Statement of Work
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| The_Agreement_Above_SAT.pdf | ||
| The_Solicitation_Above_SAT.pdf | ||
| Amendment_0001_-_Answers_to_RFI's.pdf | ||
| Amendment_0001_(GS-06-P-17-TC-P-0007_0001).pdf | ||
| SF1442_(GS-06-P-17-TC-P-0007).pdf | ||
| The_Agreement.pdf | ||
| DBWD_NE58_162017.pdf | ||
| The_Solicitation.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Manual
GSA-PBS
Nebraska Field Office
FY17 Repair Miscellaneous
Deficiencies
NE0531ZZ, Denney Federal Building & US
Courthouse, Lincoln NE
PROJECT MANUAL
30 NOV, 2016
100% Submittal
TABLE OF CONTENTS
Section 00 01 10
DIVISION 01 - GENERAL REQUIREMENTS
SOW
Existing conditions photos
01 59 30 Security Regulations
01 31 00 Project Management and Coordination
01 74 19 Construction Waste Management, Diversion, and Disposal Specifictation
DIVISION 23 – HEATING VENTILATING AND AIR CONDITIONING
23 05 00 Common Work Results HVAC
23 21 23 Hydronic Pumps
EQUIPMENT SPECIFICATIONS
SOW CORRECT DEFICIENCIES
DENNEY FEDERAL BUILDING
11/30/16
SENSITIVE BUT UNCLASSIFIED (SBU). PROPERTY OF THE UNITED STATES GOVERNMENT FOR OFFICIAL
USE ONLY. Do not remove this notice. Properly destroy or return documents when no longer needed.
SCOPE OF WORK
CORRECT MISCELLANEOUS DEFICIENCIES
SECTION: SUMMARY OF WORK
The Contractor shall furnish all necessary labor, material, equipment, and supervision to Correct identified electrical and HVAC deficiencies as described in this SOW, at the Denney Federal
Building, 100 Centennial Mall N, Lincoln, NE 68508.
SECTION: REQUIREMENTS
Contractors shall visit the site and perform a thorough site inspection. The contractor shall inspect the site to become familiar with the existing conditions relating to the work to be performed and the difficulties and restrictions to the work to be performed. The contractor shall notify the CO of any conditions that prevent the suitable completion of these requirements. All work shall be performed in accordance with attached specifications and drawings .
The work includes, but is not limited to the following:
1. UPGRADE CHILLER CONTROL PANELS
a. Contractor shall replace control panels on three (3) TRANE Centravac chillers
Model Number CVHE050FA3 (Chillers 1, 2, and 3)
b. Record present chiller operation and logged data.
c. Contractor is responsible for the removal and salvage of existing chiller controls.
d. Install new TRANE Tracer Adaptiview control panels (or an approved equivalent).
e. Configure the controller for proper operation, startup, and logging.
f. Program controller to communicate and function with the current BAS system
(LonWorks Protocol)
g. Label control panel per existing configuration.
h. Commission new controllers with a certified Trane representative.
i. Place panels into service.
2. REPLACE PURGE PUMPS
a. Contractor shall replace two (2) purge pumps, one (1) each on chillers one (1) and two (2). Chillers are Trane Centravac chillers Model Number
CVHE050FA3.
b. Disconnect and salvage two (2) existing purge pumps. All refrigerant shall be captured by a licensed HVAC technician.
c. Install new Trane Earthwise purge unit (or an approved equivalent) with interface panel.
d. Pipe new purge unit to existing suction, return, and plumbing lines.
e. Link purge unit to new Chiller control panel.
f. Label purge pumps per existing configuration.
11/30/16
SENSITIVE BUT UNCLASSIFIED (SBU). PROPERTY OF THE UNITED STATES GOVERNMENT FOR OFFICIAL
USE ONLY. Do not remove this notice. Properly destroy or return documents when no longer needed.
g. Commission new Earthwise Purge units (or approved equivalents ) with a certified Trane representative
h. Place units into service.
3. REPLACE CHILLED WATER PUMPS ONE (1), TWO (2), AND THREE (3)
a. Contractor shall replace three (3) 15 HP frame mounted chilled water pump assemblies labeled CWP#1, CWP#2, and CWP#3.
b. Remove and salvage existing pump assemblies.
c. Install new frame mounted end suction four hundred eighty (480) volt, fifteen
(15) Horse Power, thirty five (35) foot head pressure, eight hundred (800) gallons per minute pump assemblies.
d. Pumps shall be inverter rated with grounding rings.
e. Contractor is responsible for all wiring, programming, and configuration to make the new pumps work with the existing associated VFD’s.
f. Install an appropriately sized Patterson EnviroFlo ES Series Pump assembly (or an approved equivalent).
g. Contractor is responsible for all adjustments necessary to configure current supply and return piping. All Insulation types and colors shall match existing.
Match existing labeling where required.
h. Contractor is responsible for all adjustments necessary to concrete base pads and rails necessary for the new pump assemblies.
i. Replace butterfly valves at the pumps with Milwaukee (or an approved equivalent) one hundred seventy five (175) to two hundred (200) PSI constant water pressure thirty to one (30:1), EPMD seat, gear driven valves.
j. Raise filter basket assemblies on supply side of pipe to allow for the installation of an appropriately sized rubber expansion joint (anti vibration).
k. Replace existing gauges with like one hundred sixty (160) PSI gauges.
l. Label all pumps per existing configuration.
m. Commission pumps and put into service.
11/30/16
SENSITIVE BUT UNCLASSIFIED (SBU). PROPERTY OF THE UNITED STATES GOVERNMENT FOR OFFICIAL
USE ONLY. Do not remove this notice. Properly destroy or return documents when no longer needed.
4. ADDITIONAL REQUIREMENTS
a. All new valves installed shall be flanged.
b. All spool pieces, extensions, and additions to any existing pipe shall be of similar material (metal).
c. All insulation, labeling, welding, and finished shall match existing and be performed by experienced craftsmen.
d. Contractor shall supply all operational and maintenance manuals for all installed equipment.
e. Contractor shall provide up to four (4) hours of training by qualified personnel on the operation and maintenance of all installed equipment.
f. Contractor shall provide an initial schedule with all associated equipment and material lead times. The Contractor will be responsible for updating schedule weekly, or as requested by GSA, to account for delays, extended lead times, etc.
g. Contractor is required to provide single point of contact.
h. All submittals shall be provided to GSA no later than 48 hours prior to the Pre
Start meeting.
i. All utility outages shall be scheduled with the building manager.
j. All hot/burn permits shall be scheduled with the building manager.
SECTION: SUPPLIES, MATERIALS AND EQUIPMENT.
Materials, supplies and equipment used shall be commercially available products of reputable manufacturer or suppliers and shall be approved by the Contracting Officer
(CO) prior to starting the work. The contractor shall not use any material which the CO determines would be unsuitable for any purpose. The contractor shall provide submittals for all project equipment and material, for approval prior to execution of any work.
SECTION: WORK RESTRICTIONS
CONTRACTOR USE OF PREMISES: During the construction period the Contractor shall limit use of the premises to the work area indicated, to allow for Government occupancy and public use. The following guidance shall be adhered to:
1. Prior to construction, provide a written list of employees and subcontractor employees that will be working within the building during the contract period to the Building
Manager or Contracting Officer’s Representative (COR).
2. Keep entrances serving the premises clear and available at all times to the Government, Government employees, and visitors. Do not use these areas for parking or storage of materials.
3. Schedule deliveries to minimize space and time required for storage of materials and equipment on site.
4. Take precautions to protect the building, its occupants, and the public during the construction period. The Contractor is responsible to provide all labor and materials for dust control, provide adequate barriers to prevent Government Employees or the public from entering the construction area, all signage indicating necessary requirements for entering the construction area, and any other precaution necessary to provide a safe environment for Contractor personnel, Government employees and the public.
5. Space on the premises will be made available for the Contractor’s storage and related activities, provided that its use will not interfere with the operation of the Government.
Arrange and gain approval for the use of this space through the Building Manager or the
Contracting Officer’s Representative.
6. Daily issuance of keys and / or key cards will be provided by an on-site GSA field office representative. Keys will only be issued to the General Contractor unless the General
Contractor provides a list of sub’s authorized to sign for keys. Keys will only be issued to people that have received a favorable HSPD-12 security clearance. Keys must be returned to the GSA office daily.
7. Use of the loading dock facilities will be shared with Government activities on a first-come-first-served, wait-your-turn basis.
8. No apparatus with an open flame, grinding that creates sparks, or grinding that creates excessive dust is allowed to be used within the facility without prior receipt of a burn permit. Burn permits are required for each separate occurrence. Burn permits will be issued on a daily basis by a GSA representative and must be returned at close of business each day.
CONTRACT PERIOD: All work shall be completed within (60) calendar days of notice to proceed.
WORKING HOURS: Work shall be completed during normal working hours of 7 a.m. & 4 p.m.
Monday through Friday.
All work shall be scheduled through the Building Manager or their representative a minimum of two weeks in advance. Work shall be performed in a manner to avoid disruption of court proceedings.
SECTION: SUBMITTALS AND SUBSTITUTIONS
SUBMITTALS: Contractor shall provide submittals to the Project Manager or COR for approval within 10 days after receiving notice to proceed. No work shall proceed until submittals are approved by the COR. The Contractor shall submit for review to the COR prior to demolition, purchase, fabrication, or installation of materials.
1. Construction Schedule, including:
a. Lead time for materials
b. Task with start, stop & duration
c. Description of work
d. Impact to tenants (work area access)
2. Security Clearance Status Verification Form
3. Personnel listing
4. TRANE Certification for person doing commisioning
5. Waste Management Plan
6. Equipment Submittals
a. Chiller Control Panel
b. Centravac Chiller purge pump
c. 75 HP VFD
d. 15 HP 800 GPM chilled water pump assembly
e. 6” 30:1 gear driven valve
f. 12” 30:1 gear driven valve
g. 160 PSI gauges
PRODUCT SUBSTITUTIONS: For all items listed with a Brand Name or Equal, refer to
FAR 52.211-6 Brand Name or Equal. An Offeror who proposes to submit a quote based on an alternate or substitute construction material shall provide a sample of the alternate material with cut sheets, warranty, maintenance data, and sufficient technical information to ensure the material meets all salient characteristics of the building materials specified in this specification with their quote. The alternate or “equal” material information and material sample must be provided on or before the due date of the Request for Quote (RFQ).
SECTION: QUALITY REQUIREMENT
All work performed to accomplish the work specified herein shall be in strict compliance with the manufacturers’ written recommendations and all nationally or locally recognized governing bodies. Qualified installers shall install each category of work. Contractor shall without additional expense to the Government, be responsible for obtaining any necessary licenses and permits, and for complying with any Federal, State, and municipal laws, codes and regulations applicable to the performance of this work. If two codes are in conflict, the most stringent will be applied.
All work to be performed under this contract shall be executed in a careful and orderly manner by workmen skilled in their respective trades or class of work. The work shall consist of furnishing and installing all new work and doing all necessary removing, patching, filling-in, repairing, and altering of existing work specified to be performed. The materials and methods of application for new work and for patching, filling-in, and repairing shall be similar and equal quality in its new state and shall be installed in compliance with standard trade practices.
All work shall be completed in compliance with Building Standards. Lists of Building Standards are available in the Field Office upon request.
SECTION: TEMPORARY FACILTIES AND CONTROLS
UTILITY SHUTDOWN: All utility (electrical, water, sanitary, sprinkler, or HVAC) shutdowns must be scheduled with the GSA Building Manager or the COR, at a minimum of seventy-two
(72) hours in advance, and may be required to be completed after hours.
SECTION: EXECUTION REQUIREMENTS
All work must be performed by the Contractor unless noted otherwise.
WORKMANSHIP STANDARDS: The Contractor shall ensure that personnel performing tasks required under this contract are skilled and knowledgeable in the methods and craftsmanship needed to produce journeymen level of workmanship. Remove and replace work that does not comply with workmanship specified and standards recognized in the construction industry for the applications indicated. Any work performed by the Contractor that is found to be faulty or fails to meet acceptable construction standards shall be removed and replaced by the Contractor at no additional cost to the Government.
1. Manufacturer's Instructions: Where installations include manufactured products, comply with manufacturer's applicable installation instructions and recommendations to the extent that those instructions and recommendations are more explicit or stringent than requirements contained in the Contract Documents.
2. Specialists: Where the individual sections of the specifications require specialists to perform the work, comply with the requirements specified. The assignment of a specialist shall not relieve the Contractor of installation in accordance with all manufacturers’ written instructions and all nationally or locally recognized governing bodies.
CLEAN-UP: The Contractor shall be responsible for removal and legal disposal of all debris created by the work specified herein from the premises. The Contractor shall clean up the immediate area on a daily basis and must keep the area safe at all times.
SECTION: CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
The Contractor shall use all practical means to divert waste from landfills by salvaging, recycling, or reusing demolition and construction materials.
Waste Management Plan: Submit plan within 14 days of date established for the Notice to
Proceed, prepare and submit a Solid Waste Management Plan including, but not limited to, the following:
1. List of the recycling facilities, reuse facilities, municipal solid waste landfills and other disposal area(s) to be used. Include name, location, and phone number.
2. Identify materials that cannot be recycled or reused. Provide explanation or justification.
3. Distinguish between demolition and construction waste.
4. List each type of waste and whether it will be salvaged, recycled, or disposed of in landfill or incinerator.
Waste Reduction Report: Concurrent with request for Substantial Completion, submit reports for construction waste and for demolition waste. Include the quantities of waste salvaged and waste recycled.
Landfill and Incinerator Disposal Records: Indicate receipt and acceptance of waste by landfills and incinerator facilities licensed to accept them. Include manifests, weight tickets, receipts, and invoices.
Implement approved waste management plan. Provide handling, containers, storage, signage, transportation, and other items as required to implement waste management plan during the entire duration of the Contract.
DISPOSAL OF WASTE: Except for items or materials to be salvaged, recycled, or otherwise reused, remove waste materials from Project site and legally dispose of them in a landfill or incinerator acceptable to authorities having jurisdiction.
SECTION: CLOSEOUT
SUBSTANTAL COMPLETION is defined as that state when the Contractor has complied with the Contract Requirements, except for minor deviations, and the project is sufficiently complete and capable of being occupied and used by the Government for the intended purpose.
INSPECTION PROCEDURES: On receipt of the Contractor’s request for inspection, the COR or government designated representative will either proceed with the inspection or advise the
Contractor of unfilled requirements. If the Contractor is aware of any unfilled requirements prior to the inspection, the Contractor shall provide a list of incomplete items with a reason work is not complete. The COR will notify the Contractor once the project is substantially complete. This does not relieve the Contractor from correcting all punch list items. The Government may withhold funds until all items included in the Contract have been successfully completed.
SECTION: RECORD DOCUMENTS
1. Warranty, including all labor and material, dated one year from substantial completion.
2. Waste Diversion Report.
FINAL CLEANING: Employ experienced workers or professional cleaners for final cleaning.
Clean each surface or unit to the condition expected in a normal, commercial cleaning and maintenance program. Comply with the manufacturer’s instructions. Remove all temporary protection or facilities installed for the protection of new work and all barriers erected around the construction area for dust control, noise, fall protection, or any other barrier that was required for construction.
SECTION: SUSTAINABLE DESIGN REQUIREMENTS
GENERAL PHILOSOPHY: The General Services Administration (GSA) is committed to the purchase and use of environmentally sustainable products and services. “Green purchasing” is the procurement of sustainable products and services that contain recycled/recovered material(s);
are bio-based and/or non-ozone-depleting; are energy-efficient or water-efficient (are certified
ENERGY STAR and/or Water Sense); contain chemicals that are less ozone-depleting or hazardous; or have other sustainable attributes.
REQUIREMENTS FOR VENDORS/CONTRACTORS: Vendors/Contractors are required to consider and use “green (sustainable) products” if at all possible when providing any goods and/or services to the GSA.
The only three (3) exceptions to the requirements for “green products” are:
1. Unavailability
2. Products meeting the requirements do not satisfy performance requirements
3. The green product is only available at an unreasonable price.
Any exception must be documented and discussed with your GSA Contracting Officer prior to submission of your offer/proposal. In the case of unreasonable pricing, the price of the green product must be furnished and compared to the price of the product proposed for use. If you have questions regarding this please contact your GSA Contracting Officer.
PBS Key Sustainable Products and Standards
Construction Materials
Product Sustainability Standard
Nylon carpet NSF 140 Gold certification and
≥ 10% post-consumer recovered content
Interior latex paint ≤ 50 grams per liter (g/L) VOCs post-tint (i.e. SCAQMD Rule
1113 standard)
Gypsum board Greenguard Gold certification
Acoustical ceiling tiles Meets the California Section 01350 standard for low-VOC materials and
Total recycled content ≥ 20% and
Recyclable in a closed loop process and
USDA Certified BioPreferred and
Environ mental Product Declaration (EPD) available
Concrete 15% fly ash, or 25% ground granulated blast-furnace (GGBF) slag.
Current CWP Configuration
Existing CWP Configuration existing gauges existing valves and insulation expansion joint in use
RichardNWiggins Line
Denney HVAC Deficiencies
SECTION 015930 - SECURITY REGULATIONS
PART 1 - GENERAL
1.1 GENERAL SECURITY REQUIREMENTS
A. Contractors and their staff will be required to comply with security regulations imposed by the occupying agency including any necessary clearances required for access to restricted areas.
Access to the project site will be limited to specific times established by the Government.
B. After award of the Contract, all Contractor employees requiring access to restricted areas shall be required to furnish information for security clearances and shall comply with security regulations as imposed by the occupying agency and defined in this section.
C. Notification: For all contracting staff that has been successfully cleared, notify the Contracting Officer, or his designated representative, not less than 48 hours prior to performing work in a restricted security area. Include the following:
1. Companies: Name of each company performing the work.
2. Employee names.
3. Time: The exact time, date, and hours of work.
4. Areas: Specific areas of the building in which work is to be performed.
PART 2 - PRODUCTS (Not used)
PART 3 - EXECUTION (Not used)
END OF SECTION 015930
Denney Correct Miscellaneous Deficiencies
PROJECT MANAGEMENT AND COORDINATION 013100 - 1
SECTION 013100 - PROJECT MANAGEMENT AND COORDINATION
PART 1 - GENERAL
1.1 SUMMARY
A. This Section includes administrative provisions for coordinating construction operations on
Project including, but not limited to, the following:
1. Project meetings.
2. Requests for Interpretation (RFIs).
1.2 DEFINITIONS
A. RFI: Request from Contractor seeking interpretation or clarification of the Contract
Documents.
1.3 COORDINATION
A. Coordination: Coordinate construction operations included in different Sections of the
Specifications to ensure efficient and orderly installation of each part of the Work. Coordinate construction operations, included in different Sections, that depend on each other for proper installation, connection, and operation.
1. Schedule construction operations in sequence required to obtain the best results where installation of one part of the Work depends on installation of other components, before or after its own installation.
2. Coordinate installation of different components with other contractors to ensure maximum accessibility for required maintenance, service, and repair.
3. Make adequate provisions to accommodate items scheduled for later installation.
4. Where availability of space is limited, coordinate installation of different components to ensure maximum performance and accessibility for required maintenance, service, and repair of all components, including mechanical and electrical.
B. Administrative Procedures: Coordinate scheduling and timing of required administrative procedures with other construction activities and activities of other contractors to avoid conflicts and to ensure orderly progress of the Work. Such administrative activities include, but are not limited to, the following:
1. Preparation of Contractor's Construction Schedule.
2. Preparation of the Schedule of Values.
3. Installation and removal of temporary facilities and controls.
4. Delivery and processing of submittals.
5. Progress meetings.
6. Preinstallation conferences.
7. Project closeout activities.
PROJECT MANAGEMENT AND COORDINATION 013100 - 2
8. Startup and adjustment of systems.
9. Project closeout activities.
1.4 SUBMITTALS (not used)
1.5 PROJECT MEETINGS
A. General: Schedule and conduct meetings and conferences at Project site, unless otherwise indicated.
1. Attendees: Inform participants and others involved, and individuals whose presence is required, of date and time of each meeting.
2. Agenda: Prepare the meeting agenda. Distribute the agenda to all invited attendees.
3. Minutes: Record significant discussions and agreements achieved. Distribute the meeting minutes to everyone concerned within [three] <3> days of the meeting.
B. Preconstruction Conference: Schedule a preconstruction conference before starting construction, at a time convenient to GSA, but no later than [15] <15> days after execution of the Agreement. Hold the conference at Project site or another convenient location. Conduct the meeting to review responsibilities and personnel assignments.
1. Attendees: Authorized representatives of GSA, and their consultants; Contractor and its superintendent; major subcontractors; suppliers; and other concerned parties shall attend the conference. All participants at the conference shall be familiar with Project and authorized to conclude matters relating to the Work.
2. Agenda: Discuss items of significance that could affect progress, including the following:
a. Tentative construction schedule.
b. Phasing.
c. Critical work sequencing and long-lead items.
d. Designation of key personnel and their duties.
e. Procedures for testing and inspecting.
f. Submittal procedures.
g. Preparation of Record Documents.
h. Use of the premises
i. Work restrictions.
j. Construction waste management and recycling.
k. Parking availability.
l. Office, work, and storage areas.
m. Equipment deliveries and priorities.
n. Security.
o. Progress cleaning.
p. Working hours.
3. Minutes: GSA will develop and distribute meeting minutes.
PROJECT MANAGEMENT AND COORDINATION 013100 - 3
C. Progress Meetings: Conduct progress meetings as needed as directed by COR.
1. Attendees: In addition to representatives of GSA, each contractor, subcontractor, supplier, and other entity concerned with current progress or involved in planning, coordination, or performance of future activities shall be represented at these meetings.
All participants at the conference shall be familiar with Project and authorized to conclude matters relating to the Work.
2. Agenda: Review and correct or approve minutes of previous progress meeting. Review other items of significance that could affect progress. Include topics for discussion as appropriate to status of Project.
a. Contractor's Construction Schedule: Review progress since the last meeting.
Determine whether each activity is on time, ahead of schedule, or behind schedule, in relation to Contractor's Construction Schedule. Determine how construction behind schedule will be expedited; secure commitments from parties involved to do so. Discuss whether schedule revisions are required to ensure that current and subsequent activities will be completed within the Contract Time.
1) Review schedule for next period.
b. Review present and future needs of each entity present, including the following:
1) Interface requirements.
2) Sequence of operations.
3) Status of submittals.
4) Deliveries.
5) Off-site fabrication.
6) Access.
7) Site utilization.
8) Temporary facilities and controls.
9) Work hours.
10) Hazards and risks.
11) Progress cleaning.
12) Quality and work standards.
13) Status of correction of deficient items.
14) Field observations.
15) RFIs.
16) Status of proposal requests.
17) Pending changes.
18) Status of Change Orders.
19) Pending claims and disputes.
20) Documentation of information for payment requests.
3. Minutes: GSA will develop and distribute the meeting minutes.
4. Reporting: Distribute minutes of the meeting to each party present and to parties who should have been present.
a. Schedule Updating: Revise Contractor's Construction Schedule after each progress meeting where revisions to the schedule have been made or recognized. Issue revised schedule concurrently with the report of each meeting.
PROJECT MANAGEMENT AND COORDINATION 013100 - 4
1.6 REQUESTS FOR INTERPRETATION (RFIs)
A. Procedure: Immediately on discovery of the need for interpretation of the Contract Documents, and if not possible to request interpretation at Project meeting, prepare and submit an RFI in the form specified.
1. RFIs shall originate with Contractor. RFIs submitted by entities other than Contractor will be returned with no response.
2. Coordinate and submit RFIs in a prompt manner so as to avoid delays in Contractor's work or work of subcontractors.
B. Content of the RFI: Include a detailed, legible description of item needing interpretation and the following:
1. Project name.
2. Date.
3. Name of Contractor.
4. RFI number, numbered sequentially.
5. Specification Section number and title and related paragraphs, as appropriate.
6. Contractor's suggested solution(s). If Contractor's solution(s) impact the Contract Time or the Contract Sum, Contractor shall state impact in the RFI.
7. Contractor's signature.
8. Attachments: Include drawings, descriptions, measurements, photos, Product Data, Shop
Drawings, and other information necessary to fully describe items needing interpretation.
C. RFI’s to be submitted to the COR and Contracting Officer.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION (Not Used)
END OF SECTION 013100
1C-1
ENVIRONMENTAL SPECIAL CONDITIONS
NONHAZARDOUS SOLID WASTE DIVERSIONS.
In keeping with the GSA’s solid waste diversion rate goal, the contractor will divert at least 50% of the construction and demolition debris generated during the project. The waste may be reused, recycled, sent to a waste-to-energy incinerator, or managed in another approved manner that keeps it from going to a landfill.
Some items that can be recycled or reused are: scrap metal, cardboard, concrete, wood, and asphalt. The contractor will track and report the amount of construction and demolition debris disposed in a landfill, recycled, or sent to a waste-to-energy incinerator. The attached form will be completed and submitted to
Construction Management
1C-2
NON-HAZARDOUS SOLID WASTE DIVERSION
Contact information
Date:
Organization : GSA-PBS-Region 6- Nebraska Field Office
Project Number & Title:
COR/Phone:
General Contractor:
Contractor Rep:
Title:
Phone:
Time
Period:
Start Date:
End Date:
Construction and demolition related solid waste disposal data
Total solid waste disposed (tons)
Total cost for solid waste disposal
Construction and demolition related recycling data
Total recycled (tons)
Total cost for recycling
Total revenue for recycling
Materials recycled (provide tons, cost, and revenue for each)
Asphalt
Concrete
Wood scrap
Metal
Soil
Other recycling (Do not include facility-wide, routine recycling such as aluminum cans and paper.)
Describe and provide tons.
Items reused that would otherwise be disposed. Please describe and provide tons.
Pollution prevention accomplishments (Describe all efforts that reduced waste or saved resources)
Green purchasing accomplishments
(Describe energy efficient, environmentally friendly, bio-based, and recycled products used and/or purchased.)
Denney correct HVAC Deficieincies
COMMON WORK RESULTS FOR HVAC 230500 - 1
SECTION 230500 - COMMON WORK RESULTS FOR HVAC
PART 1 - GENERAL
1.1 SUMMARY
A. This Section includes the following:
1. Piping materials and installation instructions common to most piping systems.
2. Dielectric fittings.
3. Mechanical sleeve seals.
4. Sleeves.
5. Escutcheons.
6. Grout.
7. HVAC demolition.
8. Equipment installation requirements common to equipment sections.
9. Concrete bases.
10. Supports and anchorages.
1.2 DEFINITIONS
A. Finished Spaces: Spaces other than mechanical and electrical equipment rooms, furred spaces, pipe and duct chases, unheated spaces immediately below roof, spaces above ceilings, unexcavated spaces, crawlspaces, and tunnels.
B. Exposed, Interior Installations: Exposed to view indoors. Examples include finished occupied spaces and mechanical equipment rooms.
C. Exposed, Exterior Installations: Exposed to view outdoors or subject to outdoor ambient temperatures and weather conditions. Examples include rooftop locations.
D. Concealed, Interior Installations: Concealed from view and protected from physical contact by building occupants. Examples include above ceilings and chases.
E. Concealed, Exterior Installations: Concealed from view and protected from weather conditions and physical contact by building occupants but subject to outdoor ambient temperatures.
Examples include installations within unheated shelters.
1.3 SUBMITTALS
A. Welding certificates.
1.4 QUALITY ASSURANCE
A. Steel Support Welding: Qualify processes and operators according to AWS D1.1, "Structural
Welding Code--Steel."
COMMON WORK RESULTS FOR HVAC 230500 - 2
B. Steel Pipe Welding: Qualify processes and operators according to ASME Boiler and Pressure
Vessel Code: Section IX, "Welding and Brazing Qualifications."
1. Comply with provisions in ASME B31 Series, "Code for Pressure Piping."
2. Certify that each welder has passed AWS qualification tests for welding processes involved and that certification is current.
PART 2 - PRODUCTS
2.1 PIPE, TUBE, AND FITTINGS
A. Match all existing pipe and tubing for Spool pieces, extensions, etc.
B. Pipe Threads: ASME B1.20.1 for factory-threaded pipe and pipe fittings.
2.2 JOINING MATERIALS
A. Refer to individual Division 23 piping Sections for special joining materials not listed below.
B. Pipe-Flange Gasket Materials: ASME B16.21, nonmetallic, flat, asbestos-free, 1/8-inch (3.2-
mm) maximum thickness unless thickness or specific material is indicated.
C. Plastic, Pipe-Flange Gasket, Bolts, and Nuts: Type and material recommended by piping system manufacturer, unless otherwise indicated.
D. Solder Filler Metals: ASTM B 32, lead-free alloys. Include water-flushable flux according to
ASTM B 813.
E. Brazing Filler Metals: AWS A5.8, BCuP Series or BAg1, unless otherwise indicated.
F. Welding Filler Metals: Comply with AWS D10.12.
G. Solvent Cements for Joining Plastic Piping:
1. CPVC Piping: ASTM F 493.
2. PVC Piping: ASTM D 2564. Include primer according to ASTM F 656.
2.3 DIELECTRIC FITTINGS (not used)
2.4 MECHANICAL SLEEVE SEALS (not used)
2.5 SLEEVES (not used)
COMMON WORK RESULTS FOR HVAC 230500 - 3
2.6 ESCUTCHEONS (not used)
PART 3 - EXECUTION
3.1 HVAC DEMOLITION
A. Disconnect, demolish, and remove HVAC systems, equipment, and components indicated to be removed.
1. Piping to Be Removed: Remove portion of piping indicated to be removed and cap or plug remaining piping with same or compatible piping material.
