Fire Alarm System Replacement Federal contract opportunity
Solicitation number
GS-05-P-16-SC-C-7017
Issued by
General Services Administration Public Buildings Service

About this file

Amendment 01

View the file

Other files for this federal contract opportunity

Other files attached to Fire Alarm System Replacement, newest first.
File Type Posted
Amendment_02.pdf PDF
Solicitation_GS-05-P-16-SC-C-7017.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION

NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

PRE‐PROPOSAL MEETING MINUTES

August 11, 2016, 1:00 PM

Request for Proposal (RFP) GS‐05‐P‐16‐SC‐C‐7017 Fire Alarm Replacement

Melvin Price Federal Building 750 Missouri Avenue

East St. Louis, Illinois 62201

CONTRACTING OFFICER: Johanna Lujano REGIONAL FIRE PROTECTION ENGINEER: Charles Stormer PROPERTY MANAGER: Carl Minor PROPERTY MANAGER: Thomas Allsworth SUPERVISORY PROPERTY MANAGER: Leigh Ann Davis

Note: The meeting minutes are not intended to reiterate everything that was discussed during the meeting.

The purpose of the conference was to allow contractors the opportunity to ask questions regarding the solicitation and the technical elements of this project. We went through the forms that need to be submitted and the procedures that need to be followed. We concluded the conference with a walk through of the space and answered questions.

Contractors were told that any questions arising after the meeting may be submitted by email to the Contracting Officer at johanna.nieves@gsa.gov with a copy to John Shortal (john.shortal@gsa.gov). To allow sufficient time to respond to question, the contractors were asked to submit questions by Thursday, August 18, 2016.

No oral statement made by the Government Representatives during the conference had the effect of amending the RFP. In the event the discussion during the conference indicated a need to modify the RFP, it was announced that an amendment to the RFP would be issued in writing.

The following information was shared during the conference:

This procurement is set aside to small business concerns. The North American Industry Classification Code is 236220 with a size standard of $36.5 million. Offerors must ensure the NAICS code is listed in their Online Representation and Certification Application (ORCA) account.

Offerors shall submit the following documentation with their quote:

̄ Standard Form 1442, Solicitation, Offer, and Award ̄ A cost breakdown by Division ̄ Acknowledgement of Amendment(s), if any ̄ Registered and Active in SAM.gov, www.sam.gov ̄ Online Representation and Certification Application (ORCA) information – Please ensure your ORCA account is updated and active at www.sam.gov ̄ Minimum of 3 Past Performance References, Experience Summary Form, and

Qualifications of Key Personnel. The proposed key personnel must meet the qualifications/requirements set forth in the Agreement.

̄ GSA Form 527, Contractor’s Qualification and Financial Information

̄ Standard Form 24, Bid Bond

Construction Time: 240 Calendar after receipt of Notice to Proceed.

Liquidated Damages: $178.00 for each calendar day of delay until the work is completed or accepted.

Proposals are to be received no later than 3:30 PM (Central Time) on August 25, 2016. Proposals are to be mailed or hand carried to GSA, Acquisition Management Division, 230 S. Dearborn Street, Suite 3600, Chicago, Illinois 60604. Please make sure the solicitation number is on the envelope.

There is no guarantee of negotiations being opened. The Government can award based upon the receipt of initial proposals so make your initial price your best offer.

Scope of Work

Design a complete replacement of the building fire alarm system to provide new fire alarm control panels, remote fire alarm control panels, and any control equipment necessary to operate a completely new fire alarm system. This replacement shall provide a complete, supervised, non‐coded addressable/multiplex voice‐type fire alarm system that is independent and separate from other building management or control system. Construct a fire alarm control room within existing space.

Modify HVAC to accommodate new space.

Security Clearances – Reference Spec. Section 01 59 30

Upon receipt of the award letter, the contractor will be required to immediately contact the Security Clearance Contact Person (SCCP) identified in the letter to initiate the process.

Buy American Act – Reference Spec. Section 52.225‐9

Except as provided in FAR 25.202, use only domestic construction materials in construction contracts performed in the United States.

Exceptions may include the following and must be approved by the Contracting Officer.

(1) Impracticable or inconsistent with public interest

(2) Non availability

(3) Unreasonable cost

(4) Information technology that is a commercial item.

A request may be made Pre‐Award or Post‐Award to the Contracting Officer for a determination concerning the inapplicability of the Buy American Act for specifically identified construction material.

All requests must be made in accordance with FAR 52.225‐10 and 52.225‐11.

Any request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award.

Question and Answer Session‐ Reconvened in conference room after walk thru

Notes:

The contractor will be required to perform during unoccupied hours from 5:00pm to 7:30am.

Parking will be available only during unoccupied hours depending on space availability.

The building has guards 24/7.

Work may occur during Federal Holidays.

Storage space is very limited. The building is fully occupied.

The contractors will be responsible for providing shop drawing containing final design.

The system will be installed in parallel. The new system will be installed and then commissioned then the existing will be removed.

The design will require the system to interact with Lutron lighting system in each Courtroom, if any.

Some rooms may require additional strobe devices than are currently shown on the drawings.

Contractor shall comply with code regulations.

Strobe location shall meet the decibel levels for that particular room.

The new conductor wire from the jockey pump to the electric room only has to be 2 hours rated “inside of the fire pump room”.

Name:

IZ.'1.a.k. r;.A1u G\"Q<t ~o~ .• -\-.J~

1-h /',-'J•~V ~5/J ~-j

· I P, d.. ·. rln '" ·1<... t<? a c:;A ,arlil (:~ ~· £/(? V1 -1-/,,J'(__ll r '-'

1t11c.hi-f:l_ Kc1t-tr1d..

D11u.:. ~~"''-' M lhrt:./ f"AIZ.i'4 he~ ~.... I k' P>F

'\•VIA AIA.

') + "f"t.V\ N6S\L

SIGN IN SHEET

PRE-PROPOSAL CONFERENCE AND SITE VISIT

August 11, 2016, 1:00 PM Request for Proposal (RFP) GS-OS-P-16-SC-C-7017

Fire Alarm Replacement Melvin Price Federal Building

750 Missouri Avenue East St. Louis, Illinois 62201

Company: Phone Number:

S1""""1((_\J.. Grtnt1!{/ ']1"1 - 'I /'I - 7 "'"' ~-- \ - ·l\ _\,.;J ,.,....... <I .... "?; 4 - '/ 79 -Pl./?,;

£J . .---:- I 1' - 1 /_,,,,.,, :p '' )j',-~ /'J;/.f ~ <"C--u .f-. ,;r?o - &./'i -, 7C:6 o

GsA 0 d?l 7-C-i 72 -<./</tf5- K4~VS Elec-t-' /;,J.P-- :z 11.f--ztf/S-

Email:

rt;Lt-~4.yf;> s,H...fft)AflM~lf. (CIA

Q ~izq f ~ O..n u~ht -"• J.r,. .i-,,A -_ (A"Jvri

(J J Af'i , /,' (l;¥14 o - v L>.~.,,..,,,.,,~.r '/e r/>1.-f

/_:.e1ch.~ tJCv<l1~ <;'-/e~ fr4'vS SJ>'fDl ~Ye, .. Cowr f't{ /ZAIAA i ~' ~U::.z-:nz..i r.tf t {y{f-ld;j,- /l&-o iult,g.wf PB ll't'<.'' l:JLl:"d, """ ,-A~-:.J,,,~<- 'i:ll'i~"'~ I. ~1f.J.1 I/;). 2 r:~;.u ?/cJ -;;qr - 1777 J I I c\i,,1, 00>\rc;.,_zcive-<:.CC ,<(),,,,.,.,,.

..S , e -~1.8 ·.s Co f f>c! Lt ti7._ % 't. 1-£b/~1s.-i(,.,, M~T<-i-, f9t-te..1'2.-1 hetJC :51·e.l<&VS. '

1 ~ /\-i '-ti:

·p:;v·l:'.' ~.,,., •P 31'-I- .51 7- / o'-t9 , i.<l\o lf...u @ b l<Lk c l""cv f'... e- -, ,,A

FY\Jtil 1.-"-Hl ~ 1-tt..h-t>l\i !J ] l'-/-L/q L-5')l.10f ._+~ t=".,.Y"l l'D'""''ll"" i.>-<~iti-ci.~n..rv&t~ ... '

Name:

~..,,..~,, C,...,<._

£( vO" ffw I ;,, t/ fo ,/ (I ,...//J1., ri , rVJ('l r

:J-~}/s'~,;\, :; #Ji ::,r-J"'L -;".:A t" f"' '>A e ....... / . I - , -

SIGN IN SHEET

PRE-PROPOSAL CONFERENCE AND SITE VISIT

August 11~ 2016, 1:00 PM

Request for Proposal (RFP) GS-05-P-16-SC-C-7017 Fire Alarm Replacement

M.elvin Price Federal Building 750 Missouri Avenue

East St. Louis, Illinois 62201

Company: Phone Number:

~.,£, .. ,.._ ... s .,.,,. t.//,, ,c J/~~7:ss·10.s o

51t! ,,,£"1/[/C 31'-/-':> 7s--=-YJ'10 4.sA- t;10 qcn-7?oS :£;;,,rt~~J~ 1:.?11 ,, ;1 1 ~lv ~)'.: ·-l ~ ~3<,- ;''1

R..a.A. { ;;i',,. L. I' 1-..-. 3,)a ... J?? <; .• qu-lJ ~--'t-.1- "',. - "' - 'J -. '

Email:

+w l~-e ce ,.,,of.svc. ('"' -k.n/r <". (,;> v,''e-k:::J.- e 5 ; ... •"'- - - i. a-1 ~ (lact: • .,1,,~~,,.,vrtfP@ p-· e71'li /

,__~) ~:f}"9\ • ~~.,Ai;, . .\~· ',~~ ~ ;!}24~ • ~"V :/ .f-,;. j :_ ,. ~ n) hha .. ;· ,~ 11 .r. fr, · ·~ LL. .... - . (_

II.D. Technical Proposal

The Technical Proposal shall include the information requested below for the non-price factors described in Section VI.

(1) Past Performance of Offeror

This factor considers the past performance of the Offeror. The Offeror shall submit a minimum of three (3) to maximum of seven (7) references (a person or persons who may be contacted regarding the quality of the Offeror’s past performance for “similarly complex” as defined below) substantially completed within the last five (5) years. The Offeror must provide a Past Performance Reference Form (Attachment A) for each reference. The name, title, company, current address, current phone number, and current fax number for each reference must appear on the form.

A “similarly complex” project is defined as a project that is comparable in nature, type, and complexity as defined by the all of the following characteristic:

The project involved fire alarm replacement.

The project was performed in an occupied and functioning office building.

The project involved all of the following disciplines – HVAC, electrical, and fire alarm.

The project included historic restoration and repair of a building listed or eligible to be listed on the National Register of Historic Buildings.

The project included requirements for noise control.

This factor will be evaluated based on the responses of references recommended by the Offeror. The Government also reserves the right to use other government data available in its assessment of the Offeror. The quality of the reference information supplied will be considered.

In accordance with FAR 15.306, the Offeror will be given the opportunity to respond to adverse past performance information.

(2) Experience

This factor considers the extent of the Offeror’s past experience as a firm in a providing similar construction services.

The Offeror must demonstrate successful experience as a General Construction (GC) Contractor responsible for the construction of a least three (3) “similarly complex” projects (as defined above) substantially completed within the past five (5) years.

The Offeror may also present not more than five (5) additional comparable projects substantially completed within the last five (5) years.

A comparable project could include any of the combination of the above listed characteristics and the following characteristic:

Project involved construction of office and related facilities Project involved the restoration of historic finishes

Project required close coordination with occupants/owners security regulations.

For each project presented in relation to this factor, the Offeror must explain how the characteristics of the project relate to the characteristics of this project. The similarity to this project is more important than the quantity of projects presented. In addition, for each project presented, the Offeror shall submit an Experience Summary Form (Attachment B).

(3) Qualification of Key Personnel

This factor considers the proposed key team member’s qualifications related to this project; key team members must have been directly involved in the projects recommended by the Offeror for past performance and/or experience. This factor will be evaluated based on the Offeror’s written responses to the RFP and will include the calling of references to verify qualifications.

The Offeror shall identify the personnel proposed to fill key team member roles listed below and describes their roles and responsibility on this project. The Offeror shall provide resumes for each key team member clearly indicating their currently held position/title, proposed project position/title, education, qualifications, professional licensing, and work experience over the last five (5) years. Key team members include:

Project Manager and/or Construction Superintendent Fire Alarm Technician

HVAC

Other key team members as determined by the Offeror

The key team member must meet the qualifications, if any, set forth in the Agreement. No substitution to key personnel shall be made without prior approval by the Contracting Officer. In the event that personnel approved by the CO are unable to perform their duties due to death, illness, resignation from the Contractor’s employment, the CO’s request for removal, or similar reasons, the Contractor shall promptly submit to the CO, in writing, the name and qualifications of the proposed replacement with equal or superior qualifications. This replacement, if approved by the CO, shall be submitted to the Government within three (3) calendar days from the time of removal and shall in no way delay the project schedule. If the schedule is delayed due to the Contractor’s lack of timely submittal or lack of an equally qualified submittal, the Contractor shall be responsible for any and all resulting costs associated with the delay. Any approved substitutions shall be made at no increase in contract price and/or decrease in qualifications.

topmostSubform[0]:
Page1[0]:
AmendmentNo[0]: 01
Code[0]:
Code[1]:
AccountingData[0]:
A13[0]:
C13[0]:
D13[0]:
NameandTitleSigner[0]:
NameandTitleOfficer[0]: Johanna Nieves, Contracting Officer
Description[0]: GS-05-P-16-SC-C-7017, Fire Alarm Replacement, Melvin Price Federal Building and U.S. Courthouse, 750 Missouri Avenue, East St. Louis, Illinois.

This amendment is being issued to incorporate the pre-proposal conference meeting minutes and sign in sheets. This amendment also replaces the technical proposal requirements covered under Section II.D of your solicitation with the attachment. In addition, this amendment changes the Contractor's Working Hours to reflect 5:00pm to 7:00am.

FacilityCode[0]:
Code[2]:
IssuedBy[0]: U.S. General Services Administration

Southern Construction Team 230 South Dearborn Street Chicago, Illinois 60604

NameandAddress[0]:
AdministeredBy[0]: Same as Block 6
ContractIDCode[0]:
ReqNumber[0]: EQ5PSS2P2-16-5054
AmendmentNo[1]: GS-05-P-16-SC-C-7017
ModificationNo[0]:
ProjectNo[0]:
Page[0]: 1
Pages[0]: 1
EffectiveDate[0]: 08/18/2016
Dated9B[0]:
Dated10B[0]:
CheckBox9[0]: Off
CheckBox10[0]: Off
CheckBox11[0]: 1
CheckBox13A[0]: Off
CheckBox13B[0]: Off
CheckBox13C[0]: Off
CheckBox13D[0]: Off
IsNot[0]: Off
Is[0]: Off
Extended[0]: Off
NotExtended[0]: 1
DateSigned[0]:
DateSigned[1]:
Copies[0]:
CopiesReturned[0]:
2016-08-18T16:29:14-0500
JOHANNA NIEVES