Amendment 01

View the file

Other files for this federal contract opportunity

Other files attached to Recovery-Replace Curtain Wall Windows, newest first.
File Type Posted
Amendment 03.pdf PDF
Change FBO Type.doc DOC document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. Name and Title of Signer (Type or Print) 16A. Name and title of Contracting Officer (Type or Print)

MARTIN L. HARRIS (217) 492-5041

CONTRACTING OFFICER

martin.harris @gsa.gov 15B. Contractor/Offeror 15C. Date Signed 16C. Date Signed

(Signature of person authorized to sign)

16B. United States of America

(Signature of Contracting Officer)

NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)

PREVIOUS EDITIONS UNUSABLE Prescribed by GSA FAR (48 CFR) 53.243

1. Contract ID Code Page of Pages AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1 1

2. Amendment/Modification No. 3. Effective Date 4. Requisition/Purchase Req. No. 5. Project No. (if applicable)

01 08/18/2009

6. Issued By Code 7. Administered By (If other than Item 6) Code General Services Administration SEE BLOCK 6 Property Management Division 520 South Eighth Street Springfield, IL 62703

8. Name and Address of Contractor (No., Street, County, and Zip Code) (X) 9A. A mendment of Solicitation No.

GS05P09SCC0039

X 9B. Date (See Item 11) 07/09/09 10A. Modification of Contract/Order No.

CAGE:

10B. Date (See Item 13)

Code Facility Code

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended x is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDG- MENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting and Appropriation Data (if required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACT/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(x) A. This change order is issued pursuant to: (Specify authority) The changes set forth in item 14 are made in the Contract Order No. in item 10A.

B. The above numbered Contract/Order is modified to reflect the administrative changes (such as changes in paying office, appropriation date, etc.)

Set fourth item 14, pursuant to the authority of FAR 43.103 (b) C. This supplemental agreement is entered into pursuant to authority of:

D. Other (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. Description of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

1. Section 088000 – Glazing, Page 088000-1, Paragraph 1.2: Delete subparagraph B.

2. Section 088000 – Glazing, Page 088000-3, Paragraph 2.2: Add the following:

“3. Fabrication by horizontal roller heating process only, roll wave distortion parallel to bottom edge of glass as installed. The deviation from flatness at any peak (peak to valley deviation) shall not exceed 0.003” in the center of a lite and shall not exceed 0.008” within 10.5” of the leading or trailing edge.

3. Section 088000 – Glazing, Page 088000-3, Paragraph 2.3, A: Add the following:

“Basis of Design: Viracon VE3-2M.”

4. Section 088000 – Glazing, Page 088000-4, Paragraph 2.3, subparagraph 4: Replace with the following:

“a. U-Value: 0.29 winter, 0.26 summer.

b. Shading Coefficient: 0.28 c Visual Light Transmission: 35%

d. Relative Heat Gain: 60”