2. Piping to Be Abandoned in Place: Drain piping and cap or plug piping with same or compatible piping material.
3. Ducts to Be Removed: Remove portion of ducts indicated to be removed and plug remaining ducts with same or compatible ductwork material.
4. Ducts to Be Abandoned in Place: Cap or plug ducts with same or compatible ductwork material.
5. Equipment to Be Removed: Disconnect and cap services and remove equipment.
6. Equipment to Be Removed and Reinstalled: Disconnect and cap services and remove, clean, and store equipment; when appropriate, reinstall, reconnect, and make equipment operational.
7. Equipment to Be Removed and Salvaged: Disconnect and cap services and remove equipment and deliver to Owner.
B. If pipe, insulation, or equipment to remain is damaged in appearance or is unserviceable, remove damaged or unserviceable portions and replace with new products of equal capacity and quality.
3.2 PIPING SYSTEMS - COMMON REQUIREMENTS
A. Install piping indicated to be exposed and piping in equipment rooms and service areas at right angles or parallel to building walls. Diagonal runs are prohibited unless specifically indicated otherwise.
B. Install piping above accessible ceilings to allow sufficient space for ceiling panel removal.
C. Install piping to permit valve servicing.
D. Install piping free of sags and bends.
E. Install fittings for changes in direction and branch connections.
F. Install piping to allow application of insulation.
G. Select system components with pressure rating equal to or greater than system operating pressure.
COMMON WORK RESULTS FOR HVAC 230500 - 4
H. Fire-Barrier Penetrations: Maintain indicated fire rating of walls, partitions, ceilings, and floors at pipe penetrations. Seal pipe penetrations with firestop materials. Refer to Division 07
Section "Penetration Firestopping" for materials.
I. Verify final equipment locations for roughing-in.
J. Refer to equipment specifications in other Sections of these Specifications for roughing-in requirements.
3.3 PIPING JOINT CONSTRUCTION
A. Join pipe and fittings according to the following requirements and Division 23 Sections specifying piping systems.
B. Ream ends of pipes and tubes and remove burrs. Bevel plain ends of steel pipe.
C. Remove scale, slag, dirt, and debris from inside and outside of pipe and fittings before assembly.
D. Soldered Joints: Apply ASTM B 813, water-flushable flux, unless otherwise indicated, to tube end. Construct joints according to ASTM B 828 or CDA's "Copper Tube Handbook," using lead-free solder alloy complying with ASTM B 32.
E. Brazed Joints: Construct joints according to AWS's "Brazing Handbook," "Pipe and Tube"
Chapter, using copper-phosphorus brazing filler metal complying with AWS A5.8.
F. Threaded Joints: Thread pipe with tapered pipe threads according to ASME B1.20.1. Cut threads full and clean using sharp dies. Ream threaded pipe ends to remove burrs and restore full ID. Join pipe fittings and valves as follows:
1. Apply appropriate tape or thread compound to external pipe threads unless dry seal threading is specified.
2. Damaged Threads: Do not use pipe or pipe fittings with threads that are corroded or damaged. Do not use pipe sections that have cracked or open welds.
G. Welded Joints: Construct joints according to AWS D10.12, using qualified processes and welding operators according to Part 1 "Quality Assurance" Article.
H. Flanged Joints: Select appropriate gasket material, size, type, and thickness for service application. Install gasket concentrically positioned. Use suitable lubricants on bolt threads.
1. PVC Nonpressure Piping: Join according to ASTM D 2855.
3.4 PIPING CONNECTIONS
A. Make connections according to the following, unless otherwise indicated:
1. Install unions, in piping NPS 2 (DN 50) and smaller, adjacent to each valve and at final connection to each piece of equipment.
2. Install flanges, in piping NPS 2-1/2 (DN 65) and larger, adjacent to flanged valves and at final connection to each piece of equipment.
COMMON WORK RESULTS FOR HVAC 230500 - 5
3. Wet Piping Systems: Install dielectric coupling and nipple fittings to connect piping materials of dissimilar metals.
3.5 EQUIPMENT INSTALLATION - COMMON REQUIREMENTS
A. Install equipment to allow maximum possible headroom unless specific mounting heights are not indicated.
B. Install equipment level and plumb, parallel and perpendicular to other building systems and components in exposed interior spaces, unless otherwise indicated.
C. Install HVAC equipment to facilitate service, maintenance, and repair or replacement of components. Connect equipment for ease of disconnecting, with minimum interference to other installations. Extend grease fittings to accessible locations.
D. Install equipment to allow right of way for piping installed at required slope.
3.6 CONCRETE BASES
A. Concrete Bases: Anchor equipment to concrete base according to equipment manufacturer's written instructions and according to seismic codes at Project.
1. Construct concrete bases of dimensions indicated, but not less than 4 inches (100 mm) larger in both directions than supported unit.
2. Install dowel rods to connect concrete base to concrete floor. Unless otherwise indicated, install dowel rods on 18-inch (450-mm) centers around the full perimeter of the base.
3. Install epoxy-coated anchor bolts for supported equipment that extend through concrete base, and anchor into structural concrete floor.
4. Place and secure anchorage devices. Use supported equipment manufacturer's setting drawings, templates, diagrams, instructions, and directions furnished with items to be embedded.
5. Install anchor bolts to elevations required for proper attachment to supported equipment.
6. Install anchor bolts according to anchor-bolt manufacturer's written instructions.
7. Use [3000-psi (20.7-MPa)] , 28-day compressive-strength concrete and reinforcement.
3.7 ERECTION OF METAL SUPPORTS AND ANCHORAGES
A. Cut, fit, and place miscellaneous metal supports accurately in location, alignment, and elevation to support and anchor HVAC materials and equipment.
B. Field Welding: Comply with AWS D1.1.
3.8 ERECTION OF WOOD SUPPORTS AND ANCHORAGES
A. Cut, fit, and place wood grounds, nailers, blocking, and anchorages to support, and anchor
HVAC materials and equipment.
COMMON WORK RESULTS FOR HVAC 230500 - 6
B. Select fastener sizes that will not penetrate members if opposite side will be exposed to view or will receive finish materials. Tighten connections between members. Install fasteners without splitting wood members.
C. Attach to substrates as required to support applied loads.
3.9 GROUTING
A. Mix and install grout for HVAC equipment base bearing surfaces, pump and other equipment base plates, and anchors.
B. Clean surfaces that will come into contact with grout.
C. Provide forms as required for placement of grout.
D. Avoid air entrapment during placement of grout.
E. Place grout, completely filling equipment bases.
F. Place grout on concrete bases and provide smooth bearing surface for equipment.
G. Place grout around anchors.
H. Cure placed grout.
END OF SECTION 230500
23 21 23 - 1
RORSECTION 23 21 23
HYDRONIC PUMPS
PART 1 - GENERAL
1.1 DESCRIPTION
A. Hydronic pumps for Heating, Ventilating and Air Conditioning.
1.2 RELATED WORK
A. Section 23 05 00 Common Work results HVAC
B. Section 23 05 41, NOISE AND VIBRATION CONTROL FOR HVAC PIPING and
EQUIPMENT.
1.3 QUALITY ASSURANCE
A. Refer to Paragraph, QUALITY ASSURANCE, in Section 23 05 00, COMMON WORK
RESULTS FOR HVAC.
B. Design Criteria:
1. Pumps design and manufacturer shall conform to Hydraulic Institute
Standards.
2. Pump sizes, capacities, pressures, operating characteristics and efficiency shall be as scheduled.
3. Head-capacity curves shall slope up to maximum head at shut-off.
Curves shall be relatively flat for closed systems. Select pumps near the midrange of the curve, so the design capacity falls to the left of the best efficiency point, to allow a cushion for the usual drift to the right in operation, without approaching the pump curve end point and possible cavitation and unstable operation. Select pumps for open systems so that required net positive suction head
(NPSHR) does not exceed the net positive head available (NPSHA).
4. Pump Driver: Furnish with pump. Size shall be non-overloading at any point on the head-capacity curve, including in a parallel or series pumping installation with one pump in operation.
5. Provide all pumps with motors, impellers, drive assemblies, bearings, coupling guard and other accessories specified. Statically and dynamically balance all rotating parts.
23 21 23 - 2
6. Furnish each pump and motor with a nameplate giving the manufacturers name, serial number of pump, capacity in GPM and head in feet at design condition, horsepower, voltage, frequency, speed and full load current and motor efficiency.
7. Test all pumps before shipment. The manufacturer shall certify all pump ratings.
8. After completion of balancing, provide replacement of impellers or trim impellers to provide specified flow at actual pumping head, as installed.
C. Allowable Vibration Tolerance for Pump Units: Section 23 05 41, NOISE
AND VIBRATION CONTROL FOR HVAC PIPING and EQUIPMENT.
1.4 SUBMITTALS
A. Manufacturer's Literature and Data:
1. Pumps and accessories.
2. Motors and drives.
3. Variable speed motor controllers.
B. Manufacturer's installation, maintenance and operating instructions, in accordance with Section 23 05 11, COMMON WORK RESULTS FOR HVAC and
STEAM GENERATION.
C. Characteristic Curves: Head-capacity, efficiency-capacity, brake horsepower-capacity, and NPSHR-capacity for each pump and for combined pumps in parallel or series service. Identify pump and show fluid pumped, specific gravity, pump speed and curves plotted from zero flow to maximum for the impeller being furnished and at least the maximum diameter impeller that can be used with the casing.
1.5 APPLICABLE PUBLICATIONS
A. The publications listed below form a part of this specification to the extent referenced. The publications are referenced in the text by the basic designation only:
B. American Iron and Steel Institute (AISI):
AISI 1045...............Cold Drawn Carbon Steel Bar, Type 1045
23 21 23 - 3
AISI 416................Type 416 Stainless Steel
C. American National Standards Institute (ANSI):
ANSI B15.1-00(R2008)....... Safety Standard for Mechanical Power
Transmission Apparatus
ANSI B16.1-05...........Cast Iron Pipe Flanges and Flanged Fittings, Class 25, 125, 250 and 800
D. American Society for Testing and Materials (ASTM):
A48-03 (2008)...........Standard Specification for Gray Iron Castings
B62-2009................Standard Specification for Composition Bronze or Ounce Metal Castings
E. Maintenance and Operating Manuals
1.6 DEFINITIONS
A. Capacity: Liters per second (L/s) (Gallons per minute (GPM) of the fluid pumped.
B. Head: Total dynamic head in kPa (feet) of the fluid pumped.
C. Flat head-capacity curve: Where the shutoff head is less than 1.16 times the head at the best efficiency point.
1.7 SPARE MATERIALS
A. Furnish one spare seal and casing gasket for each pump to the Resident
Engineer.
PART 2 - PRODUCTS
2.1 CENTRIFUGAL PUMPS, BRONZE FITTED
A. General:
1. Provide pumps that will operate continuously without overheating bearings or motors at every condition of operation on the pump curve, or produce noise audible outside the room or space in which installed.
2. Provide pumps of size, type and capacity as indicated, complete with electric motor and drive assembly, unless otherwise indicated.
23 21 23 - 4
Design pump casings for the indicated working pressure and factory test at 1½ times the designed pressure.
3. Provide pumps of the same type, the product of a single manufacturer, with pump parts of the same size and type interchangeable.
4. General Construction Requirements
a. Balance: Rotating parts, statically and dynamically.
b. Construction: To permit servicing without breaking piping or motor connections.
c. Pump Motors: Provide high efficiency motors, inverter duty for variable speed service.
d. Heating pumps shall be suitable for handling water to 225ºF.
e. Provide coupling guards that meet ANSI B15.1, Section 8 and OSHA requirements.
f. Pump Connections: Flanged.
g. Pump shall be factory tested.
h. Performance: As scheduled
5.
PART 3 – EXECUTION
3.1 INSTALLATION
A. Follow manufacturer's written instructions for pump mounting and start-up. Access/Service space around pumps shall not be less than minimum space recommended by pumps manufacturer.
B. Provide drains for bases and seals for base mounted pumps, piped to and discharging into floor drains.
C. Coordinate location of thermometer and pressure gauges as per Section
23 21 13, HYDRONIC PIPING.
3.2 START-UP
A. Verify that the piping system has been flushed, cleaned and filled.
23 21 23 - 5
B. Lubricate pumps before start-up.
C. Prime the pump, vent all air from the casing and verify that the rotation is correct. To avoid damage to mechanical seals, never start or run the pump in dry condition.
D. Verify that correct size heaters-motor over-load devices are installed for each pump controller unit.
E. Field modifications to the bearings and or impeller (including trimming) are not permitted. If the pump does not meet the specified vibration tolerance send the pump back to the manufacturer for a replacement pump. All modifications to the pump shall be performed at the factory.
F. Ensure the disposable strainer is free of debris prior to testing and balancing of the hydronic system.
G. After several days of operation, replace the disposable start-up strainer with a regular strainer in the suction diffuser.
- - - E N D - - -
Pump Data Sheet - Patterson HVAC Pumps
Company: Specified Design Name:
Date: 11/29/2016
Pump:
Size: E4R9A-1 Type: HVES Speed: 1770 rpm Synch Speed: 1800 rpm Dia: 7.375 in Curve: 6x4x9.5 Impeller: D05-89820 Specific Speeds: Ns: 3072
Nss: 6482 Dimensions: Suction: 6 in
Discharge: 4 in
Pump Limits:
Temperature: --- Power: --- Pressure: --- Eye Area: --- Sphere Size: ---
Search Criteria:
Flow: 800 US gpm Head: 35 ft
Fluid:
Water Temperature: 60 °F Density: 62.37 lb/ft³ Vapor Pressure: 0.2563 psi a Viscosity: 1.105 cP Atm Pressure: 14.7 psi a NPSHa: ---
Motor:
Size: 15 hp Speed: 1800 rpm Frame: See Chart
Standard: NEMA Enclosure: ODP
Sizing Criteria: Max Power on Design Curve
Selected from catalog: Patterson HVAC.60 Vers: 1.3
---- Duty Point ---- Flow: 808 US gpm Head: 35.7 ft Eff: 75% Power: 9.7 hp NPSHr: 15.3 ft
---- Design Curve ---- Shutoff Head: 48.7 ft Shutoff dP: 21.1 psi Min Flow: 200 US gpm BEP: 75.1% @ 799 US gpm NOL Power:
11 hp @ 1340 US gpm
-- Max Curve -- Max Power:
14.8 hp @ 1445 US gpm
Refer to Working Pressure vs. Temperature chart for maximum rated working pressure. All data are subject to change.
Consult factory for certified data.
US gpm
N
PS
H r -ft
16001400120010008006004000 200
H ea d
- f t
160014000 1200
75.1
7.375 in
8.125 in
7 in
7.5 hp
10 hp
15 hp
Performance Evaluation:
Flow Speed Head Efficiency Power NPSHr US gpm rpm ft % hp ft 960 1770 29.7 70.8 10.1 17.5 800 1770 36 75.1 9.68 15.1 640 1770 41.5 71.3 9.36 12.9 480 1770 45.6 62.2 8.82 10.8 320 1770 47.7 47.2 8.28 10.2
175 15
4 7/8125# 5 1/2E4RA7A-1 19 4 1/2125# 11 1/2 3 1/2 3/8 7 1/2
175 15
4 7/8
125# 5 3/4E4V7A-1 19 5 1/4125# 11 1/2 3 1/2 7 1/23/8 1/4
48 44
125#E4P9A-1 125# 8 5 7
E4R9A-1 125# 125# 175 48 44
5 7 1/48
6 3/8
125#E4J11A-1 24 1/414 4 3/16 10 1/4 5 9/16 7 1/2125# **
PAGE
Toccoa, G eorgia U
.S.A.
SECTION
DATE:
2.0
** 175 P.S.I. (125# FLANGES), 250 P.S.I. (OPTIONAL 250# FLANGES)
DISCHARGE
FLANGE
DRILLING
SUCTION
FLANGE
DRILLING HA HB HD HL HO Y ZHE HF HG HLLWORKING
PRESSURE
PUMP
MODEL
XS
MOTOR FRAME
SIZES
STD OPT
SUCTION CENTERLINE
4 - 1 DIA. HOLES
(FOR ANCHOR BOLTS)
COUPLING GUARD
DISCHARGE SUCTION
NOTE: 1/4" NPT SUCTION & DISCHARGE
GAUGE TAP CONNECTIONS
O U
T
LIN
E D
IM
E
N S
IO
N
S E
N D
S U
C T
IO
N
P U
M P
S , 1800 R
P M
G R
O U
P
404TS365TS
364TS
326TS
324TS
286TS
284TS
256T
254T
215T213T
7 1/2
184T
182T
145T
145T
1 1/2
143T
13/4
1/2
HORSEPOWER
FRAME SIZE
SUCTION
SIZE
DISCHARGE
SIZE
AUG 12, 2016
NOTE: ALL DATA SUBJECT TO CHANGE. CONTACT FACTORY FOR CERTIFIED DATA.
REFER TO WORKING PRESSURE VS. TEMPERATURE CHART FOR TEMPERATURE EFFECTS*
2.1.1
182-184T
213-215T
182-184T
213-215T
184T 213-215T
254-256T
215T
254T
213-215T
254T
6 3/8
6 3/8
A 05-103571-2
HB
HF 2
HD
X
HO
HL
Y
HLL
HE HE
HA
HG
S
Z
3/8
3/8
Henry Rectangle
Henry Line
Henry Line
Henry Line
Henry Polygon
Henry Line
Tracer AdaptiView™ Chiller Control
Get a better view into your chiller
Tracer AdaptiView™ chiller control lets building operating staff take command of the chiller plant in a way never before possible. This advanced level of control translates into enhanced building performance that can increase energy efficiency.
Built on the reputation and reliability of the
Trane CenTraVac™ chiller, this innovation enhances new or legacy Trane chillers with an easy-to-use, color graphic display and advanced control technology.
With an…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .