Please see Amendment 01 for answers to RFI's change in scope and new due date of August 16 2016 at 4 00PM Central.

View the file

Other files for this federal contract opportunity

Other files attached to Lobby Reconfiguration (JCK & MFB), newest first.
File Type Posted
Lobby_Sign_In_Sheet.pdf PDF
Responses_to_Questions_7.14.16.pdf PDF
JCK_RHM_RFP.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. Contract ID Code Page of Pages

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1 2

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (if applicable)

01 August 8, 2016 EQ5P2SS1P-16-5098

6. ISSUED BY 7. ADMINISTERED BY (If other than Item 6)

General Services Administration AMD, Chicagoland Construction Contracting Team 230 S. Dearborn St., Suite 3600 Chicago, IL 60604

Same as Block 6

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, Country, State and ZIP Code) () 9A. AMENDMENT OF SOLICITATION NO.

GS-05-P-16-GC-C-7004

X 9B. DATED (SEE ITEM 11)

July 6, 2016

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of offers is extended is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning 1 copy of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (if required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

() A. THIS ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINSTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN

ITEM

14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return ____ copy to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible)

Solicitation #GS-05-P-16-GC-C-7004, Amendment 01 Lobby Reconfiguration for the John C. Kluczynski Federal Building at 230 S. Dearborn Street and Ralph H. Metcalfe Federal Building at 77 W. Jackson Boulevard in Chicago, Illinois

Amendment 01 is issued to 1) address the RFI’s received and 2) added scope and drawings for the Metcalfe Federal Building. The proposal due date/time of August 9, 2016 at 4:00PM CDT is extended to August 16, 2016 at 4:00PM CDT.

CONTINUED ON PAGE 2

Except as provided herein, all terms and conditions of the document reference in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE

SIGNED

(Signature of person authorized to sign)

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous Edition unusable

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT SOLICITATION NO. AMENDMENT NO. PAGE OF PAGES

CONTINUATION OF STANDARD FORM 30

Lobby Reconfiguration at John C. Kluczynski Federal Building and Ralph H. Metcalfe Federal Building, Chicago, IL

GS-05-P-16-GC-C-7004

Response to RFI’s

1. What type (manufacturer and model) of AC unit is required to be removed? This will determine manpower for removal.

This unit will be removed by GSA during/prior to the appropriate phase of construction.

2. Will it be permitted to re-use the existing lineset for the new mechanical service or will it be required to install new lineset?

There isn't an existing lineset, old unit was a spot cooler and will be removed per item 1 above. AN entirely new lineset WILL be required.

3. Can you please provide cut-sections of the lobby floor to clarify what the substrate is under the granite flooring and the corresponding thicknesses?

See attached drawings. Note these are for reference only.

4. Will any of the existing equipment be relocated by the government?

No

The following should be added to the solicitation as a part of the scope. All aspects, connections, coordination, hardware, etc. of the additions, whether clearly identified or not, shall be included as part of the scope:

1. The following language shall be a part of the required scope for the Metcalfe Federal Building only:

o "As part of the overall modification to the lobby fire alarm and notification system and as required by

NFPA-72 and GSA's F&LS, the existing High End Fire Alarm Speakers shall be re-calibrated to accommodate the relocation and/or addition of equipment and/or structures including but not limited to turnstiles, barrier walls - glass and granite, removal of revolving door, relocation of magnetometers, etc.

Re-calibration shall be be included as part of 283101.3.7.TESTS and be performed by a certified technician knowledgeable with these types of systems."

2. For the JCK and Metcalfe lobby turnstile installations, all exit/evacuation requirements as required by NFPA 101,

7.2.11.1.3 shall be followed.

3. The attached drawing (IL0236FC As Builts Lobby Misc Details) provides some slab details/sections for the JCK lobby floor. Information is for general reference only.

4. The attached drawing (IL0303ZZ RHM Slab Details) provides some slab details/sections for the RHM lobby floor.

Information is for general reference only.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
X
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

GS-05-P-16-GC-C-7004

File details come from the government source that posted it. Updated .