GALVANIZED_WATER_SERVICE_LINE_REPLACEMENTS_(WIFA).pdf
PDF 232 KB Posted
- Attached to
- GALVANIZED WATER SERVICE LINE REPLACEMENTS (WIFA) State and local contract opportunity
- Solicitation number
- JOC 243-B
- Issued by
- Maricopa County, Phoenix City, Arizona
About this file
This is a Request for Qualifications (RFQ) from the City of Phoenix, Arizona, Office of the City Engineer, for Galvanized Water Service Line Replacements using a 2-Step Job Order Contract (JOC) funded through the Water Infrastructure Finance Authority of Arizona (WIFA). The project aims to replace substandard water service lines within the Phoenix Water Distribution System, meeting the Lead and Copper Rule Revision (LCRR) requirements by October 2024. The City plans to select up to three contractors to replace water service lines on both the City and customer sides of water meters, with services including copper line installation, meter connections, traffic control, landscape restoration, and asset management. The solicitation is open, with a pre-submittal meeting on May 12, 2025, Statement of Qualifications (SOQ) due on May 30, 2025, and an anticipated selection notification in August 2025.
The contract will be for five years or $13 million, whichever occurs first, with individual Job Order Agreements (JOAs) not exceeding $4,000,000. The project is federally funded and subject to Davis-Bacon wage requirements, DBE program regulations, and WIFA requirements. Contractors must make good faith efforts to utilize certified Disadvantaged Business Enterprise (DBE) firms and provide performance and payment bonds. The selection process is a two-step qualifications-based method, with firms evaluated on general information, experience, key personnel, approach to services, and reference checks. Evaluation criteria are weighted, with the approach to performing services carrying the highest point value at 34.3% of the total possible points.
View the file
Other files for this state and local contract opportunity
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CITY OF PHOENIX, ARIZONA
OFFICE OF THE CITY ENGINEER
DESIGN AND CONSTRUCTION PROCUREMENT
REQUEST FOR QUALIFICATIONS
GALVANIZED WATER SERVICE LINE REPLACEMENTS (WIFA)
2-STEP JOB ORDER CONTRACT
OPENGOV ID NO. JOC243-B
RFQ Rev. 1/25 Page | 2
The City of Phoenix is seeking qualified contractors to do business on an on-call basis to provide
Galvanized Water Service Line Replacements 2-Step Job Order Contracting (JOC) Services as described below. Up to three contractors may be selected for this JOC.
This project will utilize federal funds and is subject to the requirements of 40 Code of Federal
Regulations Part 33, 49 Code of Federal Regulations Part 26, the U.S. Department of
Transportation DBE Program and the Water Infrastructure Finance Authority of Arizona (WIFA) requirements.
The JOC Contractor is required to make good faith efforts to utilize certified DSB firms on each
Job Order Agreement. See DBE clause and forms for more information.
This is a Federal-aid project. The prevailing basic hourly wage rates and fringe benefit payments, as determined by the Secretary of Labor pursuant to the provisions of the Davis-Bacon Act, shall be the minimum wages paid to the described classes of laborers and mechanics employed or working on the site to perform the contract.
Project Description
As part of the Lead and Copper Rule Revision (LCRR), the City of Phoenix was required to inventory all services within the City of Phoenix Water Distribution System by October 2024. As part of an overall plan to meet the LCRR requirements, the City plans to replace galvanized services requiring replacement within the system. The City of Phoenix plans to replace the water service lines of substandard material on both the City side and customer side of the water meter.
The City will identify service lines that may need to be repaired as part of this program. The contractor shall have experience in water service line replacements within public right-of-way and on-site (customer side/private property), pulling copper, excavation, assessment; work site preparation and closeout; backfill/compact and landscape/pavement restoration; disposing of galvanized and potential lead material. The contractor shall also have available resources and crews to replace water service lines in multiple areas, and/or make repairs to water service lines per Job Order Agreement.
At a minimum, the Contractor will be expected to successfully perform the following construction services, including, but not limited to:
• Replace substandard water service line material with new copper line on the City and customer sides
• Water meter service connections on both City and customer sides
• Furnish and install water service pipe and fittings from main to meter, and meter to customer spigot identified by City staff
• Provide traffic control, including off-duty or uniformed police officers
• Repair and replacement of service saddle and corporation stop
• Water meter relocations
Page | 3
• Water line terminations
• Water service line investigation and/or assessments identified by City staff
• Repair water services lines in public right-of-way and on-site
• Restore existing landscaping, irrigation systems, including artificial landscape
• Removal and replacement of existing concrete curb and gutter, sidewalk, and driveways
• Provide permanent and temporary asphalt, concrete pavement replacement
• Backfill with ABC slurry in heavy traffic intersections and as needed
• Provide information reflecting changes to the asset registry and geographical information system (GIS) data for new and replaced services, mains, and other water asset
• Collect field assessment data to update the registry and geographical information system (GIS) for water services and associated water assets identified by City staff
• Locating and providing asset management requirements
• Minor design services as required to replace water services with work completed by
Arizona registered professional engineer to provide plans for permitting
• Other services as required to support successful completion of the work and the City’s interests
• Providing clean-up and disposal of surplus material and restoring the job sites
• All other emergency work as it relates to the replacement of the service line.
This will be for five years or $13 million per JOC, whichever occurs first, including all JOC amendments. The City intends that each Job Order Agreement (JOA) issued under this JOC will not exceed $4,000,000 in construction costs, but in no event will any JOA exceed $4,000,000 subsequent to Council approval of the change in limits.
The Contractor is required to provide performance and payment bonds in the amount of each Job
Order proposal prior to executing the Agreement.
During the term of the JOC, work is performed as a series of individual Job Orders. Each Job
Order Agreement, initiated by the City, is defined cooperatively by the City and the Contractor. A scope, schedule, and price are agreed upon, and the Contractor is directed to proceed with the work. JOAs may include pre-construction services, construction work, project management and contract administration as comprised within the Contractor’s construction management plan.
Scope of Work
The scope of work will vary with each JOA. Minor design services may be required for some
JOAs, however, most will be designed through consultants under a separate contract with the
City. City staff may design some projects.
Page | 4
For JOAs that may require design services, the Contractor shall seek the services of an Arizona registered professional architect and/or engineer to prepare plans for permitting. It is the responsibility of the Contractor to provide cost estimating, project scheduling for design, construction and/or maintenance, and obtain permits if needed from the appropriate City departments. The Contractor is also responsible for:
• Knowledge of and compliance with current City of Phoenix adopted codes
• All other work as it relates to this JOC, and
• All work incidental to this JOC
Prior to preparing each Job Order Agreement, a scope of work conference may be scheduled to define design and construction services required of the Contractor.
The City of Phoenix will provide construction administration, inspection, and acceptance material testing for the JOAs.
Assumptions about JOAs:
• All sites will be in the State of Arizona.
• The Contractor will furnish all necessary tools and test equipment required for the performance of its work in accordance with the scope of work.
• All customer-provided documentation is obtained within a reasonable time at project start.
• All customer-required approvals are provided within a reasonable and mutually agreed upon time frame.
• Any work required at each site outside of this scope of work will be performed in accordance with the adjustment process.
• Each JOA Schedule of Values must be submitted in MAG or CSI format or it will not be accepted.
Use of UNIFIER, an Application Service Provider (ASP) web-based project management database, may be required during this JOC. The following information provides a guideline for utilization. Any questions related to the requirements of UNIFIER should be directed to the Project
Manager.
• The Contractor will be required to maintain all project records in electronic format.
• The City provides an ASP web-based project management database which the Contractor will be required to utilize in the fulfillment of the JOC requirements.
• The Contractor shall provide a computerized networked office platform with broadband internet connectivity.
• UNIFIER training will be provided through the City of Phoenix to firms under this JOC.
Page | 5
Pre-Submittal Meeting
A pre-submittal meeting will be held at 1:00 pm, Phoenix time on Monday, May 12, 2025, at 200
W. Washington Street, Phoenix City Hall, Conference Room PCH8 East AND via Teams. At this meeting, City staff will discuss the scope of work, general project requirements, and respond to questions from the attendees. It is strongly recommended that interested firms attend the pre-submittal meeting. Inquiries regarding the project scope outside of this pre-submittal meeting must be directed to the Contracts Specialist.
Pre-Submittal Meeting Information:
Join the meeting now
Meeting ID: 283 888 744 815
Passcode: 6yU9zV2u
Statement of Qualifications Evaluation Criteria
Team(s) will be selected through a qualifications-based selection process based on the criteria below. Subcriteria are listed in order of importance in relation to project services. City of Phoenix project experience is not required.
No. Evaluation Criteria Scoring Method Weight (Points) https://teams.microsoft.com/l/meetup-join/19%3ameeting_YmQxM2U2NmUtZTdkYy00NzZmLWFmMTYtMThhYzc1MGJlN2Q5%40thread.v2/0?context=%7b%22Tid%22%3a%2296b9695c-4f0e-42bd-8adf-ba755760346b%22%2c%22Oid%22%3a%225a831b97-cde4-4a33-a921-4f9e501522d9%22%7d
Page | 6
1. General Information
A. Provide a general description of the firm that is proposing to provide the requested services under this Job Order Contract.
Explain the legal organization of the proposed firm or team.
B. Provide the following information:
1. List the Arizona contractor licenses held by the firm and the key personnel who will be assigned to this Project. The contractor must hold the appropriate ADEQ certifications at the time of submittal. Provide the contractor license number.
Reference the appropriate licenses held, if needed. In order to be considered for this Project, the contractor must hold the correct license as deemed appropriate by the Arizona Registrar of
Contractors prior to submitting a Statement of
Qualifications (SOQ) for this project in accordance with
Arizona Revised Statute §32-
1151.
2. Identify the location of the firm’s principal office and the home office location of key staff on this project.
3. Identify any contract or subcontract held by the firm or officers of the firm, which has been terminated within the last five years. Identify any claims arising from a contract which resulted in litigation or arbitration within the last three years. Briefly describe the circumstances and the outcomes.
4. Provide an organization chart showing the qualifying
Points Based 150 (14.7% of Total)
Page | 7 contractor, and the contractor’s key personnel down to the superintendent level. (The organizational chart is included in the page limitation.)
2. Experience and Qualifications of the
Firm
A. Identify at least three comparable projects in which the firm played a major role in the last three years.
The projects listed should show the breadth of the firm's experience and demonstrated capabilities and show the experience in managing multiple trade subcontractors, vendors, and suppliers. For each comparable project identified, provide:
1. Description of project
2. Role of the firm either as prime or subcontractor
3. Project’s construction cost
4. Construction dates (identify if this included phased construction)
5. Project Owner
B. List water service replacement, replacement and relocation programs and/or projects by name only where the firm provided general construction services in the last five years either completed or ongoing.
Points Based 250 (24.5% of Total)
Page | 8
3. Experience of Key Personnel to be
Assigned
A. For each key person identified, list their length of time with the firm and at least two comparable projects in which they have played a primary role in the last three years. Please include information related to ADEQ operator certification held by the individual. An ADEQ Water
Distribution Grade I is required for on-site lead personnel. If a project selected for a key person is the same as one selected for the firm, provide just the project name and the role of the key person. For other projects provide the following:
1. Description of project
2. Role of the person
3. Project’s construction cost
4. Construction dates
5. Project Owner
6. ADEQ certification, discipline, grade level and Operator ID
B. List any proposed subcontractors, including key staff names and the experience and qualifications of these individuals.
Points Based 250 (24.5% of Total)
Page | 9
4. Approach to Performing the Required
Services
A. Describe the firm’s project management approach including its perspective and experience on partnering, quality control, project scheduling, claims, dispute resolution, changes in the scope of work, and construction safety.
Include critical issues that arise with water service line replacements and how your firm will resolve these issues.
B. Provide a detailed list of current contracts the firm currently holds, including individual Job Order
Agreements. Provide percentage of availability on each project.
C. Describe software systems and processes used for planning, project engineering and scheduling, estimating, and managing construction.
D. Provide a proposed subcontractor selection plan specifically for
Water Service Line Replacement project and/or program and provide an example of your subcontractor scoring and/or bid proposals used on a project with similar scope. The selection plan must select subcontractors based on qualifications alone or on a combination of qualifications and price and shall not select subcontractors based on price alone. Describe how you intend to implement this subcontractor selection plan. Discuss the benefit that your subcontractor selection plan provides to the project.
Points Based 350 (34.3% of Total)
Page | 10
5. Reference Checks
Use the form provided in the vendor questionnaire to obtain at least three references. It is preferred no more than one be a City of Phoenix project. If your firm has not completed prior projects with other agencies, you will not be penalized. It is recommended there be references outside the City of Phoenix.
*These points are in addition to the 1,000 points for the SOQ.
Points Based 21 (2.1% of Total)
Submittal Requirements
Electronic Submittal Process: Firms interested in this project must submit a Statement of
Qualifications (SOQ) electronically through the City's eProcurement Portal at https://procurement.opengov.com/portal/phoenix.
Submittal requirements are as follows:
Vendor Information: All firms must be registered in the City’s Vendor Management System prior to submitting a proposal. The vendor number should be included on the cover of the
SOQ. Information on how to register with the City is available at:
https://www.phoenix.gov/financesite/Pages/EProc-help.aspx
If your firm is already registered with the City of Phoenix’s eProcurement system, visit https://procurement.opengov.com/portal/phoenix to login and access the electronic solicitation.
Submittals:
• Form EO1-WIFA-Statement of Outreach Commitment due at time of SOQ submittal.
• Form EO2-WIFA-Small Business Outreach Efforts and Bidders List due within five (5) business days after award of a JOA.
• Form EO3-WIFA-Small Business Utilization Commitment due within five (5) business days after award of a JOA.
• Experience Modification Rate (EMR) – provide current rating; the awarded company will be asked to provide verification upon contract execution.
• Submit only one SOQ electronically, in .PDF format only, addressing all evaluation criteria. No hard copies will be accepted.
• Clearly display the firm legal name, vendor number, project title, and OpenGov ID number on the cover of the SOQ.
https://procurement.opengov.com/portal/phoenix https://www.phoenix.gov/financesite/Pages/EProc-help.aspx https://procurement.opengov.com/portal/phoenix
Page | 11
• A maximum of 10 pages is permitted to address all content in the SOQ submittal.
(Maximum page limit includes evaluation criteria and all additional content. It does not include information sheet or EO forms.)
• Submit electronically the Statement of Qualifications by 12:00 PM, Phoenix time, on
Friday, May 30, 2025.
• Page size must meet requirements of 8½” x 11”.
• Font size must not be less than 10 point.
• Content count:
o Each side of a page containing evaluation criteria and additional content will be counted toward the maximum page limit noted above.
o Pages that have project photos, charts and/or graphs will be counted towards the maximum page limit noted above.
o Front and back covers, information sheet, Table of Contents pages, EO forms, and divider (tab) pages will NOT be counted toward the maximum page limit noted above, unless they include evaluation criteria and additional content that could be considered by the selection panel.
Information Sheet: Provide an information sheet that includes project title, OpenGov ID number, legal firm name (not a trade name), address, phone number, vendor number, and the name, title, email address and signature of your contact person for the project. Do not include any additional information.
Evaluation Criteria: Address the SOQ evaluation criteria.
Bonding Statement: As a separate PDF attachment, include a statement of the firm’s bonding capacity from a Surety Company (A- or better for the prior four quarters). This bond statement will not be counted towards the maximum number of pages.
Additional Content: Resumes and other information may be included (content shall be included within the permitted maximum page limit).
Note: All pages exceeding the specified maximum page limit will be removed from the submittal and not considered in evaluating a submitted SOQ.
Grounds for Disqualification
Please be advised that the following will be grounds for disqualification, and will be strictly enforced:
• Submitting a Statement of Qualifications for a different project.
• Violating the “Contact with City Employees” policy contained in this RFQ.
• Failure to provide additional documents due a time of submittal.
• Failure to provide bonding statement.
Page | 12
Selection Process and Schedule
The successful Contractor will be selected through a two-step process which is a qualifications-based selection that includes a cost value element.
During the first step, interested firms will submit their SOQ. The selection panel will evaluate the
SOQs according to the criteria in Statement of Qualifications Evaluation Criteria above and may select up to five firms as finalists to proceed to the second step of the procurement, which is the
Request for Proposal (RFP) process.
During the second step, the RFP will be issued to the five finalists. The five finalists will submit technical and price proposals in response to the RFP. The finalists’ proposals will be evaluated and scored in accordance with the RFP scoring methodology. The firm with the highest composite scores for the technical and price proposals will be selected for the procurement. The final step is the recommendation for award of the JOC.
The City expects to create a final list of at least three, but not more than five firms for this project.
The City will enter into negotiations with the selected firm and execute a contract upon completion of negotiation of contract terms for City Council approval.
The following tentative schedule has been prepared for this project. The Pre-submittal meeting is not mandatory.
Pre-submittal Meeting 1:00 PM on Monday, May 12, SOQs Due 12:00 PM on Friday, May 30, Firms Notified for Request for Proposal June 20, 2025
Request for Proposal Sent to Firms June 26, 2025
Request for Proposal Meeting with
Firms
July 14, 2025
Request for Proposal Due July 29, 2025
Selection Notification August 2025
If the City is unsuccessful in negotiating a contract with the best-qualified firm, the City may then negotiate with the next most qualified firm until a contract is executed, or the City may decide to terminate the selection process. Once a contract is executed with the successful firm, the procurement is complete.
Firms on the short list for this project will be notified directly by the City. Notification to all other firms on the status of a short list for this project will be posted on the City of Phoenix’s e-
Procurement Portal:
https://procurement.opengov.com/portal/phoenix/projects/166100/document?section=1521971
Page | 13 https://procurement.opengov.com/portal/phoenix
The firms selected for this project will be notified directly by the City. Notification to all other firms on the status of a short list for this project will be posted on the City of Phoenix’s e-Procurement
Portal:
https://procurement.opengov.com/portal/phoenix
Construction Phase Davis Bacon Compliance
The JOC shall comply with “Federal Davis Bacon and Related Acts” in accordance with 29 CFR
Part 3 and 29 CFR Part 5 as applicable for the construction phase contract. Prior to bidding to subcontractors, the JOC shall obtain the effective federal wage determination to be included in all subcontracts. See attached WIFA document (DSB WIFA - Job Order Contracting (JOC) Contract
Clause).
General Information
Citywide Capital Improvement Projects. Consulting and contractor services supporting the
City’s Capital Improvement Projects are procured under the authority of the City Engineer, currently located within the Street Transportation Department. Design and Construction
Procurement coordinates the citywide consulting and construction contracting procurement processes.
Changes to Request for Qualifications. Any changes to this Request for Qualifications
(RFQ) will be in the form of a Notification. The City of Phoenix shall not be held responsible for any oral instructions. Notifications are available on both the Current Opportunities and City's eProcurement Portal at https://procurement.opengov.com/portal/phoenix.
It shall be the responsibility of the registered RFQ holder to determine, prior to the submittal of the Statement of Qualifications, if a Notification has been issued. Registered
RFQ holders may refer to the web page or call the Contracts Specialist (listed below) to ascertain if a Notification has been issued for this project.
Alternate Format. For more information or a copy of this publication in an alternate format, contact the Contracts Specialist (listed below) - Voice or TTY 711. Requests will only be honored if made within the first week of the advertising period.
Release of Project Information/Public Records Request. The City shall provide the release of all public information concerning the project, including selection announcements and contract awards. Those desiring to release information to the public must receive prior written approval from the City. To submit a Public Records Request, visit phoenix.gov/prr.
City Rights. The City of Phoenix reserves the right to reject any or all Statements of
Qualifications, to waive any informality or irregularity in any Statement of Qualifications received, and to be the sole judge of the merits of the respective Statements of Qualifications received.
Contact with City Employees. This policy is intended to create a level playing field for all
Proposers, assure that contracts are awarded in public, and protect the integrity of the selection process. OFFERORS THAT VIOLATE THIS POLICY WILL BE DISQUALIFIED.
https://procurement.opengov.com/portal/phoenix https://procurement.opengov.com/portal/phoenix https://procurement.opengov.com/portal/phoenix https://phoenix.gov/prr
Page | 14
Beginning on the date the RFQ is issued and until the date the contract is awarded or the RFQ withdrawn, all persons or entities that respond to the RFQ, including their authorized employees, agents, representatives, proposed partner(s), subcontractor(s), joint venture(s), member(s), or any of their lobbyists or attorneys (collectively the Proposer), will refrain from any direct or indirect contact with any person (other than the designated Contract Specialist) who may play a part in the selection process, including members of the evaluation panel, the City Manager, Assistant
City Manager, Deputy City Managers, Department heads, the Mayor and other members of the
Phoenix City Council. As long as the RFQ solicitation is not discussed, Proposers may continue to conduct business with the City and discuss business that is unrelated to this RFQ solicitation with City staff.
Commencing on the date and time a solicitation is published, potential or actual proposers
(including their representatives) will only discuss matters associated with the solicitation with the
Mayor, any members of City Council, the City Manager, any Deputy City Manager, or any department director directly associated with the solicitation (including in each case their assigned staff, except for the designated procurement officer) at a public meeting, posted under the Arizona
Revised Statutes, until the resulting contract(s) are awarded or all offers or responses are rejected and the solicitation is cancelled without any announcement by the procurement officer of the City’s intent to reissue the same or a similar solicitation.
Proposers may discuss their proposal or the RFQ solicitation with the Mayor or one or more members of the Phoenix City Council, provided such meetings are scheduled through the
Contract Specialist (listed below), conducted in person at 200 W. Washington, Phoenix, Arizona
85003, and are posted as open meetings with the City Clerk at least twenty-four (24) hours prior to the scheduled meetings. The City Clerk will be responsible for posting the meetings. The posted notice shall identify the participants and the subject matter, as well as invite the public to participate.
Conflict of Interest. The City reserves the right to disqualify any Proposer on the basis of any real or apparent conflict of interest that is disclosed by the proposal submitted or any other data available to the City. This disqualification is at the sole discretion of the City. Any Proposer submitting a proposal herein waves any right to object now or at any future time, before any body or agency, including but not limited to, the City Council of the City of Phoenix or any court.
Protest Procedures. Firms responding to disqualification or a procurement outcome are referred to the Code of the City of Phoenix Chapter 2, Article XII, Section 2-187 to 2-190.4, which governs protest procedures utilized throughout the selection process. The procedures may be reviewed through the City of Phoenix website at:
http://www.codepublishing.com/az/phoenix/
A copy of the Protest Policy is also available online at:
https://www.phoenix.gov/administration/departments/streets/careers/business-opportunities.html
Good Standing. Any JOC Contractor that currently contracts with the City must be in good standing for its Statement of Qualifications (SOQ) to be considered responsive. For the purpose of the RFQ, good standing refers to compliance with all contractual provisions, including payment of financial obligations.
http://www.codepublishing.com/az/phoenix/ https://www.phoenix.gov/administration/departments/streets/careers/business-opportunities.html
Page | 15
Questions - Questions pertaining to this selection process or contract issues should be submitted via the e-Procurement Portal.
Vendor Questionnaire
*Response required
Is the EO1 form attached?*
☐ Yes
☐ No
*Response required
Upload required documents here*
*Response required
File details come from the government source that posted it. Updated .