Grounding System Test_signed.pdf
PDF 2 MB Posted
- Attached to
- Dehumidifier Installation Federal contract opportunity
- Solicitation number
- M6740023Q0091
- Issued by
- United States Marine Corps
About this file
This document contains a transmittal form and test report for a grounding system at a Marine Corps Air Station in Okinawa, Japan. The transmittal form is from a contractor to the Naval Facilities Engineering Command Far East submitting shop drawings and test reports for a grounding system as required by Contract Number N40084-16-D-0007 Delivery Order N4008420F4580. The test report provides the results of a grounding resistance test conducted on the system, showing a maximum resistance of 4.8 ohms which is below the specification limits of 5 ohms dry and 25 ohms wet.
The related federal contract opportunity is solicitation number M6740023Q0091 for dehumidifier installation at an unspecified Marine Corps location. No further details are provided on the requirements, response deadline, place of performance, or other terms for the dehumidifier installation opportunity.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| As-built Drawings.pdf | ||
| M6740023Q0091.pdf | ||
| RFQ Cover Sheet.docx | DOCX document | |
| Hipot Megger FOC Test_signed.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TRANSMITTAL OF SHOP DRAWINGS, EQUIPMENT DATA, MATERIAL SAMPLES, TEST REPORTS,
OR MANUFACTURER’S CERTIFICATES OF COMPLIANCE
DATE TRANSMITTAL NO.
SECTION I - TRANSMITTAL INFORMATION (To be completed by Contractor)
TO: CME : LTJG GREGORY AMARAL
FEAD CAMP BUTLER
NAVFAC Far East
FROM:
KYUNAN CO., LTD.
601-9 Shimabuku, Kitanakagusuku, Nakagami Gun, Okinawa 901-2301
CONTRACT NO.
N40084-16-D-0007
DELIVERY ORDER
NO. N4008420F4580
CHECK ONE (Use a separate form for each category):
This is a new transmittal
This is a resubmittal of transmittal
This is an addition to transmittal
SPECIFICATION SECTION NO. PROJECT TITLE AND LOCATION
DB To Install Level III Preservation System, Bldg. 682 MCAS Futenma,Okinawa, Japan (ESR 016-19)
CHECK ONE (Use a separate form for each category): This transmittal is Contractor Approved (For Information Only) for Government Approval Variation for Government Approval
ITEM
NO.
a.
SUBMITTAL DESCRIPTION (SD) NUMBER
AND TYPE
b.
DESCRIPTION OF ITEM SUBMITTED
(Name, Manufacturer’s Name, Model No., Type, Size, etc.)
c.
NO. OF
COPIES
d.
SPEC. PAR. #
OR DRAWING #
e.
ACTION CODE
Reviewer f.
FEAD
g.
CONTRACTOR REMARKS: I hereby certify that the Equipment Material Article shown and marked in this submittal is that proposed to be incorporated in the Contract identified above, is in compliance with the contract drawings and specifications, and can be installed in the allocated spaces. Proposed variations, if any, are clearly marked on each submittal, are compatible with other elements of the work, and are recommended for Government approval.
Signature of QC Manager Date
SECTION II - GOVERNMENT APPROVAL ACTION (To be completed by Designer/FEAD)
DATE RECEIVED FROM KTR: DATE SENT TO REVIEWER:
ACTION CODES: The following Action Codes are given to items submitted:
REVIEWER: A-E FEAD FE FPE OTHER A - Approved as submitted
AN - Approved as noted, resubmission not required
AR - Approved as noted, resubmission required, see Sec. II Remarks
D - Disapproved, resubmission required, see Sec. II Remarks
E - Will be returned by separate cover
F - Receipt acknowledged
FX - Receipt acknowledged, does not comply with Contract Requirements, see Sec. II Remarks
G - Other, see Sec. II Remarks
NR - Not reviewed, see Sec. II Remarks
The submittals listed above have been reviewed, and are returned with actions taken as indicated in Section I, Columns f above. Approval of the listed items does not indicate approval of variations, if any, unless the variations are clearly marked on each submittal and are supported by the contractor; furthermore, approval of items does not relieve the contractor from complying with all requirements of the contract plans and specifications.
NAME, TITLE & SIGNATURE OF REVIEWER DATE
REMARKS (Attach additional sheets as necessary):
DATE RECEIVED FROM REVIEWER NAME, TITLE & SIGNATURE OF APPROVING AUTHORITY DATE DATE RETURNED TO KTR
OICC FE 4330/3 (Rev. 4/99) Sheet of To print data, feed this direction
Project Name: N4008420F4580 DB to Install Level III Preservation System, B682 MCAS Futenma, Okinawa, Japan Name of Test: Grounding Resistance Test Contract Specification Reference: Section 33 71 02 and Section 26 20 00 (Underground Electrical Distibution) Requirement: 1. Maximum resistance-to-ground of grounding system: do not exceed 5 ohms under dry conditions.
2. NFPA 70 and IEEE C2, except provide grounding systems with a resistance to solid earth ground not exceeding 25 ohms.
Testing Instrument: Kyoritsu Earth Tester Model: 4102A Calibration Date: 01 July 2023
Item No. TEST LOCATION DESCRIPTION Test Result (W) Remarks 1 Transformer area System Grounding 4.8 Passed <5 Ohms 2 Manhole System Grounding 15 Passed <25 Ohms
N1585 Text Box Item #1: Grounding Test on Transformer Area.
N1585 Text Box Item #2: Grounding Test on Manhole Area.
| TR#58_Transmittal Cover |
| TO#20F4580_TR#58_Grounding System Test_Attachment |
| Grounding Test Report 2 |
| 1 |
| 2 |
| Text1: 58 | |
| Text2: 69 | |
| Text3: | |
| Text4: | |
| Text5: | |
| Text6: | |
| Text7: | |
| Text8: | |
| Text9: Field Acceptance Checks and Tests (Grounding) | |
| Text11: | |
| Text12: | |
| Text13: | |
| Text14: | |
| Text15: | |
| Text16: | |
| Text17: 1 | |
| Text18: | |
| Text19: | |
| Text20: | |
| Text21: | |
| Text22: | |
| Text23: | |
| Text24: 3.18.1 | |
| Text25: | |
| Text26: | |
| Text27: | |
| Text28: | |
| Text29: | |
| Text30: | |
| Text31: | |
| Text32: | |
| Text33: | |
| Text34: | |
| Text35: | |
| Text36: | |
| Text37: | |
| Text38: F | |
| Text39: | |
| Text40: | |
| Text41: | |
| Text42: | |
| Text43: | |
| Text44: | |
| Text45: | |
| Text48: | |
| Text49: | |
| Check Box50: Off | |
| Check Box51: Off | |
| Check Box52: Off | |
| Check Box53: Off | |
| Check Box54: Yes | |
| Check Box55: Off | |
| Check Box56: Off | |
| Check Box57: Off | |
| Check Box58: Yes | |
| Text59: 33 71 02 | |
| Check Box60: Yes | |
| Check Box61: Off | |
| Check Box62: Off | |
| Text63: | |
| Text64: | |
| Date65_af_date: 5/8/23 | |
| Date66_af_date: 5/8/23 | |
| Date67_af_date: | |
| Date68_af_date: | |
| Date69_af_date: | |
| Date70_af_date: | |
| Date71_af_date: 15MAY2023 | |
| Text72: 1 | |
| Text73: 1 | |
| Dropdown74: [SD-06 Test Report] | |
| Dropdown75: [ ] | |
| Dropdown76: [ ] | |
| Dropdown77: [ ] | |
| Dropdown78: [ ] | |
| Dropdown79: [ ] | |
| Dropdown 80: [ ] | |
| Text75: Modification P0002 (Transformer Installation) Submittal. | |
| 2023-05-15T11:09:20+0900 | |
| AMARAL.GREGORY.GIL.1558647295 |
Date79_af_date: