Solicitation_-_Sally_Port.pdf
PDF 498 KB Posted
- Attached to
- SallyPort/Elevator Construction - Houston, TX Federal contract opportunity
- Solicitation number
- GS-07P-15-UR-C-0005
About this file
Solicitation
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Pre-ProposalMTG-_Q A.pdf | ||
| Reps_and_Certs.pdf | ||
| Structural_Drawings.pdf | ||
| Architectural_Drawings.pdf | ||
| MEP_Drawings.pdf | ||
| Civil_-_Drawings.pdf | ||
| Statement_of_Work.pdf | ||
| Specs.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation Document
SallyPort/Elevator Construction
Bob Casey Federal Building, Houston, TX
GSA Solicitation No. GS-07P-15-UR-C-0005
Document: C201-SB / Dec 2014 (The Solicitation) Pages 1 of 26
Construction Contract for SallyPort/Elevator Construction, Bob Casey Federal Building, Houston, Texas The Solicitation
Notice to Offerors of Total Service-Disabled Veteran-Owned Small Business Set-Aside
The General Services Administration (GSA) is setting aside the contract under the following clause found in the Agreement:
52.219-27, Notice of Total Service-Disabled Veteran-Owned Small Business Set-Aside
Table of Contents
I. General Information A. The Solicitation and Contract B. List of Solicitation Documents C. Authorized Representatives D. Pre-Proposal Conference E. Estimated Price Range F. FAR 52.228-1 Bid Guarantee G. FAR 52.236-27 Site Visit - Construction H. Receipt of Offers
II. Proposals A. Proposal Contents B. Proposal Format C. Price Proposal D. Technical Proposal E. Other Information to be Submitted with Proposal F. Requirements for Joint Venture Offerors
III. General Provisions A. Availability of Funds B. Requests for Clarification or Interpretation C. Notice to Small Business Firms D. Information Concerning the Disclosure of Solicitation Results E. Affirmative Procurement Program F. Notice Concerning Preparation of Proposals G. Contractor Performance Information H. Safeguarding Documents Designated as Sensitive But Unclassified
IV. FAR/GSAR Solicitation Provisions A. FAR 52.215-1 Instructions to Offerors—Competitive Acquisition B. FAR 52.216-1 Type of Contract C. FAR 52.222-5 Construction Wage Rate Requirements—Secondary Site of the Work D. FAR 52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal
Employment Opportunity for Construction E. FAR 52.233-2 Service of Protest F. Buy American G. Buy American Exceptions
(The Solicitation) Pages 2 of 26
H. FAR 52.252-1 Solicitation Provisions Incorporated by Reference
V. Additional Solicitation Provisions and Instructions A. FAR Provisions Incorporated by reference B. FAR Provisions Full Text
VI. Method of Award A. Evaluation of Offers B. Determination of Responsibility C. Price Reasonablenes D. Unbalanced Prices E. Total Evaluated Price F. Non-Price Factors G. Evaluation of Joint Venture Offerors
(The Solicitation) Pages 3 of 26
I. General Information
I.A. The Solicitation and Contract
(1) This Solicitation is set-aside for Service-Disabled Veteran-Owned Small Businesses, in accordance with FAR 19. This Solicitation sets forth requirements for proposals for a Contract to construct the Project described in the attached Agreement. Proposals conforming to the Solicitation requirements will be evaluated in accordance with the Method of Award set forth herein. The Government will award the Contract to the selected Offeror, subject to the conditions set forth herein.
(2) Neither the Solicitation nor any part of an Offeror's proposal shall be part of the Contract except to the extent expressly incorporated therein by the Contracting Officer.
(3) The Offeror's proposal submitted in response to this Solicitation shall constitute a firm offer.
No contract shall be formed unless and until the Contracting Officer has countersigned the SF 1442 submitted by an Offeror, and delivered to the Contractor a copy of the SF 1442 with original signatures together with the Agreement reflecting the Offeror's proposed prices.
I.B. List of Solicitation Documents
The Solicitation Documents are comprised of:
(1) The Solicitation
(2) Offeror Representations and Certifications Form
(3) Other Forms Required For Submission with Proposals
(4) Standard Form (SF) 1442 – Solicitation Offer and Award
(5) The Agreement and Attachments to the Agreement
(6) The Statement of Work, Dated 10/10/2014
(7) Specifications and Drawings, Dated 3/18/2014
I.C. Authorized Representatives
The following individuals are designated as the authorized GSA representatives under this Solicitation:
(1) Contracting Officer
Name: Roderick Blouin Address: 1919 Smith Street, Houston, TX 77002
Telephone: 832-397-8458 Email: Roderick.blouin@gsa.gov
(2) Alternate Point of Contact
Name: Isaac Karto Address: 1919 Smith Street, Houston, TX 77002
Telephone: 832-397-8464 Email: Isaac.karto@gsa.gov
(The Solicitation) Pages 4 of 26
I.D. Pre-Proposal Conference
(1) A pre-proposal conference regarding this Solicitation is scheduled as follows:
Date: February 17, 2015 Time: 10:00 AM Central Standard Time
Location: 515 Rusk Ave, Conference Room 10004 Houston, TX 77002
(2) Interested parties must notify the Alternate Point of Contact for further information about attendance and to confirm location, time, and date. Only those parties who have notified the Contracting Officer and provided necessary information in advance of the meeting will be allowed to attend in person. To request a reasonable accommodation due to a disability, contact the Contracting Officer.
(3) Questions regarding this RFP will be addressed at a pre-proposal conference. All prospective Offerors shall submit in advance and in writing any questions they may have to Isaac Karto at Isaac.karto@gsa.gov. The submission of written questions will not preclude anyone from posing questions during the pre-proposal conference.
(4) Failure of a prospective Offeror to attend the pre-proposal conference will be construed to mean that the Offeror fully understands all requirements of the solicitation. Prospective Offerors are advised that the pre-proposal conference will be held solely for the purpose of explaining the concepts involved in the, specifications, terms, drawings and conditions of this solicitation. Interested Offerors are strongly encouraged to attend the pre-proposal conference. A site visit will be included as part of the pre-proposal conference.
(5) All prospective Offerors are advised that this solicitation will remain unchanged unless it is amended in writing. All amendments will be published on FedBizOpps.
(6)
I.E. Estimated Price Range
The estimated price range for the Project is between $1,000,000 and $5,000,000 .
I.F. FAR 52.228-1 Bid Guarantee (SEP 96)
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier’s check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds—
(1) To unsuccessful bidders as soon as practicable after the opening of bids; and
(2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.
(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3,000,000, whichever is less.
(The Solicitation) Pages 5 of 26
(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.
(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.
I.G. FAR 52.236-27 Site Visit - Construction (FEB 95)
(1) The clauses at FAR 52.236-2, Differing Site Conditions, and FAR 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation and are in the attached Agreement. Accordingly, Offerors are urged and expected to inspect the site where the work will be performed.
I.H. Receipt of Offers
(1) In order to be considered for award, offers conforming to the requirements of the Solicitation must be received at the following office no later than 3:00 PM CST local time on the following date and at the following address:
Date: March 2, 2015 Address: 1919 Smith Street, Suite 1600
Houston, TX 77002
(2) Offers sent by commercial package delivery and hand delivery shall be deemed received as of the date and time of delivery to the office designated for receipt of offers.
(3) Offers sent by United States Mail shall be deemed timely if delivered to the address of the government installation designated for receipt of offers on or before the date established for receipt of offers.
II. Proposals
II.A Proposal Contents Proposals shall consist of the following documents, completed and executed in accordance with this Solicitation:
(1) Price Proposal
(2) Technical Proposal
(3) Representations and Certifications (C301)
(4) Bid Guarantee, using Standard Form 24
II.B. Proposal Format
To aid in evaluation of proposals, each proposal shall be clearly and concisely prepared in writing: include all information required by the solicitation, with pages numbered and logically assembled. Each proposal shall identify name of Offeror, date of submission, and solicitation number.
(The Solicitation) Pages 6 of 26
Each proposal shall consist of one physical volume; titled, numbered, and containing a technical proposal, pricing proposal and the offeror representations and certifications. Each Proposal must also include a bid guarantee.
Offerors are to submit an original proposal and two additional copies.
II.C. Price Proposal
(1) Contents
The Price Proposal shall consist of the SF 1442 and the Agreement, with prices and/or rates indicated for each price element shown on the pricing form included in Section II of the Agreement. Indicate the Base Contract Price, or if no such distinction is made, the Contract Price, in Block 17 of the SF 1442, which must be fully executed by the Offeror.
(2) Qualifications, Exclusions and Conditions
If the Offeror communicates in its proposal any qualifications, exclusions, or conditions to the proposed prices not provided for in the Contract Documents, the Contracting Officer may reject the proposal and exclude the Offeror from further discussions.
(3) If the Offeror is proposing a Contractor Team Arrangement in accordance with FAR Subpart 9.601(1), either as a Joint Venture or Partnership:
• All offers submitted must include a copy of an executed joint venture or partnership agreement (with original signatures) which fully discloses the legal identity of each member, the relationship between the members, the form of ownership of each member, and any limitations on liability or authority for each member.
• An authorized representative of each member of the joint venture or partnership must sign the SF1442 accompanying an offer regardless of any agency relationship between the members
II.D. Technical Proposal
The Technical Proposal shall include the information requested below for the non-price factors described in Section VI.
(1) Management Plan
This factor is comprised of the offeror's management capability and ability for planning, organizing and controlling the execution of construction and repair and alteration projects simultaneously, including scheduling work, coordination of subcontractors, trades and suppliers, minimization of delays and compliance with tenants’ needs. It includes: the coordination to assure compliance with contract requirements; a safety plan, technique for dealing with issues, problems, questions, emergencies and other areas of concern.
Submittal Requirement:
The offeror shall submit a narrative describing their:
Plan for organizing and controlling projects.
Plan to manage sub-contractors (if any).
Sustainability and Waste Management Plan.
Quality Control Plan.
(The Solicitation) Pages 7 of 26
The offeror shall also submit a list of proposed sub-contractors (if any), and length of partnership.
Use the following questionnaire for your responses. Information must be typed.
You may create a computer-generated questionnaire to complete, as long as it mirrors exactly the questionnaire shown below. You may attach additional pages for your responses, if necessary.
2. Experience and Past Performance of the Firm.
A. List three (3) projects your firm has completed during the past five (5) years that are similar to this project. "Similar” is defined for this project as: Installation of (a) Sallyport (b) Installation of an Elevator on the exterior or interior of a building (c) Sallyport/elevator construction performed in a courthouse or similar building, where there is a high security requirement (d) Sallyport/elevator construction performed in a courthouse or similar building environment where there is an extremely delicate political requirement.
a). Name/Address of Building Owner:___________________________________
Building Owner's Representative's name, phone number and email address who can be contacted to verify the Offeror's experience and performance. (Do not include "General Contractors") _______________________________________
Elevator system's manufacturer: _________________________
Elevator system installed (include specific product names/types of system installed):
Exterior Elevator Height in stories:____________________ Sallyport Dimensions:_______________________________ Original construction award amount: __________________________________ Final construction cost at completion: _________________________________ Actual construction period: ____________to____________ b). Name/Address of Building Owner:___________________________________
Building Owner's Representative's name, phone number and email address who can be contacted to verify the Offeror's experience and performance. (Do not include "General Contractors") _______________________________________
Elevator system's manufacturer: ________________________________________
Elevator system installed (include specific product names/types of system installed):
Exterior Elevator Height in stories:____________________ Sallyport Dimensions:_______________________________ Original construction award amount: __________________________________ Final construction cost at completion: _________________________________ Actual construction period: ____________to____________
(The Solicitation) Pages 8 of 26 c). Name/Address of Building Owner:___________________________________
Building Owner's Representative's name, phone number and email address who can be contacted to verify the Offeror's experience and performance. (Do not include "General Contractors") _______________________________________
Elevator system's manufacturer: _________________________
Elevator system installed (include specific product names/types of system installed):
Exterior Elevator Height in stories:____________________ Sallyport Dimensions:_______________________________ Original construction award amount: __________________________________ Final construction cost at completion: _________________________________ Actual construction period: ____________to____________
If additional pages are needed to list additional "similar projects", copies of this page shall be made and included in the Offeror's proposal.
The Government is not limited to contacting only those references provided by the Offeror above. The Government may also consider the Offeror’s performance on contracts not submitted by the Offeror that the Government is aware of or becomes aware of as result of reference interviews or previous contracts with the Government.
Firm(s) without a past performance will be rated as neutral on this evaluation factor.
(The Solicitation) Pages 9 of 26
3. Experience and qualification of Key Personnel
Provide the following information regarding the experience and qualification of the Offeror's Key Personnel (Project Manager, On-Site Full Time Project Superintendent, etc.) proposed for this project. The experience must be on “similar” projects completed within the past five (5) years.
"Similar” is defined for this project as a) Installation of (a) Sallyport (b) Installation of an Elevator on the exterior or interior of a building (c) Sallyport/elevator construction performed in a courthouse or similar building, where there is a high security requirement (d) Sallyport/elevator construction performed in a courthouse or similar building environment where there is an extremely delicate political requirement.
Project Manager Qualifications:
Name: ________________________________________________ Years employed by Offeror: ______ a). Describe formal training and experience of the person to be assigned as the Project Manager. Attach any current certifications or licensing:
b). List the responsibilities of this position, including on-site monetary signature authority level proposed for this project:
c). List "similar projects", as previously defined, the Project Manager has completed within the past 5 years.
a). Project Manager employed by: _____________________________ Name/Address/Telephone Number of Building Owner:
Elevator system installed (include specific product names/types of system installed, etc.)
Exterior Elevator Height in stories:____________________ Sallyport Dimensions:_______________________________
(The Solicitation) Pages 10 of 26
Original construction award amount: __________________________________ Final construction cost at completion: _________________________________ Actual construction period: ____________to____________ b). Project Manager employed by: _____________________________ Name/Address of Building Owner: ___________________________
Elevator system installed (include specific product names/types of system installed, etc.)
Exterior Elevator Height in stories:____________________ Sallyport Dimensions:_______________________________ Original construction award amount: __________________________________ Final construction cost at completion: _________________________________ Actual construction period: ____________to____________ c). Project Manager employed by: _____________________________ Name/Address of Building Owner: ___________________________
Elevator system installed (include specific product names/types of system installed):
Exterior Elevator Height in stories:____________________ Sallyport Dimensions:_______________________________ Original construction award amount: __________________________________ Final construction cost at completion: _________________________________ Actual construction period: ____________to____________
No substitution for the proposed Project Manager shall be made without the prior approval by the Contracting Officer of his/her substitute.
If more than three (3) "similar projects" have been managed and completed by the proposed Project Manager within the past three (5) years, copies of this page shall be made and included in the Offeror's proposal.
Full Time On-site Construction Superintendent
Name: ________________________________________________ Years employed by Offeror: ______ years, ______ months
1). Describe formal training and experience of the person to be assigned as the full time on-site Construction Superintendent. Attach any current certifications or licensing.
(The Solicitation) Pages 11 of 26
2). List the responsibilities of this position including on-site monetary signature authority level proposed for this project:
3). List "similar projects", as previously defined, that the full time on-site Construction Superintendent has performed on 3 "similar projects" completed within the past 5 years.
a). ). Construction Superintendent employed by: ____________________ Name/Address of Courthouse: ___________________________ Elevator system's manufacturer:__________________ Type exterior elevator system installed: _________________
Elevator height in stories:____________ Sallyport dimensions:_______________ Original construction award amount: _________________________ Final construction cost at completion: ________________________ Original construction period: ___________to___________ Actual construction period: ____________to____________ b). Construction Superintendent employed by: ____________________ Name/Address of Courthouse: ___________________________ Elevator system's manufacturer:__________________ Type exterior elevator system installed: _________________
Elevator height in stories:____________ Sallyport dimensions:_______________ Original construction award amount: _________________________ Final construction cost at completion: ________________________ Original construction period: ___________to___________ Actual construction period: ____________to____________ c). ). Construction Superintendent employed by: ____________________ Name/Address of Courthouse: ___________________________
(The Solicitation) Pages 12 of 26
Elevator system's manufacturer:__________________ Type exterior elevator system installed: _________________
Elevator height in stories:____________ Sallyport dimensions:_______________ Original construction award amount: _________________________ Final construction cost at completion: ________________________ Original construction period: ___________to___________ Actual construction period: ____________to____________
No substitutions for the proposed Full Time On-site Construction Superintendent shall be made without the prior approval by the Contracting Officer of his/her substitute.
If more than three (3) "similar projects" have been supervised and completed by the proposed Full Time On-site Construction Superintendent within the past five (5) years, copies of this page shall be made and included in the Offeror's proposal.
II.E. Other Information to Submit with Proposal
(1) Representations and Certifications
Offerors submitting a proposal in response to this Solicitation shall complete electronic Annual Representations and Certifications in conjunction with required Entity registration in the System for Award Management (SAM), accessed via https://www.sam.gov. Offerors shall also submit with their proposal, the Annual Representations and Certifications (FAR 52.204-8), using the attached Offeror’s Representations and Certifications (C301).
II.F. Requirements for Joint Venture Offerors
(1) All offers submitted by joint ventures must include a copy of an executed joint venture agreement (with original signatures) which fully discloses the legal identity of each member of the joint venture, the relationship between the members, the form of ownership of each member, and any limitations on liability or authority for each member.
(2) An authorized representative of each member of the joint venture must sign the SF 1442 accompanying an offer regardless of any agency relationship established between the members.
(3) In the case of corporations that are joint venture members, the corporation secretary must certify that the corporation is authorized to participate in the joint venture, either by so certifying in the joint venture agreement, or by submitting a separate certification to the Government. The joint venture must also provide a certificate that identifies a principal representative of the joint venture with full authority to bind the joint venture.
(4) Representations and certifications, financial information, and past performance information must be submitted for each member of the joint venture.
III. General Provisions
III.A Availability of Funds
(The Solicitation) Pages 13 of 26
Issuance of this Solicitation does not warrant that funds are presently available for award of a Contract. Award of the contract shall be subject to the availability of appropriated funds, and the Government shall incur no obligation under this Solicitation in advance of such time as funds are made available to the Contracting Officer for the purpose of contract award.
III.B. Requests for Clarification or Interpretation
The Government will attempt to answer all requests for clarifications or interpretations of the Solicitation Documents prior to the date set for receipt of offers, but does not warrant that all such requests will be answered within 10 calendar days. Prospective Offerors should make such requests not less than 10 calendar days prior to the date set for receipt of offers.
III.C. Notice to Small Business Firms
A program for the purpose of assisting qualified small business concerns in obtaining certain bid, payment, or performance bonds that are otherwise not obtainable is available through the Small Business Administration (SBA) (www.sba.gov). For information concerning SBA's surety bond guarantee assistance, contact your SBA District Office.
III.D. Information Concerning the Disclosure of Solicitation Results
This acquisition is being conducted under the provisions of FAR Part 15 as a negotiated procurement. In accordance with FAR 3.104 and FAR 15.207, after receipt of proposals, no information regarding the identity of those submitting offers, the number of offers received, or the information contained in such offers will be made available until after award except as provided by FAR 15.503.
III.E. Affirmative Procurement Program
GSA has implemented an Affirmative Procurement Program (APP) intended to maximize the use of recovered materials, environmentally preferable, and bio-based products. Offerors should familiarize themselves with the requirements for using and reporting on the use of such materials in performance as set forth in the Agreement. Refer to clauses FAR 52.204-4 requiring double sided printing on recycled paper for all reports and FAR 52.223-10 encouraging vendors to practice waste reduction.
III.F. Notice Concerning Preparation of Proposals
Offerors are cautioned to carefully read the entire Solicitation and the Agreement to be included in the Contract contemplated by the Solicitation in order to be fully aware of all requirements and clauses in the contemplated Contract. Verify that all blanks requiring information to be supplied in an Offer have been properly filled out, that all pricing and other numerical data is accurately calculated, and that all copies of the Offer contain the same information.
III.G. Contractor Performance Information
(1) Evaluating Contractor Performance: The General Services Administration is using the Contractor Performance Assessment Reporting System (CPARS) module as the secure, confidential, information management tool to facilitate the performance evaluation process.
CPARS enables a comprehensive evaluation by capturing comments from both GSA and the contractor. The website for CPARS is http://www.cpars.gov
Completed CPARS evaluations are sent to the Past Performance Information Retrieval System (PPIRS) which may then be used by Federal acquisition community for use in making source selection decisions. PPIRS assists acquisition officials by serving as the single source for contractor past performance data.
(The Solicitation) Pages 14 of 26
(2) CPARS Registration: Each award requiring an evaluation must be registered in CPARS.
The contractor will receive several automated emails. Within thirty days of award, the contractor will receive an e-mail that contains user account information, as well as the applicable contract and order number(s) assigned. Contractors will be granted one user account to access all evaluations.
(3) Contractor CPARS Training: Contractors may sign up for CPARS training. A schedule of classes will be posted to the CPARS training site (http://www.cpars.gov/allapps/cpcbtdlf.htm) and updated as needed.
(4) Contractor Representative (CR) Role: All evaluations will be sent the Contractor Representative (CR) named on your award. The CR will be able to access CPARS to review and comment on the evaluation. If your CR is not already in the CPARS system, the contracting officer will request the name and email address of the person that will be responsible for the CR role on your award.
Once an evaluation is ready to be released the CR will receive an email alerting them the evaluation is ready for their review and comment. The email will indicate the time frame the CR has to respond to the evaluation; however, the CR may return the evaluation earlier than this date.
GSA shall provide for review at a level above the contracting officer (i.e., contracting director) to consider any disagreement between GSA and the contractor regarding GSA’s evaluation of the contractor. Based on the review, the individual at a level above the contracting officer will issue the ultimate conclusion on the performance evaluation.
Copies of the evaluations, contractor responses, and review comments, if any, will be retained as part of the contract file.
III.H. Safeguarding Documents Designated as Sensitive But Unclassified
Certain information contained in the Solicitation Documents may have been designated as Sensitive but Unclassified (SBU) building information. With respect to such information, Offerors shall agree to the terms for receipt of such information, as set forth in the provision “Administrative Matters” in Section III of the Agreement, as a condition of receipt of such information.
IV. FAR/GSAR Solicitation Provisions
IV.A. FAR 52.215-1 Instructions to Offerors—Competitive Acquisition (JAN 04)
(a) Definitions. As used in this provision— “Discussions” are negotiations that occur after establishment of the competitive range that may, at the Contracting Officer’s discretion, result in the offeror being allowed to revise its proposal.
“In writing,” “writing,” or “written” means any worded or numbered expression that can be read, reproduced, and later communicated, and includes electronically transmitted and stored information.
“Proposal modification” is a change made to a proposal before the solicitation’s closing date and time, or made in response to an amendment, or made to correct a mistake at any time before award.
“Proposal revision” is a change to a proposal made after the solicitation closing date, at the request of or as allowed by a Contracting Officer as the result of negotiations.
“Time,” if stated as a number of days, is calculated using calendar days, unless otherwise specified, and will include Saturdays, Sundays, and legal holidays. However, if the
(The Solicitation) Pages 15 of 26 last day falls on a Saturday, Sunday, or legal holiday, then the period shall include the next working day.
(b) Amendments to solicitations. If this solicitation is amended, all terms and conditions that are not amended remain unchanged. Offerors shall acknowledge receipt of any amendment to this solicitation by the date and time specified in the amendment(s).
(c) Submission, modification, revision, and withdrawal of proposals.
(1) Unless other methods (e.g., electronic commerce or facsimile) are permitted in the solicitation, proposals and modifications to proposals shall be submitted in paper media in sealed envelopes or packages (i) addressed to the office specified in the solicitation, and
(ii) showing the time and date specified for receipt, the solicitation number, and the name and address of the offeror. Offerors using commercial carriers should ensure that the proposal is marked on the outermost wrapper with the information in paragraphs (c)(1)(i) and (c)(1)(ii) of this provision.
(2) The first page of the proposal must show—
(i) The solicitation number;
(ii) The name, address, and telephone and facsimile numbers of the offeror (and electronic address if available);
(iii) A statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation and agreement to furnish any or all items upon which prices are offered at the price set opposite each item;
(iv) Names, titles, and telephone and facsimile numbers (and electronic addresses if available) of persons authorized to negotiate on the offeror’s behalf with the Government in connection with this solicitation; and
(v) Name, title, and signature of person authorized to sign the proposal.
Proposals signed by an agent shall be accompanied by evidence of that agent’s authority, unless that evidence has been previously furnished to the issuing office.
(3) Submission, modification, revision, and withdrawal of proposals.
(i) Offerors are responsible for submitting proposals, and any modifications or revisions, so as to reach the Government office designated in the solicitation by the time specified in the solicitation. If no time is specified in the solicitation, the time for receipt is 4:30 p.m., local time, for the designated Government office on the date that proposal or revision is due.
(ii) (A) Any proposal, modification, or revision received at the Government office designated in the solicitation after the exact time specified for receipt of offers is “late” and will not be considered unless it is received before award is made, the Contracting Officer determines that accepting the late offer would not unduly delay the acquisition; and—
(1) If it was transmitted through an electronic commerce method authorized by the solicitation, it was received at the initial point of entry to the Government infrastructure not later than 5:00 p.m. one working day prior to the date specified for receipt of proposals; or
(2) There is acceptable evidence to establish that it was received at the Government installation designated for receipt of offers and was under the Government’s control prior to the time set for receipt of offers; or
(3) It is the only proposal received.
(B) However, a late modification of an otherwise successful proposal that makes its terms more favorable to the Government, will be considered at any time it is received and may be accepted.
(iii) Acceptable evidence to establish the time of receipt at the Government installation includes the time/date stamp of that installation on the proposal wrapper, other
(The Solicitation) Pages 16 of 26 documentary evidence of receipt maintained by the installation, or oral testimony or statements of Government personnel.
(iv) If an emergency or unanticipated event interrupts normal Government processes so that proposals cannot be received at the office designated for receipt of proposals by the exact time specified in the solicitation, and urgent Government requirements preclude amendment of the solicitation, the time specified for receipt of proposals will be deemed to be extended to the same time of day specified in the solicitation on the first work day on which normal Government processes resume.
(v) Proposals may be withdrawn by written notice received at any time before award. Oral proposals in response to oral solicitations may be withdrawn orally. If the solicitation authorizes facsimile proposals, proposals may be withdrawn via facsimile received at any time before award, subject to the conditions specified in the provision at 52.215-5, Facsimile Proposals. Proposals may be withdrawn in person by an offeror or an authorized representative, if the identity of the person requesting withdrawal is established and the person signs a receipt for the proposal before award.
(4) Unless otherwise specified in the solicitation, the offeror may propose to provide any item or combination of items.
(5) Offerors shall submit proposals in response to this solicitation in English, unless otherwise permitted by the solicitation, and in U.S. dollars, unless the provision at FAR 52.225- 17, Evaluation of Foreign Currency Offers, is included in the solicitation.
(6) Offerors may submit modifications to their proposals at any time before the solicitation closing date and time, and may submit modifications in response to an amendment, or to correct a mistake at any time before award.
(7) Offerors may submit revised proposals only if requested or allowed by the Contracting Officer.
(8) Proposals may be withdrawn at any time before award. Withdrawals are effective upon receipt of notice by the Contracting Officer.
(d) Offer expiration date. Proposals in response to this solicitation will be valid for the number of days specified on the solicitation cover sheet (unless a different period is proposed by the offeror).
(e) Restriction on disclosure and use of data. Offerors that include in their proposals data that they do not want disclosed to the public for any purpose, or used by the Government except for evaluation purposes, shall—
(1) Mark the title page with the following legend:
This proposal includes data that shall not be disclosed outside the Government and shall not be duplicated, used, or disclosed—in whole or in part—for any purpose other than to evaluate this proposal. If, however, a contract is awarded to this offeror as a result of—or in connection with—the submission of this data, the Government shall have the right to duplicate, use, or disclose the data to the extent provided in the resulting contract. This restriction does not limit the Government's right to use information contained in this data if it is obtained from another source without restriction. The data subject to this restriction are contained in sheets [insert numbers or other identification of sheets]; and
(2) Mark each sheet of data it wishes to restrict with the following legend:
Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.
(f) Contract award.
(1) The Government intends to award a contract or contracts resulting from this solicitation to the responsible offeror(s) whose proposal(s) represents the best value after evaluation in accordance with the factors and subfactors in the solicitation.
(The Solicitation) Pages 17 of 26
(2) The Government may reject any or all proposals if such action is in the Government’s interest.
(3) The Government may waive informalities and minor irregularities in proposals received.
(4) The Government intends to evaluate proposals and award a contract without discussions with offerors (except clarifications as described in FAR 15.306(a)). Therefore, the offeror’s initial proposal should contain the offeror’s best terms from a cost or price and technical standpoint. The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. If the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.
(5) The Government reserves the right to make an award on any item for a quantity less than the quantity offered, at the unit cost or prices offered, unless the offeror specifies otherwise in the proposal.
(6) The Government reserves the right to make multiple awards if, after considering the additional administrative costs, it is in the Government’s best interest to do so.
(7) Exchanges with offerors after receipt of a proposal do not constitute a rejection or counteroffer by the Government. (f)(4) The Government intends to evaluate proposals and award a contract after conducting discussions with offerors whose proposals have been determined to be within the competitive range. If the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals. Therefore, the offeror's initial proposal should contain the offeror's best terms from a price and technical standpoint.
(8) The Government may determine that a proposal is unacceptable if the prices proposed are materially unbalanced between line items or subline items. Unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or more contract line items is significantly overstated or understated as indicated by the application of cost or price analysis techniques. A proposal may be rejected if the Contracting Officer determines that the lack of balance poses an unacceptable risk to the Government.
(9) If a cost realism analysis is performed, cost realism may be considered by the source selection authority in evaluating performance or schedule risk.
(10) A written award or acceptance of proposal mailed or otherwise furnished to the successful offeror within the time specified in the proposal shall result in a binding contract without further action by either party.
(11) If a post-award debriefing is given to requesting offerors, the Government shall disclose the following information, if applicable:
(i) The agency’s evaluation of the significant weak or deficient factors in the debriefed offeror’s offer.
(ii) The overall evaluated cost or price and technical rating of the successful and the debriefed offeror and past performance information on the debriefed offeror.
(iii) The overall ranking of all offerors, when any ranking was developed by the agency during source selection.
(iv) A summary of the rationale for award.
(v) For acquisitions of commercial items, the make and model of the item to be delivered by the successful offeror.
(vi) Reasonable responses to relevant questions posed by the debriefed offeror as to whether source-selection procedures set forth in the solicitation, applicable regulations, and other applicable authorities were followed by the agency.
(The Solicitation) Pages 18 of 26
IV.B. FAR 52.216-1 Type of Contract (APR 84)
The Government contemplates award of a Firm-Fixed-Price contract resulting from this solicitation.
IV.C. FAR 52.222-5 Construction Wage Rate Requirements—Secondary Site of the Work
(MAY 14)
(a) (1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements, of this solicitation.
(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.
(b) (1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.
(2) The due date for receipt of offers will not be extended as a result of an offeror’s request for a wage determination for a secondary site of the work.
IV.D. FAR 52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for Construction (FEB 1999)
(Applicable to solicitations resulting in construction contracts in excess of $10,000.)
(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:
Goals for Minority Participation for Each Trade Goals for Female Participation for Each Trade
27.3%. 6.9%
These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.
(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order
(The Solicitation) Pages 19 of 26
11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.
(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the--
(1) Name, address, and telephone number of the subcontractor;
(2) Employer's identification number of the subcontractor;
(3) Estimated dollar amount of the subcontract;
(4) Estimated starting and completion dates of the subcontract; and
(5) Geographical area in which the subcontract is to be performed.
(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is:
Houston, Harris County Texas
IV.E. FAR 52.233-2 Service of Protest (SEP 06)
(a) Protests, as defined in section 31.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from the Contracting Officer at the address provided in the provision “Receipt of Offers” in Section I (General Information).
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.
IV.F. Buy American
52.225-10 Notice of Buy American Requirement—Construction Materials (MAY 2014)
(a) Definitions. “Commercially available off-the-shelf (COTS) item,” “construction material,” “domestic construction material,” and “foreign construction material,” as used in this provision, are defined in the clause of this solicitation entitled “Buy American --Construction Materials” (Federal Acquisition Regulation (FAR) clause 52.225-9).
(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-9 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.
(c) Evaluation of offers.
(1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction material, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(3)(i) of the clause at FAR 52.225-9.
(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an
(The Solicitation) Pages 20 of 26 exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.
(d) Alternate offers.
(1) When an offer includes foreign construction material not listed by the Government in this solicitation in paragraph (b)(2) of the clause at FAR 52.225-9, the offeror also may submit an alternate offer based on use of equivalent domestic construction material.
(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of the clause at FAR 52.225-9 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.
(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of the clause at FAR 52.225-9 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic construction material, and the offeror shall be required to furnish such domestic construction material. An offer based on use of the foreign construction material for which an exception was requested—
(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or
(ii) May be accepted if revised during negotiations.
(End of provision)
IV.G. Buy American Exceptions
For Buy American exceptions, if any, see the applicable Buy American clause in Section IV of the Agreement.
IV.H. FAR 52.252-1 Solicitation Provisions Incorporated by Reference (FEB 98)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .