0106002.pdf

PDF 111 KB Posted

Attached to
BUBBLER, SIGHTFEED, FOR CONOFLOW SIGHTFEED ASSEMBLY Federal contract opportunity
Solicitation number
G15PS00510
Issued by
Department of the Interior US Geological Survey

About this file

Drawing 0106002

View the file

Other files for this federal contract opportunity

Other files attached to BUBBLER, SIGHTFEED, FOR CONOFLOW SIGHTFEED ASSEMBLY, newest first.
File Type Posted
Sol_G15PS00510_Amd_000001.pdf PDF
0106001.pdf PDF
0106003.pdf PDF
Sol_G15PS00510.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FRONT

BACK

NOTES:

1. DIMENSIONS IN BRACKETS ARE IN MILLIMETERS.

2. (.XXX) = DECIMAL EQUIVALENT.

3. ARTWORK TO BE SUPPLIED BY USGS/HIF.

4 MATERIAL: .024 [0.61] THICK LEXAN.

LETTERING SHALL BE BLACK ON WHITE

BACKGROUND. MATTE FINISH BOTH SIDES.

63 [1.6] µm THIRD ANGLE PROJECTION

METRIC CONVERSION

DECIMAL [mm]

X.XX.XXX

.X X

X.X.XX

SURFACE FINISH:

ANGLES

1/16FRACTIONS

UNLESS OTHERWISE SPECIFIED DIMENSIONS

ARE IN INCHES AND INCLUDE PLATING

DECIMAL TOLERANCE [mm] = 0.13

= 1.6 = 0.8 = 0.38

.XXX .005

.XX .015

.X .030

- DO NOT SCALE THIS DRAWING -

UNITED STATES DEPARTMENT OF THE INTERIOR

GEOLOGICAL SURVEY - WATER RESOURCES DIVISION

PARTS LIST

NOTESDESCRIPTION

NO. REQ'D

APPROVALS

REVISION-DESCRIPTIONLTR. DATE

DATE

SCALE

TITLE

MATERIAL

SIZE DWG. NO. REV.

ITEM SH. QTY.

NO. SIZE DRAWING/PART NO. REQD.

DRAFTING CHECK:

DRAWN BY:

DESIGN CHECK:

DESIGN APPROVAL:

C

1/2

NIKKI DENTON

HRM/EJN

C.S. CLAYTON

DATA CARD

0106002FULL -

7/27/10 5/3/12 5/7/12

REVISED AND REDRAWN

7/27/10

REVISED AND REDRAWN

LINE PURGE

To purge the orifice line:

* Close valves 1, 2, and 3 in that order.

* Open valve 4 all the way.

* Allow nitrogen to flow for one minute or as needed.

* Close valve 4.

* Open valves 3, 2, and 1 in that order.

Flow-rate adjustment instructions are on the opposite side of this card.

3 2

FLOW RATE

ADJUSTMENT

This unit has been preset to 60 bubbles per minute.

The packing nut on the flow adjustment needle valve was tightened to eliminate leaking at the valve stem packing.

Loosen the packing nut before adjusting the flow rate.

Re-tighten the packing nut after the flow rate has been adjusted.

Purge instructions are on the opposite side of this card.

4.5 [114]

2.25 [57.2]

1.0 [25]

5.8 [146]

R.3 [6]4X Ø1-1/2 (1.500) THRU

File details come from the government source that posted it. Updated .