payment bond must be no less than the amount of the performance bond.
(c) Contracts exceeding $35,000 but not exceeding $150,000. Unless the contracting officer determines that a lesser amount is adequate for the protection of the Government, the penal amount of the payment bond or the amount of alternative payment protection must equal—
(1) 100 percent of the original contract price; and
(2) If the contract price increases, an additional amount equal to 100 percent of the increase.
(d) Securing additional payment protection. If the contract price increases, the Government must secure any needed additional protection by directing the contractor to—
(1) Increase the penal sum of the existing bond;
(2) Obtain an additional bond; or
(3) Furnish additional alternative payment protection.
(e) Reducing amounts. The contracting officer may reduce the amount of security to support a bond, subject to the conditions of 28.203-5(c) or 28.204(b).
https://www.acquisition.gov/sites/default/files/current/far/html/Subpart%2028_2.html#wp1073401 https://www.acquisition.gov/sites/default/files/current/far/html/Subpart%2028_2.html#wp1073424
GSA Public Buildings Service Greater Southwest Region 7, Fort Worth, Texas
January 19, 2017
Project Title:
HVAC Replacement in Various Building
Project Locations:
TX0695BN, Gateway LPOE Kennels 1500 East Elizabeth Street Brownsville, TX 78520
TX0333LI USDA BLDG
100 Los Indios Blvd Los Indios, TX 78567
SCOPE OF WORK
The Contractor shall provide all material, labor, tools, equipment and supervision, necessary to complete demolition and installation of the following scope of work.
TX0334LI – USDA BLDG Los Indios LPOE
A. Demolition
1. Remove existing HVAC split systems four (4) ea. and dispose of properly. Demolition to include, but not limited to: cabinet, flexible duct connectors, plumbing lines connections, and all related electrical accessories.
2.
a. One (1) ea. 3.5 Ton AC condenser with natural gas furnace
b. One (1) ea. 4 Ton AC condenser with natural gas furnace
c. One (1) ea. 6 Ton AC condenser with natural gas furnace
d. Two (2) ea. 6 Ton AC condensers with One (1) ea. 12 Ton Air Handler with 45 KW Elect. heat
B. New Work
1. Replace Air Handler and condensing units.
USDA BLDG.– 1 EA 12 TON 3400 CFM Air Handler with 45 KW and one (1) 6 Ton condenser replace with a 4 ton condenser with Matching Air Handler with 20 KW equal to or better than AHU Trane Model # TTR5048E Condenser with minimum 15 SEER.
1 EA 6 TON Split HVAC System with natural gas heat furnace equal to or better than Trane Model #TTA073H with minimum 11.2 EER.
1 EA 3.5 TON Split HVAC System with natural gas heat equal furnace to or better than Trane Model #TTR5042E with minimum 15 SEER.
1 EA 4 TON Split HVAC System with natural gas heat furnace equal to or better than Trane Model #TTR5048E with minimum 15 SEER.
a. Provide condenser coil guards (Hail Guards) and epoxy coating on cooling/condenser coils for corrosion protection. Unit shall include a low ambient kit, and barometric relief damper mounted in return duct. New rooftop units shall include an economizer cycle.
b. Contractor shall run wires using EMT conduit, unless otherwise approved.
c. Contractor shall install new, appropriate size disconnects for new rooftop units
d. Contractor shall ensure electrical panel is balanced properly on all phases.
Label all installed equipment, to include panel schedule, as per latest NEC standards. Label panel board with laminated adhesive-back engraved labels.
e. Install all conduits using compression type fittings.
f. Any roof penetration or modification must be accomplished by an authorized roofing contractor. Submit your proposed roofing contractor to the GSA Project Manager for review and approval. Existing inside ductwork shall be re-used with new unit.
g. New equipment shall use MERV 8 filters, as a minimum.
h. Existing HVAC units are connected to the Building Automated System (BAS).
Contractor shall ensure that new units include BACnet communication interface and are connected to the BAS. Update the existing BAS graphics page to reflect new unit, economizer and install the additional points.
i. Provide and install new condensate drain line connections to new rooftop units. Connections shall be of the same material as existing plumbing lines.
j. Contractor shall install new appropriate size disconnects for all rooftop units.
k. Contractor shall reuse existing smoke detector(s) and shall be interlocked with the smoke detector and fire alarm panel.
2. New HVAC units shall be labeled the same as previous units. Label shall be paint markings and shall match existing size. Label shall be easily visible to people servicing unit.
TX0695BN – Gateway LPOE Kennels BLDG A. Demolition
1. Remove existing two (2) HVAC Split Systems and dispose of properly. Demolition to include, but not limited to: cabinet, flexible duct connectors, plumbing lines connections, and all related electrical accessories.
a. One (1) ea. 10 Ton Split System Air Handler and Condenser model# Carrier 38AKS-012---501-- and 40RM-012-B610HC 10 ton split system 4,000 cfm
b. One (1) ea. 7.5 Ton Split System Air Handler and Condenser model# Carrier 38AK-008---511-- and 40RM-008-B610HC 7.5 ton split system 3,000 cfm
B. New Work
1. Furnish and install new HVAC Split System of same cooling and heating capacities as the existing units being replaced and to be equal to or better than the following existing Trane models:
a. 1 EA 10 TON Air Handler with electric heat equal to or better than trane Model# TWE120E with matching condenser Trane model# TTA120H E with minimum 11.2 EER.
b. 1 EA 7.5 TON Air Handler with electric heat equal to or better than trane Model# TWE090E with matching condenser Trane model# TTA090H with minimum 11.2 EER.
2. Provide condenser coil guards (Hail Guards) and epoxy coating on cooling/condenser coils for corrosion protection. Unit shall include a low ambient kit, and barometric relief damper mounted in return duct. New rooftop units shall include an economizer cycle.
3. Contractor shall run wires using EMT conduit, unless otherwise approved.
4. Contractor shall install new, appropriate size disconnects for new rooftop units
5. Contractor shall ensure electrical panel is balanced properly on all phases. Label all installed equipment, to include panel schedule, as per latest NEC standards. Label panel board with laminated adhesive-back engraved labels.
6. Install all conduits using compression type fittings.
7. All new rooftop package units may require new roof curbs and or roof curb adapters to insure proper installation in accordance with the manufactures recommendation to insure correct leak proof seal. Any roof penetration or modification must be accomplished by an authorized roofing contractor. Submit your proposed roofing contractor to the GSA Project Manager for review and approval. Existing inside ductwork shall be re-used with new unit.
8. New equipment shall use MERV 8 filters, as a minimum.
9. Existing HVAC units are connected to the Building Automated System (BAS).
Contractor shall ensure that new units include BACnet communication interface and are connected to the BAS. Update the existing BAS graphics page to reflect new unit, economizer and install the additional points.
10. Provide and install new condensate drain line connections to new rooftop units.
Connections shall be of the same material as existing plumbing lines.
11. Contractor shall install new appropriate size disconnects for all rooftop units.
12. Contractor shall reuse existing smoke detector(s) and shall be interlocked with the smoke detector and fire alarm panel.
13. Furnish and install new split system units (condenser and air handlers) of same cooling and heating capacities as the existing units being replaced equal to or better than the Trane models provided.
MISCELLANEOUS INSTRUCTIONS:
1. Contractor shall perform the following Mechanical work in accordance with the latest
International Mechanical Code and NEC Standards.
2. To maintain roof manufacturer’s warranty, any required new roof penetrations shall be performed by a roofer certified by the manufacturer to perform roof work. All certifications shall be provided by roofer prior to performing any work. After completion of work, roofer shall provide a certificate by manufacturer stating all warranties remain valid.
3. Contractor shall patch and paint all openings and penetrations made as a result of the work required on this SOW.
4. All piping, including electrical conduit, shall be run behind walls and/or ceilings whenever possible. If piping cannot be concealed, Contractor shall paint it to match wall and/or ceiling color.
5. Unit downtime shall be kept to a minimum.
6. Temporary spot coolers shall be placed in areas where equipment downtime is longer than one day.
7. Contractor shall provide a minimum of 4 hours of training to GSA maintenance personnel.
8. Contractor shall provide a complete commissioning report to GSA PM with completed close out documents once all units are fully functional. All adjustments to the systems shall be in accordance with manufacturer’s specifications.
9. Contractors are to submit proposal with a cost breakdown.
10. Integration Technician: Integration technician performing installation shall be certified on the Niagara AX JACE for both installation and maintenance of the system and shall have a minimum of 3 years’ experience performing the required tasks. The Contractor shall provide with their offer the integration technician’s resume and certification documentation. Additionally the programmer must apply for and receive clearance in accordance with Homeland Security Presidential Directive 12 (HSPD-12) to perform their duties on the GSA secured network.
SPECIAL INSTRUCTIONS
1. Remove all existing refrigerant lines servicing existing split system units to be demolished and dispose of properly (IF NEW EQUIPMENT REQUIRES UPGRADES ON REFRIGERANT LINES). Demolition to include, but not limited to, insulation and hangers.
2. All existing electrical wires shall be removed and disposed of properly (If electrical needs to be upgraded for new equipment). Existing conduit shall be re-used for new replacement unit.
3. All gas lines that will no longer be used will need to be cut off and capped off at the nearest location to the main branched off point.
4. Contractor shall inspect existing roof stand for stability and integrity and prepare for re-use with new rooftop unit. Repair as necessary.
5. Existing ductwork shall remain in place and operational on all Buildings for the exception of Inspection booths. Contractor shall inspect existing ductwork entering the building through the roof for rust and/or damage once the unit has been removed. Repair/replace as necessary.
6. All HVAC equipment not included in the demolition notes and not within project footprint shall remain in place and operational.
MATERIAL TECHNICAL SPECIFICATIONS
Where a particular manufacturer's product is specified, it is not intended to discriminate against other manufacturer's which are equal in quality of material, workmanship, appearance and function to those specified. Rather, it is intended to establish and indicate the desired standard of quality. If any tests are required to determine the equality of any substitutes, such tests shall be made by an independent authority as approved by the government. All expenses related to proposed substitutions shall to be paid by the Contractor. Proposed items are to be submitted with the bid and shall be a basis for the award of the contract.
All materials and equipment shall bear evidence of the Underwriter's Laboratories Inc. Label (UL) or approval of other nationally recognized independent testing organizations adequately equipped and competent to perform such services when these standards are required and such product listing is available.
PRODUCT DATA AND SAMPLES
Product Data: Contractor shall submit one electronic set of rooftop units, mini-split and all new equipment.
Provide catalog sheets, brochures, performance charts or other standard descriptive data provided by any Subcontractor, supplier or distributor. Product Data must be certified by the Contractor stating that it was reviewed and approved. Product to be used must be highlighted on the data sheet by the Contractor.
Product Data used for construction must bear GSA’s stamp certifying final review and approval. No product shall be used that does not bear such stamp. Submittals shall be identified on a submittal register provided by the Contractor and transmitted using a transmittal letter.
Samples: Contractor shall submit physical samples establishing standards by which completed work is judged. Samples shall indicate color range, functional characteristics and shall represent exact material to be used on the project.
PERFORMANCE REQUIREMENTS
1. The contractor shall field verify existing conditions prior to any demolition.
2. The Contractor shall be responsible for coordinating all activities of subcontractors. This responsibility includes coordination of; preparation of shop drawings preparation of shop drawings produced by different subcontractors where their work interfaces or may potentially conflict or interfere and the installation of such work; scheduling of work by subcontractors and use of the Project site for staging and logistics.
3. The contractor shall reinstall existing access panels; etc, back to their original location and condition after all work is completed.
4. Safety Plan: Contractor shall submit a site specific plan including hazardous communication plan list of the flow of communication in case of emergency, lock-out / tag-out with narrative that explains lock-out / tag out procedures, AHA / JHA’s for major activities, crane safety plan (if applicable) for crane erection and use. Include preferred location for crane set up, operator certification credentials, and crane inspection/certification documentation within fourteen (14) of Partial Notice to Proceed.
5. Contractor to provide a work plan within fourteen (14) days of receipt of the Partial Notice to Proceed (NTP) identifying phasing plan by building name and all requested access needed.
6. Contractor to provide schedule of values within fourteen (14) days of receipt of the Partial Notice of Proceed (NTP). The Contractor shall prepare and submit for approval a detail cost breakdown of the Contract price, to be referred to as the Schedule of Values, assigning values to each component of the Work.
a. Values must include all direct and indirect cost, although a separate value for bond cost may be established.
b. The Schedule of Values must contain sufficient detail to enable the Project Manager to evaluate applications for payment.
c. Before submitting a request for payment, the Contractor shall schedule a pencil copy review with the Project Manager for review and acceptance.
7. The contractor shall remove and dispose of all construction debris as it accumulates on a daily basis. Upon completion of work the contactor shall leave the premised clean and free of any debris.
SECURITY CLEARANCE REQUIREMENT
All contractor personnel performing working on premises at GSA owned and operated buildings are required to pass a security background check conducted by the Department of Homeland Security/Federal Protective Service. No contractor employee will be allowed to perform work on the building premises until employee has been determined to be suitable for hire by the Department of Homeland Security/Federal Protective Service.
Special CBP Requirements: In addition to the GSA security check, on all Customs and Border Protection facilities, an additional security check of all individuals entering the facility will be performed by Customs and Border Protection. The information required is Full Name, Date of Birth and Last 4 Digits of their Social Security Number. This information must be submitted to the Project Manager a minimum of 72 hours prior to entering the secured areas of the facilities for any reason. This includes all pre-bid and pre-construction meeting as well as all employees of the Contractor awarded the project.
WORKING HOURS
Normal business hours are Monday through Friday 6:00 am to 6:00 pm. Work performed under this Contract shall be performed during normal working hours of the building occupants and shall not interfere with the operations of the building. Any work that may disrupt the building tenants shall be scheduled at times other normal duty hours.
GSA Standard Form 139 will be posted at an agreed upon location at the job site. All personnel employed on the job site shall sign in daily upon arrival at the job site and sign out upon leaving. The Contractor shall submit such log to the GSA On-Site Representative each Monday for the preceding week.
Contractor shall submit a list of the personnel that will work on this project to the Project Manager (PM), Contracting Officer’s Representative (COR), and Contracting Officer (CO). Personnel list shall include name, date of birth and last four digits of social security number of each person.
PERIOD OF PERFORMANACE
All work shall be completed within 90 calendar days after equipment delivery and issuance of the full Notice to Proceed (NTP). A Limited Notice to Proceed (NTP) will be issued after bonds and insurance are accepted to authorize the contractor to order the equipment upon approved submittals. The contractor shall provide the GSA Project Manager a proof of purchase document for the approved equipment within 14 calendar days from the date the submittals were approved by the GSA project team.
LIQUIDATED DAMAGES
If substantial completion is not achieved, the Contracting Officer may assess liquidated damages at a rate of $158.00 per day.
PROJECT SCHEDULE
Contractor shall submit to the GSA Project Manager a project schedule within thirty (30) days of the Partial Notice to Proceed. The project schedule shall include a written narrative describing the major work activities, activities critical path and major constraints underlying the sequence and logic, all tasks to be performed under this project, duration of each task and tentative date/s each task will be performed. Project schedule must be approved by the GSA Project Manager prior to performing any work under this project. The project schedule shall incorporate milestone events specifics in the Contract, including as applicable NTP, Substantial Completion and milestones related to specific work phases and site restrictions. The project schedule shall also include Contractor-defined milestones to identify target dates for critical events, based upon the Contractor’s chosen sequence of work.
Microsoft Project or other similar format can be used for this schedule.
EXTENSION OF TIME
If the Contractor requests an extension of the time for Substantial Completion, the Contractor shall base its request on analysis of time impact using the Project Schedule as its baseline, and shall propose as a new Substantial Completion date to account for the impact. The Contractor shall submit a written request to the Contracting Officer setting forth facts and analysis in sufficient detail to enable the Contracting Officer to evaluate the Contractor’s entitlement to an extension of time. (See Section III.E. Extensions of Time in the Agreement)
GENERAL CONSTRUCTION REQUIREMENTS
1. Keep work areas clean on a daily basis.
2. Remove debris from site on a daily basis.
3. Protect all existing walls and furniture from damage.
4. Contractor is responsible for all damages to government property caused by him/her and their subcontractors.
5. Contractor is responsible for all dimensions and quantities. Any discrepancies between field conditions and this SOW shall be identified in writing to the CO as an RFI.
6. Contractor shall field verify all existing conditions prior to submitting a proposal.
7. Contractor shall not commence work unless authorized in writing by the CO. Only the CO, and no other person, is authorized to order the Contractor to start, stop and/or modify work.
8. All technical questions shall be addressed to the PM/COR for resolution.
9. Contractor shall not perform any work outside the written requirements in this SOW. Any changes to the SOW shall be authorized in writing by the CO in an official contract modification prior to performing the work.
10. All work shall be accomplished in accordance with contract specifications, technical requirements on this SOW.
11. Prior to beginning any work, the Contractor shall obtain any related permits required to complete the work requirements stated in this SOW.
12. Contractor shall verify the location of all underground utilities prior to any excavation or demolition operation taking place.
13. Contractor shall provide continuous competent supervision and adequate number of skilled workmen, materials and equipment to complete work requirements and meet the project schedule.
14. Contractor shall not use the work area to store any equipment materials not belonging to the Government. All equipment and/or materials related to the work to be performed, that are property of the Contractor, are the Contractor’s responsibility to secure daily. The Government shall not be liable for equipment and/or materials that get lost or stolen from the work area.
15. Contractor shall provide temporary safety barriers, as necessary, to provide safety for the workers, pedestrians and vehicles during construction.
16. Contractor shall ensure all Contractor employees use appropriate PPE at all times.
17. Contractor shall remove and dispose of excess materials, debris or waste at an approved off-site location in accordance with applicable Local, State and Federal laws and regulations, and pay any related fees. Burning or burial of materials is not permitted. Contractor shall not use existing, onsite, disposal receptacles intended for use by building occupants.
18. Although this SOW identifies specific elements of construction, it is the Contractor’s responsibility to provide any and all elements which are incidental to the functioning of the work to be provided.
19. All materials, finishes and hardware shall be selected for their ease of maintenance, high durability, and local availability, and shall be coordinated with those currently used in the building. Restoration of damaged elements or surfaces shall be promptly executed in like materials, as part of this contract.
20. Contractor shall be responsible for all cutting and patching incidental to the work described herein. All openings shall be sealed with fire stopping material. Contractor shall promptly repair/replace any damage to structures, elements, utilities, finishes, etc., occurring due to construction, as part of this contract.
21. Contractor shall bear full financial responsibility for any damages caused by the Contractor, or the Contractor’s employees, due to negligence or failure of the Contractor to ensure that reasonable precautions are taken to prevent damages caused by contracted work, to either public or private property. Any damage to property shall be repaired by the Contractor, at no cost to the Government, to match original conditions.
CONSTRUCTION WASTE MANAGEMENT PLAN SPECIFICS (AFTER CONTRACT AWARD)
Fourteen days (14) after receipt of the Partial Notice to Proceed, the Contractor shall submit to the Project Manager, a draft Waste Management Plan for mixed debris recycling to GSA approval. The plan shall include (but not be limited to) the following: List of the materials to be reused or recycled.
The Contractor will record and track the type and quantity, by weight or each material salvaged, reused, recycled or disposed throughout the project. The Contractor shall provide a Construction Management Waste Management Report upon request of Substantial Completion
SUSTAINABILITY
1. Green Purchasing:
a. The contractor shall refer to the “Green Procurement Compilation” for all products being installed in federal facilities. The Green Procurement Compilation can be found at https://sftool.gov/greenprocurement. The standards found in this compilation shall guide all product purchasing decisions as they relate to federal facilities.
b. The use of the following standards (“Key Sustainable Product” or “KSP” standards) is mandatory for all contracts and task orders. See https://sftool.gov/green-products/1037/key-sustainable-products for more details.
i. Nylon Carpet: NSF 140 Gold certification and > 10% post-consumer recovered content.
ii. Interior Latex Paint: < 50 grams per liter (g/L) VOCs post tint (i.e. SCAQMD Rule 1113 standard).
iii. Gypsum Board: Greenguard Gold Standard or 0 g/L VOCs.
iv. Acoustical Ceiling Tiles: Meets California Section 01350 standard for low-VOC materials and total recycled content > 20% and recyclable in a closed loop process and USDA Certified BioPreferred and Environmental Product Declaration (EPD) available.
v. Concrete (ready-mix and site-mix): > 25% fly ash or > 15% ground granulated blast-furnace (GGBF) slag
2. For each KSP listed, the Contractor shall submit proof of compliance to the CO or his designee prior to the installation of the product or material. The CO’s designee shall verify compliance.
If the KSP materials listed above are
a. not reasonably available within a reasonable period of time
b. fail to meet the performance standards set forth in the specification or fail to meet reasonable performance standards of GSA; or
c. are available only at an unreasonable price, only then can the Contractor use other types of products. In these cases the Contractor shall select products and materials, to the extent possible, which are the safest and most environmentally friendly. Exemptions must be submitted in writing and can only be approved by the CO
PRE-PROPOSAL CONFERENCE
Interested parties must notify the Contracting Officer for further information about attendance and to confirm location, time, and date. On all Customs and Border Protection facilities, an additional security check of all individuals entering the facility will be performed by Customs and Border Protection. The information required is Full Name, Date of Birth and Last 4 Digits of their Social Security Number. Only those parties who have notified the Contracting Officer and provided necessary information in advance of the meeting will be allowed to attend. Contractors are encouraged to verify all existing conditions at the job site prior to submitting a proposal. Failure to do so will not relieve the Contractor of any responsibility to properly estimate the cost of this project.
The following items will be discussed during the conference:
1. On site storage.
2. Parking.
3. Use of elevators.
4. Access through secured area.
5. Contractor shall coordinate with the GSA mechanical maintenance contractor, for placing the fire alarm system in test mode prior to performing any work that may result in the activation of an alarm signal from the fire alarm system including but not limited to: connecting devices to fire alarm system, cutting, welding or other work that creates excessive dust. Contractor is responsible for all costs associated with placing the fire alarm system in test mode.
6. A GSA approved welding permit will be required before performing any cutting and welding.
Contractor shall contact the GSA Project Manager at least 48 hours in advance to request a permit for cutting and welding.
7. Contractor shall be responsible for all quantities, measurements, correct installation of all items and for any damages to the building, items such as parked vehicles and surrounding areas.
8. All materials, equipment and supplies to be incorporated into work under the terms of this contract shall have been “NEW” and “UNUSED” at time of award.
9. Materials of equipment containing asbestos in any form shall not be incorporated into this project.
10. All material, workmanship and equipment shall be subject to the inspection and approval by the
Contracting Officer Representative. All work unsatisfactorily performed shall be promptly corrected and made acceptable for the Government.
FINAL PREPARATIONS
1. Contractor shall provide minimum four (4) hours of training to GSA maintenance personnel.
2. Contactor shall provide two (2) sets of as-built drawings on compact disk (CD). As-built drawings shall be in Auto CAD format and shall illustrate all alterations performed under this contract. Final payment will not be authorized until all as-built drawings are provided.
3. Contractor shall provide two hard copies (2) copies and one (1) on compact disk (CD) of owner’s (O&M) manuals for all new equipment.
4. Contractor shall return all GSA Badges issued for this project. Final payment will not be authorized until all O&M manuals and badges are provided and returned.
APPLICABLE PUBLICATIONS
A. Department of Labor:
1. Occupational and Health Standards: (29 CFR part 1926).
2. Safety and Health Regulations for Construction: (29CFR part 1518).
3. Federal Code:
All renovations shall be in accordance with the current design requirements as found in the Federal Construction & Safety Standard, and Third Party approved structure design package.
Latest Edition of the following Codes/Regulations:
4. Fire Codes: All units shall meet or exceed all required Federal, State and Local Fire Codes.
5. Housing & Urban Development (HUD 24 CFR 3280).
6. National Electrical Code (NEC).
7. International Building Code (IBC).
8. International Mechanical Code (IMC).
9. International Plumbing Code (IPC).
10. American Society of Heating, Refrigeration and Air Conditioning (ASHRA).
11. Occupational and Safety Act (OSHA).
12. National Fire Protection Association (NFPA).
13. U.S. Environmental Protection Agency (EPA), “Mold Remediation in Schools and Commercial
Buildings”.
B. Manufacture, installation and testing shall comply with manufacturer’s instructions and standards. When more stringent requirements are call for either this S.O.W. or codes and regulations, the priority of precedence in compliance shall be:
1. Federal Requirements.
2. State Requirements.
3. Local Requirements.
4. Manufacturer’s Requirements.
5. Contractor’s Requirements.
DISCLOSURE OF INFORMATION
1. Any information made available to the Contractor by the government shall be used only for the purpose of carrying out the provisions of this contract. This information shall not be divulged or made known in any manner to any persons except as may be necessary in the performance of the contract.
2. In the performance of this contract the Contractor assumes responsibility for the protection of the confidentiality of government records.
3. The Contractor shall adhere to the requirements found in Part 24 of the Federal Acquisition Regulation, Protection of Privacy and Freedom of Information.
WARRANTY
1. All workmanship and materials shall be warranted for a period of not less than three hundred sixty five (365) days from date of acceptance by the Government (Standard Warranty
2. The Contractor shall provide a copy of warranty of items procured. Warranty shall be in writing and shall include any conditions which may invalidate the warranty.
3. Warranty shall include procedures on how to exercise warranty rights. Provide points of contact in order to get services required.
4. Standard warranty shall be all inclusive of parts, labor and materials, related coverage and additional costs, if any.
5. Contractor shall provide all applicable manufacturers’ warranties at time of completion
END OF SCOPE OF WORK
GSA Solicitation No. GS-07-P-17-HT-C-0001 GSA Contract No. TBD
Document: C101-SAT / DEC 2016 (The Agreement) Pages 1 of 28
Simplified Acquisition Construction Contract for HVAC Replacements at Gateway and Los Indios LPOEs
The Agreement
Table of Contents
I. Project Information A. Project Summary B. The Contract C. Period of Performance D. Work Conditions/Site Requirements E. Authorized Representative F. Contract Liquidated Damages Rate G. Buy American Exceptions H. Statement of Work, Specifications, Drawings, Exhibits, and Other Attachments II. Prices A. Basis of Pricing B. Contract Price Form III. Terms and Conditions
A. Commencement, Prosecution, and Completion of Work B. Contractor Responsibilities C. Contractor Management and Personnel D. Material and Workmanship E. Project Schedule F. Extensions of Time G. Interpretation of Specifications and Drawings H. Submittals I. Government’s Right to Stop Work for Non-Compliance J. Other Contracts K. Substantial Completion and Contract Completion L. Use and Possession Prior to Substantial Completion M. Equitable Adjustments N. Finality of Contract Modifications O. Liquidated Damages P. Insurance Requirements Q. Administrative Matters R. Bonds S. Safeguarding Sensitive Data and Information Technology Resources T. Options and Allowances U. Additional Terms and Conditions
IV. Contract Clauses A. Clauses Incorporated in Full Text B. Clauses Incorporated by Reference
Pages 2 of 28
I. Project Information
I.A. Project Summary The contractor shall provide all materials, supplies, labor, equipment and supervision, necessary to remove and replace six (6) HVAC split systems. The Place of Performance is at the Gateway LPOE Kennels and the USDA Building at the Los Indios LPOE.
I.B. The Contract
(1) The Contract consists of the SF 1442, the Agreement, the Statement of Work, Specifications, Drawings, Exhibits, Amendments, Modifications, and other Attachments identified herein (collectively, the Contract Documents). The Contract contains the entire agreement of the Parties, and no prior written or oral agreement, express or implied, shall be admissible to contradict or modify any part of the Contract.
(2) The Contractor shall provide and pay for all labor, materials, equipment, tools, water, heat, utilities, transportation, and other facilities and services necessary for the proper execution of the work described in and reasonably inferable from the Contract Documents (the Work), whether temporary or permanent. In consideration for, and upon condition of, the Contractor's completion of the Work, GSA shall pay the Contractor the price or prices established in Section II, subject to the terms and conditions set forth in this Contract.
I.C. Period of Performance
(1) Commencement. The Contractor shall commence performance of the Work within 10 days after the Contractor receives the Notice to Proceed (NTP). A Limited Notice to Proceed (NTP) will be issued after bonds and insurance are accepted to authorize the contractor to order the equipment upon approved submittals.
(2) Substantial Completion. The Contractor shall achieve Substantial Completion of the Work, as that term is defined in this Agreement, no later than 75 calendar days from issuance of the Full Notice to Proceed (NTP).
(3) Contract Completion. The Contractor shall achieve Contract Completion, as the term is defined in this Agreement, within 90 calendar days of Substantial Completion
I.D. Work Conditions/Site Requirements All contractor and subcontractor employees will have to be vetted by the Customs and Border Protection Agency (CBP) as well as obtain security clearances from GSA.
I.E. Authorized Representative
(1) This Contract is between the United States of America, acting by and through the Administrator of General Services (GSA), and the Contractor (the Parties). References in this Contract to "the Owner" or "the Government" shall be understood to refer to GSA. The following individual is designated as the only authorized GSA representative under this Contract, unless other warranted contracting officers are designated in writing:
(The Agreement) Pages 3 of 28
Contracting Officer Name: Shawna Villarreal Address: 819 Taylor St RM 12B01, Fort Worth, TX 76102 Telephone: 817-850-5541 Email: Shawna.villarreal@gsa.gov
(2) Authorities and Limitations
(a) All rights, responsibilities and authorities of GSA under this Contract are vested in the Contracting Officer. The Contracting Officer may delegate these rights, responsibilities, and authorities to other GSA representatives. Such delegations shall be effective and binding only if communicated in writing to the Contractor, and subject to any limitations specified therein.
(b) The Contractor shall perform the Contract in accordance with any order (including but not limited to instruction, direction, interpretation, or determination) issued by the Contracting Officer or other representative to whom the Contracting Officer has delegated authority. The Contractor assumes all the risk and consequences of performing work in accordance with an order issued by a person lacking authority to issue such order.
I.F. Contract Liquidated Damages Rate In accordance with “Liquidated Damages” clause in Section III (Terms and Conditions), liquidated damages shall be calculated at the rate of $158.00 per calendar day.
I.G. Buy American Exceptions For the applicable Buy American clause and any exceptions, see Section IV of this Agreement.
I.H. Statement of Work, Specifications, Drawings, Exhibits, and Other Attachments The following documents are incorporated by reference into this Contract.
(1) Statement of Work, Dated 01/19/2017
(2) Wage Determination TX170285, Dated 01/06/2017
II. Prices
II.A Basis of Pricing
(1) Contract Prices. All Contract prices set forth in this Section include all costs necessary to complete the work for which the price is established (e.g., Base Contract, Unit Price, Options) in accordance with the Contract Documents, including, but not limited to, the cost of work performed by subcontractors and consultants, indirect costs, fees, expenses, taxes, and profit.
(2) Knowledge of Conditions Affecting Price. FAR 52.236-3, Site Investigations and Conditions Affecting the Work, is incorporated by reference in this Contract. The Contractor shall be presumed to have established all prices with knowledge of general and local conditions that may affect the cost of Contract performance at the site where the Work is to be performed, to the extent that such information is reasonably obtainable.
(The Agreement) Pages 4 of 28
(3) Unit Prices and Allowances. If any portion of the Work is to be performed on a unit price basis, the Unit Price shall include all costs of coordinating and incorporating the unit-priced portion of the Work into the Base Contract Work. The Contractor shall only be obligated to perform unit-priced work to the extent that an Allowance has been established. The Contractor shall be obligated to perform such work in excess of a unit quantity for which an Allowance is established only if directed by the Contracting Officer in writing. The Contractor shall be bound to the unit price or prices set forth herein in all equitable adjustments for changes including unit priced work, and no markups shall be applied to such unit prices.
(4) Options. If any portion of the Work is to be performed upon the timely exercise of an Option, the Option Price shall include all costs of coordinating and incorporating the Option-priced portion of the Work into the Base Contract Work. An adjustment to the Contract price for such additional work shall be computed solely on the basis of the Option price or prices set forth herein. Unless otherwise specified, all options may be exercised within 90 days of Contract award.
(5) Bid Rates. If this Contract includes Bid Rates to be used in determination of equitable adjustments (e.g., overhead, profit, daily rates for time-related costs), such rates shall be deemed to include all costs recoverable as components of an equitable adjustment consistent with the requirements, definitions, and exclusions applicable to equitable adjustments set forth in this Contract, and consistent with the Contractor's cost accounting practices. Unless otherwise specified, the bid rates shall be deemed to include only the Contractor's costs, and not the costs of any subcontractors.
Pages 5 of 28
II.B. Contract Price Form Please provide a detailed cost breakdown as well as providing your price on the SF 1442.
III. Terms and Conditions
III.A. Commencement, Prosecution, and Completion of Work The Contractor shall not commence the Work until the Contracting Officer has issued NTP. The Contractor shall diligently prosecute the Work so as to achieve Substantial Completion of the Work, as defined in Section III (Terms and Conditions), “Substantial Completion and Contract Completion” clause, within the time specified in Section I (Project Information), “Period of Performance” clause.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .