Grounding System Test_signed.pdf

PDF 2 MB Posted

Attached to
Dehumidifier Installation Federal contract opportunity
Solicitation number
M6740023Q0091
Issued by
United States Marine Corps

About this file

This document contains a transmittal form and test report for a grounding system at a Marine Corps Air Station in Okinawa, Japan. The transmittal form is from a contractor to the Naval Facilities Engineering Command Far East submitting shop drawings and test reports for a grounding system as required by Contract Number N40084-16-D-0007 Delivery Order N4008420F4580. The test report provides the results of a grounding resistance test conducted on the system, showing a maximum resistance of 4.8 ohms which is below the specification limits of 5 ohms dry and 25 ohms wet.

The related federal contract opportunity is solicitation number M6740023Q0091 for dehumidifier installation at an unspecified Marine Corps location. No further details are provided on the requirements, response deadline, place of performance, or other terms for the dehumidifier installation opportunity.

View the file

Other files for this federal contract opportunity

Other files attached to Dehumidifier Installation, newest first.
File Type Posted
As-built Drawings.pdf PDF
M6740023Q0091.pdf PDF
RFQ Cover Sheet.docx DOCX document
Hipot Megger FOC Test_signed.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TRANSMITTAL OF SHOP DRAWINGS, EQUIPMENT DATA, MATERIAL SAMPLES, TEST REPORTS,

OR MANUFACTURER’S CERTIFICATES OF COMPLIANCE

DATE TRANSMITTAL NO.

SECTION I - TRANSMITTAL INFORMATION (To be completed by Contractor)

TO: CME : LTJG GREGORY AMARAL

FEAD CAMP BUTLER

NAVFAC Far East

FROM:

KYUNAN CO., LTD.

601-9 Shimabuku, Kitanakagusuku, Nakagami Gun, Okinawa 901-2301

CONTRACT NO.

N40084-16-D-0007

DELIVERY ORDER

NO. N4008420F4580

CHECK ONE (Use a separate form for each category):

This is a new transmittal

This is a resubmittal of transmittal

This is an addition to transmittal

SPECIFICATION SECTION NO. PROJECT TITLE AND LOCATION

DB To Install Level III Preservation System, Bldg. 682 MCAS Futenma,Okinawa, Japan (ESR 016-19)

CHECK ONE (Use a separate form for each category): This transmittal is Contractor Approved (For Information Only) for Government Approval Variation for Government Approval

ITEM

NO.

a.

SUBMITTAL DESCRIPTION (SD) NUMBER

AND TYPE

b.

DESCRIPTION OF ITEM SUBMITTED

(Name, Manufacturer’s Name, Model No., Type, Size, etc.)

c.

NO. OF

COPIES

d.

SPEC. PAR. #

OR DRAWING #

e.

ACTION CODE

Reviewer f.

FEAD

g.

CONTRACTOR REMARKS: I hereby certify that the Equipment Material Article shown and marked in this submittal is that proposed to be incorporated in the Contract identified above, is in compliance with the contract drawings and specifications, and can be installed in the allocated spaces. Proposed variations, if any, are clearly marked on each submittal, are compatible with other elements of the work, and are recommended for Government approval.

Signature of QC Manager Date

SECTION II - GOVERNMENT APPROVAL ACTION (To be completed by Designer/FEAD)

DATE RECEIVED FROM KTR: DATE SENT TO REVIEWER:

ACTION CODES: The following Action Codes are given to items submitted:

REVIEWER: A-E FEAD FE FPE OTHER A - Approved as submitted

AN - Approved as noted, resubmission not required

AR - Approved as noted, resubmission required, see Sec. II Remarks

D - Disapproved, resubmission required, see Sec. II Remarks

E - Will be returned by separate cover

F - Receipt acknowledged

FX - Receipt acknowledged, does not comply with Contract Requirements, see Sec. II Remarks

G - Other, see Sec. II Remarks

NR - Not reviewed, see Sec. II Remarks

The submittals listed above have been reviewed, and are returned with actions taken as indicated in Section I, Columns f above. Approval of the listed items does not indicate approval of variations, if any, unless the variations are clearly marked on each submittal and are supported by the contractor; furthermore, approval of items does not relieve the contractor from complying with all requirements of the contract plans and specifications.

NAME, TITLE & SIGNATURE OF REVIEWER DATE

REMARKS (Attach additional sheets as necessary):

DATE RECEIVED FROM REVIEWER NAME, TITLE & SIGNATURE OF APPROVING AUTHORITY DATE DATE RETURNED TO KTR

OICC FE 4330/3 (Rev. 4/99) Sheet of To print data, feed this direction

Project Name: N4008420F4580 DB to Install Level III Preservation System, B682 MCAS Futenma, Okinawa, Japan Name of Test: Grounding Resistance Test Contract Specification Reference: Section 33 71 02 and Section 26 20 00 (Underground Electrical Distibution) Requirement: 1. Maximum resistance-to-ground of grounding system: do not exceed 5 ohms under dry conditions.

2. NFPA 70 and IEEE C2, except provide grounding systems with a resistance to solid earth ground not exceeding 25 ohms.

Testing Instrument: Kyoritsu Earth Tester Model: 4102A Calibration Date: 01 July 2023

Item No. TEST LOCATION DESCRIPTION Test Result (W) Remarks 1 Transformer area System Grounding 4.8 Passed <5 Ohms 2 Manhole System Grounding 15 Passed <25 Ohms

N1585 Text Box Item #1: Grounding Test on Transformer Area.

N1585 Text Box Item #2: Grounding Test on Manhole Area.

TR#58_Transmittal Cover
TO#20F4580_TR#58_Grounding System Test_Attachment
Grounding Test Report 2
1
2
Text1: 58
Text2: 69
Text3:
Text4:
Text5:
Text6:
Text7:
Text8:
Text9: Field Acceptance Checks and Tests (Grounding)
Text11:
Text12:
Text13:
Text14:
Text15:
Text16:
Text17: 1
Text18:
Text19:
Text20:
Text21:
Text22:
Text23:
Text24: 3.18.1
Text25:
Text26:
Text27:
Text28:
Text29:
Text30:
Text31:
Text32:
Text33:
Text34:
Text35:
Text36:
Text37:
Text38: F
Text39:
Text40:
Text41:
Text42:
Text43:
Text44:
Text45:
Text48:
Text49:
Check Box50: Off
Check Box51: Off
Check Box52: Off
Check Box53: Off
Check Box54: Yes
Check Box55: Off
Check Box56: Off
Check Box57: Off
Check Box58: Yes
Text59: 33 71 02
Check Box60: Yes
Check Box61: Off
Check Box62: Off
Text63:
Text64:
Date65_af_date: 5/8/23
Date66_af_date: 5/8/23
Date67_af_date:
Date68_af_date:
Date69_af_date:
Date70_af_date:
Date71_af_date: 15MAY2023
Text72: 1
Text73: 1
Dropdown74: [SD-06 Test Report]
Dropdown75: [ ]
Dropdown76: [ ]
Dropdown77: [ ]
Dropdown78: [ ]
Dropdown79: [ ]
Dropdown 80: [ ]
Text75: Modification P0002 (Transformer Installation) Submittal.
2023-05-15T11:09:20+0900
AMARAL.GREGORY.GIL.1558647295

Date79_af_date:

File details come from the government source that posted it. Updated .